CN204457466U - Colliery geologic drilling rod - Google Patents
Colliery geologic drilling rod Download PDFInfo
- Publication number
- CN204457466U CN204457466U CN201520085820.5U CN201520085820U CN204457466U CN 204457466 U CN204457466 U CN 204457466U CN 201520085820 U CN201520085820 U CN 201520085820U CN 204457466 U CN204457466 U CN 204457466U
- Authority
- CN
- China
- Prior art keywords
- section
- square
- drill
- drill pipe
- square section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 27
- 239000003245 coal Substances 0.000 claims abstract description 11
- 238000003466 welding Methods 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 abstract description 5
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 8
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
本实用新型公开了一种煤矿用地质钻杆,包括杆体以及连接在杆体两端的公头、母头,所述公头和母头与杆体采用焊接连接,所述公头包括设置在轴线方向上的两个四方段以及与其它钻杆连接的锥螺纹段,两个四方段分别为用于和钻机钻套连接的第一四方段以及用于拆卸钻杆的第二四方段,第一四方段、第二四方段和锥螺纹段的设置顺序依次是锥螺纹段、第一四方段、第二四方段,其中第二四方段靠近与杆体相连的一端,所述母头设置锥螺纹孔,锥螺纹孔与锥螺纹段相匹配。本实用新型采用第一四方与钻机钻套连接传动,提高了钻杆使用寿命;采用U型销与钻套进行轴向固定,并利用第二四方固定钻杆,拆卸钻杆过程简便,提高了井下工人工作效率,降低工人劳动强度。
The utility model discloses a geological drilling rod for coal mines, which comprises a rod body and a male head and a female head connected to two ends of the rod body. The male head and the female head are connected to the rod body by welding, and the male head includes a The two square sections and the tapered thread section connected with other drill pipes, the two square sections are the first square section for connecting with the drill bushing and the second square section for removing the drill pipe, the first The arrangement order of the square section, the second square section and the tapered thread section is the tapered thread section, the first square section, and the second square section, wherein the second square section is close to the end connected to the rod body, and the female The head is provided with a tapered threaded hole, and the tapered threaded hole matches the tapered threaded section. The utility model adopts the connection and transmission of the first square and the drill bushing of the drilling rig, which improves the service life of the drill pipe; adopts the U-shaped pin and the drill bush for axial fixing, and uses the second square to fix the drill pipe, and the process of disassembling the drill pipe is simple and convenient. Improve the work efficiency of underground workers and reduce the labor intensity of workers.
Description
技术领域technical field
本实用新型涉及一种煤矿用地质钻杆,属于煤矿机械设备领域。The utility model relates to a geological drill pipe used in coal mines, which belongs to the field of coal mine mechanical equipment.
背景技术Background technique
在煤矿开采中,钻机、钻杆是常用设备,钻杆与钻机钻套之间大多采用螺纹连接。钻机打钻时,钻杆受到的扭矩大,钻杆螺纹容易损坏,造成钻杆报废,增加消耗。In coal mining, drilling rigs and drill pipes are commonly used equipment, and threaded connections are mostly used between the drill pipes and the drill bushings of the drilling rig. When the drilling rig is drilling, the drill pipe is subjected to a large torque, and the thread of the drill pipe is easily damaged, causing the drill pipe to be scrapped and increasing consumption.
钻杆钻完孔时,需要将钻杆拆下,在拔钻及拆卸钻杆时,由于被拆卸钻杆与钻机钻套或者相邻钻杆均是通过螺纹连接的,因此,需要将与被拆卸钻杆连接的相邻钻杆固定,钻机旋转并后退,才能完成拆卸。在拆卸过程中,经常出现被拆卸钻杆一端螺纹松脱,一端螺纹连接的现象。这时需要工人人工拆卸钻杆。拆卸效率低,工人劳动强度大。When the drill pipe is drilled, the drill pipe needs to be removed. When pulling out and disassembling the drill pipe, since the removed drill pipe is connected to the drill bushing of the drilling rig or the adjacent drill pipe through threads, it is necessary to connect the drill pipe with the drill pipe to be removed. The adjacent drill pipes connected by the dismantling drill pipes are fixed, and the drilling rig rotates and retreats to complete the disassembly. During the dismantling process, it often occurs that one end of the dismantled drill pipe is threaded loose and the other end is threaded. At this time, workers need to manually disassemble the drill pipe. The disassembly efficiency is low, and the labor intensity of workers is high.
实用新型内容Utility model content
本实用新型需要解决的技术问题是提供一种拆卸容易、使用寿命长的煤矿用地质钻杆。The technical problem to be solved by the utility model is to provide a coal mine geological drill pipe which is easy to disassemble and has a long service life.
为解决上述问题,本实用新型所采取的技术方案是:For solving the problems referred to above, the technical scheme that the utility model takes is:
一种煤矿用地质钻杆,包括杆体以及连接在杆体两端的公头、母头;其特征在于:所述公头和母头与杆体采用焊接连接,所述公头包括设置在轴线方向上的两个四方段以及与其它钻杆连接的锥螺纹段,两个四方段分别为用于和钻机钻套连接的第一四方段以及用于拆卸钻杆的第二四方段,第一四方段、第二四方段和锥螺纹段的设置顺序依次是锥螺纹段、第一四方段、第二四方段,其中第二四方段靠近与杆体相连的一端,所述母头设置锥螺纹孔,锥螺纹孔与锥螺纹段相匹配。A geological drill pipe for coal mines, including a rod body and a male head and a female head connected to both ends of the rod body; it is characterized in that: the male head and the female head are connected to the rod body by welding, and the male head includes a Two square sections and taper thread sections connected with other drill pipes, the two square sections are the first square section for connecting with the drill bushing of the drilling rig and the second square section for removing the drill pipe, the first four The arrangement sequence of the square section, the second square section and the tapered thread section is the tapered thread section, the first square section, and the second square section, wherein the second square section is close to the end connected to the rod body, and the female head Set the taper threaded hole, the taper thread hole matches the taper thread segment.
进一步的,所述公头上还设有U型销销槽,位于第一四方段中部。Further, the male head is also provided with a U-shaped pin groove, which is located in the middle of the first quadrangular section.
更进一步的,所述公头上还设有一段阶梯细轴段,位于公头端部,紧挨锥螺纹段。Further, the male head is also provided with a stepped thin shaft section, which is located at the end of the male head and is close to the tapered thread section.
采用上述技术方案所产生的有益效果在于:The beneficial effects produced by adopting the above-mentioned technical scheme are:
本实用新型煤矿用地质钻杆采用第一四方与钻机钻套连接传动,提高了钻杆的使用寿命;采用U型销与钻套进行轴向固定,并利用第二四方固定钻杆,拆卸钻杆过程简便快捷,提高了井下工人工作效率,降低工人劳动强度。The geological drill pipe used in coal mines of the utility model adopts the connection and transmission of the first square and the drill sleeve of the drilling rig, which improves the service life of the drill pipe; the U-shaped pin and the drill sleeve are used for axial fixing, and the second square is used to fix the drill pipe. The process of dismantling the drill pipe is simple and fast, which improves the work efficiency of underground workers and reduces the labor intensity of workers.
附图说明Description of drawings
图1是本实用新型结构示意图;Fig. 1 is a structural representation of the utility model;
图2是本实用新型公头结构示意图;Fig. 2 is a schematic diagram of the structure of the male head of the utility model;
图3是本实用新型图2A-A剖视结构示意图;Fig. 3 is a schematic diagram of the sectional structure of Fig. 2A-A of the utility model;
图4是本实用新型图2B-B剖视结构示意图;Fig. 4 is the utility model Fig. 2B-B sectional structure schematic diagram;
图5是本实用新型母头结构示意图;Fig. 5 is a schematic diagram of the structure of the female head of the utility model;
图6是本实用新型和钻机钻套以及其它钻杆连接结构示意图;Fig. 6 is a schematic diagram of the connection structure between the utility model and the drilling rig drill sleeve and other drill pipes;
图7是本实用新型图6C-C剖视结构示意图;Fig. 7 is a schematic cross-sectional structure diagram of Fig. 6C-C of the utility model;
图8是本实用新型图6D-D剖视结构示意图;Fig. 8 is a schematic diagram of the sectional structure of Fig. 6D-D of the present utility model;
具体实施方式Detailed ways
下面结合附图对实用新型做进一步详细描述:Below in conjunction with accompanying drawing, utility model is described in further detail:
本实用新型涉及一种煤矿用地质钻杆,通过设计特殊的连接头,方便拆卸,提高效率,减轻工人劳动强度,其结构如图1所示。The utility model relates to a geological drill pipe used in coal mines. By designing a special joint, it is convenient to disassemble, improve efficiency, and reduce labor intensity of workers. Its structure is shown in Figure 1.
如图1~5所示,本实用新型包括公头41,杆体42,母头43,所述的公头41,母头43分别与杆体42两端通过焊接连接。所述公头在轴线方向上依次设置阶梯细轴段411,锥螺纹段412、第一四方段413、第二四方段415,其中阶梯细轴段411位于公头端部,第二四方段靠近与杆体相连的一端,阶梯细轴段411用于与钻机钻套1配合安装,并利用安装在钻机钻套中的的O型密封圈2密封,打钻通水时,起到密封作用;锥螺纹段412用于和其它钻杆的母头配合连接,所述母头43上设置锥螺纹孔,锥螺纹孔与锥螺纹段412相匹配。第一四方段413用于和钻机钻套连接传动,第二四方段415用于固定钻杆进行钻杆拆卸。为了方便拆卸,在第一四方段中部设置U型销销槽414,第一四方段和钻机钻套连接时,利用U型销限制钻杆的轴向位移。As shown in Figures 1 to 5, the utility model includes a male head 41, a rod body 42, and a female head 43. The male head 41 and the female head 43 are respectively connected to two ends of the rod body 42 by welding. The male head is sequentially provided with a stepped thin shaft section 411, a tapered thread section 412, a first square section 413, and a second square section 415 in the axial direction, wherein the stepped thin shaft section 411 is located at the end of the male head, and the second four The square section is close to the end connected with the rod body. The stepped thin shaft section 411 is used to cooperate with the drill sleeve 1 and seal it with the O-ring 2 installed in the drill sleeve. When drilling through the water, it acts as a seal Function: the tapered thread section 412 is used to cooperate with the female head of other drill rods, and the tapered threaded hole is provided on the female head 43, and the tapered threaded hole matches the tapered threaded section 412. The first quadrangular section 413 is used to connect and drive the drill bushing of the drilling rig, and the second quadrangular section 415 is used to fix the drill pipe for removal of the drill pipe. In order to facilitate disassembly, a U-shaped pin groove 414 is provided in the middle of the first square section. When the first square section is connected to the drill sleeve of the drilling rig, the U-shaped pin is used to limit the axial displacement of the drill rod.
图6~8示出了本实用新型实施例的地质钻杆与钻机钻套的连接方式图。Figures 6 to 8 show the connection mode diagrams of the geological drill pipe and the drill bushing of the drilling rig according to the embodiment of the utility model.
钻杆端部阶梯细轴与钻机钻套1安装的O型密封圈圈2配合,打钻通水时,起到密封作用。The stepped thin shaft at the end of the drill pipe cooperates with the O-shaped sealing ring 2 installed on the drill bushing 1 of the drilling rig, and plays a sealing role when drilling through water.
在打钻时,钻杆4与钻机钻套2通过四方传递扭矩,四方传递扭矩大,使用寿命长。When drilling, the drill rod 4 and the drill bushing 2 of the drilling rig transmit torque through the four directions, and the four directions transmit the torque large and have a long service life.
在拔钻时,钻杆与钻机钻套通过U型销3连接,钻机后退,由于U型销3的轴向限位作用,钻机带动钻杆拔出。When pulling out the drill, the drill rod and the drill bushing of the drilling rig are connected through the U-shaped pin 3, and the drilling rig retreats. Due to the axial limit effect of the U-shaped pin 3, the drilling rig drives the drill rod to be pulled out.
在拆卸钻杆时,被拆卸钻杆4母头螺纹431与另外的钻杆5公头螺纹相连,另一端与钻机钻套1通过第一四方连接,U型销3固定。钻杆卡6将与被拆卸钻杆4连接的钻杆5固定(钻杆公头有两个四方,第二四方专门用于在拆卸钻杆时,固定钻杆)。钻机转动并后退,螺纹松开,将U型销3拔出,从钻机钻套1中将钻杆4取出。When disassembling the drill rod, the removed drill rod 4 female screw thread 431 is connected with the other drill rod 5 male screw threads, and the other end is connected with the drill bushing 1 through the first square, and the U-shaped pin 3 is fixed. Drill rod clamp 6 fixes the drill rod 5 that is connected with the drill rod 4 that is disassembled (the drill rod male head has two squares, and the second square is specially used for fixing the drill rod when dismounting the drill rod). The drilling rig rotates and retreats, the thread is unclamped, the U-shaped pin 3 is pulled out, and the drill pipe 4 is taken out from the drilling rig drill bushing 1 .
通过本实用新型的技术方案,提高了钻杆的使用寿命,拆卸钻杆过程简便快捷,提高了井下工人工作效率。Through the technical scheme of the utility model, the service life of the drill pipe is improved, the process of disassembling the drill pipe is simple and fast, and the work efficiency of underground workers is improved.
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520085820.5U CN204457466U (en) | 2015-02-05 | 2015-02-05 | Colliery geologic drilling rod |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520085820.5U CN204457466U (en) | 2015-02-05 | 2015-02-05 | Colliery geologic drilling rod |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204457466U true CN204457466U (en) | 2015-07-08 |
Family
ID=53664368
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520085820.5U Expired - Fee Related CN204457466U (en) | 2015-02-05 | 2015-02-05 | Colliery geologic drilling rod |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204457466U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107448229A (en) * | 2017-09-27 | 2017-12-08 | 山东金诚联创管业股份有限公司 | Two way seal bell and spigot steel pipe for drawing-off gas |
| CN108332991A (en) * | 2018-01-25 | 2018-07-27 | 温州诚力工程项目管理有限公司 | A kind of cutting ring soil sampler |
| CN111720072A (en) * | 2020-06-11 | 2020-09-29 | 盐城市欧特威机械科技有限公司 | A kind of geological drill pipe for coal mine |
-
2015
- 2015-02-05 CN CN201520085820.5U patent/CN204457466U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107448229A (en) * | 2017-09-27 | 2017-12-08 | 山东金诚联创管业股份有限公司 | Two way seal bell and spigot steel pipe for drawing-off gas |
| CN108332991A (en) * | 2018-01-25 | 2018-07-27 | 温州诚力工程项目管理有限公司 | A kind of cutting ring soil sampler |
| CN111720072A (en) * | 2020-06-11 | 2020-09-29 | 盐城市欧特威机械科技有限公司 | A kind of geological drill pipe for coal mine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204754796U (en) | Roadway support is high -speed joint formula drilling rod for anchor | |
| CN104453729B (en) | Combined aluminum alloy double-wall drill pipe unit | |
| CN102337844B (en) | Directional drilling signal transmission drill pipe | |
| CN205532334U (en) | Quickly detachable drill pipe for coal mine | |
| CN103670294A (en) | Combined-type mine drill rod | |
| CN104879062A (en) | Double-drill drilling-type coal mining machine drill stem bearing stabilizer | |
| CN204984280U (en) | Novel sealed drilling rod | |
| CN206737844U (en) | Drilling rod attachment structure | |
| CN202190049U (en) | Cable connecting seat | |
| CN207017946U (en) | A kind of rig drill straight drill drilling rod combination | |
| CN205370501U (en) | Colliery is high -pressure hydraulic fracturing hole packer in pit | |
| CN205591846U (en) | Possesses multi -purpose hole head soon | |
| CN201730553U (en) | Expansion pipe column for petroleum drill | |
| CN205237973U (en) | Quick borehole stressmeter installation push rod of dismantling | |
| CN204436278U (en) | A kind of novel snap ring and front connector assembly structure | |
| CN209195278U (en) | A kind of polygonal attachment device of drill rod boring tool convenient for dismantling installation in a limited space | |
| CN209083230U (en) | A kind of pair goes out to position quick inserted joint pipe | |
| CN211081738U (en) | Quick-change large-torque efficient joint for drill rod of drilling machine | |
| CN103982147B (en) | A kind of underground drill rig auger stem Auto-mounting and dismounting joint | |
| CN207879275U (en) | Spline slip-type drill string coupling arrangement | |
| CN202611617U (en) | Internal and external thickening high-strength sleeve connector for thickened oil thermal production well | |
| CN204457759U (en) | A kind of with brill instrument connection anti-rotation torpedo adapter assembly | |
| CN211549603U (en) | A drill pipe reducing joint | |
| CN104989288A (en) | Novel special double-wall drill pipe for soil-rock horizontal directional drilling machine | |
| CN201786280U (en) | Wear-resistant spiral drill collar with middle-thickened tube |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150708 |