CN103711433A - Roadheader-mounted hydraulic drilling rig - Google Patents

Roadheader-mounted hydraulic drilling rig Download PDF

Info

Publication number
CN103711433A
CN103711433A CN201310720761.XA CN201310720761A CN103711433A CN 103711433 A CN103711433 A CN 103711433A CN 201310720761 A CN201310720761 A CN 201310720761A CN 103711433 A CN103711433 A CN 103711433A
Authority
CN
China
Prior art keywords
hydraulic
drilling rig
oil
roadheader
fully
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310720761.XA
Other languages
Chinese (zh)
Other versions
CN103711433B (en
Inventor
张保东
宋来武
高春生
臧宝
徐卿
于政德
王坤明
卫涛
李丙全
贺炜
王栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU YONGRUN COAL INDUSTRY Co Ltd
Original Assignee
GUIZHOU YONGRUN COAL INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU YONGRUN COAL INDUSTRY Co Ltd filed Critical GUIZHOU YONGRUN COAL INDUSTRY Co Ltd
Priority to CN201310720761.XA priority Critical patent/CN103711433B/en
Publication of CN103711433A publication Critical patent/CN103711433A/en
Application granted granted Critical
Publication of CN103711433B publication Critical patent/CN103711433B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a roadheader-mounted hydraulic drilling rig. The roadheader-mounted hydraulic drilling rig comprises a hydraulic motor (4), a handle (5), a drill bit (6), an oil inlet (9) and an oil outlet (10). The hydraulic drilling rig is characterized in that the hydraulic drilling rig is provided with an oil conveying pipe (2) connected with a roadheader hydraulic oil tank, one end of the oil conveying pipe (2) is connected with the oil inlet (9) of the drilling rig, and the other end of the oil conveying pipe (2) is connected with a rapid connector (1) capable of being connected with the roadheader hydraulic oil tank. Due to the utilization of the technical scheme, in the mine tunneling process, holes can be drilled at any time according to requirements, and a set of special hole drilling equipment does not need to be provided additionally. Furthermore, due to the fact that rapid assembly and disassembly of the hydraulic drilling rig and a roadheader are achieved, little interference exists between hole drilling of the hydraulic drilling rig and operation of the roadheader. Compared with a traditional scheme with a air drill used, the hydraulic drilling rig is more convenient and faster to use, low in installation cost, low in noise during operation, safe and environmentally friendly.

Description

A kind of fully-mechanized digging machine load hydraulic rig
Technical field
The present invention relates to a kind of mine drilling equipment, particularly relate to a kind of fully-mechanized digging machine load hydraulic rig being installed on fully-mechanized digging machine.
Background technology
Current most of colliery is mainly all to adopt fully-mechanized digging machine to tunnel, in tunneling process, often need to use rig to hole in advance and discharge gas or ventilation etc., and existing and rig fully-mechanized digging machine collaborative work are mainly pneumatic drilling machines, and pneumatic drilling machine is short of power conventionally, noise greatly, not environmental protection, and it is high to consume energy, under mine, result of use is undesirable.
Summary of the invention
The object of the present invention is to provide a kind of hydraulic drill rig that is carried dress by fully-mechanized digging machine, can in fully-mechanized digging machine tunneling process, complete as required boring work, this hydraulic drill rig efficiency is high simultaneously, noise is little, safety and environmental protection.
For realizing object of the present invention, the present invention has adopted such technical scheme:
The present invention has adopted a kind ofly can carry the hydraulic drill rig being contained on fully-mechanized digging machine, this hydraulic drill rig the comprise parts such as hydraulic motor, handle, drill bit, oil-in, oil-out the same as existing rig, wherein it is provided with a petroleum pipeline for being connected with fully-mechanized digging machine hydraulic oil container, petroleum pipeline one end is connected with the oil-in of rig, and the other end connects the snap joint that can be connected with fully-mechanized digging machine hydraulic oil container.The oil pipe picking out with fuel tank from fully-mechanized digging machine by snap joint is connected or dismantles fast, need not be so both that hydraulic drill rig is arranged oil circuit in addition, thereby again can be at any time hydraulic drill rig is removed and recovered fully-mechanized digging machine and normally work from fully-mechanized digging machine.
Therefore, snap joint must be convenient to Fast Installation and dismounting, and the present invention realizes like this: the link of snap joint is connected with the link of the petroleum pipeline of hydraulic drill rig by an adapter sleeve.Adapter sleeve is provided with internal thread, and the link of aforesaid petroleum pipeline and snap joint is provided with the external screw thread mating with the internal thread of adapter sleeve.When needs connect fully-mechanized digging machine by hydraulic drill rig, only the adapter sleeve in the link of the petroleum pipeline of hydraulic drill rig and snap joint need to be tightened like this, owing to being threaded connection, the two connection procedure is easy to and is quick.When needs make hydraulic drill rig separated with fully-mechanized digging machine, only need unclamp adapter sleeve.
Further, aforesaid hydraulic motor acts on drill bit by axis.Axis and drill bit junction are provided with drill bushing.
Owing to having adopted technical scheme of the present invention, in mine development end process, can hole as required at any time, and not need to be equipped with again a set of special rig.And owing to having realized Fast Installation and the dismounting of hydraulic drill rig and fully-mechanized digging machine, so hydraulic drill rig is holed and fully-mechanized digging machine work is disturbed very little.The present invention adopts hydraulic drill rig, and more more convenient than the scheme of traditional employing air drill, equipment installation cost is also low, and when work noise little, safety and environmental protection.
Accompanying drawing explanation
Fig. 1 is hydraulic drill rig structural representation of the present invention.
Description of reference numerals: 1-snap joint, 2-petroleum pipeline, 3-drill bushing, 4-hydraulic motor, 5-handle, 6-drill bit, 7-axis, 8-adapter sleeve, 9-oil-in, 10-oil-out.
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is described in further detail.
As shown in Figure 1, fully-mechanized digging machine load hydraulic rig of the present invention, it is provided with provides the hydraulic motor of hydraulic power 4, and hydraulic motor 4 acts on drill bit 6 by axis 7, and axis 7 is provided with drill bushing 3 with drill bit 6 junctions.This hydraulic drill rig is provided with shell certainly, and a side of shell is provided with the handle 5 for hand-held operation.It is also provided with oil-in 9, oil-out 10, and it is provided with a petroleum pipeline 2 for being connected with fully-mechanized digging machine hydraulic oil container, and petroleum pipeline 2 one end are connected with the oil-in 9 of rig, and the other end connects the snap joint 1 that can be connected with fully-mechanized digging machine hydraulic oil container.The link of snap joint 1 is connected with the link of petroleum pipeline 2 by an adapter sleeve 8.Adapter sleeve 8 is provided with internal thread, and the link of petroleum pipeline 2 and snap joint 1 is provided with the external screw thread mating with the internal thread of adapter sleeve 8.
The present invention implements like this: when fully-mechanized digging machine needs to hole in work plane tunneling process, suspend fully-mechanized digging machine work, hydraulic drill rig of the present invention is taken out, with the snap joint 1 on the petroleum pipeline 2 of hydraulic drill rig, be connected with the interface that the hydraulic oil container of fully-mechanized digging machine arranges, hydraulic oil enters hydraulic drill rig inside by petroleum pipeline 2 through oil-in 9, make hydraulic motor 4 obtain power, hydraulic motor 4 promotes drill bit 6 by axis 7 and holes, and by oil-out 10 oil extractions.
After boring, close hydraulic drill rig, unload snap joint 1, hydraulic drill rig folding and unfolding is good, and fully-mechanized digging machine continues driving forward.
Certainly, be more than concrete exemplary applications of the present invention, the present invention also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, within all dropping on protection domain of the presently claimed invention.

Claims (5)

1. a fully-mechanized digging machine load hydraulic rig, comprise hydraulic motor (4), handle (5), drill bit (6), oil-in (9), oil-out (10), it is characterized in that: it is provided with a petroleum pipeline (2) for being connected with fully-mechanized digging machine hydraulic oil container, petroleum pipeline (2) one end is connected with the oil-in (9) of rig, and the other end connects the snap joint (1) that can be connected with fully-mechanized digging machine hydraulic oil container.
2. fully-mechanized digging machine load hydraulic rig according to claim 1, is characterized in that: the link of described snap joint (1) is connected with the link of described petroleum pipeline (2) by an adapter sleeve (8).
3. fully-mechanized digging machine load hydraulic rig according to claim 2, is characterized in that: described adapter sleeve (8) is provided with internal thread, and the link of described petroleum pipeline (2) and snap joint (1) is provided with the external screw thread mating with the internal thread of adapter sleeve (8).
4. fully-mechanized digging machine load hydraulic rig according to claim 1, is characterized in that: described hydraulic motor (4) acts on drill bit (6) by axis (7).
5. fully-mechanized digging machine load hydraulic rig according to claim 4, is characterized in that: described axis (7) is provided with drill bushing (3) with drill bit (6) junction.
CN201310720761.XA 2013-12-24 2013-12-24 A kind of fully-mechanized digging machine load hydraulic rig Expired - Fee Related CN103711433B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310720761.XA CN103711433B (en) 2013-12-24 2013-12-24 A kind of fully-mechanized digging machine load hydraulic rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310720761.XA CN103711433B (en) 2013-12-24 2013-12-24 A kind of fully-mechanized digging machine load hydraulic rig

Publications (2)

Publication Number Publication Date
CN103711433A true CN103711433A (en) 2014-04-09
CN103711433B CN103711433B (en) 2016-05-18

Family

ID=50404739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310720761.XA Expired - Fee Related CN103711433B (en) 2013-12-24 2013-12-24 A kind of fully-mechanized digging machine load hydraulic rig

Country Status (1)

Country Link
CN (1) CN103711433B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351570A (en) * 2016-09-22 2017-01-25 安徽理工大学 Mine handheld hydraulic drilling rig based on multi-action inner curve radial hydraulic motor
CN106351571A (en) * 2016-09-22 2017-01-25 安徽理工大学 Handheld seven-star wheel hydraulic drilling rig for mines
CN106368702A (en) * 2016-09-22 2017-02-01 安徽理工大学 Mining handheld all-hydraulic drill based on internal curve motor
CN106563835A (en) * 2016-10-08 2017-04-19 郑州神利达钻采设备有限公司 Variable-diameter drill bit capable of controlling drilling depth

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3612762A1 (en) * 1986-04-16 1987-10-22 E & Pk Ingbuero Telescopic drilling implement
CN2700560Y (en) * 2004-05-21 2005-05-18 张立刚 Hand-held hydraulic drilling rig for mining
CN201152173Y (en) * 2008-01-24 2008-11-19 王彦武 Outburst-proof diggning anchor machine set
CN201209459Y (en) * 2008-06-20 2009-03-18 浦国树 Abnormal protrusion mine coal road digging anti- protrusion jumbo loader
CN201588530U (en) * 2010-01-29 2010-09-22 平顶山市冠宏工贸有限责任公司 Handheld emulsion drilling machine used in coal mines
CN201786256U (en) * 2010-09-19 2011-04-06 王彦武 Abnormal protrusion mine coal road digging anti-protrusion boring jumbo loading set
CN203626606U (en) * 2013-12-24 2014-06-04 贵州永润煤业有限公司 Hydraulic drilling rig additionally arranged on integrated excavator

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3612762A1 (en) * 1986-04-16 1987-10-22 E & Pk Ingbuero Telescopic drilling implement
CN2700560Y (en) * 2004-05-21 2005-05-18 张立刚 Hand-held hydraulic drilling rig for mining
CN201152173Y (en) * 2008-01-24 2008-11-19 王彦武 Outburst-proof diggning anchor machine set
CN201209459Y (en) * 2008-06-20 2009-03-18 浦国树 Abnormal protrusion mine coal road digging anti- protrusion jumbo loader
CN201588530U (en) * 2010-01-29 2010-09-22 平顶山市冠宏工贸有限责任公司 Handheld emulsion drilling machine used in coal mines
CN201786256U (en) * 2010-09-19 2011-04-06 王彦武 Abnormal protrusion mine coal road digging anti-protrusion boring jumbo loading set
CN203626606U (en) * 2013-12-24 2014-06-04 贵州永润煤业有限公司 Hydraulic drilling rig additionally arranged on integrated excavator

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351570A (en) * 2016-09-22 2017-01-25 安徽理工大学 Mine handheld hydraulic drilling rig based on multi-action inner curve radial hydraulic motor
CN106351571A (en) * 2016-09-22 2017-01-25 安徽理工大学 Handheld seven-star wheel hydraulic drilling rig for mines
CN106368702A (en) * 2016-09-22 2017-02-01 安徽理工大学 Mining handheld all-hydraulic drill based on internal curve motor
CN106351571B (en) * 2016-09-22 2018-06-08 安徽理工大学 A kind of mining hand-held seven-star wheel hydraulic drill rig
CN106368702B (en) * 2016-09-22 2018-06-08 安徽理工大学 A kind of mining hand-held all-hydraulic drill based on inner curve motor
CN106351570B (en) * 2016-09-22 2018-08-24 安徽理工大学 A kind of mining hand held hydraulic drill based on multiple-action inner curved radial motor
CN106563835A (en) * 2016-10-08 2017-04-19 郑州神利达钻采设备有限公司 Variable-diameter drill bit capable of controlling drilling depth

Also Published As

Publication number Publication date
CN103711433B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN103711433B (en) A kind of fully-mechanized digging machine load hydraulic rig
CN203905973U (en) Mining downhole recycling device for anchor rods
CN203626606U (en) Hydraulic drilling rig additionally arranged on integrated excavator
CN103470185A (en) Casing-running device and casing-running operation process
CN204457466U (en) Colliery geologic drilling rod
CN205577901U (en) A lifting device for riser pipe and related parts
CN203961987U (en) The full section cutterhead of mining rock gangway speedy drivage machine
CN202745720U (en) Geological drill pipe
CN206016705U (en) Driver extension bar union joint
CN202832589U (en) Anchor bolt recovery device
CN204984280U (en) Novel sealed drilling rod
CN201874456U (en) Mining water drill
CN204691699U (en) A kind of drilling rod Quick Connect Kit
CN104251122A (en) Non-excavation horizontal directional drilling electric drill rod
CN202391351U (en) Waterproof sleeve connecting device
CN102865045A (en) Rock drilling quick replacing drilling rod with taper thread
CN203202408U (en) Oil tube fixing device for minitype downhole coal mining machine
CN203655222U (en) Rapidly-connected underground grouting pipe for coal mine
CN102383799A (en) High pressure resistant internal-leakage-free cutting device of tunnel boring machine
CN205895576U (en) Formula relief valve and shear type relief valve exchange to use's connecting piece but slush pump resets
CN204024642U (en) Measurement while-drilling instrument power supply communication pipe nipple apparatus
CN203367727U (en) Cone punch
CN102704883A (en) Special fishing device for downhole motor rotor of kilometer-level drilling machine
CN201391238Y (en) Special device for breakouting pack of dynamite of drill pipe
CN105576560A (en) Traction end for power cable ground traction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20161224