CN103676997B - 一种基于实时监测数据的大体积混凝土温度监控方法 - Google Patents
一种基于实时监测数据的大体积混凝土温度监控方法 Download PDFInfo
- Publication number
- CN103676997B CN103676997B CN201310484856.6A CN201310484856A CN103676997B CN 103676997 B CN103676997 B CN 103676997B CN 201310484856 A CN201310484856 A CN 201310484856A CN 103676997 B CN103676997 B CN 103676997B
- Authority
- CN
- China
- Prior art keywords
- temperature
- concrete
- unit
- real
- coefficient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310484856.6A CN103676997B (zh) | 2013-10-16 | 2013-10-16 | 一种基于实时监测数据的大体积混凝土温度监控方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310484856.6A CN103676997B (zh) | 2013-10-16 | 2013-10-16 | 一种基于实时监测数据的大体积混凝土温度监控方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103676997A CN103676997A (zh) | 2014-03-26 |
CN103676997B true CN103676997B (zh) | 2016-09-21 |
Family
ID=50314873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310484856.6A Expired - Fee Related CN103676997B (zh) | 2013-10-16 | 2013-10-16 | 一种基于实时监测数据的大体积混凝土温度监控方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103676997B (zh) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104133052B (zh) * | 2014-07-30 | 2016-01-13 | 中国水利水电科学研究院 | 一种大体积混凝土温控效果全过程评价方法 |
CN105155542B (zh) * | 2015-09-30 | 2017-03-29 | 武汉大学 | 一种用于圆形断面结构衬砌混凝土温控防裂设计计算方法 |
CN105260531B (zh) * | 2015-09-30 | 2019-03-19 | 武汉大学 | 一种圆形断面衬砌混凝土施工期内部最高温度的计算方法 |
CN105672187B (zh) * | 2015-10-28 | 2017-11-28 | 武汉大学 | 一种用于门洞形断面结构衬砌混凝土温控防裂设计计算方法 |
CN105544578B (zh) * | 2015-12-18 | 2017-11-17 | 中冶建筑研究总院有限公司 | 一种确定大体积混凝土结构施工养护方法的方法 |
CN105842278B (zh) * | 2016-05-12 | 2018-05-18 | 中国水利水电科学研究院 | 一种室内测量混凝土表面放热系数的方法 |
CN106020031B (zh) * | 2016-06-22 | 2018-08-31 | 中国水利水电第七工程局有限公司 | 拆分式迷你多功能混凝土温度智能在线监控系统 |
CN106738350A (zh) * | 2016-12-07 | 2017-05-31 | 徐州徐工施维英机械有限公司 | 混凝土搅拌站多模式温控方法、装置和系统 |
CN107256045B (zh) * | 2017-07-13 | 2019-03-22 | 中国水利水电科学研究院 | 大体积混凝土智能温控的方法及装置 |
CN109547745B (zh) * | 2018-11-16 | 2021-01-19 | 江苏高智项目管理有限公司 | 一种基于视频技术的监测系统和方法 |
CN109992833B (zh) * | 2019-03-01 | 2023-03-10 | 中国三峡建设管理有限公司 | 圆形断面衬砌混凝土温控防裂拉应力安全系数控制设计方法 |
DE102019110657A1 (de) * | 2019-04-25 | 2020-10-29 | Air Liquide Deutschland Gmbh | Verfahren zur Einhaltung von Frischbetontemperaturen |
CN110670592A (zh) * | 2019-09-24 | 2020-01-10 | 中国水利水电第五工程局有限公司 | 高温条件下大体积泵送混凝土的施工方法 |
CN111411785A (zh) * | 2020-03-31 | 2020-07-14 | 五冶集团上海有限公司 | 高温条件下混凝土施工入模温控系统及温控方法 |
CN113687673B (zh) * | 2021-08-24 | 2022-11-29 | 中国电建集团成都勘测设计研究院有限公司 | 一种基于坯层振捣温度云图的混凝土浇筑温控方法及系统 |
CN114277799A (zh) * | 2021-10-14 | 2022-04-05 | 中国水利水电科学研究院 | 抽水蓄能电站地下厂房蜗壳外围混凝土结构温控防裂方法 |
CN113944480A (zh) * | 2021-10-14 | 2022-01-18 | 中国水利水电科学研究院 | 盾构工作井洞门墙温控防裂方法 |
CN114323290B (zh) * | 2021-12-28 | 2023-11-03 | 中国水利水电科学研究院 | 混凝土拌合楼骨料温度和出机口混凝土温度信息采集方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101265706A (zh) * | 2008-04-10 | 2008-09-17 | 中国水利水电第四工程局 | 混凝土浇筑中温控防裂的施工方法 |
KR20090092021A (ko) * | 2008-02-26 | 2009-08-31 | 주식회사 리더스큐엠 | 매스 콘크리트의 균열 제어방법 |
CN202150037U (zh) * | 2011-04-15 | 2012-02-22 | 中国水利水电科学研究院 | 混凝土坝温控防裂数字式动态监控系统 |
CN102409678A (zh) * | 2011-09-26 | 2012-04-11 | 武汉理工大学 | 基于gps的大坝混凝土料罐碰撞监测与导航定位方法 |
CN102852145A (zh) * | 2012-08-14 | 2013-01-02 | 清华大学 | 在建大坝混凝土智能温度控制方法及系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3464272B2 (ja) * | 1994-05-11 | 2003-11-05 | 日本国土開発株式会社 | マスコンクリートの施工方法 |
-
2013
- 2013-10-16 CN CN201310484856.6A patent/CN103676997B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090092021A (ko) * | 2008-02-26 | 2009-08-31 | 주식회사 리더스큐엠 | 매스 콘크리트의 균열 제어방법 |
CN101265706A (zh) * | 2008-04-10 | 2008-09-17 | 中国水利水电第四工程局 | 混凝土浇筑中温控防裂的施工方法 |
CN202150037U (zh) * | 2011-04-15 | 2012-02-22 | 中国水利水电科学研究院 | 混凝土坝温控防裂数字式动态监控系统 |
CN102409678A (zh) * | 2011-09-26 | 2012-04-11 | 武汉理工大学 | 基于gps的大坝混凝土料罐碰撞监测与导航定位方法 |
CN102852145A (zh) * | 2012-08-14 | 2013-01-02 | 清华大学 | 在建大坝混凝土智能温度控制方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN103676997A (zh) | 2014-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103676997B (zh) | 一种基于实时监测数据的大体积混凝土温度监控方法 | |
CN105260531B (zh) | 一种圆形断面衬砌混凝土施工期内部最高温度的计算方法 | |
GUI et al. | In-situ tests on structural responses of energy piles during heat exchanging process | |
Zhang et al. | Thermo–mechanical coupled analysis for tunnel lining with circular openings | |
CN104133052B (zh) | 一种大体积混凝土温控效果全过程评价方法 | |
MRRI | Three dimensional turbulent fluid flow and heat transfer mathematical model for the analysis of a continuous slab caster | |
CN104690815B (zh) | 一种大体积混凝土的多功能养护箱 | |
CN107271062A (zh) | 一种基于成熟度的混凝土拆模时机判定方法 | |
CN103541552B (zh) | 基于智能手机的大体积混凝土防裂智能监控方法 | |
CN103605888A (zh) | 一种基于实时监测数据的大体积混凝土温度过程预测方法 | |
CN105880501A (zh) | 一种测量连铸结晶器内保护渣与结晶器界面热阻的方法 | |
CN101260670A (zh) | 混凝土热管养护法 | |
Chen et al. | Temperature control and thermal-induced stress field analysis of GongGuoQiao RCC dam | |
CN109977480A (zh) | 门洞形断面衬砌混凝土温控防裂拉应力安全系数控制设计方法 | |
CN108120644A (zh) | 一种气压作用下孔道岩石试件的蠕变试验装置与方法 | |
CN110105085A (zh) | 碾压混凝土大坝施工期通水冷却方法 | |
CN104634316B (zh) | 水平热力管道保温层下沉检测方法 | |
Su et al. | Dynamic splitting response and mechanical effect of joint angle in sandstone containing various weak-filling joints | |
CN204546742U (zh) | 一种大体积混凝土的多功能养护箱 | |
Mizobuchi et al. | Effect of heat elimination by pipe cooling system for temperature rise with heat of cement hydration in beam using high strength engineered Cementitious composites | |
Saleem et al. | Helium-assisted sand casting | |
CN208334256U (zh) | 无损检测钢筋混凝土锈胀程度的装置 | |
Mishin et al. | Microalloyed pipe line steel fracture analysis during continuous casting process | |
Liu et al. | PFC2D simulation of thermally induced cracks in concrete specimens | |
Hong et al. | Temperature Stress Monitor and Computation on Foundation Mass Concrete Construction Process [J] |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Zhenhong Inventor after: Zhang Guoxin Inventor after: Huang Tao Inventor after: Liu Yi Inventor after: Liu Youzhi Inventor after: Zhang Lei Inventor after: Li Songhui Inventor after: You Linxian Inventor before: Zhang Guoxin |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHANG GUOXIN TO: WANG ZHENHONG ZHANG GUOXIN HUANG TAO LIU YI LIU YOUZHI ZHANG LEI LI SONGHUI YOU LINXIAN |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160921 Termination date: 20211016 |
|