CN103669393B - A kind of Multipurpose foundation bolt erecting tools - Google Patents

A kind of Multipurpose foundation bolt erecting tools Download PDF

Info

Publication number
CN103669393B
CN103669393B CN201310723102.1A CN201310723102A CN103669393B CN 103669393 B CN103669393 B CN 103669393B CN 201310723102 A CN201310723102 A CN 201310723102A CN 103669393 B CN103669393 B CN 103669393B
Authority
CN
China
Prior art keywords
lag plate
clamp nut
bolt
rod
lag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310723102.1A
Other languages
Chinese (zh)
Other versions
CN103669393A (en
Inventor
王烽
王广鹏
杨林
胡波
庞心莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID SHANXI POWER GRID ENGINEERING CONSTRUCTION Co
Original Assignee
STATE GRID SHANXI POWER GRID ENGINEERING CONSTRUCTION Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID SHANXI POWER GRID ENGINEERING CONSTRUCTION Co filed Critical STATE GRID SHANXI POWER GRID ENGINEERING CONSTRUCTION Co
Priority to CN201310723102.1A priority Critical patent/CN103669393B/en
Publication of CN103669393A publication Critical patent/CN103669393A/en
Application granted granted Critical
Publication of CN103669393B publication Critical patent/CN103669393B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to transformer station's stone bolt mounting technique, specifically a kind of Multipurpose foundation bolt erecting tools.The invention solves existing stone bolt erecting tools in use easily to obscure, be not easy to process and operate, have enough to meet the need the problem that access times are low, location efficiency is low.A kind of Multipurpose foundation bolt erecting tools comprises annular chassis, the first U-lag plate, braking bolt, the second U-lag plate, adjusting screw(rod); Wherein, the upper disk surface inner peripheral portion on annular chassis respectively offer with upper disk surface peripheral part together with annular chute; The inner bottom surface of the first U-lag plate and the upper disk surface on annular chassis are close to; The bottom surface of the first U-lag plate offers the bolt fixing hole of two up/down perforations; Two sides of the first U-lag plate respectively offer about one through screw rod adjustment hole; Two braking bolts are arranged in two bolt fixing hole respectively; Adjusting screw(rod) is arranged in two screw rod adjustment holes simultaneously.The present invention is applicable to the installation of stone bolt.

Description

A kind of Multipurpose foundation bolt erecting tools
Technical field
The present invention relates to transformer station's stone bolt mounting technique, specifically a kind of Multipurpose foundation bolt erecting tools.
Background technology
In transformer station's building course, in order to improve the safe operation reliability of transformer station, construction party needs to install foot bolt in large quantities, and is connected with equipment Foundations by structure support by stone bolt.Under prior art conditions, when carrying out the installation of stone bolt, first construction party uses circular positioning disk to be positioned by stone bolt, is then connected with equipment Foundations by structure support by stone bolt.Practice shows, existing stone bolt erecting tools (i.e. circular positioning disk) limit due to self structure, there are the following problems: one, because the stone bolt model that will install is different, it is different to install radius, construction party needs the circular positioning disk of machining kinds in advance various (kind reaches 12 kinds usually), and miscellaneous circular positioning disk is not only in use easily obscured, and be not easy to processing and operation.Its two, because the turnover access times of circular positioning disk are lower, cause the installation cost of stone bolt higher.Its three, because the location efficiency of circular positioning disk is lower, cause the installation effectiveness of stone bolt lower.Based on this, be necessary to invent a kind of brand-new stone bolt erecting device, in use easily obscure to solve existing stone bolt erecting tools, be not easy to process and operate, have enough to meet the need the problem that access times are low, location efficiency is low.
Summary of the invention
The present invention in use easily obscures to solve existing stone bolt erecting tools, be not easy to processing and operation, have enough to meet the need the problem that access times are low, location efficiency is low, provides a kind of Multipurpose foundation bolt erecting tools.
The present invention adopts following technical scheme to realize: a kind of Multipurpose foundation bolt erecting tools, comprises annular chassis, the first U-lag plate, braking bolt, the second U-lag plate, adjusting screw(rod); Wherein, the upper disk surface inner peripheral portion on annular chassis respectively offer with upper disk surface peripheral part together with annular chute; The inner bottom surface of the first U-lag plate and the upper disk surface on annular chassis are close to; The bottom surface of the first U-lag plate offers the bolt fixing hole of two up/down perforations; Two sides of the first U-lag plate respectively offer about one through screw rod adjustment hole, and two screw rod adjustment hole positions are just right; The number of braking bolt is two; Two braking bolts are arranged in two bolt fixing hole respectively, and the tail end of two braking bolts stretches in twice annular chute respectively; The bottom surface of the second U-lag plate offers the through square locating hole in left and right; Two sides of the second U-lag plate respectively offer the anchor bolt installation hole of a up/down perforation, and two anchor bolt installation hole positions are just right; The right side extension of adjusting screw(rod) is fixed with square backstay; The right side extension of square backstay is fixed with positioning screw; Adjusting screw(rod) is arranged in two screw rod adjustment holes simultaneously; Square backstay is arranged in square locating hole; Adjusting screw(rod) is screwed from left to right successively the first clamp nut, the second clamp nut, the 3rd clamp nut, the 4th clamp nut; Positioning screw is screwed the 5th clamp nut; First clamp nut presses the left outside side in the first U-lag plate; Second clamp nut presses the left internal side in the first U-lag plate; 3rd clamp nut presses the right inside side in the first U-lag plate; 4th clamp nut presses the right outside side in the first U-lag plate; 5th clamp nut presses the inner bottom surface in the second U-lag plate.
During use, annular chassis is fixed on outer template bracing frame.Concrete use procedure is as follows: first, along annular chute circumference slip two braking bolts, two braking bolts drive the axis of the first U-lag plate around annular chassis to rotate, first U-lag strip is moved the axis of adjusting screw(rod) around annular chassis and is rotated, and adjusting screw(rod) drives the axis of the second U-lag plate around annular chassis to rotate.When the rotational angle of the second U-lag plate and the design and installation angle of stone bolt adapt, two braking bolts are screwed into downwards in twice annular chute, and ensure that the breech face of two braking bolts presses the inner bottom surface of twice annular chute.Then, the first clamp nut, the second clamp nut, the 3rd clamp nut, the 4th clamp nut are unscrewed respectively, and to slide axially adjusting screw(rod) along two screw rod adjustment holes, adjusting screw(rod) drives the second U-lag plate to move along the axis of adjusting screw(rod).When the move distance of the second U-lag plate and the design and installation radius of stone bolt adapt, respectively the first clamp nut, the second clamp nut, the 3rd clamp nut, the 4th clamp nut are tightened.Subsequently, stone bolt is worn and is fixed in two anchor bolt installation holes, just achieve the location of stone bolt thus.On this basis, structure support can be connected with equipment Foundations by stone bolt.In the process, the stone bolt of different model is if desired installed, then only need changes the second U-lag plate (the second U-lag strip changed has the anchor bolt installation hole of different pore size), can installation requirement be met.Based on said process, compared with existing stone bolt erecting tools (i.e. circular positioning disk), a kind of Multipurpose foundation bolt erecting tools tool of the present invention has the following advantages: one, a kind of Multipurpose foundation bolt erecting tools of the present invention passes through the setting angle of adjustably foot bolt and installs radius, achieves and different model, the different stone bolt installing radius is positioned.Therefore compared with circular positioning disk, there is not miscellaneous problem in a kind of Multipurpose foundation bolt erecting tools of the present invention, it not only in use can not be obscured, and facilitate processing and operation.Its two, compared with circular positioning disk, the turnover access times of a kind of Multipurpose foundation bolt erecting tools of the present invention are higher, effectively reduce the installation cost of stone bolt thus.Its three, compared with circular positioning disk, the location efficiency of a kind of Multipurpose foundation bolt erecting tools of the present invention is higher, effectively improves the installation effectiveness of stone bolt thus.In sum, a kind of Multipurpose foundation bolt erecting tools of the present invention, based on brand new, efficiently solves existing stone bolt erecting tools and in use easily obscures, is not easy to process and operate, have enough to meet the need the problem that access times are low, location efficiency is low.
The present invention is rational in infrastructure, it is ingenious to design, efficiently solve existing stone bolt erecting tools in use easily to obscure, be not easy to process and operate, have enough to meet the need the problem that access times are low, location efficiency is low, be applicable to the installation of stone bolt in transformer station's building course.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the structural representation on annular chassis of the present invention.
Fig. 3 is the A-A sectional view of Fig. 2.
Fig. 4 is the structural representation of the first U-lag plate of the present invention.
Fig. 5 is the structural representation of the second U-lag plate of the present invention.
Fig. 6 is the structural representation of adjusting screw(rod) of the present invention.
Fig. 7 is the B-B sectional view of Fig. 6.
In figure: 1-annular chassis, 2-first U-lag plate, 3-braking bolt, 4-second U-lag plate, 5-adjusting screw(rod), 6-annular chute, 7-bolt fixing hole, 8-screw rod adjustment hole, the square locating hole of 9-, 10-anchor bolt installation hole, the square backstay of 11-, 12-positioning screw, 13-first clamp nut, 14-second clamp nut, 15-the 3rd clamp nut, 16-the 4th clamp nut, 17-the 5th clamp nut, 18-stone bolt.
Detailed description of the invention
A kind of Multipurpose foundation bolt erecting tools, comprises annular chassis 1, first U-lag plate 2, braking bolt 3, second U-lag plate 4, adjusting screw(rod) 5; Wherein, the upper disk surface inner peripheral portion on annular chassis 1 respectively offer with upper disk surface peripheral part together with annular chute 6; The inner bottom surface of the first U-lag plate 2 and the upper disk surface on annular chassis 1 are close to; The bottom surface of the first U-lag plate 2 offers the bolt fixing hole 7 of two up/down perforations; Two sides of the first U-lag plate 2 respectively offer about one through screw rod adjustment hole 8, and two screw rod adjustment hole 8 positions are just right; The number of braking bolt 3 is two; Two braking bolts 3 are arranged in two bolt fixing hole 7 respectively, and the tail end of two braking bolts 3 stretches in twice annular chute 6 respectively; The bottom surface of the second U-lag plate 4 offers the through square locating hole 9 in left and right; Two sides of the second U-lag plate 4 respectively offer the anchor bolt installation hole 10 of a up/down perforation, and two anchor bolt installation hole 10 positions are just right; The right side extension of adjusting screw(rod) 5 is fixed with square backstay 11; The right side extension of square backstay 11 is fixed with positioning screw 12; Adjusting screw(rod) 5 is arranged in two screw rod adjustment holes 8 simultaneously; Square backstay 11 is arranged in square locating hole 9; Adjusting screw(rod) 5 is screwed from left to right successively the first clamp nut 13, second clamp nut 14, the 3rd clamp nut 15, the 4th clamp nut 16; Positioning screw 12 is screwed the 5th clamp nut 17; First clamp nut 13 presses the left outside side in the first U-lag plate 2; Second clamp nut 14 presses the left internal side in the first U-lag plate 2; 3rd clamp nut 15 presses the right inside side in the first U-lag plate 2; 4th clamp nut 16 presses the right outside side in the first U-lag plate 2; 5th clamp nut 17 presses the inner bottom surface in the second U-lag plate 4.
During concrete enforcement, the thickness of the thickness on annular chassis, the thickness of the first U-lag plate, the second U-lag plate is 10mm.The interior well width of the first U-lag plate, the interior well width of the second U-lag plate are 60mm.The diameter of braking bolt is 10mm, and length is 25mm.The internal diameter of the first-four clamp nut is 22mm.The internal diameter of the 5th clamp nut is 16mm.

Claims (1)

1. a Multipurpose foundation bolt erecting tools, is characterized in that: comprise annular chassis (1), the first U-lag plate (2), braking bolt (3), the second U-lag plate (4), adjusting screw(rod) (5); Wherein, the upper disk surface inner peripheral portion of annular chassis (1) respectively offer with upper disk surface peripheral part together with annular chute (6); The inner bottom surface of the first U-lag plate (2) and the upper disk surface of annular chassis (1) are close to; The bottom surface of the first U-lag plate (2) offers the bolt fixing hole (7) of two up/down perforations; Two sides of the first U-lag plate (2) respectively offer about one through screw rod adjustment hole (8), and two screw rod adjustment hole (8) positions are just right; The number of braking bolt (3) is two; Two braking bolts (3) are arranged in two bolt fixing hole (7) respectively, and the tail end of two braking bolts (3) stretches in twice annular chute (6) respectively; The bottom surface of the second U-lag plate (4) offers the through square locating hole (9) in left and right; Two sides of the second U-lag plate (4) respectively offer the anchor bolt installation hole (10) of a up/down perforation, and two anchor bolt installation hole (10) positions are just right; The right side extension of adjusting screw(rod) (5) is fixed with square backstay (11); The right side extension of square backstay (11) is fixed with positioning screw (12); Adjusting screw(rod) (5) is arranged in two screw rod adjustment holes (8) simultaneously; Square backstay (11) is arranged in square locating hole (9); Adjusting screw(rod) (5) is screwed from left to right successively the first clamp nut (13), the second clamp nut (14), the 3rd clamp nut (15), the 4th clamp nut (16); Positioning screw (12) is screwed the 5th clamp nut (17); First clamp nut (13) presses the left outside side in the first U-lag plate (2); Second clamp nut (14) presses the left internal side in the first U-lag plate (2); 3rd clamp nut (15) presses the right inside side in the first U-lag plate (2); 4th clamp nut (16) presses the right outside side in the first U-lag plate (2); 5th clamp nut (17) presses the inner bottom surface in the second U-lag plate (4).
CN201310723102.1A 2013-12-25 2013-12-25 A kind of Multipurpose foundation bolt erecting tools Expired - Fee Related CN103669393B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310723102.1A CN103669393B (en) 2013-12-25 2013-12-25 A kind of Multipurpose foundation bolt erecting tools

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310723102.1A CN103669393B (en) 2013-12-25 2013-12-25 A kind of Multipurpose foundation bolt erecting tools

Publications (2)

Publication Number Publication Date
CN103669393A CN103669393A (en) 2014-03-26
CN103669393B true CN103669393B (en) 2015-09-16

Family

ID=50308107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310723102.1A Expired - Fee Related CN103669393B (en) 2013-12-25 2013-12-25 A kind of Multipurpose foundation bolt erecting tools

Country Status (1)

Country Link
CN (1) CN103669393B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924505B (en) * 2014-05-07 2016-08-24 河南省交通规划设计研究院股份有限公司 Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100574064B1 (en) * 2006-02-02 2006-04-27 (주)진우종합건축사사무소 Assembly anchor structure for apartment house
CN101748747B (en) * 2008-12-18 2012-06-27 鞍钢建设集团有限公司 Annular furnace base movable thread stand bolt positioning method
CN101947759A (en) * 2010-09-21 2011-01-19 林勇 Bolt mounting device
JP5526001B2 (en) * 2010-11-17 2014-06-18 株式会社東芝 Foundation-based level adjustment method and foundation-base fixing method
CN201879711U (en) * 2010-11-25 2011-06-29 郑国静 Special bracket for X-ray radiography
CN203322651U (en) * 2013-04-26 2013-12-04 国家电网公司 Novel assembly platform for complete set of foundation bolts
CN203625923U (en) * 2013-12-25 2014-06-04 国网山西供电工程承装公司 Multifunctional foundation bolt mounting tool

Also Published As

Publication number Publication date
CN103669393A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN203755640U (en) Slope surface scaffold pedestal device
CN103669393B (en) A kind of Multipurpose foundation bolt erecting tools
CN203390247U (en) Punching positioning device
CN201597015U (en) Pawl used for removing bushings from blind holes
CN203868555U (en) Centering type flange
CN203625923U (en) Multifunctional foundation bolt mounting tool
CN204524062U (en) A kind of stamping line and pusher positioner thereof
CN203863063U (en) Multi-spindle drill for air boosting pump
CN110159067A (en) A kind of upright fence post pedestal with blocking function
CN106838507B (en) A kind of screw position adjustable oil pipe ring flange connector
CN215803402U (en) Floor preformed hole plugging device
CN205201404U (en) Engine cylinder overlaps dismounting device
CN204365809U (en) Portable hydraulic puncher
CN203509487U (en) Square tube core penetrating assemble jig frame for vibration-resistant support
CN202532062U (en) Connection pipe with rotary flange plate
CN104307978A (en) Portable hydraulic perforating machine
CN103273325B (en) A kind of steel plate shearing machine load bearing holder mounting structure
CN105313070A (en) Installation device for engine cylinder sleeve
CN104812199A (en) PCB fixing device
CN217400551U (en) Safe region protection rail of hoisting equipment
CN218225273U (en) Welding auxiliary device for steel structure
CN109079681B (en) Positioning tool for petroleum equipment machining
CN214217696U (en) Pipe laying and paying-off device for hydraulic engineering
CN203977998U (en) Insert the anti-inclination enclosing of installing type column
CN218462385U (en) Punching device for circuit board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

Termination date: 20201225

CF01 Termination of patent right due to non-payment of annual fee