CN103699971A - ECN (engineering change notice) process control system - Google Patents

ECN (engineering change notice) process control system Download PDF

Info

Publication number
CN103699971A
CN103699971A CN201310729349.4A CN201310729349A CN103699971A CN 103699971 A CN103699971 A CN 103699971A CN 201310729349 A CN201310729349 A CN 201310729349A CN 103699971 A CN103699971 A CN 103699971A
Authority
CN
China
Prior art keywords
ecn
module
control system
content
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310729349.4A
Other languages
Chinese (zh)
Inventor
李明锁
徐春明
严文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TDG TECHNOLOGY ZHEJIANG Co Ltd
Original Assignee
TDG TECHNOLOGY ZHEJIANG Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TDG TECHNOLOGY ZHEJIANG Co Ltd filed Critical TDG TECHNOLOGY ZHEJIANG Co Ltd
Priority to CN201310729349.4A priority Critical patent/CN103699971A/en
Publication of CN103699971A publication Critical patent/CN103699971A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an ECN (engineering change notice) process control system. The ECN process control system comprises an SMT production line control system, an ECN compilation module, an ECN approval module, an ECN configuration module, an ECN issuing module, an ECN response module and an ECN closing module. An ECN file is compiled through the ECN compilation module, the ECN file is approved by the ECN approval module, then the ECN content is configured through the ECN configuration module, finally the ECN content is issued to the SMT production line control system through the ECN issuing module, the ECN content is executed through the SMT production line control system so as to give an alarm and interrupt a production flow, after the ECN is confirmed on the site to be executed, a confirmation signal is generated by the ECN response module, a closing signal is generated through the ECN closing module, so that the configured ECN content is relieved by the SMT production line control system under the control of the closing signal, the ECN is prevented from being forgotten in the production process, and the execution control level of the enterprise ECN can be enhanced.

Description

ECN Process Control System
Technical field
The present invention relates to control system, relate in particular to the ECN Process Control System for SMT.
Background technology
Prior art is for the ECN(EngineeringChangeNotice of SMT, the Chinese meaning is change order) process control takes paper files form, and such paper files generally includes customer ID, client codes, finished product odd numbers, change project, change reason, material situation etc.When needs carry out ECN control, operating personnel examine the ECN file of paper shelves to relevant specified right personnel, after having examined, to examine document gives operating personnel and carries out ECN, in real process, there will be and because of operating personnel carelessness, forget and carry out the situation of ECN and make the management and control level of ECN low.
Summary of the invention
The problem that the present invention solves is that the ECN control in existing SMT exists the situation of forgetting execution ECN and the low problem of management and control level that makes ECN.
For addressing the above problem, the invention provides a kind of ECN Process Control System, this ECN Process Control System comprises that SMT product line traffic control system, ECN compiling module, ECN examine module, ECN configuration module, ECN release module, ECN respond module and ECN closing module, wherein, described ECN compiling module completes the establishment of ECN content and generates the ECN file of electronics shelves form, and receives and send instruction and send this ECN file and to described ECN, examine the elementary audit link of module; Described ECN examines module and starts to the circulation of next link and receive and examine qualified or defective instruction in this link from elementary audit link, is back to step by step and respectively examines link receiving while examining defective instruction; After qualified instruction is examined in reception, circulation to next link is examined until qualified in the audit of superlative degree audit link; Described ECN configuration module reception ECN examines the highest audit of module link and examines after qualified instruction, configuration ECN content; Described ECN release module is confirmed the ECN content configuring in ECN configuration module, when the ECN content configuring is correct, issues deploy content to the product line traffic control system of SMT; Sequence of threads is produced in described product line traffic control system execution, produces alerting signal middle stopping pregnancy linear flow journey when carrying out to described deploy content; Described ECN respond module produces confirmation signal after producing line traffic control system execution ECN; Described ECN closing module produces shutdown signal after the confirmation signal of receiving ECN respond module, and described product line traffic control system receives this shutdown signal and closes corresponding ECN content.
In further scheme, this system also comprises logging modle, and this logging modle records described ECN and carries out flow process.
Compared with prior art, the present invention has the following advantages:
The present invention is by ECN compiling module establishment ECN file, at ECN, examine after module is examined and configure ECN content by ECN configuration module, then, by ECN release module, this ECN content is distributed to SMT and produces line traffic control system, by SMT, producing line traffic control system carries out ECN content and produces warning and breaks in production flow process, and by ECN respond module, produce confirmation signal and make SMT produce the ECN content that line traffic control system is removed configuration under the control of shutdown signal by ECN closing module generation shutdown signal after confirming at the scene to carry out ECN, by such mode, ECN in production run can not passed into silence, even if being ECN before producing prepares, by the present invention, also can again remind, so, the present invention does not exist and forgets and carry out the situation of ECN and the execution management and control level of enterprise ECN.
Accompanying drawing explanation
Fig. 1 is the theory diagram of ECN Process Control System of the present invention.
Embodiment
By describing technology contents of the present invention, structural attitude in detail, being reached object and effect, below in conjunction with embodiment and coordinate accompanying drawing to be described in detail.
Refer to Fig. 1, ECN Process Control System of the present invention comprises that SMT product line traffic control system 1, ECN compiling module 2, ECN examine module 3, ECN configuration module 4, ECN release module 5, ECN respond module 6 and ECN closing module 7.Described ECN compiling module 2 completes the establishment of ECN content and generates the ECN file of electronics shelves form, and receive to send instruction and send this ECN file and to described ECN, examine the elementary audit link of module, the described ECN file being compiled into is the electronics shelves of paper shelves ECN file, and both contents are identical.Described ECN examines module 3 and starts to the circulation of next link and receive and examine qualified or defective instruction in this link from elementary audit link, is back to step by step and respectively examines link receiving while examining defective instruction; After qualified instruction is examined in reception, circulation to next link is examined until qualified in the audit of superlative degree audit link, Practical Project change relates to a plurality of departments (being also referred to as link), all departments could change ECN after all signing and confirming, so, in the present invention, adopt the mode of circulation step by step to make all departments can write the suggestion of agreeing to change or disagree with change, agree to click after changing just to send form and examine qualified instruction, disagree with to click after changing to send to form and examine defective instruction.ECN configuration module 4 reception ECN examine the highest audit of module link and examine after qualified instruction, configuration ECN content, here, highest audit link is last department in examining department, like this, and the in the situation that of all agreement in all departments, configuration ECN content, how to configure ECN content and belong to prior art, do not repeat them here, the ECN content of configuration at least comprises product signal and operation point.After described ECN configuration module configures, transferring quality department to confirms, namely in 5 pairs of ECN configuration modules 4 of described ECN release module, the ECN content of configuration is confirmed, when the ECN content configuring is correct, issue deploy content is to the product line traffic control system 1 of SMT.Sequence of threads is produced in described product line traffic control system 1 execution, produces alerting signal middle stopping pregnancy linear flow journey when carrying out to described deploy content, and when interrupting, operating personnel go to production scene to be confirmed whether to produce the ECN content that line has been carried out configuration.If carried out,, operating personnel click ECN respond module 6 and make described ECN respond module 6 produce confirmation signal after producing line traffic control system execution ECN content, if do not carried out,, transposing material etc. completes ECN content, after executing, produce confirmation signal.Described ECN closing module 7 produces shutdown signal after the confirmation signal of receiving ECN respond module 6, described product line traffic control system 1 receives this shutdown signal and closes corresponding ECN content, that is to say, only after executing ECN content, described product line traffic control system 1 could continue to carry out production procedure, otherwise, in interruption status.
For the handling suggestion of ECN content and each link can be reviewed, the present invention also comprises logging modle, and this logging modle records described ECN and carries out ECN content in flow process and the handling suggestion of each link.
In sum, the present invention is by ECN compiling module 2 establishment ECN files, at ECN, examine after module 3 is examined and configure ECN contents by ECN configuration module 4, then, by ECN release module 5, this ECN content is distributed to SMT and produces line traffic control system 1, by SMT, producing line traffic control system 1 carries out ECN content and produces warning and breaks in production flow process, and by ECN respond module 6, produce confirmation signal and make SMT produce the ECN content that line traffic control system 1 is removed configuration under the control of shutdown signal by ECN closing module 6 generation shutdown signals after confirming at the scene to carry out ECN, by such mode, ECN in production run can not passed into silence, even if being ECN before producing prepares, by the present invention, also can again remind, so, the present invention does not exist and forgets and carry out the situation of ECN and the execution management and control level of enterprise ECN.In addition, the mode that adopts ECN compiling module 2, ECN to examine module 3 substitutes the countersign of paper shelves form of the prior art and has trackability and keeping quality.

Claims (2)

1.ECN Process Control System, comprises that SMT produces line traffic control system, it is characterized in that: this control system also comprises that ECN compiling module, ECN examine module, ECN configuration module, ECN release module, ECN respond module and ECN closing module, wherein,
Described ECN compiling module completes the establishment of ECN content and generates the ECN file of electronics shelves form, and receives and send instruction and send this ECN file and to described ECN, examine the elementary audit link of module;
Described ECN examines module and starts to the circulation of next link and receive and examine qualified or defective instruction in this link from elementary audit link, is back to step by step and respectively examines link receiving while examining defective instruction; After qualified instruction is examined in reception, circulation to next link is examined until qualified in the audit of superlative degree audit link;
Described ECN configuration module reception ECN examines the highest audit of module link and examines after qualified instruction, configuration ECN content;
Described ECN release module is confirmed the ECN content configuring in ECN configuration module, when the ECN content configuring is correct, issues deploy content to the product line traffic control system of SMT;
Sequence of threads is produced in described product line traffic control system execution, produces alerting signal middle stopping pregnancy linear flow journey when carrying out to described deploy content;
Described ECN respond module produces confirmation signal after producing line traffic control system execution ECN;
Described ECN closing module produces shutdown signal after the confirmation signal of receiving ECN respond module, and described product line traffic control system receives this shutdown signal and closes corresponding ECN content.
2. ECN Process Control System as claimed in claim 1, is characterized in that: this system also comprises logging modle, and this logging modle records described ECN and carries out flow process.
CN201310729349.4A 2013-12-25 2013-12-25 ECN (engineering change notice) process control system Pending CN103699971A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310729349.4A CN103699971A (en) 2013-12-25 2013-12-25 ECN (engineering change notice) process control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310729349.4A CN103699971A (en) 2013-12-25 2013-12-25 ECN (engineering change notice) process control system

Publications (1)

Publication Number Publication Date
CN103699971A true CN103699971A (en) 2014-04-02

Family

ID=50361493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310729349.4A Pending CN103699971A (en) 2013-12-25 2013-12-25 ECN (engineering change notice) process control system

Country Status (1)

Country Link
CN (1) CN103699971A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107491941A (en) * 2017-08-28 2017-12-19 北京福田戴姆勒汽车有限公司 Engineering change management information processing method and system
CN107590644A (en) * 2017-08-28 2018-01-16 北京福田戴姆勒汽车有限公司 Management information system and method are implemented in change in the work

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1501298A (en) * 2002-11-15 2004-06-02 英业达股份有限公司 Trial run handling system and method for engineering alteration
US20090048881A1 (en) * 2007-08-17 2009-02-19 Microsoft Corporation Visualizers for Change Management System
CN102034142A (en) * 2010-10-26 2011-04-27 东莞市思特电子技术有限公司 SMT (surface mount technology) intelligent management system
CN102880137A (en) * 2012-09-24 2013-01-16 南通明兴科技开发有限公司 Control method and device for production line processes

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1501298A (en) * 2002-11-15 2004-06-02 英业达股份有限公司 Trial run handling system and method for engineering alteration
US20090048881A1 (en) * 2007-08-17 2009-02-19 Microsoft Corporation Visualizers for Change Management System
CN102034142A (en) * 2010-10-26 2011-04-27 东莞市思特电子技术有限公司 SMT (surface mount technology) intelligent management system
CN102880137A (en) * 2012-09-24 2013-01-16 南通明兴科技开发有限公司 Control method and device for production line processes

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘正林: "高科技电子企业的工程变更管理", 《中国高新技术企业》 *
李之勇: "电子产品工程变更管理", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107491941A (en) * 2017-08-28 2017-12-19 北京福田戴姆勒汽车有限公司 Engineering change management information processing method and system
CN107590644A (en) * 2017-08-28 2018-01-16 北京福田戴姆勒汽车有限公司 Management information system and method are implemented in change in the work

Similar Documents

Publication Publication Date Title
CN108540483A (en) A kind of apparatus monitoring method and device based on block chain
EP2239640A2 (en) A method and system for using membrane calculus to model dynamic coordination logics for automation systems
CN104331294A (en) Visual program generation method and device
TW202305681A (en) Domain module computation unit, system containing a model of an enterprise, single board computational unit, grid of computational units, method to provide propagation traceability, and non-transitory computer program product
CN102902767A (en) Method and system for rapidly creating forms
CN105786505A (en) Json based complex web page component self-defining method and device
CN104049976A (en) System for automatically generating interlocking software based on Boolean logic
CN106649239A (en) Method and device for generating report in cloud monitoring system based on visualization
CN109611815B (en) Energy consumption alarm management method and device for gas steam boiler
CN110244936A (en) Method and apparatus for supporting VISIO flow chart to be automatically imported DCS algorithm configuration software
CN106327100A (en) Change list generation method and device
CN103699971A (en) ECN (engineering change notice) process control system
CN107025214B (en) Data processing method and device
CN105488268A (en) PDM platform based three-dimensional data reuse system
CN107347086B (en) Self-checking system based on spare part identification
CN111258840B (en) Cluster node management method and device and cluster
CN103197961B (en) A kind of Internet of Things flow chart of data processing automatic generation method based on RFID
JP5725974B2 (en) Power distribution monitoring control system
KR20110012342A (en) Method of designing programmable logic controller ladder logic and generating ladder code
CN205049934U (en) Realize online device of modifing of monitored control system service logic
CN103218291B (en) The detection method that in multiple task operating system, mutex amount is abnormal and device
US9766871B2 (en) Method and apparatus for operating a processing and/or production installation
CN105809495A (en) Billing system dependent on background non-independent interface and method for billing system
CN102750822B (en) Intelligent traffic service processing system and service processing method
CN102204099A (en) Resetting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140402