CN103711126A - 一种用于打桩扶正结构 - Google Patents

一种用于打桩扶正结构 Download PDF

Info

Publication number
CN103711126A
CN103711126A CN201310701698.5A CN201310701698A CN103711126A CN 103711126 A CN103711126 A CN 103711126A CN 201310701698 A CN201310701698 A CN 201310701698A CN 103711126 A CN103711126 A CN 103711126A
Authority
CN
China
Prior art keywords
piling
pilot sleeve
isolated
righting structure
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310701698.5A
Other languages
English (en)
Inventor
吴根佑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310701698.5A priority Critical patent/CN103711126A/zh
Publication of CN103711126A publication Critical patent/CN103711126A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种用于打桩扶正结构,包括导向套筒以及用于连接所述导向套筒的支撑杆,所述导向套筒上横向设有两个连接臂,且两个连接臂之间夹角为60°~180°,所述连接臂与所述支撑杆可拆卸连接。与现有技术相比,本发明所提供的一种用于打桩扶正结构,通过多个所述导向套筒的组合,以及连接臂与支撑杆之间的可拆卸连接,可适用于海上多个孤立桩的打桩,且可预先设定多个孤立桩之间的间距。

Description

一种用于打桩扶正结构
技术领域
本发明涉及海上打桩辅助结构,尤其涉及的是一种用于打桩扶正结构。
背景技术
目前,公知的海上孤立桩打桩辅助结构包括打桩扶正器和打桩定位架,打桩扶正器是以液压动力驱动导向套筒的闭合和开启,因此回收时不会有卡桩现象。但是由于打桩扶正器只有一个导向套筒,因此只适用于单个孤立桩的海上打桩,对于多个海上孤立桩打桩,需要多次下放打桩扶正器进行打桩作业,每下放一次只能打入一个孤立桩,且多个孤立桩彼此之间的间距精度难以控制。
发明内容
鉴于上述现有技术的不足,本发明的目的在于提供一种用于打桩扶正结构,可用于多个孤立桩同时打桩,且可预先设置彼此孤立桩之间的间距,操作方便,精度可控。
本发明的技术方案如下:
一种用于打桩扶正结构,包括导向套筒以及用于连接所述导向套筒的支撑杆,所述导向套筒上横向设有两个连接臂,且两个连接臂之间夹角为60°~180°,所述连接臂与所述支撑杆可拆卸连接。
作为优选方案,所述连接臂的端部设有第一法兰盘。
作为优选方案,所述支撑杆的两端设有与所述连接臂对应的第二法兰盘。
作为优选方案,所述支撑杆上设有用于吊装的吊耳。
作为优选方案,所述导向套筒的内壁设有限位块,以及与所述限位块螺纹连接并横向穿过所述导向套筒的调节螺栓。
作为优选方案,所述调节螺栓设有两个。
本发明有益效果:
与现有技术相比,本发明所提供的一种用于打桩扶正结构,通过多个所述导向套筒的组合,以及连接臂与支撑杆之间的可拆卸连接,可适用于海上多个孤立桩的打桩,且可预先设定多个孤立桩之间的间距。
附图说明
图1是本发明一种用于打桩扶正结构较佳实施例的结构示意图。
图2是本发明一种用于打桩扶正结构较佳实施例图1中A的局部放大图。
图3是本发明一种用于打桩扶正结构较佳实施例俯视图。
图4是本发明一种用于打桩扶正结构较佳实施例中连接臂夹角为180°的导向套筒的结构示意图。
图5是本发明一种用于打桩扶正结构较佳实施例中连接臂夹角为120°的导向套筒的结构示意图。
图6是本发明一种用于打桩扶正结构较佳实施例中连接臂夹角为90°的导向套筒的结构示意图。
图7是本发明一种用于打桩扶正结构较佳实施例中连接臂夹角为60°的导向套筒的结构示意图。
具体实施方式
本发明提供一种用于打桩扶正结构,为使本发明的目的、技术方案及效果更加清楚、明确,以下参照附图并举实例对本发明进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
本发明所提供的一种用于打桩扶正结构较佳实施例,如图1所示,所述用于打桩扶正结构包括:导向套筒100和支撑杆200,导向套筒100横向设有两个连接臂300,且两个连接臂之间夹角为60°~180°,如图4、图5、图6、图7所示,夹角为60°、90°、120°以及180°为最优方案,本实施例中所采用的是夹角为90°的导向套筒。如图1所示,所述连接臂300的端部设有第一法兰盘310,并在支撑杆200的两端设置与第一法兰盘310对应的第二法兰盘210,通过第一法兰盘310和第二法兰盘210将连接臂300与支撑杆200连接在一起,这样就形成了可拆卸连接结构。
本发明为组合式结构,也就是说,根据实际孤立桩所确定的位置,通过选择不同夹角的连接臂的导向套筒与支撑杆可拆卸连接组成不同形状的打桩扶正结构,如图3所示,夹角为90°的导向套筒组合成的截面为正方形结构,如夹角为60°的导向套筒组合,则截面为正三角形结构,如夹角为120°,则截面为正六边形结构。再者,在预设多个孤立桩的间距,可根据选择不同的支撑杆以确定,这样一来,可实现精度可控。
进一步,如图1所示,为使所述用于打桩扶正结构吊装方便,在所支撑杆200上设置用于吊装的吊耳201。
进一步,如图1和图2所示,在孤立桩101穿入导向套筒100时,为保持其竖直放置的姿态,在导向套筒100的内壁设置限位块102,以及与所述限位块102螺纹连接并横向穿过所述导向套筒100的调节螺栓103,限位块102贴上孤立桩101,并通过转动调节螺栓103,实现限位块102对孤立桩101的夹紧,此处所采用的调节螺栓103为上下两个。
在实际使用时,首先根据图纸中所要安放的孤立桩其截面形状以及多个孤立桩之间的间距,从而来选择什么样的导向套筒和不同尺寸的支撑杆。在确定下来的导向套筒和支撑杆可拆卸连接组合在一起,再通过吊装的方式安置好位置,从各个导向套筒中插入孤立桩,再通过限位块和调节螺栓对孤立桩调整好姿态并夹紧。完成整个操作后,可开始打桩施工,在孤立桩进入预定深度后,反向转动调节螺栓,松开限位块对孤立桩的夹持,再通过吊装结构吊离所述打桩扶正结构,最后拆解为单个的导向套筒和支撑杆。
综上所述,本发明提供的一种用于打桩扶正结构,通过多个所述导向套筒的组合,以及连接臂与支撑杆之间的可拆卸连接,可适用于海上多个孤立桩的打桩,且可预先设定多个孤立桩之间的间距。
应当理解的是,本发明的应用不限于上述的举例,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,所有这些改进和变换都应属于本发明所附权利要求的保护范围。

Claims (3)

1.一种用于打桩扶正结构,包括导向套筒以及用于连接所述导向套筒的支撑杆,其特征在于,所述导向套筒上横向设有两个连接臂,且两个连接臂之间夹角为60°~180°,所述连接臂与所述支撑杆可拆卸连接; 
所述连接臂的端部设有第一法兰盘;
所述支撑杆的两端设有与所述连接臂对应的第二法兰盘; 
所述支撑杆上设有用于吊装的吊耳。
2.根据权利要求1所述的用于打桩扶正结构,其特征在于,所述导向套筒的内壁设有限位块,以及与所述限位块螺纹连接并横向穿过所述导向套筒的调节螺栓。
3.根据权利要求1所述的用于打桩扶正结构,其特征在于,所述调节螺栓设有两个。
CN201310701698.5A 2013-12-19 2013-12-19 一种用于打桩扶正结构 Pending CN103711126A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310701698.5A CN103711126A (zh) 2013-12-19 2013-12-19 一种用于打桩扶正结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310701698.5A CN103711126A (zh) 2013-12-19 2013-12-19 一种用于打桩扶正结构

Publications (1)

Publication Number Publication Date
CN103711126A true CN103711126A (zh) 2014-04-09

Family

ID=50404446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310701698.5A Pending CN103711126A (zh) 2013-12-19 2013-12-19 一种用于打桩扶正结构

Country Status (1)

Country Link
CN (1) CN103711126A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735248A (zh) * 2016-03-14 2016-07-06 中冶成都勘察研究总院有限公司 一种保证预制桩桩端进入持力层并提高承载力的施工方法
CN111622220A (zh) * 2020-06-05 2020-09-04 浙江广厦建设职业技术学院 一种土木施工用打桩装置
CN116591164A (zh) * 2023-07-14 2023-08-15 中冶路桥建设有限公司 一种路桥施工打桩装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005005735A1 (fr) * 2003-07-11 2005-01-20 Armand Lagace Appareil de plantage de pieux et de palpanches
CN201045190Y (zh) * 2007-01-17 2008-04-09 上海勘测设计研究院 水下打桩定位器
CN201660899U (zh) * 2009-12-25 2010-12-01 利丰海洋工程(天津)有限公司 一种组合式打桩扶正结构
CN102392450A (zh) * 2011-10-14 2012-03-28 江苏海上龙源风力发电有限公司 一种海上风电沉桩扶正导向架专用设备
CN202416320U (zh) * 2011-12-16 2012-09-05 山东中凯海洋工程有限公司 水下钢管桩基打桩扶正架

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005005735A1 (fr) * 2003-07-11 2005-01-20 Armand Lagace Appareil de plantage de pieux et de palpanches
CN201045190Y (zh) * 2007-01-17 2008-04-09 上海勘测设计研究院 水下打桩定位器
CN201660899U (zh) * 2009-12-25 2010-12-01 利丰海洋工程(天津)有限公司 一种组合式打桩扶正结构
CN102392450A (zh) * 2011-10-14 2012-03-28 江苏海上龙源风力发电有限公司 一种海上风电沉桩扶正导向架专用设备
CN202416320U (zh) * 2011-12-16 2012-09-05 山东中凯海洋工程有限公司 水下钢管桩基打桩扶正架

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735248A (zh) * 2016-03-14 2016-07-06 中冶成都勘察研究总院有限公司 一种保证预制桩桩端进入持力层并提高承载力的施工方法
CN111622220A (zh) * 2020-06-05 2020-09-04 浙江广厦建设职业技术学院 一种土木施工用打桩装置
CN111622220B (zh) * 2020-06-05 2021-06-29 浙江广厦建设职业技术学院 一种土木施工用打桩装置
CN116591164A (zh) * 2023-07-14 2023-08-15 中冶路桥建设有限公司 一种路桥施工打桩装置
CN116591164B (zh) * 2023-07-14 2023-09-19 中冶路桥建设有限公司 一种路桥施工打桩装置

Similar Documents

Publication Publication Date Title
CN202099804U (zh) 跨越基坑管线贝雷架悬挂托换系统
CN109811767B (zh) 吸力桶基础沉桩定位架
CN103711126A (zh) 一种用于打桩扶正结构
CN203929508U (zh) 植物根系拉力测试系统
CN104773654A (zh) 一种水泥电杆排杆装置
CN103174124B (zh) 一种立式沙障原地叠加布设方法
CN201649668U (zh) 格构柱提升架
CN210829196U (zh) 一种海底勘察用基盘
CN204080793U (zh) 钢筋笼吊装装置
CN203867273U (zh) 一种倾斜电杆扶正器
CN204510221U (zh) 旋转式水上打桩导架
CN204317265U (zh) 溪沟防鱼逃拦网
CN204529148U (zh) 水泥电杆排杆装置
CN210239088U (zh) 用于综合管廊施工的外壁悬挑架
CN204456114U (zh) 一种稳固结构
CN204023579U (zh) 一种逆作法柱插筋工具架
CN208870552U (zh) 一种定向钻海上作业卡持钻杆安全装置
CN203652713U (zh) 一种薄壁齿圈的翻身工装
CN203834448U (zh) 一种新型6腿平台导管架
CN206655239U (zh) 钢管混凝土支架基础结构
CN204326073U (zh) 地下抗浮锚杆结构
CN204793909U (zh) 插地电缆支架
CN205275084U (zh) 一种方便实用的檩条吊装装置
CN204456087U (zh) 基桩快速旋转对接结构
CN112177032B (zh) 风电机组吊装施工塔筒基础作业平台及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140409