CN103669919A - Arrangement structure of gas turbine power plant circulating water pump station - Google Patents

Arrangement structure of gas turbine power plant circulating water pump station Download PDF

Info

Publication number
CN103669919A
CN103669919A CN201310622729.8A CN201310622729A CN103669919A CN 103669919 A CN103669919 A CN 103669919A CN 201310622729 A CN201310622729 A CN 201310622729A CN 103669919 A CN103669919 A CN 103669919A
Authority
CN
China
Prior art keywords
cooling tower
circulating water
water pump
pump
filter screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310622729.8A
Other languages
Chinese (zh)
Inventor
曾上将
吴建国
沈又幸
钱海平
李琪
艾月平
邱纪龙
韩建民
钱锋
沈聪儿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Electric Power Design Institute
Original Assignee
Zhejiang Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Design Institute filed Critical Zhejiang Electric Power Design Institute
Priority to CN201310622729.8A priority Critical patent/CN103669919A/en
Publication of CN103669919A publication Critical patent/CN103669919A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

An arrangement structure of a gas turbine power plant circulating water pump station comprises a mechanical draft cooling tower and a circulating water pump. The mechanical draft cooling tower and a cooling tower water tank are elevated to the ground. The circulating water pump is arranged nearby in the open air on the ground near the cooling tower water tank, is directly connected with the cooling tower water tank and sucks water from the cooling tower water tank. A suction well is disposed at a suction hole of the circulating water pump and disposed in the cooling tower water tank. The circulating water pump is a horizontal single-stage double-suction centrifugal pump in a horizontal split structure. A flat-plate filter screen used for filtering impurity is disposed in front of the suction wheel of the circulating water pump. An electric hoist meeting the needs of the flat-plate filter screen for washing and maintenance during operating is disposed on the upper portion of the flat-plate filter screen. The arrangement structure has the advantages that a system is greatly simplified; investment and floor area are saved; compared to vertical diagonal flow pumps, the circulating water pump which is the horizontal split centrifugal pump is higher in reliability, more convenient to maintain, and low in manufacture cost.

Description

A kind of arrangement that fires dynamo-electric factory circulating pump room
Technical field
What the present invention relates to is to adopt mechanical-draft cooling tower to carry out the arrangement of the dynamo-electric factory of the cooling combustion of secondary cycle circulating pump room.
Background technology
Deposits in Eastern Coastal China economic development is at present rapid, and power demand is large, the requirement improving in order to meet this area economic development and people's living standard, and country often needs every year to drop into huge fund and is used for building power plant.The abbreviation that fires dynamo-electric Chang Wei gas-turbine electric power plant is a kind of clean power technology.The fuel that fires dynamo-electric factory is natural gas, fuel oil or industrial associated gas etc., and because burning is complete, emission that its burning generates is few to ambient influnence, and noise pollution is little; And fire that dynamo-electric factory has that installation piece, volume are little, reduced investment, the advantage such as efficiency is high, running cost is low and life cycle is long, the dynamo-electric factory of state's internal combustion project development is built more at present.
For adopting mechanical-draft cooling tower to carry out the dynamo-electric factory of the cooling combustion of secondary cycle, generally need near cooling tower, build a semi-underground type circulating pump room, in following pump house, arrange the equipment such as circulating water pump, filter screen, gate, driving, circulating water pump pattern can adopt centrifugal pump of horizontal axis or vertical diagonal flow pump.The general dark 2 meters of left and right of pond of cooling tower, be arranged in below ground, recirculated cooling water is undertaken falling within pond under caloic exchange afterwards by regions such as packings, then by dark culvert or open channel, from flowing to, follow pump house, after the impurity in filter screen equipment filtering recirculated water, by circulating water pump, boost to condenser and re-start circulation.
For fear of circulating pump room, the air intake of mechanical-draft cooling tower is had a negative impact, total plain cloth is set up General Requirements mechanical-draft cooling tower and leaves other building more than 15 meters, and this has increased floor space and investment to a certain extent.Fire dynamo-electric factory due to the reasons such as needs heat supply (electricity) be generally positioned at industrial park or near urban district to approach load center as far as possible, along with expanding economy, the land used index in these regions is also more and more nervous.Therefore, optimize and improve the arrangement form of traditional recirculating cooling water system, have great importance.
Summary of the invention
The object of the invention is to overcome the deficiency of the dynamo-electric factory of existing combustion circulating pump room arrangement, a kind of employing pond of cooling tower ground type layout, the outdoor layout in circulating water pump ground are provided, when reducing initial investment and project occupation of land, can guarantee the arrangement of the dynamo-electric factory of the combustion circulating pump room of system reliability.
The object of the invention is to complete by following technical solution, it comprises mechanical-draft cooling tower and circulating water pump, and described mechanical-draft cooling tower and pond of cooling tower integral raising are to ground configuration; Described circulating water pump is nearby near the outdoor ground being arranged in pond of cooling tower, is directly connected with pond of cooling tower and from wherein absorbing water; Water sucking mouth at circulating water pump is provided with absorbing well, absorption well, and this absorbing well, absorption well is placed in described pond of cooling tower.
The horizontal single-stage double suction centrifugal pump of opening structure pattern in described circulating water pump employing level, arranges one for the plate filter screen of impurity screening before the absorbing well, absorption well of circulating water pump; On the top of described plate filter screen, be provided with and meet the electric block that needs were rinsed, overhauled in plate filter screen lifting in service.
The preferred technical scheme of the present invention is: described mechanical-draft cooling tower disposes 6 altogether, and the amount of cooling water of every mechanical-draft cooling tower is 3200m 3/ h; Dispose 4 outdoor horizontal circulating water pump; 6 described mechanical-draft cooling towers are arranged on same straight line, and every 3 mechanical-draft cooling towers are one group, and 4-6 meters of the spacing between two groups of mechanical-draft cooling towers are preferably 5 meters.
Compared with prior art, advantage of the present invention is: more than the pond of cooling tower that is generally arranged in below ground is raised to ground, and cancelled traditional dark culvert of recirculated water artesian diversion or open channel, cancelled the underground and superstructure of traditional circulating pump room, circulating water pump is outdoor being arranged near the ground of pond of cooling tower nearby, directly from pond of cooling tower water suction, thereby greatly simplified system, saved investment and taken up an area.In addition, open, centrifugal pump of horizontal axis in circulating water pump pattern employing level, compare with adopting vertical diagonal flow pump, reliability is higher, repair and maintenance is more convenient, and cost is also lower.
Accompanying drawing explanation
Fig. 1 is structural configuration schematic diagram of the present invention.
Fig. 2 is the A-A cross-sectional view in Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is further introduced: shown in Fig. 1,2, the arrangement of the dynamo-electric factory of combustion of the present invention circulating pump room, it comprises mechanical-draft cooling tower 1 and circulating water pump 2, and described mechanical-draft cooling tower 1 and pond of cooling tower 3 integral raisings of configuration are to ground configuration; Described circulating water pump 2 is nearby near the outdoor ground being arranged in pond of cooling tower 3, is directly connected with pond of cooling tower 3 and from wherein absorbing water; In the water sucking mouth of circulating water pump 2, be provided with absorbing well, absorption well 4, and this absorbing well, absorption well 4 is placed in described pond of cooling tower 3.
The horizontal single-stage double suction centrifugal pump of opening structure pattern in described circulating water pump 2 employing levels, one plate filter screen for impurity screening of the front setting of absorbing well, absorption well 4 of circulating water pump 2; On the top of described plate filter screen, be provided with and meet the electric block that needs were rinsed, overhauled in plate filter screen lifting in service.
The preferred technical scheme of the present invention is: described mechanical-draft cooling tower disposes 6 altogether, and the amount of cooling water of every mechanical-draft cooling tower is 3200m 3/ h; Dispose 4 outdoor horizontal circulating water pump; 6 described mechanical-draft cooling towers are arranged on same straight line, and every 3 mechanical-draft cooling towers are one group, and 4-6 meters of the spacing between two groups of mechanical-draft cooling towers are preferably 5 meters.
Embodiment:
The specific embodiment that the present invention adopts is as follows:
The first step: calculate according to recirculated water optimization, this electric power plant circulating water system configures 6 mechanical-draft cooling tower (6 * 3200m altogether 3/ h)+4 outdoor horizontal circulating water pump, 6 base power towers are arranged on same straight line, and every 3 base power towers are one group, and between two groups of machine power towers, spacing is 5 meters.The operation number of units of machine power tower and circulating water pump can according to the external heating load of unit (take out solidifying machine condensing amount), season (day and night) temperature variation carry out flexible modulation.
Second step: opening structure, horizontal single-stage double suction centrifugal pump in circulating water pump pattern employing level.
The 3rd step: circulating water pump adopts the outdoor layout of ground type, does not build circulating pump room, the directly water suction of the pond below cooling tower of circulating water pump.For meeting the requirement of circulating water pump self filling type water suction, by mechanical-draft cooling tower together with pond integral raising to ground configuration, follow pump water sucking mouth absorbing well, absorption well be set.
The 4th step: one plate filter screen (twice groove being set, the using and the reserved) is set with the impurity in filtration cycle water before following pump absorbing well, absorption well.
The 5th step: on plate filter screen top, electric block is set, plate filter screen lifting in service is rinsed to meet, the needs of maintenance.When need to overhauling, circulating water pump considers to adopt flexible mobile crane.
Above example only, for an aspect in invention application process, the invention is not restricted to above example, and can also be widely used in the various mechanical-draft cooling towers that utilize carries out in hydronic project recirculated water, as engineerings such as municipal administration, petrochemical industries.All distortion that those of ordinary skill in the art can directly derive or associate from content disclosed by the invention, all should think protection scope of the present invention.

Claims (2)

1. fire an arrangement for dynamo-electric factory circulating pump room, it comprises mechanical-draft cooling tower and ring pump house, it is characterized in that described mechanical-draft cooling tower and pond of cooling tower integral raising are to ground configuration; Described circulating water pump is nearby near the outdoor ground being arranged in pond of cooling tower, is directly connected with pond of cooling tower and from wherein absorbing water; Water sucking mouth at circulating water pump is provided with absorbing well, absorption well, and this absorbing well, absorption well is placed in described pond of cooling tower.
2. the arrangement of the dynamo-electric factory of combustion according to claim 1 circulating pump room, the horizontal single-stage double suction centrifugal pump that it is characterized in that opening structure pattern in described circulating water pump employing level, arranges one for the plate filter screen of impurity screening before the absorbing well, absorption well of circulating water pump; On the top of described plate filter screen, be provided with and meet the electric block that needs were rinsed, overhauled in plate filter screen lifting in service.
CN201310622729.8A 2013-11-30 2013-11-30 Arrangement structure of gas turbine power plant circulating water pump station Pending CN103669919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310622729.8A CN103669919A (en) 2013-11-30 2013-11-30 Arrangement structure of gas turbine power plant circulating water pump station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310622729.8A CN103669919A (en) 2013-11-30 2013-11-30 Arrangement structure of gas turbine power plant circulating water pump station

Publications (1)

Publication Number Publication Date
CN103669919A true CN103669919A (en) 2014-03-26

Family

ID=50308628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310622729.8A Pending CN103669919A (en) 2013-11-30 2013-11-30 Arrangement structure of gas turbine power plant circulating water pump station

Country Status (1)

Country Link
CN (1) CN103669919A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111366009A (en) * 2020-03-13 2020-07-03 中国能源建设集团广东省电力设计研究院有限公司 Circulating cooling water system arrangement structure
CN114991541A (en) * 2022-06-16 2022-09-02 中国能源建设集团广东省电力设计研究院有限公司 Circulating water supply system building clustering arrangement structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2267581C2 (en) * 2000-01-27 2006-01-10 Сименс Акциенгезелльшафт Industrial building structure for industrial plant and method for industrial building structure use
CN101598132A (en) * 2008-06-06 2009-12-09 贵阳铝镁设计研究院 A kind of vertical collocation method of circulation and structure
CN202544436U (en) * 2012-01-30 2012-11-21 浙江省电力设计院 Steam turbine room bottom layer arrangement structure of steam-driven feed water pump of thermal power plant
CN202689613U (en) * 2012-07-03 2013-01-23 河北省电力勘测设计研究院 Combined arrangement of GIS (gas insulated switchgear) power distribution device area and circulating water pump house of thermal power plant
CN203684747U (en) * 2013-11-30 2014-07-02 浙江省电力设计院 Arrangement structure of circulating water pump house of gas turbine power plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2267581C2 (en) * 2000-01-27 2006-01-10 Сименс Акциенгезелльшафт Industrial building structure for industrial plant and method for industrial building structure use
CN101598132A (en) * 2008-06-06 2009-12-09 贵阳铝镁设计研究院 A kind of vertical collocation method of circulation and structure
CN202544436U (en) * 2012-01-30 2012-11-21 浙江省电力设计院 Steam turbine room bottom layer arrangement structure of steam-driven feed water pump of thermal power plant
CN202689613U (en) * 2012-07-03 2013-01-23 河北省电力勘测设计研究院 Combined arrangement of GIS (gas insulated switchgear) power distribution device area and circulating water pump house of thermal power plant
CN203684747U (en) * 2013-11-30 2014-07-02 浙江省电力设计院 Arrangement structure of circulating water pump house of gas turbine power plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111366009A (en) * 2020-03-13 2020-07-03 中国能源建设集团广东省电力设计研究院有限公司 Circulating cooling water system arrangement structure
CN114991541A (en) * 2022-06-16 2022-09-02 中国能源建设集团广东省电力设计研究院有限公司 Circulating water supply system building clustering arrangement structure

Similar Documents

Publication Publication Date Title
CN203684747U (en) Arrangement structure of circulating water pump house of gas turbine power plant
CN209586604U (en) A kind of offshore boosting station platform configuring mixing circulation ocean temperature difference power generating system
CN105275717A (en) Rainwater pipeline water collecting power generation system and power generation method thereof
CN103669919A (en) Arrangement structure of gas turbine power plant circulating water pump station
CN204435946U (en) A kind of coal-fired 1,000,000 unit turbine house structures
CN202728990U (en) Crude oil solar heating device
KR101114220B1 (en) High efficiency geothermal hybrid system and operating method thereof
CN204299702U (en) Gas turbine distributed CCHP system
CN203201657U (en) Container power station
CN202431031U (en) Low-position layout structure for steam feed pump of large fuel electric plant
CN210032787U (en) Main power house layout structure of gas and steam combined cycle generator set
CN102287342A (en) United energy device and construction method and application thereof
CN211424746U (en) Energy-saving and environment-friendly device using waste water source heat pump
CN209483444U (en) A kind of steam turbine building based on coal base distributing-supplying-energy system
CN207377658U (en) A kind of combustion gas of Novel filtration structure and machine generating set
CN203295978U (en) Integrated structure of wind power generation device and bridge tower
CN202251092U (en) Butt-splicing low-hump-type bidirectional water outflow passage
CN207568252U (en) A kind of underground machine room
CN207767603U (en) A kind of emulation ecology tree being used in gardens with Air purification
CN205663205U (en) Can have enough to meet need formula photovoltaic reinforcing bar adds builder's temporary shed
CN201705681U (en) Turbine parallel multi-suction-opening single-discharge vertical lift pump
CN215107728U (en) Land-saving type thermal power plant
CN218843232U (en) Land-saving sludge incineration plant water supply system arrangement structure
CN219509317U (en) Factory building high-order arrangement structure of single-shaft gas steam combined cycle generator set
CN205225505U (en) Engine combustion -supporting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140326

RJ01 Rejection of invention patent application after publication