CN103726487A - Leaking stoppage method for waterproof curtain - Google Patents

Leaking stoppage method for waterproof curtain Download PDF

Info

Publication number
CN103726487A
CN103726487A CN201310742773.2A CN201310742773A CN103726487A CN 103726487 A CN103726487 A CN 103726487A CN 201310742773 A CN201310742773 A CN 201310742773A CN 103726487 A CN103726487 A CN 103726487A
Authority
CN
China
Prior art keywords
defect
water
fault location
pressure rotary
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310742773.2A
Other languages
Chinese (zh)
Inventor
马德强
陈云彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jingye Engineering Co ltdxiamen Branch
Original Assignee
China Jingye Engineering Co ltdxiamen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jingye Engineering Co ltdxiamen Branch filed Critical China Jingye Engineering Co ltdxiamen Branch
Priority to CN201310742773.2A priority Critical patent/CN103726487A/en
Publication of CN103726487A publication Critical patent/CN103726487A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a leaking stoppage method for a waterproof curtain. The method comprises the following steps of (1) drilling a hole in the upper portion of a defect of the waterproof curtain until reaching the defect, (2) stuffing soft ribs into the defect from the drilled hole in the upper portion of the defect until the soft ribs can not be stuffed any more, (3) placing a high-pressure rotary spraying pipe into the drilled hole until reaching the defect, (4) conducting high-pressure rotary spraying on the defect through the high-pressure rotary spraying pipe, and enabling cement paste and the soft ribs at the defect to be solidified in situ to form a reinforced rotary spraying body so as to repair the defect. The soft ribs used in the method play a role in reinforcing, the influence of water flows on forming and solidifying of a pile body can be effectively removed, and the pile body can be kept complete.

Description

A kind of leakage-plugging method for water-stopping curtain
Technical field
The invention belongs to technical field of civil engineering, be specifically related to a kind of leakage-plugging method for water-stopping curtain.
Background technology
In prior art, for the defect blocking method of the water-stop curtain of foundation ditch, generally adopt mechanical geotechnological digging mode to expose after leakage point, then carry out leak stopping work, but for the larger situation of water yield, cannot do like this, the difficulty of blocking construction is larger.In prior art, also there is the high-pressure rotary-spray of utilization to repair the defect of water-stop curtain, but due to flowing of underground water, conventional high-pressure rotary jet grouting pile is easily rushed rare washing away by current and cannot form curing stake at fault location, even if add accelerating admixture to be also unable to catch up with the speed of current scour, effect is not satisfactory.
Summary of the invention
The object of the invention is to overcome prior art defect, a kind of leakage-plugging method for water-stopping curtain is provided.
Technical scheme of the present invention is as follows:
A kind of leakage-plugging method for water-stopping curtain, comprises the steps:
(1) above the fault location of water-stop curtain boring to this fault location;
(2) soft muscle body is filled in to this fault location to till not filling in from the top drill hole of defect;
(3) from described drill hole, insert high-pressure rotary-spray pipe to fault location;
(4) by this high-pressure rotary-spray pipe, fault location is carried out to high-pressure rotary-spray, make the soft muscle body in-situ solidifying of cement paste and fault location form reinforcement churning body with correction of the defect place.
In a preferred embodiment of the invention, described soft muscle body is cellucotton.
In a preferred embodiment of the invention, the hydraulic pressure >=38MPa of described high-pressure rotary-spray, blast is 0.7MPa, it is 2~3MPa that slurry is pressed.
In a preferred embodiment of the invention, the rotary speed of described high-pressure rotary-spray is 10r/min, and slurry flow is 100~150L/min.
In a preferred embodiment of the invention, the water/binder ratio of described cement paste is 1.0, and proportion is 1.5~1.6, and returning slurry proportion is 1.2~1.3.
The invention has the beneficial effects as follows:
1, method of the present invention is filled in this fault location to till not filling in by soft muscle body from the top drill hole of the defect of water-stop curtain, at this place, carry out high-pressure rotary-spray again, soft muscle body plays the effect of reinforcement, can effectively eliminate the impact of current on pile body forming and hardening, makes pile body keep complete;
2, cement churning body of the present invention is after the reinforced action of soft muscle body, and intensity is improved, and the stability of sealing is stronger;
3, method of the present invention adopts cellucotton as soft muscle body, with low cost;
4, method of the present invention can effectively be processed the defect that water yield is large and needn't excavate on a large scale with correction of the defect place, and activities is ripe simple, respond well, with low cost.
The specific embodiment
By the specific embodiment, technical scheme of the present invention is further detailed and is described below.
A kind of leakage-plugging method for water-stopping curtain, comprises the steps:
(1) above the fault location of water-stop curtain boring to this fault location;
(2) cellucotton is filled in to this fault location to till not filling in from the top drill hole of defect;
(3) from described drill hole, insert high-pressure rotary-spray pipe to fault location;
(4) by this high-pressure rotary-spray pipe, fault location is carried out to high-pressure rotary-spray, make the cellucotton in-situ solidifying of cement paste and fault location form reinforcement churning body with correction of the defect place.Hydraulic pressure >=the 38MPa of described high-pressure rotary-spray, blast is 0.7MPa, and it is 2~3MPa that slurry is pressed, and rotary speed is 10r/min, and slurry flow is 100~150L/min,, the water/binder ratio of described cement paste is 1.0, proportion is 1.5~1.6.
Embodiment 1
Yu Jing center, Xiamen Foundation Pit Support Engineering
Water-stop curtain is that castinplace pile adds rotary churning pile between stake, and due to the local disappearance of rotary churning pile, Sand situation appears in foundation ditch.Processing method is: the place's backfill earthwork of leaking in foundation ditch, draw hole to fault location, and utilize drilling rod on machine, fill in cellucotton, fill up hole, by this high-pressure rotary-spray pipe, fault location is carried out to high-pressure rotary-spray, make the cellucotton in-situ solidifying of cement paste and fault location form reinforcement churning body with correction of the defect place.Hydraulic pressure >=the 38MPa of described high-pressure rotary-spray, blast is 0.7MPa, and it is 2~3MPa that slurry is pressed, and rotary speed is 10r/min, and slurry flow is 100~150L/min, and the water/binder ratio of described cement paste is 1.0, and proportion is 1.5~1.6.
Embodiment 2
Quanzhou s seascape garden Foundation Pit Support Engineering
Water-stop curtain is that castinplace pile adds rotary churning pile between stake, and due to rotary churning pile perpendicularity deviation, rotary churning pile and castinplace pile do not overlap, and forms 10cm~40cm vertical cut (V. cut), and Sand situation appears in foundation ditch.Processing method is: the place's backfill earthwork of leaking in foundation ditch, draw hole to fault location, and utilize drilling rod on machine, fill in cellucotton, fill up hole, by this high-pressure rotary-spray pipe, fault location is carried out to high-pressure rotary-spray, make the cellucotton in-situ solidifying of cement paste and fault location form reinforcement churning body with correction of the defect place.Hydraulic pressure >=the 38MPa of described high-pressure rotary-spray, blast is 0.7MPa, and it is 2~3MPa that slurry is pressed, and rotary speed is 10r/min, and slurry flow is 100~150L/min, and the water/binder ratio of described cement paste is 1.0, and proportion is 1.5~1.6.
The above, be only preferred embodiment of the present invention, therefore can not limit according to this scope of the invention process, the equivalence done according to the scope of the claims of the present invention and description changes and modifies, and all should still belong in the scope that the present invention contains.

Claims (5)

1. a leakage-plugging method for water-stopping curtain, is characterized in that: comprise the steps:
(1) above the fault location of water-stop curtain boring to this fault location;
(2) soft muscle body is filled in to this fault location to till not filling in from the top drill hole of defect;
(3) from described drill hole, insert high-pressure rotary-spray pipe to fault location;
(4) by this high-pressure rotary-spray pipe, fault location is carried out to high-pressure rotary-spray, make the soft muscle body in-situ solidifying of cement paste and fault location form reinforcement churning body with correction of the defect place.
2. a kind of leakage-plugging method for water-stopping curtain as claimed in claim 1, is characterized in that: described soft muscle body is cellucotton.
3. a kind of leakage-plugging method for water-stopping curtain as claimed in claim 1, is characterized in that: the hydraulic pressure >=38MPa of described high-pressure rotary-spray, and blast is 0.7MPa, it is 2~3MPa that slurry is pressed.
4. a kind of leakage-plugging method for water-stopping curtain as claimed in claim 3, is characterized in that: the rotary speed of described high-pressure rotary-spray is 10r/min, and slurry flow is 100~150L/min.
5. a kind of leakage-plugging method for water-stopping curtain as claimed in claim 4, is characterized in that: the water/binder ratio of described cement paste is 1.0, and proportion is 1.5~1.6, and returning slurry proportion is 1.2~1.3.
CN201310742773.2A 2013-12-27 2013-12-27 Leaking stoppage method for waterproof curtain Pending CN103726487A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310742773.2A CN103726487A (en) 2013-12-27 2013-12-27 Leaking stoppage method for waterproof curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310742773.2A CN103726487A (en) 2013-12-27 2013-12-27 Leaking stoppage method for waterproof curtain

Publications (1)

Publication Number Publication Date
CN103726487A true CN103726487A (en) 2014-04-16

Family

ID=50450758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310742773.2A Pending CN103726487A (en) 2013-12-27 2013-12-27 Leaking stoppage method for waterproof curtain

Country Status (1)

Country Link
CN (1) CN103726487A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464119A (en) * 2014-09-11 2016-04-06 中建四局第一建筑工程有限公司 Inclined type high-pressure rotary jet grouting pile on inner side of deep foundation pit for stopping leakage and construction method
CN112095647A (en) * 2020-09-18 2020-12-18 江苏建院营造股份有限公司 Plugging method for quickly plugging leakage point of waterproof curtain
CN114808931A (en) * 2022-03-21 2022-07-29 中交二航局第一工程有限公司 Leakage-stopping rod for leakage stopping of slurry of cast-in-situ bored pile on rubble dike in complex sea area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1380470A (en) * 2001-04-13 2002-11-20 河北省水利工程局 Impervious wall construction and soilslip-resisting and leakage-blocking process
CN101428995A (en) * 2008-12-11 2009-05-13 济南大学 Cement based intelligent loss circulation material and method for producing the same
CN102587400A (en) * 2012-03-08 2012-07-18 天津建岩岩土工程有限公司 Leakage-plugging method for water-stopping curtain
CN102605796A (en) * 2012-04-12 2012-07-25 天津建岩岩土工程有限公司 Leaking stoppage method for foundation pit
JP2013147933A (en) * 2013-05-08 2013-08-01 Ohbayashi Corp Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1380470A (en) * 2001-04-13 2002-11-20 河北省水利工程局 Impervious wall construction and soilslip-resisting and leakage-blocking process
CN101428995A (en) * 2008-12-11 2009-05-13 济南大学 Cement based intelligent loss circulation material and method for producing the same
CN102587400A (en) * 2012-03-08 2012-07-18 天津建岩岩土工程有限公司 Leakage-plugging method for water-stopping curtain
CN102605796A (en) * 2012-04-12 2012-07-25 天津建岩岩土工程有限公司 Leaking stoppage method for foundation pit
JP2013147933A (en) * 2013-05-08 2013-08-01 Ohbayashi Corp Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姚春雷等: "高坝洲工程基坑岩溶漏水通道堵漏灌浆技术", 《水力发电》, no. 03, 21 March 2002 (2002-03-21) *
李少芹等: "浅谈大坝基础灌浆工作中特殊情况的处理", 《黑龙江水利科技》, vol. 2, no. 02, 20 June 2002 (2002-06-20), pages 3 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464119A (en) * 2014-09-11 2016-04-06 中建四局第一建筑工程有限公司 Inclined type high-pressure rotary jet grouting pile on inner side of deep foundation pit for stopping leakage and construction method
CN112095647A (en) * 2020-09-18 2020-12-18 江苏建院营造股份有限公司 Plugging method for quickly plugging leakage point of waterproof curtain
CN114808931A (en) * 2022-03-21 2022-07-29 中交二航局第一工程有限公司 Leakage-stopping rod for leakage stopping of slurry of cast-in-situ bored pile on rubble dike in complex sea area

Similar Documents

Publication Publication Date Title
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN103541359B (en) Method for repairing and treating quality defect of cast-in-place pile
CN204343312U (en) A kind of plugging device of precipitation well in foundation pit
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN105887886B (en) A kind of strong karsts developing area stratum Curtain Grouting Construction method
CN104696664A (en) High-polymer composite grouting method for leakage and sand inrush blocking of underground pipeline
CN207177933U (en) A kind of advanced plugging structure of high-pressure high-flow underground water
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN203924137U (en) A kind of diaphragm wall serious leakage plugging structure
CN103912003B (en) The method of water and hole is moved on a kind of simple and efficient shutoff stratum
CN101498220B (en) Vertical shaft working surface artesian flow sand layer slurry protecting rotary spraying grouting process
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN109024641A (en) Triple tube double-liquid rotary spray is used for the construction method of deep basal pit leak stopping
CN108086296B (en) Dynamic and static combined grouting foundation reinforcing construction method
CN103114599A (en) Deep foundation pit sealed precipitation device and construction method thereof
CN203361143U (en) Combination structure of high-pressure jet grouting pile and prestressed pipe pile
CN103437351A (en) Treatment method of deviation and fracture remediation of pile body of filling pile
CN103924987A (en) SMW pile shielding portal waterproof structure and construction method thereof
CN103388338A (en) Novel rapid water stopping and soil mass improving method
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN103437340A (en) Method for strengthening soft foundation through high-pressure jet grouting
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
CN110685272B (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN102953374A (en) High pressure rotary jet grouting pile construction method for power transmission line iron tower pile foundation construction
CN204491646U (en) A kind of high water level area fender body device for plugging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140416

RJ01 Rejection of invention patent application after publication