CN103726493A - 锤击法预应力管桩施工时的对桩定位装置及其使用方法 - Google Patents

锤击法预应力管桩施工时的对桩定位装置及其使用方法 Download PDF

Info

Publication number
CN103726493A
CN103726493A CN201310714818.5A CN201310714818A CN103726493A CN 103726493 A CN103726493 A CN 103726493A CN 201310714818 A CN201310714818 A CN 201310714818A CN 103726493 A CN103726493 A CN 103726493A
Authority
CN
China
Prior art keywords
stake
jacket part
pile
cylindric horn
horn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310714818.5A
Other languages
English (en)
Other versions
CN103726493B (zh
Inventor
于景涛
宿巳光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
MUNICIPAL ENGINEERING Co OF CHINA THIRD METALLURGICAL GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MUNICIPAL ENGINEERING Co OF CHINA THIRD METALLURGICAL GROUP Co Ltd filed Critical MUNICIPAL ENGINEERING Co OF CHINA THIRD METALLURGICAL GROUP Co Ltd
Priority to CN201310714818.5A priority Critical patent/CN103726493B/zh
Publication of CN103726493A publication Critical patent/CN103726493A/zh
Application granted granted Critical
Publication of CN103726493B publication Critical patent/CN103726493B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及锤击法预应力管桩施工对桩定位装置及其使用方法,所述装置包括圆筒喇叭型套件、锁紧螺栓、顶紧螺栓、合页、横锁销、加强筋板;其使用方法如下步骤:(1)锁紧圆筒喇叭型套件,穿入横锁销,套在下桩的桩顶上;(2)用顶紧螺栓顶紧在下桩的金属箍处,拔出横锁销;(3)引桩,自动对正就位;(4)把上下桩点焊在一起;(5)松开顶紧螺栓及锁紧螺栓,卸下圆筒喇叭型套件。与现有技术相比,本发明的有益效果是:结构简单,体积小,使用方便可靠,能实现上下桩自动对正,快速引桩,节省人力工时,提高施工速度及施工质量。

Description

锤击法预应力管桩施工时的对桩定位装置及其使用方法
技术领域
本发明涉及建设工程施工领域,尤其涉及锤击法预应力管桩施工对桩定位装置及其使用方法。 
背景技术
由于能够很好地满足工程结构对承载能力和变形的要求,桩基在各类建设工程中得到了广泛应用,目前工程中应用最多的是钢筋混凝土桩,分为预制桩和灌注桩两大类。钻孔灌注桩存在施工周期较长,施工现场泥浆多,桩身、桩端混凝土浇筑质量不易控制,单方混凝土提供的承载力较低等缺点,而预制桩因为质量易保证、形状可根据需要改变、施工工序简便、可实现机械化施工等优点,在工程中得到了广泛应用。 
预应力管桩比普通的预制方桩强度高,耐打性好,穿透力强,承载能力大,在同一建筑物基础中可使用不同直径的管桩,容易解决布桩问题,充分发挥每根桩的承载能力,单桩可接成任意长度,不受施工机械能力和施工条件的限制。预应力管桩的施工方法主要有锤击法和静压法,静压法施工需要大容量的电源及只能在承载能力不高、地质条件好的地方施工,而锤击法施工则不受这些因素的限制,因而应该广泛。 
应用锤击法进行预应力管桩施工时,接桩时的对中和调直这道工序对成桩质量起关键作用,如果接桩不对中,成桩后的桩位偏差会超过规范要求,如果桩身未调直就开锤,不仅桩的垂直度会超过规范要求,而且会发生偏心锤击,易将桩头打裂击碎,以往对桩时没有专用的定位装置,只能采取人工对接的方式,对中调直费工费力。 
发明内容
本发明克服现有技术的不足,提供了一种结构简单、安装方便、体积小、定位效果好的锤击法预应力管桩施工对桩定位装置及其使用方法。 
为了达到上述目的,本发明采用以下技术方案实现: 
锤击法预应力管桩施工对桩定位装置,包括圆筒喇叭型套件、锁紧螺栓、顶紧螺栓、合页、横锁销、加强筋板,所述圆筒喇叭型套件由上下两部分焊接而成,上、下部分分别由钢板卷成圆台筒型,并从中间剖开,在一侧对接处安装合页,另一侧同一水平面上安装 锁紧螺栓,下卷筒上均布数个顶紧螺栓,在上、下卷筒水平对接面上钻一通长孔,穿入横锁销;圆筒喇叭型套件沿圆周方向均布数个加强筋板,且加强筋板的位置不能与上述结构发生干涉;上、下卷筒水平对接面沿圆周方向均匀开设数个孔洞,用于上、下桩的对位点焊焊接。 
所述圆筒喇叭型套件上卷筒圆台面与下水平面夹角优选120°,但不限于此角度。 
所述圆筒喇叭型套件下卷筒圆台面与下水平面夹角优选80°,但不限于此角度。 
所述顶紧螺栓安装在圆筒喇叭型套件下卷筒中间高度位置。 
锤击法预应力管桩施工对桩定位装置的使用方法,包括如下步骤:(1)锁紧圆筒喇叭型套件,将横锁销穿入圆筒喇叭型套件上、下卷筒水平对接面上钻的通长孔中,将下卷筒部分套在下桩的桩顶上;(2)用顶紧螺栓将圆筒喇叭型套件的下部顶紧在下桩的金属箍处,拔出横锁销;(3)吊起上桩,直立后与圆筒喇叭型套件的上部对中,慢慢向下引桩,自动对正就位;(4)用人工焊通过预留的焊接孔把上下桩点焊在一起;(5)点焊牢固后,松开顶紧螺栓及锁紧螺栓,卸下圆筒喇叭型套件。 
与现有技术相比,本发明的有益效果是: 
本发明所述装置结构简单,体积小,使用方便可靠,能实现上下桩自动对正,快速引桩,节省人力工时,提高施工速度及施工质量。 
附图说明
图1是本发明锤击法预应力管桩施工对桩定位装置的结构示意图。 
图中:1.圆筒喇叭型套件2.锁紧螺栓3.顶紧螺栓4.合页5.横锁销6.加强筋板 
具体实施方式
下面结合附图对本发明的具体实施方式作进一步说明: 
见图1,是本发明锤击法预应力管桩施工对桩定位装置的结构示意图,包括圆筒喇叭型套件1、锁紧螺栓2、顶紧螺栓3、合页4、横锁销5、加强筋板6,所述圆筒喇叭型套件1由上下两部分焊接而成,上、下部分分别由钢板卷成圆台筒型,并从中间剖开,在一侧对接处安装合页4,另一侧同一水平面上安装锁紧螺栓2,下卷筒上均布数个顶紧螺栓3,在上、下卷筒水平对接面上钻一通长孔,穿入横锁销5;圆筒喇叭型套件沿圆周方向均布数个加强筋板6,且加强筋板6的位置不能与上述结构发生干涉;上、下卷筒水平对 接面沿圆周方向均匀开设数个孔洞,用于上、下桩的对位点焊焊接。 
所述圆筒喇叭型套件上卷筒圆台面与下水平面夹角优选120°;所述圆筒喇叭型套件上卷筒圆台面与下水平面夹角优选80°;所述顶紧螺栓安装在圆筒喇叭型套件下卷筒中间高度位置。 
锤击法预应力管桩施工对桩定位装置的使用方法,包括如下步骤: 
(1)装置设计及加工,根据管桩规格确定装置各部尺寸; 
(2)锁紧圆筒喇叭型套件,将横锁销穿入圆筒喇叭型套件上、下卷筒水平对接面上钻的通长孔中,防止装置下滑,将下卷筒部分套在下桩的桩顶上; 
(3)用顶紧螺栓将圆筒喇叭型套件的下部顶紧在下桩的金属箍处,拔出横锁销; 
(4)吊起上桩,直立后与圆筒喇叭型套件的上部对中,慢慢向下引桩,在装置的引导下上、下桩自动对正就位; 
(5)用人工焊通过预留的焊接孔把上下桩点焊在一起; 
(6)点焊牢固后,松开顶紧螺栓及锁紧螺栓,卸下圆筒喇叭型套件。 
以下实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。下述实施例中所用方法如无特别说明均为常规方法。 
[实施例1]应用本发明在鞍山某小区施工中的具体施工过程(管桩直径550mm): 
(1)装置设计及加工 
圆筒喇叭型套件采用厚度8mmA3钢板制作,上卷筒尺寸:高度200mm,上口直径782mm,下口直径551mm,下卷筒尺寸:高度160mm,上口直径551mm,下口直径607mm;横锁销长度630mm,直径10mm,钻孔直径11mm;焊接孔为4个30×30mm方孔均布。 
(2)下桩打完后,锁紧圆筒喇叭型套件,将横锁销穿入圆筒喇叭型套件上、下卷筒水平对接面上钻的通长孔中,将下卷筒部分套在下桩的桩顶上; 
(3)用顶紧螺栓将圆筒喇叭型套件的下部顶紧在下桩的金属箍处,拔出横锁销; 
(4)吊起上桩,直立后与圆筒喇叭型套件的上部对中,慢慢向下引桩,对正就位; 
(5)用人工焊通过预留的焊接孔把上下桩点焊在一起; 
(6)点焊牢固后,松开顶紧螺栓及锁紧螺栓,卸下圆筒喇叭型套件。 

Claims (5)

1.锤击法预应力管桩施工对桩定位装置,其特征在于,包括圆筒喇叭型套件、锁紧螺栓、顶紧螺栓、合页、横锁销、加强筋板,所述圆筒喇叭型套件由上下两部分焊接而成,上、下部分分别由钢板卷成圆台筒型,并从中间剖开,在一侧对接处安装合页,另一侧同一水平面上安装锁紧螺栓,下卷筒上均布数个顶紧螺栓,在上、下卷筒水平对接面上钻一通长孔,穿入横锁销;圆筒喇叭型套件沿圆周方向均布数个加强筋板,且加强筋板的位置不能与上述结构发生干涉;上、下卷筒水平对接面沿圆周方向均匀开设数个孔洞,用于上、下桩的对位点焊焊接。
2.根据权利要求1所述的一种锤击法预应力管桩施工对桩定位装置,其特征在于,所述圆筒喇叭型套件上卷筒圆台面与下水平面夹角优选120°,但不限于此角度。
3.根据权利要求1所述的一种锤击法预应力管桩施工对桩定位装置,其特征在于,所述圆筒喇叭型套件下卷筒圆台面与下水平面夹角优选80°,但不限于此角度。
4.根据权利要求1所述的一种锤击法预应力管桩施工对桩定位装置,其特征在于,所述顶紧螺栓安装在圆筒喇叭型套件下卷筒中间高度位置。
5.锤击法预应力管桩施工对桩定位装置的使用方法,其特征在于,包括如下步骤:(1)锁紧圆筒喇叭型套件,将横锁销穿入圆筒喇叭型套件上、下卷筒水平对接面上钻的通长孔中,将下卷筒部分套在下桩的桩顶上;(2)用顶紧螺栓将圆筒喇叭型套件的下部顶紧在下桩的金属箍处,拔出横锁销;(3)吊起上桩,直立后与圆筒喇叭型套件的上部对中,慢慢向下引桩,自动对正就位;(4)用人工焊通过预留的焊接孔把上下桩点焊在一起;(5)点焊牢固后,松开顶紧螺栓及锁紧螺栓,卸下圆筒喇叭型套件。
CN201310714818.5A 2013-12-20 2013-12-20 锤击法预应力管桩施工时的对桩定位装置及其使用方法 Active CN103726493B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310714818.5A CN103726493B (zh) 2013-12-20 2013-12-20 锤击法预应力管桩施工时的对桩定位装置及其使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310714818.5A CN103726493B (zh) 2013-12-20 2013-12-20 锤击法预应力管桩施工时的对桩定位装置及其使用方法

Publications (2)

Publication Number Publication Date
CN103726493A true CN103726493A (zh) 2014-04-16
CN103726493B CN103726493B (zh) 2016-03-30

Family

ID=50450764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310714818.5A Active CN103726493B (zh) 2013-12-20 2013-12-20 锤击法预应力管桩施工时的对桩定位装置及其使用方法

Country Status (1)

Country Link
CN (1) CN103726493B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522226A (zh) * 2016-11-18 2017-03-22 金陵科技学院 一种协助基桩垂直沉降的装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59199914A (ja) * 1983-04-25 1984-11-13 Hasegawa Komuten Co Ltd Pc杭の継足し建込み方法
CN201531028U (zh) * 2009-11-05 2010-07-21 上海强劲基础工程有限公司 一种带有喇叭导向口的对桩器
CN201809767U (zh) * 2010-09-15 2011-04-27 中铁十七局集团第三工程有限公司 预应力混凝土管桩接桩定位装置
CN202247891U (zh) * 2011-10-09 2012-05-30 中建七局第三建筑有限公司 接桩定位器
CN203668936U (zh) * 2013-12-20 2014-06-25 中国三冶集团有限公司市政工程公司 锤击法预应力管桩施工时的对桩定位装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59199914A (ja) * 1983-04-25 1984-11-13 Hasegawa Komuten Co Ltd Pc杭の継足し建込み方法
CN201531028U (zh) * 2009-11-05 2010-07-21 上海强劲基础工程有限公司 一种带有喇叭导向口的对桩器
CN201809767U (zh) * 2010-09-15 2011-04-27 中铁十七局集团第三工程有限公司 预应力混凝土管桩接桩定位装置
CN202247891U (zh) * 2011-10-09 2012-05-30 中建七局第三建筑有限公司 接桩定位器
CN203668936U (zh) * 2013-12-20 2014-06-25 中国三冶集团有限公司市政工程公司 锤击法预应力管桩施工时的对桩定位装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522226A (zh) * 2016-11-18 2017-03-22 金陵科技学院 一种协助基桩垂直沉降的装置

Also Published As

Publication number Publication date
CN103726493B (zh) 2016-03-30

Similar Documents

Publication Publication Date Title
CN102021908B (zh) 一种用于预制方桩接桩的机械连接结构及施工方法
CN101429768B (zh) 预应力高强砼管桩静压施工方法
CN204200093U (zh) 钻孔桩桩机对中辅助装置
CN108316290B (zh) 无承台的一柱一桩结构及其施工方法
CN102175484B (zh) 土的静三轴压缩试验专用取土器
CN113323011B (zh) 既有建筑地基基础下钢管新型托换施工方法
CN103726493B (zh) 锤击法预应力管桩施工时的对桩定位装置及其使用方法
CN203668936U (zh) 锤击法预应力管桩施工时的对桩定位装置
CN102828533A (zh) 灌注桩竖向抗压静载试验桩头超前处理节点及施工方法
CN210264751U (zh) 一种锁脚锚管定位装置
CN208965567U (zh) 锁口钢管桩及其形成的钢围堰
CN206205012U (zh) 一种smw工法桩测斜管布设装置
CN215105278U (zh) 一种地下空间拓建锚杆桩定位器
CN211347473U (zh) 一种用于水泥搅拌桩试验检测的取芯装置
CN201935825U (zh) 土的静三轴压缩试验专用取土器
CN105544551B (zh) 一种超长灌注桩快速下放钢筋笼的施工方法
CN212317846U (zh) 一种孔壁加固和孔身校直的钻孔辅助装置
CN113502827A (zh) 一种适用于回填土的高压旋喷锚杆及注浆方法
CN210134420U (zh) 一种用于栈桥钢管桩平联的复合式抱箍
CN109797635B (zh) 一种用于公路施工的混凝土浇筑模板自动施工方法及配套装置
CN207244623U (zh) 一种用于dtr设备的立柱桩转接装置
CN205205826U (zh) 一种管桩底部注浆装置
CN109024911A (zh) 一种装配式楼梯现浇节点预埋螺栓定位装置及其施工方法
CN210827449U (zh) Phc管桩桩尖
CN202787336U (zh) 灌注桩竖向抗压静载试验桩头超前处理节点

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA THIRD METALLURGICAL GROUP CO., LTD.

Free format text: FORMER OWNER: MUNICIPAL ENGINEERING CO., LTD. OF CHINA THIRD METALLURG GROUP CO., LTD.

Effective date: 20150521

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150521

Address after: 114039 Anshan province Liaoning City Mountain Road No. 105 building materials

Applicant after: CHINA THREE METALLURGICAL GROUP CO., LTD.

Address before: Anshan City, Liaoning province fitness road 114036 Lishan District No. 122

Applicant before: MUNICIPAL ENGINEERING COMPANY OF CHINA THIRD METALLURGICAL GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant