CN103711071A - Elevated section structure used for straddle type single-track transportation - Google Patents

Elevated section structure used for straddle type single-track transportation Download PDF

Info

Publication number
CN103711071A
CN103711071A CN201310742654.7A CN201310742654A CN103711071A CN 103711071 A CN103711071 A CN 103711071A CN 201310742654 A CN201310742654 A CN 201310742654A CN 103711071 A CN103711071 A CN 103711071A
Authority
CN
China
Prior art keywords
pier stud
reserved
crossbeam
fitting
box built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310742654.7A
Other languages
Chinese (zh)
Other versions
CN103711071B (en
Inventor
陈文艳
王安宇
邢晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN201310742654.7A priority Critical patent/CN103711071B/en
Publication of CN103711071A publication Critical patent/CN103711071A/en
Application granted granted Critical
Publication of CN103711071B publication Critical patent/CN103711071B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the field of bridges, in particular to an elevated section structure used for straddle type single-track transportation. The elevated section structure is characterized in that piers are reinforced concrete piers, and the top of each pier is provided with a box type embedded part provided with a short prearranged column; transverse beams are prefabricated steel beams, installation holes are preformed in the installation positions, corresponding to the box type embedded parts, of lower wing boards at the two ends of each transverse beam respectively, preformed cavities are formed above the beam bodies of the transverse beams, and the installation holes are matched with the short prearranged columns in a sleeved mode and are connected in a matched mode so that the transverse beams can be fixedly connected with the piers. The elevated section structure has the advantages that construction quality of the steel transverse beams is guaranteed, the construction period is shortened, influence on ground transportation is reduced, and potential safety hazards caused by full-of-frame construction on a road are eliminated; the problem of anchoring installation of a single-track transportation pull support is solved, installation accuracy is high, and the supporting effect is good.

Description

The overhead segment structure of cross-saddle single-track traffic
Technical field
The present invention relates to bridge field, be specifically related to the overhead segment structure of cross-saddle single-track traffic.
Background technology
Cross-saddle single-track traffic elevated line trackside in road is changed mutually, distance between centers of tracks is larger and multi-thread place need arrange a type pier structure.Common practices is to adopt prestressed reinforced concrete construction door type pier crossbeam, Full space support construction, while adopting steel work, the pulling force bearing of supporting monorail transit is directly welded on steel member, but above-mentioned way shortcoming is obvious: first, because needs are set up full framing in road, road traffic impact is large and have a potential safety hazard over the ground; Secondly, because pulling force bearing is a complex system, higher to installation accuracy requirement, directly adopt welding manner to be difficult to meet required precision, cannot meet required precision and easily monorail transit circuit be caused to potential safety hazard.
Summary of the invention
The object of the invention is according to above-mentioned the deficiencies in the prior art, provide cross-saddle single-track traffic overhead segment structure, pre-manufactured steel transverse beam lifting is built and is integral again after performance of concrete column confined, not only shortened the construction period, reduced the impact of traffic above-ground and eliminated the potential safety hazard that in road, Full space support construction brings; Meanwhile, by pulling force bearing anchor case and the reserved chamber of pre-manufactured steel crossbeam, build and be integral, its installation accuracy and bearing strength are protected.
The object of the invention realizes and being completed by following technical scheme:
The overhead segment structure of a kind of cross-saddle single-track traffic, comprise crossbeam and pier stud, described crossbeam, by the pier stud fixed bearing that is positioned at its both sides, is characterized in that: described pier stud is Reinforced Concrete Pier Column, described pier stud capital is provided with box built-in fitting, on described box built-in fitting, has reserved short column; Described crossbeam is steel case beam, its two ends lower wing plate is reserved with respectively installing hole with the corresponding installed position of described reserved short column, the beam body top of described crossbeam is provided with reserved chamber, and wherein said installing hole is set with to coordinate and form to be connected with described reserved short column described crossbeam is fixedly connected with described pier stud.
In described reserved chamber, be provided with for supporting the pulling force bearing anchor case of single track.
Described box built-in fitting is constituted by some coaming plates, and the reserved main muscle of described coaming plate and described pier stud is welded and fixed, and described box built-in fitting inside is concrete casting building body, and described box built-in fitting and described installing hole bolt are connected and fixed.
Between the concrete casting building body of described box built-in fitting inside and described pier stud, be integrally formed structure.
Between the bearing anchor case of described reserved chamber and fixing described pulling force bearing, by concreting, be integrally formed structure.
Advantage of the present invention is: when guaranteeing gooseneck construction quality, shortened the construction period, reduced the impact of traffic above-ground and eliminated the potential safety hazard that in road, Full space support construction brings; The anchoring installation question that has solved monorail transit rail beam pulling force bearing, installation accuracy is high, and support effects is good.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the johning knot composition of pier stud and crossbeam in the present invention;
Fig. 3 is the johning knot composition of middle cross beam of the present invention and pulling force bearing;
Fig. 4 is the elevation of middle cross beam of the present invention;
Fig. 5 is the upward view of Fig. 4;
Fig. 6 is the sectional view of Fig. 4;
Fig. 7 is the elevation of pier stud in the present invention;
Fig. 8 is pier stud capital top view in the present invention;
Fig. 9 is the transverse sectional view of Fig. 8;
Figure 10 is the longitudinal sectional view of Fig. 8.
The specific embodiment
Below in conjunction with accompanying drawing, by embodiment, feature of the present invention and other correlated characteristic are described in further detail, so that technician's of the same trade understanding:
As Figure 1-10 shows, number in the figure 1-20 is respectively: after pier stud 1, crossbeam 2, pulling force bearing 3, reserved short column 4, crossbeam after pouring concrete 5, pier stud in pouring concrete 6, vertical coaming plate 7, bolt 8, dowel 9, cavity after pouring concrete 10, reserved chamber 11, installing hole 12, the main muscle 13 of bridge pier, bolt hole 14, level board 15, base plate 16, junction plate 17, lower wing plate 18, box built-in fitting 19, bearing anchor case 20.
Embodiment: as shown in Figure 1, cross-saddle single-track traffic in the present embodiment forms with the door type structure that overhead segment structure consists of pier stud 1, crossbeam 2, its middle cross beam 2 is by pier stud 1 fixed bearing that is positioned at its two ends, two pulling force bearings 3 of crossbeam 2 top fixed installations, each pulling force bearing 3 supports respectively a monorail track beam.
As shown in Fig. 9,10, pier stud 1 is a performance of concrete column confined, and its capital is provided with a box built-in fitting 19 straight up, on box built-in fitting 19, there is a reserved short column 4, reserved short column 4 is as the coupling part with crossbeam 2, and its periphery is also provided with junction plate 17, has bolt hole 14 on junction plate 17, as Figure 4-Figure 6, crossbeam 2 is pre-manufactured steel crossbeam, and its both sides lower wing plate 18 is reserved and had installing hole 12 respectively with the corresponding installed position of reserved short column 4, and the lower wing plate 18 of installing hole 12 both sides has the bolt hole matching with bolt hole 14 positions, as shown in Figure 2, the installing hole 12 respectively reserved short column corresponding with both sides 4 suits coordinates, make to form and be fixedly connected with between crossbeam 2 and pier stud 1, lower wing plate 18 on crossbeam 2 and the horizontal coaming plate 15 on pier stud 1 are formed and are fastenedly connected and make to be integrally formed structure between crossbeam 2 and pier stud 1 by pouring concrete 5 after building crossbeam by bolt 8, when guaranteeing the supporting force of 1 pair of crossbeam 2 of pier stud, realize prefabrication, the mode of on-site hoisting is carried out building of overhead segment structure, not only shortened the construction period, also reduced the impact of traffic above-ground and eliminated the potential safety hazard that in road, Full space support construction brings.
As shown in Figure 4,5, prefabricated crossbeam 2 tops offer two reserved chambeies 11, and reserved chamber 11 is respectively as the installation position of supporting the pulling force bearing 3 of two monorail transit circuits.As shown in Figure 3, the dowel 9 that is embedded with some horizontal arrangement in reserved chamber 11 makes reserved chamber 11 form bearing anchor case 20, pouring concrete 10 after building again in cavity after pulling force bearing 3 is positioned in bearing anchor case 20, pulling force bearing 3 and bearing anchor case 20 are integrally formed, when guaranteeing that pulling force bearing 3 installation accuracies require, also strengthened the support effects of 2 pairs of pulling force bearings 3 of crossbeam.
As shown in Fig. 7-10, the periphery of the reserved short column 4 of the capital of pier stud 1 is provided with a box built-in fitting 19, and this box built-in fitting 19 plays the reserved short column 4 of positioning support, and the effect that itself and pier stud 1 are integrally formed.This box built-in fitting 19 consists of vertical coaming plate 7, level board 15 and base plate 16, wherein vertical coaming plate 7 around the capital circumferential direction setting of pier stud 1 and respectively with pier stud 1 on the reserved main muscle 13 of bridge pier fix, the casting area of vertical coaming plate 7 pouring concrete 6 after the capital of pier stud 1 forms pier stud; Base plate 16 is fixed on the middle part, region consisting of vertical coaming plate 7, and its plate body surrounding is welded and fixed with vertical coaming plate 7 respectively, and its upper surface is fixedly connected with the reserved short column 4 of supporting; The semiclosed region upper shed that level board 15 encapsulation consists of vertical coaming plate 7, because the height of reserved short column 4 is greater than the height of vertical coaming plate 7, so the coverage of level board 15 plate bodys is the cylinders to reserved short column 4 by the upper limb of vertical coaming plate 7.Casting area in the coaming plate structure being formed by vertical coaming plate 7, level board 15 and base plate 16 by pier stud after pouring concrete 6 fill, realize fixing between reserved pier stud 4 and pier stud 1.
The present embodiment is in the specific implementation: pre-buried pier stud 4 vertical coaming plate 7 around first welds with the main muscle 13 of pier stud, then welds all the other coaming plates again, and calibration after-pouring concrete completes pre-buried pier stud 4 installations.
The crossbeam 2 that lifting is made in factory process in advance, is directly sleeved on gooseneck 2 two ends lower wing plate installing holes 12 on the reserved short column 4 at pier stud 1 top while setting up, and tightens the bolt 8 of beam-ends and locates temporarily.
During installation, fixing dead between crossbeam 2 and pier stud 1, after rail beam and other the second stage of dead load have been constructed, be converted to and be rigidly connected again, this kind of mode reduced pier stud bending square, improves structure stress.
The interior dowel 9 that welded in reserved chamber 11 on crossbeam 2, lifting pulling force bearing 3, builds rear pouring concrete 10 in cavity again after calibration.

Claims (5)

1. the overhead segment structure of cross-saddle single-track traffic, comprise crossbeam and pier stud, described crossbeam, by the pier stud fixed bearing that is positioned at its both sides, is characterized in that: described pier stud is Reinforced Concrete Pier Column, described pier stud capital is provided with box built-in fitting, on described box built-in fitting, has reserved short column; Described crossbeam is prefabricated girder steel, its two ends lower wing plate is reserved with respectively installing hole with the corresponding installed position of described reserved short column, the beam body top of described crossbeam is provided with reserved chamber, and wherein said installing hole is set with to coordinate and form to be connected with described reserved short column described crossbeam is fixedly connected with described pier stud.
2. the overhead segment structure of a kind of cross-saddle single-track traffic according to claim 1, is characterized in that: in described reserved chamber, be provided with for supporting the pulling force bearing of monorail track beam.
3. the overhead segment structure of a kind of cross-saddle single-track traffic according to claim 1, it is characterized in that: described box built-in fitting is constituted by some coaming plates, the reserved main muscle of described coaming plate and described pier stud is welded and fixed, described box built-in fitting inside is concrete casting building body, and described box built-in fitting and described installing hole bolt are connected and fixed.
4. the overhead segment structure of a kind of cross-saddle single-track traffic according to claim 3, is characterized in that: between the concrete casting building body of some described box built-in fittings inside and described pier stud, be integrally formed structure.
5. the overhead segment structure of a kind of cross-saddle single-track traffic according to claim 1, is characterized in that: between described reserved chamber and the bearing anchor case of fixing described pulling force bearing, by concreting, be integrally formed structure.
CN201310742654.7A 2013-12-30 2013-12-30 The overhead segment structure of cross-saddle single-track traffic Active CN103711071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310742654.7A CN103711071B (en) 2013-12-30 2013-12-30 The overhead segment structure of cross-saddle single-track traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310742654.7A CN103711071B (en) 2013-12-30 2013-12-30 The overhead segment structure of cross-saddle single-track traffic

Publications (2)

Publication Number Publication Date
CN103711071A true CN103711071A (en) 2014-04-09
CN103711071B CN103711071B (en) 2015-12-09

Family

ID=50404391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310742654.7A Active CN103711071B (en) 2013-12-30 2013-12-30 The overhead segment structure of cross-saddle single-track traffic

Country Status (1)

Country Link
CN (1) CN103711071B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104233947A (en) * 2014-09-22 2014-12-24 中铁工程设计咨询集团有限公司 Steel-concrete combined rail beam for straddle monorail
CN106049260A (en) * 2016-07-18 2016-10-26 北京交通大学 Straddling type monorail traffic prefabricated pier bottom positioning and pier height adjusting method
CN108277704A (en) * 2018-01-05 2018-07-13 中铁工程设计咨询集团有限公司 A kind of straddle-type monorail composite bridge track and its construction method
CN111719414A (en) * 2020-07-07 2020-09-29 郑琼华 Internal welding and external pouring type bridge pier and beam connection structure and beam and bridge pier butt joint method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2423313Y (en) * 2000-02-11 2001-03-14 宝鸡桥梁工厂 Straddle type track traffic PC track beam support
CN2426489Y (en) * 2000-06-07 2001-04-11 国营重庆重型铸锻厂 Single-track traffic PC rail beam cast steel supporter
CN201144398Y (en) * 2007-12-27 2008-11-05 中铁二院工程集团有限责任公司 Straddling type track traffic elevated 'bridge-build' structure
JP2010236260A (en) * 2009-03-31 2010-10-21 Taisei Corp Track girder for saddle-type monorail, box girder, and construction method for box girder
CN202705921U (en) * 2012-08-24 2013-01-30 中国建筑土木建设有限公司路桥分公司 Assembly type cast-in-place beam passing door opening support
CN203782540U (en) * 2013-12-30 2014-08-20 上海市隧道工程轨道交通设计研究院 Elevated section structure for straddle type monorail transit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2423313Y (en) * 2000-02-11 2001-03-14 宝鸡桥梁工厂 Straddle type track traffic PC track beam support
CN2426489Y (en) * 2000-06-07 2001-04-11 国营重庆重型铸锻厂 Single-track traffic PC rail beam cast steel supporter
CN201144398Y (en) * 2007-12-27 2008-11-05 中铁二院工程集团有限责任公司 Straddling type track traffic elevated 'bridge-build' structure
JP2010236260A (en) * 2009-03-31 2010-10-21 Taisei Corp Track girder for saddle-type monorail, box girder, and construction method for box girder
CN202705921U (en) * 2012-08-24 2013-01-30 中国建筑土木建设有限公司路桥分公司 Assembly type cast-in-place beam passing door opening support
CN203782540U (en) * 2013-12-30 2014-08-20 上海市隧道工程轨道交通设计研究院 Elevated section structure for straddle type monorail transit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈扬义 游励辉: "《土木工程与高新技术——中国土木工程学会第十届年会论文集》", 31 December 2002, article "跨座式单轨交通系统轨道梁桥设计", pages: 187-192 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104233947A (en) * 2014-09-22 2014-12-24 中铁工程设计咨询集团有限公司 Steel-concrete combined rail beam for straddle monorail
CN106049260A (en) * 2016-07-18 2016-10-26 北京交通大学 Straddling type monorail traffic prefabricated pier bottom positioning and pier height adjusting method
CN108277704A (en) * 2018-01-05 2018-07-13 中铁工程设计咨询集团有限公司 A kind of straddle-type monorail composite bridge track and its construction method
CN108277704B (en) * 2018-01-05 2023-08-08 中铁工程设计咨询集团有限公司 Straddle type monorail combined bridge rail bearing platform and construction method thereof
CN111719414A (en) * 2020-07-07 2020-09-29 郑琼华 Internal welding and external pouring type bridge pier and beam connection structure and beam and bridge pier butt joint method

Also Published As

Publication number Publication date
CN103711071B (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN103711082B (en) The cross-saddle single-track traffic construction method of overhead section
CN104264575B (en) A kind of prestress steel case Concrete Combination Continuous Beam bridge structure and construction technology
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN103485279A (en) Wet joint for straddle type monorail traffic
CN103741792A (en) Whole assembly frame system and construction method thereof
CN100395410C (en) Grooved steel-concrete combination beam
CN103711071A (en) Elevated section structure used for straddle type single-track transportation
CN103498570A (en) Floor-adding transformation structure inside old factory building and construction method thereof
CN105714681B (en) Implementation method of suspension type monorail traffic rigid frame system
CN104818772A (en) Large-span long-cantilever connection structure and construction technique
CN103498569A (en) Steel frame concrete structure for floor-adding transformation inside old factory building and construction method thereof
CN105803924B (en) Mixed passenger and freight railway Simple T-Girders pavement combining structure and combined method
CN103243649A (en) System and method for quickly installing and positioning cable saddle
CN201013008Y (en) Corbel of cable-stayed bridge rope tower anchorage zone
CN203782540U (en) Elevated section structure for straddle type monorail transit
CN102605717A (en) Pier-top longitudinal support scaffolding method
KR101335382B1 (en) Constrution method of Prestressed Composite Truss girder with internal hinge structure
CN109930469B (en) Steel box girder thin-wall pier rigid frame cable-stayed bridge suitable for straddle type monorail
CN107780337A (en) Cast-in-place balance swivel gate pier and its construction method
CN112342915A (en) Construction method for gantry hoisting beam of overhead track
CN203668828U (en) Bridge tower combination anchoring system applied to space cable cable-stayed bridge
CN110258633A (en) A kind of Underground Station section of track well with prestressed concrete beam
WO2022083380A1 (en) Overhead cover structure system applicable in operational railway line and implementation method for system
JP6130678B2 (en) Reinforcement method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant