CN103711433B - A kind of fully-mechanized digging machine load hydraulic rig - Google Patents
A kind of fully-mechanized digging machine load hydraulic rig Download PDFInfo
- Publication number
- CN103711433B CN103711433B CN201310720761.XA CN201310720761A CN103711433B CN 103711433 B CN103711433 B CN 103711433B CN 201310720761 A CN201310720761 A CN 201310720761A CN 103711433 B CN103711433 B CN 103711433B
- Authority
- CN
- China
- Prior art keywords
- fully
- hydraulic
- digging machine
- mechanized digging
- rig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The invention discloses a kind of fully-mechanized digging machine load hydraulic rig, comprise hydraulic motor (4), handle (5), drill bit (6), oil-in (9), oil-out (10), feature is that it is provided with a petroleum pipeline (2) for being connected with fully-mechanized digging machine hydraulic oil container, petroleum pipeline (2) one end is connected with the oil-in (9) of rig, and the other end connects the snap joint (1) that can be connected with fully-mechanized digging machine hydraulic oil container. Owing to having adopted technical scheme of the present invention, in mine development end process, can hole as required at any time, and not need to be equipped with again a set of special rig. And owing to having realized Fast Installation and the dismounting of hydraulic drill rig and fully-mechanized digging machine, therefore hydraulic drill rig boring and fully-mechanized digging machine work are disturbed very little. The present invention is more more convenient than the scheme of traditional employing air drill, and equipment installation cost is also low, and when work noise little, safety and environmental protection.
Description
Technical field
The present invention relates to a kind of mine drilling equipment, particularly relate to a kind of fully-mechanized digging machine load hydraulic rig being installed on fully-mechanized digging machine.
Background technology
Current most of colliery is mainly all to adopt fully-mechanized digging machine to tunnel, in tunneling process, often need to use rig to hole in advance and discharge gas or ventilation etc., and existing and rig fully-mechanized digging machine collaborative work are mainly pneumatic drilling machines, and pneumatic drilling machine is short of power conventionally, noise greatly, not environmental protection, and it is high to consume energy, under mine, result of use is undesirable.
Summary of the invention
The object of the present invention is to provide a kind of hydraulic drill rig that is carried dress by fully-mechanized digging machine, can in fully-mechanized digging machine tunneling process, complete as required boring work, this hydraulic drill rig efficiency is high simultaneously, noise is little, safety and environmental protection.
For realizing object of the present invention, the present invention has adopted such technical scheme:
The present invention has adopted a kind ofly can carry the hydraulic drill rig being contained on fully-mechanized digging machine, this hydraulic drill rig the comprise parts such as hydraulic motor, handle, drill bit, oil-in, oil-out the same as existing rig, wherein it is provided with a petroleum pipeline for being connected with fully-mechanized digging machine hydraulic oil container, petroleum pipeline one end is connected with the oil-in of rig, and the other end connects the snap joint that can be connected with fully-mechanized digging machine hydraulic oil container. Be connected or dismantle fast with the oil pipe picking out from the fuel tank of fully-mechanized digging machine by snap joint, so both need not, in addition for hydraulic drill rig is arranged oil circuit, normally working thereby can at any time hydraulic drill rig be removed to recovery fully-mechanized digging machine from fully-mechanized digging machine again.
Therefore, snap joint must be convenient to Fast Installation and dismounting, and the present invention realizes like this: the link of snap joint is connected with the link of the petroleum pipeline of hydraulic drill rig by an adapter sleeve. Adapter sleeve is provided with internal thread, and the link of aforesaid petroleum pipeline and snap joint is provided with the external screw thread mating with the internal thread of adapter sleeve. Like this in the time that hydraulic drill rig is connected fully-mechanized digging machine by needs, only the adapter sleeve in the link of the petroleum pipeline of hydraulic drill rig and snap joint need to be tightened, owing to being threaded connection, the two connection procedure be easy to fast. In the time that needs make hydraulic drill rig separate with fully-mechanized digging machine, only need unclamp adapter sleeve.
Further, aforesaid hydraulic motor acts on drill bit by axis. Axis and drill bit junction are provided with drill bushing.
Owing to having adopted technical scheme of the present invention, in mine development end process, can hole as required at any time, and not need to be equipped with again a set of special rig. And owing to having realized Fast Installation and the dismounting of hydraulic drill rig and fully-mechanized digging machine, therefore hydraulic drill rig boring and fully-mechanized digging machine work are disturbed very little. The present invention adopts hydraulic drill rig, and more more convenient than the scheme of traditional employing air drill, equipment installation cost is also low, and when work noise little, safety and environmental protection.
Brief description of the drawings
Fig. 1 is hydraulic drill rig structural representation of the present invention.
Description of reference numerals: 1-snap joint, 2-petroleum pipeline, 3-drill bushing, 4-hydraulic motor, 5-handle, 6-drill bit, 7-axis, 8-adapter sleeve, 9-oil-in, 10-oil-out.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further detail.
As shown in Figure 1, fully-mechanized digging machine load hydraulic rig of the present invention, it is provided with provides the hydraulic motor of hydraulic power 4, and hydraulic motor 4 acts on drill bit 6 by axis 7, and axis 7 is provided with drill bushing 3 with drill bit 6 junctions. This hydraulic drill rig is provided with shell certainly, and a side of shell is provided with the handle 5 for hand-held operation. It is also provided with oil-in 9, oil-out 10, and it is provided with a petroleum pipeline 2 for being connected with fully-mechanized digging machine hydraulic oil container, and petroleum pipeline 2 one end are connected with the oil-in 9 of rig, and the other end connects the snap joint 1 that can be connected with fully-mechanized digging machine hydraulic oil container. The link of snap joint 1 is connected with the link of petroleum pipeline 2 by an adapter sleeve 8. Adapter sleeve 8 is provided with internal thread, and the link of petroleum pipeline 2 and snap joint 1 is provided with the external screw thread mating with the internal thread of adapter sleeve 8.
The present invention implements like this: in the time that fully-mechanized digging machine needs to hole in working face tunneling process, suspend fully-mechanized digging machine work, hydraulic drill rig of the present invention is taken out, be connected with the interface that the hydraulic oil container of the snap joint 1 on the petroleum pipeline 2 of hydraulic drill rig and fully-mechanized digging machine arranges, hydraulic oil enters hydraulic drill rig inside by petroleum pipeline 2 through oil-in 9, make hydraulic motor 4 obtain power, hydraulic motor 4 promotes drill bit 6 by axis 7 and holes, and by oil-out 10 oil extractions.
After boring, close hydraulic drill rig, unload snap joint 1, hydraulic drill rig folding and unfolding is good, and fully-mechanized digging machine continues driving forward.
Certainly, be more than concrete exemplary applications of the present invention, the present invention also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, within all dropping on protection domain of the presently claimed invention.
Claims (3)
1. a fully-mechanized digging machine load hydraulic rig, comprise hydraulic motor (4), handle (5), drill bit (6), oil-in (9), oil-out (10), it is characterized in that: it is provided with a petroleum pipeline (2) for being connected with fully-mechanized digging machine hydraulic oil container, petroleum pipeline (2) one end is connected with the oil-in (9) of rig, and the other end connects the snap joint (1) that can be connected with fully-mechanized digging machine hydraulic oil container; The link of described snap joint (1) is connected with the link of described petroleum pipeline (2) by an adapter sleeve (8); Described adapter sleeve (8) is provided with internal thread, and the link of described petroleum pipeline (2) and snap joint (1) is provided with the external screw thread mating with the internal thread of adapter sleeve (8); Snap joint (1) when use on the use petroleum pipeline (2) of hydraulic drill rig and fully-mechanized digging machine
The interface that hydraulic oil container arranges connects, hydraulic oil enters hydraulic drill rig inside by petroleum pipeline (2) through oil-in (9), make hydraulic motor (4) obtain power, hydraulic motor (4) promotes drill bit (6) by axis (7) and holes, and by oil-out (10) oil extraction.
2. fully-mechanized digging machine load hydraulic rig according to claim 1, is characterized in that: described hydraulic motor (4) acts on drill bit (6) by axis (7).
3. fully-mechanized digging machine load hydraulic rig according to claim 2, is characterized in that: described axis (7) is provided with drill bushing (3) with drill bit (6) junction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310720761.XA CN103711433B (en) | 2013-12-24 | 2013-12-24 | A kind of fully-mechanized digging machine load hydraulic rig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310720761.XA CN103711433B (en) | 2013-12-24 | 2013-12-24 | A kind of fully-mechanized digging machine load hydraulic rig |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103711433A CN103711433A (en) | 2014-04-09 |
CN103711433B true CN103711433B (en) | 2016-05-18 |
Family
ID=50404739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310720761.XA Expired - Fee Related CN103711433B (en) | 2013-12-24 | 2013-12-24 | A kind of fully-mechanized digging machine load hydraulic rig |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103711433B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106351570B (en) * | 2016-09-22 | 2018-08-24 | 安徽理工大学 | A kind of mining hand held hydraulic drill based on multiple-action inner curved radial motor |
CN106368702B (en) * | 2016-09-22 | 2018-06-08 | 安徽理工大学 | A kind of mining hand-held all-hydraulic drill based on inner curve motor |
CN106351571B (en) * | 2016-09-22 | 2018-06-08 | 安徽理工大学 | A kind of mining hand-held seven-star wheel hydraulic drill rig |
CN106563835A (en) * | 2016-10-08 | 2017-04-19 | 郑州神利达钻采设备有限公司 | Variable-diameter drill bit capable of controlling drilling depth |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3612762C2 (en) * | 1986-04-16 | 1994-06-23 | E & Pk Ingbuero | Telescopic drill |
CN2700560Y (en) * | 2004-05-21 | 2005-05-18 | 张立刚 | Hand-held hydraulic drilling rig for mining |
CN201152173Y (en) * | 2008-01-24 | 2008-11-19 | 王彦武 | Outburst-proof diggning anchor machine set |
CN201209459Y (en) * | 2008-06-20 | 2009-03-18 | 浦国树 | Abnormal protrusion mine coal road digging anti- protrusion jumbo loader |
CN201588530U (en) * | 2010-01-29 | 2010-09-22 | 平顶山市冠宏工贸有限责任公司 | Handheld emulsion drilling machine used in coal mines |
CN201786256U (en) * | 2010-09-19 | 2011-04-06 | 王彦武 | Abnormal protrusion mine coal road digging anti-protrusion boring jumbo loading set |
CN203626606U (en) * | 2013-12-24 | 2014-06-04 | 贵州永润煤业有限公司 | Hydraulic drilling rig additionally arranged on integrated excavator |
-
2013
- 2013-12-24 CN CN201310720761.XA patent/CN103711433B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103711433A (en) | 2014-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103711433B (en) | A kind of fully-mechanized digging machine load hydraulic rig | |
CN202483565U (en) | Pressurized short section of negative impulse measurement apparatus while drilling | |
CN207436898U (en) | All-in-one machine is divided in a kind of rock-boring | |
CN202199809U (en) | Chamfering device | |
CN203905973U (en) | Mining downhole recycling device for anchor rods | |
CN203626606U (en) | Hydraulic drilling rig additionally arranged on integrated excavator | |
CN204457466U (en) | Colliery geologic drilling rod | |
CN202745720U (en) | Geological drill pipe | |
CN206016705U (en) | Driver extension bar union joint | |
CN204691699U (en) | A kind of drilling rod Quick Connect Kit | |
CN204984280U (en) | Novel sealed drilling rod | |
CN201874456U (en) | Mining water drill | |
CN102865045A (en) | Rock drilling quick replacing drilling rod with taper thread | |
CN104251122A (en) | Non-excavation horizontal directional drilling electric drill rod | |
CN204002612U (en) | A kind of drill rod boring tool torque clutch | |
CN205023784U (en) | Directly drive winch | |
CN203202408U (en) | Oil tube fixing device for minitype downhole coal mining machine | |
CN203367727U (en) | Cone punch | |
CN201391238Y (en) | Special device for breakouting pack of dynamite of drill pipe | |
CN204754765U (en) | Double tube unit head | |
CN204738774U (en) | Mining spiral corer | |
CN203403822U (en) | Back-dragging broaching device with centering device | |
CN102704883A (en) | Special fishing device for downhole motor rotor of kilometer-level drilling machine | |
CN204386478U (en) | A kind of bearing-lubricating device of rock bit | |
CN204024642U (en) | Measurement while-drilling instrument power supply communication pipe nipple apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160518 Termination date: 20161224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |