CN203631049U - Hot state experiment device used for combustion organization optimization - Google Patents

Hot state experiment device used for combustion organization optimization Download PDF

Info

Publication number
CN203631049U
CN203631049U CN201320847691.XU CN201320847691U CN203631049U CN 203631049 U CN203631049 U CN 203631049U CN 201320847691 U CN201320847691 U CN 201320847691U CN 203631049 U CN203631049 U CN 203631049U
Authority
CN
China
Prior art keywords
assembly
organization optimization
hot
flame
secondary air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320847691.XU
Other languages
Chinese (zh)
Inventor
张彦军
张殿军
刘恒宇
栾世健
赵丰宇
崔凯
黄莺
孙浩
左国华
段跃非
孟晓冬
李伟
翟胜兵
郭森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Boiler Co Ltd
Original Assignee
Harbin Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Boiler Co Ltd filed Critical Harbin Boiler Co Ltd
Priority to CN201320847691.XU priority Critical patent/CN203631049U/en
Application granted granted Critical
Publication of CN203631049U publication Critical patent/CN203631049U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a hot state experiment device used for combustion organization optimization. In our country, a traditional hot state experiment device used for boiler combustion organization optimization research is small in capacity, and requirements for full-scale test research for boiler combustion cannot be met. The hot state experiment device comprises a W flame device (1), and is characterized in that one end of the W flame device (1) is connected with a water sealed slag hopper (2), and the other end of the W flame device (1) is connected with a four-corner-tangential cutting device (3), the four-corner-tangential cutting device (3) is connected with an full-combustion device (4), the full-combustion device (4) is connected with a horizontal flue (5), the horizontal flue (5) is connected with a secondary blast preheater (6), the secondary blast preheater (6) is connected with a primary blast preheater (7), the primary blast preheater (7) is connected with a coal economizer (8), and the coal economizer (8) is connected with an outlet flue (9). The hot state experiment device is used for hot state experiments of the combustion organization optimization.

Description

For the hot experimental provision of the organization optimization that burns
technical field:
the utility model relates to a kind of hot experimental provision for the organization optimization that burns.
background technology:
the domestic hot test equipment capacity for the research of boiler combustion organization optimization is less, can not meet the full-scale test research of boiler combustion.
utility model content:
the purpose of this utility model is to provide a kind of hot experimental assembly for the organization optimization that burns.
the purpose of this utility model is achieved in that
a kind of hot experimental provision for the organization optimization that burns, its composition comprises: W flame attachment, described W flame attachment one end is connected with water seal slag bucket, the described W flame attachment other end is connected with quadrangle tangential circle device, described quadrangle tangential circle device is connected with burning device, described burning device is connected with horizontal flue, described horizontal flue is connected with Secondary Air primary heater, described secondary preheating device is connected with a wind primary heater, a described wind primary heater is connected with saver device, and described economizer is connected with exhaust pass.
the described hot test device for the organization optimization that burns, described W flame attachment is that W flame assembly is connected with W flame export coupling assembling, inner ash dropping hopper is arranged on the below of described W flame attachment.
the described hot experiment dress for the organization optimization that burns, described water seal slag bucket is connected to form successively by slag-removing hopper, water seal slag bucket.
the described hot experimental provision for the organization optimization that burns, described burning device is connected to form successively by Secondary Air assembly A, Secondary Air assembly B and furnace outlet assembly A, furnace outlet assembly B.
the described hot experimental provision for the organization optimization that burns, described horizontal flue assembly is connected to form by horizontal flue assembly A and horizontal flue assembly B.
the described hot experimental provision for the organization optimization that burns, described Secondary Air preheating device is connected to form by Secondary Air preheating assembly and transition section.
the described hot experimental provision for the organization optimization that burns, described economizer is connected to form by high-temperature economizer and low-level (stack-gas) economizer.
the described hot experimental provision for the organization optimization that burns, the connected mode between above device is that flange connects.
beneficial effect:
1. the various combustion systems of the utility model energy full-scale simulation, the influence factor under the various combustion systems of research boiler, optimizing product performance, fills up the blank in domestic boiler combustion performance basis data, building database, and exploitation fuel design software.
the utility model is the hot test equipment that combustion system is carried out to performance optimization of current largest domestic, system perfecting, can carry out the multiple combustion system test such as large-scale quadrangle tangential circle, the wall formula circle of contact, opposed firing, W flame combustion, biomass combustion and oxygen-enriched combusting combustion, optimize existing product performance.
accompanying drawing explanation:
accompanying drawing 1 is overall schematic of the present utility model.
accompanying drawing 2 is front views of the present utility model.
accompanying drawing 3 is side views of the present utility model.
accompanying drawing 4 is vertical views of the present utility model.
in figure, 1 is W flame attachment, 2 is quadrangle tangential circle device, 3 is burning device, 4 is water seal slag bucket, 5 is horizontal flue, 6 is secondary preheating device, 7 is a primary heater, 8 is economizer, 9 is exhaust pass, 10 is W flame assembly, 11 is W flame export coupling assembling, 12 is Secondary Air assembly A, 13 is Secondary Air assembly B, 14 is furnace outlet assembly A, 15 is furnace outlet assembly B, 16 is horizontal flue assembly A, 17 is horizontal flue B, 18 is transition section, 19 is high-temperature economizer, 20 is low-level (stack-gas) economizer, 21 is low-level (stack-gas) economizer, 22 is inner ash dropping hopper, 23 is water seal slag bucket assembly, 24 is slag-removing hopper.
embodiment:
embodiment 1:
a kind of hot experimental provision for the organization optimization that burns, its composition comprises: W flame attachment 1, described W flame attachment one end is connected with water seal slag bucket 4, the described W flame attachment other end is connected with quadrangle tangential circle 2 devices, described quadrangle tangential circle device is connected with burning device 3, described burning device is connected with horizontal flue 5, described horizontal flue is connected with Secondary Air primary heater 6, described Secondary Air primary heater is connected with a wind primary heater 7, a described wind primary heater is connected with economizer 8 devices, and described economizer is connected with exhaust pass 9.
embodiment 2:
according to the hot test device for the organization optimization that burns described in embodiment 1, described W flame attachment is that W flame assembly 10 is connected with W flame export coupling assembling 11, and inner ash dropping hopper 22 is arranged on the below of described W flame attachment.
embodiment 3:
according to the hot experimental provision for the organization optimization that burns described in embodiment 1 or 2, described water seal slag bucket is connected to form successively by slag-removing hopper 24, water seal slag bucket assembly 23.
embodiment 4:
according to the hot experimental provision for the organization optimization that burns described in embodiment 1 or 2 or 3, described burning device is by Secondary Air assembly A, label 12, Secondary Air assembly B, label 13 and furnace outlet assembly A, label 14, furnace outlet assembly B, label 15 connects to form successively.
embodiment 5:
according to the hot experimental provision for the organization optimization that burns described in embodiment 1 or 2 or 3 or 4, described horizontal flue assembly is by horizontal flue assembly A, label 16 and horizontal flue assembly B, and label 17 is connected to form.
embodiment 6:
according to the hot experimental provision for the organization optimization that burns described in embodiment 1 or 2 or 3 or 4 or 5, described Secondary Air preheating device is connected to form by Secondary Air preheating assembly 18 and transition section 19.
embodiment 7:
according to the hot test device for the organization optimization that burns described in embodiment 1 or 2 or 3 or 4 or 5 or 6, described economizer is connected to form by high-temperature economizer 20 and low-level (stack-gas) economizer 21.
embodiment 8:
according to the hot experimental provision for the organization optimization that burns described in embodiment 1 or 2 or 3 or 4 or 5 or 6 or 7, the connected mode between above device is that flange connects.

Claims (8)

1. the hot experimental provision for the organization optimization that burns, its composition comprises: W flame attachment, it is characterized in that: described W flame attachment one end is connected with water seal slag bucket, the described W flame attachment other end is connected with quadrangle tangential circle device, described quadrangle tangential circle device is connected with burning device, described burning device is connected with horizontal flue, described horizontal flue is connected with Secondary Air primary heater, described Secondary Air primary heater is connected with a wind primary heater, a described wind primary heater is connected with saver device, and described economizer is connected with exhaust pass.
2. the hot test device for the organization optimization that burns according to claim 1, is characterized in that: described W flame attachment is that W flame assembly is connected with W flame export coupling assembling, and inner ash dropping hopper is arranged on the below of described W flame attachment.
3. the hot experiment dress for the organization optimization that burns according to claim 1 and 2, is characterized in that: described water seal slag bucket is connected to form successively by slag-removing hopper, water seal slag bucket assembly.
4. the hot experimental provision for the organization optimization that burns according to claim 1 and 2, is characterized in that: described burning device is connected to form successively by Secondary Air assembly A, Secondary Air assembly B and furnace outlet assembly A, furnace outlet assembly B.
5. the hot experimental provision for the organization optimization that burns according to claim 1 and 2, is characterized in that: described horizontal flue assembly is connected to form by horizontal flue assembly A and horizontal flue assembly B.
6. the hot experimental provision for the organization optimization that burns according to claim 1 and 2, is characterized in that: described Secondary Air preheating device is connected to form by Secondary Air preheating assembly and transition section.
7. the hot experimental provision for the organization optimization that burns according to claim 1 and 2, is characterized in that: described economizer is connected to form by high-temperature economizer and low-level (stack-gas) economizer.
8. the hot experimental provision for the organization optimization that burns according to claim 1 and 2, is characterized in that: the connected mode between device and assembly is that flange connects above.
CN201320847691.XU 2013-12-21 2013-12-21 Hot state experiment device used for combustion organization optimization Expired - Fee Related CN203631049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320847691.XU CN203631049U (en) 2013-12-21 2013-12-21 Hot state experiment device used for combustion organization optimization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320847691.XU CN203631049U (en) 2013-12-21 2013-12-21 Hot state experiment device used for combustion organization optimization

Publications (1)

Publication Number Publication Date
CN203631049U true CN203631049U (en) 2014-06-04

Family

ID=50817506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320847691.XU Expired - Fee Related CN203631049U (en) 2013-12-21 2013-12-21 Hot state experiment device used for combustion organization optimization

Country Status (1)

Country Link
CN (1) CN203631049U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103700309A (en) * 2013-12-21 2014-04-02 哈尔滨锅炉厂有限责任公司 Thermal-state experiment device for combustion organization optimization

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103700309A (en) * 2013-12-21 2014-04-02 哈尔滨锅炉厂有限责任公司 Thermal-state experiment device for combustion organization optimization

Similar Documents

Publication Publication Date Title
CN204756900U (en) Medium temperature gas recirculation device of high sodium metal coal pi type boiler
CN203631049U (en) Hot state experiment device used for combustion organization optimization
CN203642146U (en) Boiler with regenerative chamber
CN103700309B (en) Thermal-state experiment device for combustion organization optimization
CN204986979U (en) High temperature gas recirculation device of high sodium metal coal pi type boiler
CN204756899U (en) Low temperature gas recirculation device of high sodium metal coal pi type boiler
CN201652330U (en) Vertical biomass boiler
CN2937886Y (en) Heating installation of wind energy source and light energy complementary
CN203744276U (en) Boiler with bagasse as fuel
CN204535078U (en) The dual-purpose hot-blast stove of a kind of multifunctional coal-fired gas
CN103697450B (en) Regenerator boiler
CN203190428U (en) Shock wave soot blower
CN203704327U (en) Special vertical gas furnace
CN203190403U (en) Secondary air inlet industrial hot blast biomass boiler
CN202470050U (en) Self-preheating type coal cinder powder cyclone combustor
CN203745213U (en) Large-scale test device used for combustor research and development
CN203116268U (en) Energy-saving vertical hot blast stove
CN202813745U (en) Energy-saving boiler of boiling furnace
CN203190444U (en) Secondary air inlet industrial pressure-bearing steam or hot water biomass boiler
CN202747610U (en) Biomass fuel organic heat carrier furnace with chain grate
CN203413656U (en) Structure for improving ignition performance of coal-fired boiler
CN202328180U (en) Flue-gas waste heat recovery device
CN202371702U (en) Boiler ash recovery after-combustion reutilization energy saving and emission reduction system
CN202692236U (en) Novel coal-fired energy-saving heating device
CN203671632U (en) Energy-saving fan powder returning device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20161221