CN103674599A - Large-scale testing equipment for burner research and development - Google Patents

Large-scale testing equipment for burner research and development Download PDF

Info

Publication number
CN103674599A
CN103674599A CN201310711954.9A CN201310711954A CN103674599A CN 103674599 A CN103674599 A CN 103674599A CN 201310711954 A CN201310711954 A CN 201310711954A CN 103674599 A CN103674599 A CN 103674599A
Authority
CN
China
Prior art keywords
burner
assembly
development
research
end ductwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310711954.9A
Other languages
Chinese (zh)
Inventor
张彦军
张殿军
刘恒宇
栾世健
赵丰宇
崔凯
黄莺
孙浩
左国华
段跃非
孟晓冬
李伟
翟胜兵
郭森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Boiler Co Ltd
Original Assignee
Harbin Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Boiler Co Ltd filed Critical Harbin Boiler Co Ltd
Priority to CN201310711954.9A priority Critical patent/CN103674599A/en
Publication of CN103674599A publication Critical patent/CN103674599A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Air Supply (AREA)

Abstract

The invention relates to large-scale testing equipment for burner research and development. There is no special large-scale hot testing equipment for comprehensive performance test during the research and development process of a burner in our country, and the research and development of a novel burner lacks necessary experimental verification link. The large-scale testing equipment comprises a burning device (1), wherein the burning device (1) is connected with a convection bank device (2); the convection bank device (2) is connected with a crust block bank device (3); the crust block bankdevice (3) is connected with a secondary air preheater device (4); the secondary air preheater device (4) is connected with a primary air preheater device (5); the primary air preheater device (5) is connected with a high saving device (6); the high saving device (6) is connected with a low saving device (7); the low saving device (7) is connected with a rear smoke channel device (8). The invention is used for the large-scale testing equipment for burner research and development.

Description

Large-scale experiment equipment for burner research and development
technical field:
the present invention relates to a kind of large-scale experiment equipment for burner research and development.
background technology:
the domestic large-scale hot test equipment that is not specifically designed to the test of burner R&D process all round properties, lacks essential verification experimental verification link to the research and development of novel burner.
summary of the invention:
the object of the present invention is to provide a kind of large-scale experiment equipment for burner research and development.
the object of the present invention is achieved like this:
a kind of large-scale experiment equipment for burner research and development, its composition comprises: the burner described in burner is connected with convection bank device, described convection bank device is connected with Crust blocks pipe bundle device, described Crust blocks pipe bundle device is connected with Secondary Air pre-heater apparatus, described Secondary Air pre-heater apparatus is connected with a wind pre-heater apparatus, a described wind pre-heater apparatus is connected with the high device of economizing, described height is economized device and is connected with low province device, and described low province device is connected with back-end ductwork device.
the described large-scale experiment equipment for burner research and development, described burner is connected to form successively by burner hearth assembly A, burner hearth assembly B, burner hearth assembly C, burner hearth assembly D, burner hearth assembly E, burner hearth assembly F.
the described large-scale experiment equipment for burner research and development, described Crust blocks pipe bundle device is connected to form successively by reducing device A, head bending device B and Crust blocks pipe bundle assembly.
the described large-scale experiment equipment for burner research and development, described height economize device by height economize assembly, reducing assembly B, elbow assembly B connect to form successively.
the described large-scale experiment equipment for burner research and development, described low province device is connected to form successively by transition section assembly, reducing assembly C, low province assembly, reducing assembly D.
the described large-scale experiment equipment for burner research and development, described back-end ductwork device is connected to form successively by back-end ductwork A, back-end ductwork B, back-end ductwork C, back-end ductwork D, back-end ductwork E, back-end ductwork F.
beneficial effect:
1. the present invention is the hot test equipment that burner is carried out to performance test of current largest domestic, system perfecting.Burner performance under air distribution forms inside and outside difference for various atures of coal is studied, Optimizing Combustion device structure and performance, the applicable many coals type burner of exploitation.
in novel burner R&D process, carry out cold and hot experimental test, improve properties of product, shorten the development time, reduce the risk of direct engineering application.
accompanying drawing explanation:
accompanying drawing 1 is overall schematic of the present invention.
accompanying drawing 2 is cross-sectional view of the present invention.
accompanying drawing 3 is vertical views of integral body of the present invention.
accompanying drawing 4 is side views of integral body of the present invention.
in figure, 1 is burner, 2 is convection bank device, 3 is Crust blocks pipe bundle device, 4 is Secondary Air pre-heater apparatus, 5 is a wind pre-heater apparatus, 6 is the high device of economizing, 7 is low province device, 8 is back-end ductwork device, 9 is burner hearth assembly A, 10 is burner hearth assembly B, 11 is burner hearth assembly C, 12 is burner hearth assembly D, 13 is burner hearth assembly E, 14 is reducing assembly A, 15 is elbow assembly A, 16 is reducing assembly B, 17 is elbow assembly B, 18 is transition section assembly, 19 is reducing assembly C, 20 is low province assembly, 21 is reducing assembly D, 22 is back-end ductwork assembly A, 23 is back-end ductwork assembly B, 24 is back-end ductwork assembly C, 25 is back-end ductwork assembly D, 26 is back-end ductwork assembly E, 27 is back-end ductwork assembly F, 28 is reducing assembly E, 29 is burner hearth assembly F, 30 is Crust blocks pipe bundle assembly, 31 is the high assembly of economizing.
embodiment:
embodiment 1:
a kind of large-scale experiment equipment for burner research and development, its composition comprises: the burner described in burner 1 is connected with convection bank device 2, described convection bank device is connected with Crust blocks pipe bundle device 3, described Crust blocks pipe bundle device is connected with Secondary Air pre-heater apparatus 4, described Secondary Air pre-heater apparatus is connected with a wind pre-heater apparatus 5, a described wind pre-heater apparatus is connected with the high device 6 of economizing, described height is economized device and is connected with low province device 7, and described low province device is connected with back-end ductwork device 8.
embodiment 2:
according to the large-scale experiment equipment for burner research and development described in embodiment 1, described burner is by burner hearth assembly A, label 9, burner hearth assembly B, label 10, burner hearth assembly C label 11, burner hearth assembly D, label 12, burner hearth assembly E, label 13, burner hearth assembly F, label 29 connects to form successively.
embodiment 3:
according to the equipment of the large-scale experiment for burner research and development described in embodiment 1 or 2, described Crust blocks pipe bundle device is by reducing device A, label 14, head bending device B, and label 15 and Crust blocks pipe bundle assembly label 30 connect to form successively.
embodiment 4:
according to the large-scale experiment equipment for burner research and development described in embodiment 1 or 2 or 3, described height is economized device and is economized assembly 31, reducing assembly B by height, label 16, elbow assembly B, and label 17 connects to form successively.
embodiment 5:
according to the large-scale experiment equipment for burner research and development described in embodiment 1 or 2 or 3 or 4, described low province device is by transition section assembly 18, reducing assembly C, label 19, low province assembly 20, reducing assembly D, and label 21 connects to form successively.
embodiment 6:
according to the large-scale experiment equipment for burner research and development described in embodiment 1 or 2 or 3 or 4 or 5, described back-end ductwork device is by back-end ductwork A, label 22, back-end ductwork B, label 23, reducing assembly E, label 28, back-end ductwork C, label 24, back-end ductwork D, label 25, back-end ductwork E, label 26, back-end ductwork F, label 27 connects to form successively.

Claims (5)

1. the large-scale experiment for burner research and development is equipped, its composition comprises: burner is characterized in that: described burner is connected with convection bank device, described convection bank device is connected with Crust blocks pipe bundle device, described Crust blocks pipe bundle device is connected with Secondary Air pre-heater apparatus, described Secondary Air pre-heater apparatus is connected with a wind pre-heater apparatus, a described wind pre-heater apparatus is connected with the high device of economizing, described height is economized device and is connected with low province device, and described low province device is connected with back-end ductwork device.
2. the large-scale experiment for burner research and development according to claim 1 is equipped, it is characterized in that: described burner connects to form successively the large-scale experiment for burner research and development according to claim 1 by burner hearth assembly A, burner hearth assembly B, burner hearth assembly C, burner hearth assembly D, burner hearth assembly E, burner hearth assembly F and equips, and it is characterized in that: described Crust blocks pipe bundle device is connected to form successively by reducing device A, head bending device B and Crust blocks pipe bundle assembly.
3. the equipment of the large-scale experiment for burner research and development according to claim 1 and 2, is characterized in that: described height economize device by height economize assembly, reducing assembly B, elbow assembly B connect to form successively.
4. according to the large-scale experiment equipment for burner research and development described in claim 1 or 2 or 3, it is characterized in that: described low province device is connected to form successively by transition section assembly, reducing assembly C, low province assembly, reducing assembly D.
5. according to the large-scale experiment equipment for burner research and development described in claim 1 or 2 or 3 or 4, it is characterized in that: described back-end ductwork device is connected to form successively by back-end ductwork A, back-end ductwork B, back-end ductwork C, back-end ductwork D, back-end ductwork E, back-end ductwork F.
CN201310711954.9A 2013-12-21 2013-12-21 Large-scale testing equipment for burner research and development Pending CN103674599A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310711954.9A CN103674599A (en) 2013-12-21 2013-12-21 Large-scale testing equipment for burner research and development

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310711954.9A CN103674599A (en) 2013-12-21 2013-12-21 Large-scale testing equipment for burner research and development

Publications (1)

Publication Number Publication Date
CN103674599A true CN103674599A (en) 2014-03-26

Family

ID=50312821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310711954.9A Pending CN103674599A (en) 2013-12-21 2013-12-21 Large-scale testing equipment for burner research and development

Country Status (1)

Country Link
CN (1) CN103674599A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111595998A (en) * 2020-05-09 2020-08-28 哈尔滨锅炉厂有限责任公司 Pilot system for researching pyrolysis semicoke and coal synergistic combustion characteristics and NOx emission

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004033011A1 (en) * 2004-07-08 2006-02-02 Test Gmbh Fastener e.g. screw joint, testing device for internal combustion engine, has heat shield located in gap formed between holder and unit, where shield is divided centrically in order to allow movement of parts of holder against each other
US20080105175A1 (en) * 2006-11-02 2008-05-08 General Electric Methods and systems to increase efficiency and reduce fouling in coal-fired power plants
CN101586799A (en) * 2009-06-23 2009-11-25 武汉天元锅炉有限责任公司 Moderate temperature moderate voltage steam boiler capable of burning down the blast furnace gas
CN102445354A (en) * 2011-09-28 2012-05-09 南京创能电力科技开发有限公司 Multifunctional pulverized coal combustion demonstrating comprehensive test bed
CN103277782A (en) * 2013-05-24 2013-09-04 太原锅炉集团有限公司 Carbon black tail gas combusting boiler
CN203190633U (en) * 2013-03-11 2013-09-11 王民发 Vertical heat carrier boiler
CN203745213U (en) * 2013-12-21 2014-07-30 哈尔滨锅炉厂有限责任公司 Large-scale test device used for combustor research and development

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004033011A1 (en) * 2004-07-08 2006-02-02 Test Gmbh Fastener e.g. screw joint, testing device for internal combustion engine, has heat shield located in gap formed between holder and unit, where shield is divided centrically in order to allow movement of parts of holder against each other
US20080105175A1 (en) * 2006-11-02 2008-05-08 General Electric Methods and systems to increase efficiency and reduce fouling in coal-fired power plants
CN101586799A (en) * 2009-06-23 2009-11-25 武汉天元锅炉有限责任公司 Moderate temperature moderate voltage steam boiler capable of burning down the blast furnace gas
CN102445354A (en) * 2011-09-28 2012-05-09 南京创能电力科技开发有限公司 Multifunctional pulverized coal combustion demonstrating comprehensive test bed
CN203190633U (en) * 2013-03-11 2013-09-11 王民发 Vertical heat carrier boiler
CN103277782A (en) * 2013-05-24 2013-09-04 太原锅炉集团有限公司 Carbon black tail gas combusting boiler
CN203745213U (en) * 2013-12-21 2014-07-30 哈尔滨锅炉厂有限责任公司 Large-scale test device used for combustor research and development

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吕俊复 等: "116MW水冷方形分离循环流化床热水锅炉的运行经验", 《动力工程》, vol. 24, no. 5, 31 October 2004 (2004-10-31), pages 618 - 622 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111595998A (en) * 2020-05-09 2020-08-28 哈尔滨锅炉厂有限责任公司 Pilot system for researching pyrolysis semicoke and coal synergistic combustion characteristics and NOx emission

Similar Documents

Publication Publication Date Title
CN103834755A (en) Pulverized coal preheating technique of blast furnace coal injection system
CN204114893U (en) Residual heat from boiler fume recycle device
CN107447066B (en) Integrated blast furnace pulverized coal injection preheater
CN103674599A (en) Large-scale testing equipment for burner research and development
CN203745213U (en) Large-scale test device used for combustor research and development
CN205079453U (en) Natural gas phase transition heating furnace with automatic blevile of push
CN203053246U (en) Hot air combustion-supporting device in kiln cavity
CN202092089U (en) Fire coal boiler unit
CN201756562U (en) Double gun channel blow pipe of air-intake system of ironmaking blast furnace
CN203923240U (en) A kind of top burning type hot blast stove combustor
CN204779718U (en) Flat cold rolled sheet is with annealing stove
CN204345622U (en) A kind of biomass gasification burning is applied to kiln calcination system
CN204629460U (en) Tertiary air staged combustion device
CN202791980U (en) Heat pipe type low pressure superheated steam mixed air device
CN202945306U (en) Device utilizing flue waste heat to circularly heat plating assistant agent
CN204779719U (en) Flat cold rolled sheet is with exhaust pipe of annealing stove
CN103700309B (en) Thermal-state experiment device for combustion organization optimization
CN204529911U (en) The electric heater unit of non-ferrous metal Heat Treatment Furnace
CN203631049U (en) Hot state experiment device used for combustion organization optimization
CN204955246U (en) Intermediate frequency heating device of tee bend pipe fitting
CN204153972U (en) A kind of coal pulverizer black furnace hot blast preparation system for boiler of power plant igniting
CN204227920U (en) A kind of furnace construction with heat recovery function
CN203099869U (en) Device using high-temperature smoke to heat baffle door sealing air
CN203478969U (en) Curtain-type burner ignition furnace
CN203877747U (en) Smelting furnace tube lifting frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140326

RJ01 Rejection of invention patent application after publication