CN103711654B - A kind of tower is internally integrated girder device and installation method thereof - Google Patents

A kind of tower is internally integrated girder device and installation method thereof Download PDF

Info

Publication number
CN103711654B
CN103711654B CN201310712707.0A CN201310712707A CN103711654B CN 103711654 B CN103711654 B CN 103711654B CN 201310712707 A CN201310712707 A CN 201310712707A CN 103711654 B CN103711654 B CN 103711654B
Authority
CN
China
Prior art keywords
tower
truss
joist body
joist
fairlead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310712707.0A
Other languages
Chinese (zh)
Other versions
CN103711654A (en
Inventor
许世俊
沙德权
陈海骏
曹刚
宋红军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Haili Wind Power Equipment Technology Co., Ltd.
Original Assignee
JIANGSU HAILI WIND POWER EQUIPMENT TECHNICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HAILI WIND POWER EQUIPMENT TECHNICAL CO Ltd filed Critical JIANGSU HAILI WIND POWER EQUIPMENT TECHNICAL CO Ltd
Priority to CN201310712707.0A priority Critical patent/CN103711654B/en
Publication of CN103711654A publication Critical patent/CN103711654A/en
Application granted granted Critical
Publication of CN103711654B publication Critical patent/CN103711654B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of tower and be internally integrated girder device, it is characterized in that: include the truss of square structure, it is arranged at the cable testing bridge on outside truss, it is arranged at the cat ladder inside truss, it is arranged at the elevator within truss and the illuminator being arranged on truss outer wall, described truss is made up of more piece joist body, the quantity of described joist body is identical with the hop count of tower, the height of the height difference tower of section corresponding thereto often saving described joist body is identical, on described, lower two joint joist bodies are connected by guider, often save described joist body to be fixed on the inwall of tower each through connecting device.The invention have the advantage that reasonable in design, not only quick and easy for installation but also intensity high, cable testing bridge, illuminator are fixed on outside truss so that the consumable accessory within tower all concentrates in the controllable scope at truss center simultaneously, it is easy to subsequent maintenance, reduces maintenance cost.

Description

A kind of tower is internally integrated girder device and installation method thereof
Technical field
The present invention relates to a kind of girder device, specifically, relate to a kind of tower and be internally integrated girder device and installation method thereof, belong to offshore wind energy plant field.
Background technology
At wind power industry, generally cat ladder, power cable clamping plate or crane span structure, light conduits crane span structure, elevator decile are offered meter.But the tower diameter being as high-power wind-driven generator group is increasing (current 5MW, 6MW tower base diameter reaches 6 ~ 7 meters), tower inner cable quantity is more and more, cable clamp or crane span structure width also increasing, make partial cables more and more remote with the distance of cat ladder, cause that maintainer is difficult to the cable on cable clamp or crane span structure be safeguarded or keeps in repair on cat ladder, considerably increase follow-up maintenance difficulty and cost.Accordingly, it would be desirable to a kind of new technical scheme solves above-mentioned technical problem.
Summary of the invention
It is an object of the invention to provide a kind of tower and be internally integrated girder device, cat ladder and elevator are integrated into inside truss by this device, cable testing bridge, illuminator are fixed on outside truss, the consumable accessory within tower is made all to concentrate in the controllable scope at truss center, it is easy to follow-up maintenance and maintenance, reduces maintenance difficulty and maintenance cost.
The technical solution used in the present invention is:
A kind of tower is internally integrated girder device, including the truss of square structure, the cable testing bridge being arranged on outside truss, it is arranged at the cat ladder inside truss, is arranged at the elevator within truss and the illuminator being arranged on truss outer wall, described truss is made up of more piece joist body, the quantity of described joist body is identical with the hop count of tower, the height of the height difference tower of section corresponding thereto often saving described joist body is identical, described upper and lower two joint joist bodies are connected by guider, often save described joist body and are fixed on the inwall of tower each through connecting device.
Further, described guider includes upper and lower fairlead and guiding harness cord, described upper and lower fairlead is fixing with upper and lower joint joist body respectively to be connected, guiding harness cord above described upper fairlead is provided with adjusting nut, the guiding harness cord below described lower fairlead is provided with lower adjusting nut.
Further, the adjusting bolt that the thread bush that described connecting device includes matching with tower matches with thread bush, the lock washer being sequentially fixed on the thread bush inside tower and thin nut, it is additionally provided with fluid sealant between described thread bush and tower.
The installation of the present invention adopts stagewise to install, namely along with each section of tower is installed section by section;First the adjusting bolt distance with tower inwall is regulated to ensure the concentricity of truss according to the tapering of tower, by adjusting bolt and thread bush, first segment joist body is fixed on first paragraph tower inwall after first paragraph tower is installed, and be directed in the fairlead that harness cord is fixed on first segment joist body top by adjusting nut, and according to circumstances suitably regulate the height that guiding harness cord stretches out;Then second segment tower dock with first paragraph tower fixing after, the fairlead bottom second section joist body is enclosed within guiding harness cord and fixing to complete the first joist body docking with adjusting nut;Install till having joist body to install successively more.
Owing to the cylinder of tower is generally cone structure, its diameter little 1.5-2.5 rice more general than the diameter of bottom topmost, and the present invention is in order to ensure the concentricity of truss, adopt the mode that thread bush and bolt are fixed, it can not only according to the requirement meeting concentricity, but also avoid and between truss with tower, adopt the mode welded, reduce the internal stress of tower further, improve the intensity of tower.It addition, in order to reduce tower and truss error in height, the present invention adopts guider to regulate the height of truss, it is not only simple quick, but also ensures the intensity of truss.
The invention have the advantage that reasonable in design, not only quick and easy for installation but also intensity high, cable testing bridge, illuminator are fixed on outside truss so that the consumable accessory within tower all concentrates in the controllable scope at truss center simultaneously, it is easy to subsequent maintenance, reduces maintenance cost.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the present invention.
Fig. 2 is design sketch after the present invention installs.
Fig. 3 is the structural representation of connecting device of the present invention.
Fig. 4 is the structural representation of guider of the present invention.
Wherein: 1, truss, 2, cable testing bridge, 3, cat ladder, 4, elevator, 5, illuminator, 6, joist body, 7, upper fairlead, 8, lower fairlead, 9, guiding harness cord, 10, upper adjusting nut, 11, lower adjusting nut, 12, thread bush, 13, adjusting bolt, 14, lock washer, 15, thin nut, 16, tower, 17, connecting device, 18, fluid sealant.
Detailed description of the invention
As shown in Figure 1, a kind of tower is internally integrated girder device, truss 1 including square structure, it is arranged at the cable testing bridge 2 on outside truss 1, it is arranged at the cat ladder 3 inside truss 1, it is arranged at the elevator 4 within truss 1 and the illuminator 5 being arranged on truss 1 outer wall, truss 1 is made up of more piece joist body 6, the quantity of joist body 6 is identical with the hop count of tower, the height of the height difference tower of section corresponding thereto often saving joist body 6 is identical, on, lower two joint joist bodies are connected by guider, often joint joist body 6 is fixed on the inwall of tower 16 each through connecting device 17.
As shown in Figure 4, guider includes upper and lower fairlead 7,8 and guiding harness cord 9, upper and lower fairlead 7,8 is fixing with upper and lower joint joist body 6 respectively to be connected, guiding harness cord 9 above upper fairlead 7 is provided with adjusting nut 10, the guiding harness cord 9 below lower fairlead 8 is provided with lower adjusting nut 11.
As shown in Figure 3, the adjusting bolt 13 that the thread bush 12 that connecting device 17 includes matching with tower 16 matches with thread bush 12, the lock washer 14 being sequentially fixed on the thread bush 12 inside tower 16 and thin nut 15, be additionally provided with fluid sealant 18 between thread bush 12 and tower 16.
Installation process adopt stagewise install, namely along with each section of tower is installed section by section;First the adjusting bolt distance with tower inwall is regulated to ensure the concentricity of truss according to the tapering of tower, by adjusting bolt and thread bush, first segment joist body is fixed on first paragraph tower inwall after first paragraph tower is installed, and be directed in the fairlead that harness cord is fixed on first segment joist body top by adjusting nut, and according to circumstances suitably regulate the height that guiding harness cord stretches out;Then second segment tower dock with first paragraph tower fixing after, the fairlead bottom second section joist body is enclosed within guiding harness cord and fixing to complete the first joist body docking with adjusting nut;Successively install till all joist bodies install (as shown in Figure 2).

Claims (2)

1. a tower is internally integrated girder device, it is characterized in that: include the truss of square structure, it is arranged at the cable testing bridge on outside truss, it is arranged at the cat ladder inside truss, it is arranged at the elevator within truss and the illuminator being arranged on truss outer wall, described truss is made up of more piece joist body, the quantity of described joist body is identical with the hop count of tower, the height of the height difference tower of section corresponding thereto often saving described joist body is identical, on, connected by guider between lower two joint joist bodies, often save described joist body to be fixed on the inwall of tower each through connecting device;Described guider includes upper and lower fairlead and guiding harness cord, described upper and lower fairlead is fixing with upper and lower joint joist body respectively to be connected, guiding harness cord above described upper fairlead is provided with adjusting nut, the guiding harness cord below described lower fairlead is provided with lower adjusting nut;The adjusting bolt that the thread bush that described connecting device includes matching with tower matches with thread bush, the lock washer being sequentially fixed on the thread bush inside tower and thin nut, be additionally provided with fluid sealant between described thread bush and tower.
2. a tower is internally integrated the installation method of girder device, it is characterised in that: it adopts stagewise to install, namely along with each section of tower is installed section by section;First the adjusting bolt distance with tower inwall is regulated to ensure the concentricity of truss according to the tapering of tower, by adjusting bolt and thread bush, first segment joist body is fixed on first paragraph tower inwall after first paragraph tower is installed, and be directed in the fairlead that harness cord is fixed on first segment joist body top by adjusting nut, and according to circumstances suitably regulate the height that guiding harness cord stretches out;Then second segment tower dock with first paragraph tower fixing after, the fairlead bottom second section joist body is enclosed within guiding harness cord and fixing to complete the first joist body docking with adjusting nut;Install till all joist bodies install successively.
CN201310712707.0A 2013-12-23 2013-12-23 A kind of tower is internally integrated girder device and installation method thereof Active CN103711654B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310712707.0A CN103711654B (en) 2013-12-23 2013-12-23 A kind of tower is internally integrated girder device and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310712707.0A CN103711654B (en) 2013-12-23 2013-12-23 A kind of tower is internally integrated girder device and installation method thereof

Publications (2)

Publication Number Publication Date
CN103711654A CN103711654A (en) 2014-04-09
CN103711654B true CN103711654B (en) 2016-07-06

Family

ID=50404920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310712707.0A Active CN103711654B (en) 2013-12-23 2013-12-23 A kind of tower is internally integrated girder device and installation method thereof

Country Status (1)

Country Link
CN (1) CN103711654B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737011B (en) * 2018-12-29 2020-07-28 三一重能有限公司 Tower drum accessory installation method and system

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2007775A (en) * 1977-08-18 1979-05-23 Pohl L L Windturbine system
CN1556898A (en) * 2002-02-06 2004-12-22 ���ܿ���ϵͳ���޹�˾ Method of mounting elements in a wind turbine tower, wind tower suspension unit, system of mutually attachable members
CN201261671Y (en) * 2008-06-17 2009-06-24 中际联合工业技术(北京)有限公司 Tower barrel elevator
CN101484698A (en) * 2006-06-29 2009-07-15 维斯塔斯风力系统有限公司 A tower construction for a wind turbine
DE202010007565U1 (en) * 2010-06-04 2010-09-02 Zarges Aluminium Systeme Gmbh Tower, in particular wind turbine tower
CN201729557U (en) * 2010-07-06 2011-02-02 沈阳瑞祥风能设备有限公司 Device with elevator and ladder stand arranged in tower tube of wind generating set
CN201786579U (en) * 2010-08-11 2011-04-06 上海泰胜(东台)电力工程机械有限公司 Tower of wind power generating unit
ES2373495B2 (en) * 2009-06-09 2012-09-25 Gamesa Innovation & Technology, S.L. METHOD AND SYSTEM FOR FIXING ELECTRIC CABLES.
CN102889052A (en) * 2012-08-29 2013-01-23 广东明阳风电产业集团有限公司 Ladder stand safety protection device on top of tower of wind driven generator
CN103195660A (en) * 2012-01-05 2013-07-10 李泽宇 Truss-structured tower
CN103410670A (en) * 2013-08-01 2013-11-27 南京飓能电控自动化设备制造有限公司 Trussed wind turbine tower and wind turbine unit with same
CN203742904U (en) * 2013-12-23 2014-07-30 江苏海力风电设备科技有限公司 Internal integration truss device of tower

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2007775A (en) * 1977-08-18 1979-05-23 Pohl L L Windturbine system
CN1556898A (en) * 2002-02-06 2004-12-22 ���ܿ���ϵͳ���޹�˾ Method of mounting elements in a wind turbine tower, wind tower suspension unit, system of mutually attachable members
CN101484698A (en) * 2006-06-29 2009-07-15 维斯塔斯风力系统有限公司 A tower construction for a wind turbine
CN201261671Y (en) * 2008-06-17 2009-06-24 中际联合工业技术(北京)有限公司 Tower barrel elevator
ES2373495B2 (en) * 2009-06-09 2012-09-25 Gamesa Innovation & Technology, S.L. METHOD AND SYSTEM FOR FIXING ELECTRIC CABLES.
DE202010007565U1 (en) * 2010-06-04 2010-09-02 Zarges Aluminium Systeme Gmbh Tower, in particular wind turbine tower
CN201729557U (en) * 2010-07-06 2011-02-02 沈阳瑞祥风能设备有限公司 Device with elevator and ladder stand arranged in tower tube of wind generating set
CN201786579U (en) * 2010-08-11 2011-04-06 上海泰胜(东台)电力工程机械有限公司 Tower of wind power generating unit
CN103195660A (en) * 2012-01-05 2013-07-10 李泽宇 Truss-structured tower
CN102889052A (en) * 2012-08-29 2013-01-23 广东明阳风电产业集团有限公司 Ladder stand safety protection device on top of tower of wind driven generator
CN103410670A (en) * 2013-08-01 2013-11-27 南京飓能电控自动化设备制造有限公司 Trussed wind turbine tower and wind turbine unit with same
CN203742904U (en) * 2013-12-23 2014-07-30 江苏海力风电设备科技有限公司 Internal integration truss device of tower

Also Published As

Publication number Publication date
CN103711654A (en) 2014-04-09

Similar Documents

Publication Publication Date Title
CN104121155A (en) Prestressed concrete and steel combined tower on which self-support wind generator set can be assembled and anchoring method of prestressed concrete and steel combined tower
CN203128000U (en) Hoisting device for direct-driven wind power generator set
CN203998746U (en) Portable suspension installation
CN103711654B (en) A kind of tower is internally integrated girder device and installation method thereof
CN103311865B (en) A kind of rack type regulation elbow
CN202274981U (en) Static force loading device of high-power blade test bench
CN203742904U (en) Internal integration truss device of tower
CN103993730B (en) Steel coal hopper abutting joint constructing operation platform
CN203513056U (en) Retractable staircase lower truss
CN202596242U (en) Concrete tower
CN201010459Y (en) Flexible attaching device used for tower crane body
CN103206852A (en) Installation method for rotary kiln for large-sized cement production line
CN204371545U (en) A kind of power station impeller apparatus for examination and repair
CN105384089A (en) Tower crane cargo boom pull rod structure
CN107017600B (en) Wind driven generator cable clamp holds device
CN105591312A (en) Equipment for erecting special power transmission cable for substations
CN203905426U (en) Steel coal scuttle butt-connection installation construction operation table
CN104033340A (en) Wind power generation precast concrete tower internal pre-stress tension method
CN201590816U (en) Integrated base station
CN202596237U (en) Cantilever for wind measurement tower
CN203173741U (en) Steel strand lifting and clamping device
CN203529713U (en) High-pressure sleeve hoisting structure
CN202769052U (en) Pipeline movable cradle
CN104389747A (en) Working platform of high-power offshore wind generator unit tower frame electrical appliance component and mounting method thereof
CN205241107U (en) Tower crane boom rod structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 226400 north side of Jinshajiang Road and east side of Jinggangshan Road, Rudong Economic Development Zone, Nantong City, Jiangsu Province

Patentee after: Jiangsu Haili Wind Power Equipment Technology Co., Ltd.

Address before: 226400 north side of Jialing River Road, Rudong Economic Development Zone, Nantong, Jiangsu

Patentee before: Jiangsu Haili Power Equipment Technology Co.,Ltd.

CP03 Change of name, title or address