CN101748747B - Annular furnace base movable thread stand bolt positioning method - Google Patents

Annular furnace base movable thread stand bolt positioning method Download PDF

Info

Publication number
CN101748747B
CN101748747B CN2008102299135A CN200810229913A CN101748747B CN 101748747 B CN101748747 B CN 101748747B CN 2008102299135 A CN2008102299135 A CN 2008102299135A CN 200810229913 A CN200810229913 A CN 200810229913A CN 101748747 B CN101748747 B CN 101748747B
Authority
CN
China
Prior art keywords
movable thread
thread stand
bolt
stand
central point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008102299135A
Other languages
Chinese (zh)
Other versions
CN101748747A (en
Inventor
郝卫国
钟一坚
吴长荣
黄云广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Original Assignee
ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANGANG CONSTRUCTION CONSORTIUM Co Ltd filed Critical ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Priority to CN2008102299135A priority Critical patent/CN101748747B/en
Publication of CN101748747A publication Critical patent/CN101748747A/en
Application granted granted Critical
Publication of CN101748747B publication Critical patent/CN101748747B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to an annular furnace base movable thread stand bolt positioning method. The method is implemented by arranging a total station at the central point of the annular base, putting the marked movable thread stand on a reinforcing steel bar fixing stand, moving the movable thread stand so that one straight line on the movable thread stand steel plate is in superposition with the straight line of the positioning bolt group, which passes through the central point of the annular base; the reinforcing steel bar fixing stand is marked; the total station is used for measuring the distance L from the central point of the annular base to central points of two mutually orthogonal straight lines on the movable thread stand, the difference value A between distance L and the radius R of the group of bolts is calculated, the position points of the group of bolts can be determined according to the difference value and marked on the reinforcing steel bar fixing stand to realize positioning the bolts. The method adopts the movable thread stand to mark on the reinforcing steel bar fixing stand, thus dispensing with quantities of steel plates or profile steel, being simple and fast, saving materials, and having precise positioning.

Description

A kind of annular furnace base movable thread stand bolt positioning method
Technical field
The present invention relates to the pre-embedded bolt localization method of a kind of industry, civilian ring foundation.
Background technology
Many groups pre-embedded bolt of annular distribution on the large-scale ring-like Equipment Foundations such as industry rotary heating furnace basis and the cold hole of sintered ring (the most nearly group surplus in the of 160) is the critical process of foundation construction, and its precision directly influences the next procedure installation quality.
Because bolt is distributed on the annulus, difficulty is bigger when measuring unwrapping wire.Traditional measurement unwrapping wire mounting method is: adopt §=4-6mm steel plate or 16a channel-section steel bolt frame plane as a whole, and unwrapping wire in the above, the boring erection bolt, every group of bolt needs one of the steel plate or [5.5 meters on the 12 channel-section steel bands of 1.2 meters * 1.2 meters of sizes.Adopt the method erection bolt operation many, high material consumption need be used square during unwrapping wire on steel plate, and precision is difficult for guaranteeing, influences the bolt installation quality.
Summary of the invention
The purpose of this invention is to provide a kind of annular furnace base movable thread stand bolt positioning method, this method adopts movable thread stand on the reinforcing bar fixed mount, to mark, and need not to use in a large number steel plate or shaped steel, and is simple and efficient, save material, accurate positioning.
For realizing above-mentioned purpose, the present invention adopts following technical scheme to realize:
A kind of annular furnace base movable thread stand bolt positioning method is characterized in that, this method comprises the steps:
1) make movable thread stand, its structure is the middle structural frame that can rule;
2) on the flat board of movable thread stand, draw two orthogonal lines, marked;
3) welded reinforcement fixed mount on the good steel mesh reinforcement of colligation is as the usefulness of measuring cultellation;
4) at the ring foundation central point total powerstation is set, the movable thread stand of marked is placed on the reinforcing bar fixed mount, move movable thread stand, the straight line on the movable thread stand steel plate is overlapped with the straight line that passes through the ring foundation central point of positioning bolt group; And on the reinforcing bar fixed mount, perform mark;
5) measure the distance L of ring foundation central point two mutual vertical line central points on the movable thread stand with total powerstation; Calculate the difference A of distance L and this group bolt radius R of living in; Can determine each location point of this group bolt according to difference; On the reinforcing bar fixed mount, perform mark, promptly realized the location of bolt.
Compared with prior art, the invention has the beneficial effects as follows:
1) cancels steel plate or shaped steel as the bolt mounting and fixing support, fundamentally solved the problem of high material consumption;
2) reduce working procedure, reduced engineering cost, saved the operation that making, installation steel plate or shaped steel fixed mount, unwrapping wire are holed;
3) improved the bolt installation accuracy.
Description of drawings
Fig. 1 is the application sketch map of the inventive method.
Among the figure: the distance of 1-circle centre position test desk 2-ring foundation 3-movable thread stand 4-bolt L-annular furnace central point two vertical line intersection points on the movable thread stand
R-should organize bolt radius of living in
The difference of the distance L of A-annular furnace central point two vertical line intersection points on the movable thread stand and this group bolt radius R of living in
The specific embodiment
Further specify the present invention through specific embodiment below.
This embodiment is an application example in φ 177 petroleum pipeline engineering annular furnace bases.
1, equipment, material are prepared:
A. welding equipment: one of electric welding machine.
B. ∠ 50 * 5 angle steel, §=6mm steel plate, φ 20 indented barss.
C. total powerstation is one.
2, movable thread stand is made:
A. adopt the frame of ∠ 50 * 5 angle steel weldering system 800 * 600, middle steel plate and angle frame firm welding with 6mm thick 600 * 400.
B. make two mutually perpendicular lines in the steel plate center, and marked.
3, reinforcing bar fixed mount welding: the continuous fixed mount of welded closure on the good steel mesh reinforcement of colligation, as the usefulness of measuring cultellation, fixed mount should be stablized firmly.
4, total powerstation range finding cultellation:
A. at the good total powerstation of ring-like base center point frame, on the reinforcing bar fixed mount, move movable thread stand, make straight line and the straight line that passes through the ring foundation central point of positioning bolt group on the movable thread stand steel plate heavily be incorporated in marked on the reinforcing bar fixed mount.
B. record the distance L of annular furnace central point two vertical line intersection points on the movable thread stand with total powerstation, calculate the difference A of L and this group bolt radius R of living in, can confirm the location point of this group bolt according to difference A, and on the reinforcing bar fixed mount marked.
5, bolt is installed: move movable thread stand out, and measure installation absolute altitude, erection bolt.
6, bolt accuracy checking:, carry out national current standard with chi and level gauge inspection bolt level and vertical missing.

Claims (1)

1. an annular furnace base movable thread stand bolt positioning method is characterized in that, this method comprises the steps:
1) make movable thread stand, its structure is the middle structural frame that can rule;
2) on the flat board of movable thread stand, draw two orthogonal lines, marked;
3) welded reinforcement fixed mount on the good steel mesh reinforcement of colligation is as the usefulness of measuring cultellation;
4) at the ring foundation central point total powerstation is set, the movable thread stand of marked is placed on the reinforcing bar fixed mount, move movable thread stand, the straight line on the movable thread stand steel plate is overlapped with the straight line that passes through the ring foundation central point of positioning bolt group; And on the reinforcing bar fixed mount, perform mark;
5) measure the distance L of ring foundation central point two mutual vertical line central points on the movable thread stand with total powerstation; Calculate the difference A of distance L and this group bolt radius R of living in; Can determine each location point of this group bolt according to difference; On the reinforcing bar fixed mount, perform mark, promptly realized the location of bolt.
CN2008102299135A 2008-12-18 2008-12-18 Annular furnace base movable thread stand bolt positioning method Expired - Fee Related CN101748747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102299135A CN101748747B (en) 2008-12-18 2008-12-18 Annular furnace base movable thread stand bolt positioning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102299135A CN101748747B (en) 2008-12-18 2008-12-18 Annular furnace base movable thread stand bolt positioning method

Publications (2)

Publication Number Publication Date
CN101748747A CN101748747A (en) 2010-06-23
CN101748747B true CN101748747B (en) 2012-06-27

Family

ID=42476323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102299135A Expired - Fee Related CN101748747B (en) 2008-12-18 2008-12-18 Annular furnace base movable thread stand bolt positioning method

Country Status (1)

Country Link
CN (1) CN101748747B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669393B (en) * 2013-12-25 2015-09-16 国网山西供电工程承装公司 A kind of Multipurpose foundation bolt erecting tools
CN106322997B (en) * 2016-08-31 2018-04-20 中国十五冶金建设集团有限公司 Copper making refines grate installation method
CN107653899B (en) * 2017-11-13 2020-03-31 中冶建工集团有限公司 Rapid positioning method for annular foundation bolt
CN107794937A (en) * 2017-11-13 2018-03-13 中冶建工集团有限公司 Use ring-type foundation bolt fast-positioning device in a kind of novel device basis
CN108265741B (en) * 2018-01-26 2020-06-16 中国化学赛鼎宁波工程有限公司 Practical method for foundation bolt construction positioning
CN111827697A (en) * 2020-07-24 2020-10-27 武汉一冶建筑安装工程有限责任公司 Rapid paying-off method for warp and weft shaft net square column
CN112681366A (en) * 2020-12-23 2021-04-20 中国石油天然气第六建设有限公司 Positioning method for embedded foundation bolt of ultra-large equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1168689A1 (en) * 1984-02-28 1985-07-23 Государственный Ордена Трудового Красного Знамени Проектный Институт "Ленинградский Промстройпроект" Jig for setting anchor bolts into foundation
SU1283335A1 (en) * 1985-08-06 1987-01-15 Куйбышевский инженерно-строительный институт им.А.И.Микояна Jig for setting anchorage bolts in foundation
CN101260964A (en) * 2008-04-17 2008-09-10 中国第一冶金建设有限责任公司 Ring apparatus foundation bolt rapid mounting method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1168689A1 (en) * 1984-02-28 1985-07-23 Государственный Ордена Трудового Красного Знамени Проектный Институт "Ленинградский Промстройпроект" Jig for setting anchor bolts into foundation
SU1283335A1 (en) * 1985-08-06 1987-01-15 Куйбышевский инженерно-строительный институт им.А.И.Микояна Jig for setting anchorage bolts in foundation
CN101260964A (en) * 2008-04-17 2008-09-10 中国第一冶金建设有限责任公司 Ring apparatus foundation bolt rapid mounting method

Also Published As

Publication number Publication date
CN101748747A (en) 2010-06-23

Similar Documents

Publication Publication Date Title
CN101748747B (en) Annular furnace base movable thread stand bolt positioning method
CN103437374B (en) Group's foundation bolt installation positioner and installation method thereof
CN202382696U (en) Pipe straightness detection device
CN107489163B (en) method for mounting ring bolt of metallurgical industrial furnace body
CN101398118A (en) Installing and centering method for power reels
CN111852052A (en) Steel pipe column bracket accurate positioning control tool and positioning control method thereof
CN103696410B (en) Rack-and-pinion climbing type vertical ship lift Nut column Efficient installation method and servicing unit
CN110594536A (en) Verticality adjusting method for tower equipment
CN103291724A (en) Adjusting nut for roadway surrounding rock convergence and deformation monitoring and using method thereof
CN204988237U (en) A base plate is examined to modularization
CN213015474U (en) Loading hole built-in fitting location frock
CN111750839B (en) Method for measuring installation and maintenance of base of fan-shaped section of continuous casting machine and special detection device
CN202195793U (en) Three-phase electrode circle center positioning device for electric furnace and ladle refining furnace
CN111609779A (en) Rapid acceptance device and detection method for anchor backing plate
CN109680711B (en) Ring-arranged direct-buried bolt pre-embedding positioning device and construction method
CN202522213U (en) High-speed rail measurement control point CPIII marking post detector
CN204286797U (en) A kind of locating support and analyzing flat instrument
CN202928893U (en) Bending rigidity test device
CN219732099U (en) Steel pile pressure testing device
CN110747914A (en) Large tower equipment inclination correction method
CN107941114A (en) The comprehensive check tool of large and medium-sized Sheet Metal Part
CN109443328B (en) Prestressed pipeline coordinate positioning ruler and use method thereof
CN219862927U (en) Equipment foundation bolt pre-buried positioner
CN110315035A (en) Fan-shaped sections of slab continuous pedestal installation measuring device and its construction method
CN206618372U (en) A kind of concrete mixer mixes cylinder axiality detection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120627

Termination date: 20171218