CN103661831A - Full circle swinging tug with two anchor windlasses on bow - Google Patents

Full circle swinging tug with two anchor windlasses on bow Download PDF

Info

Publication number
CN103661831A
CN103661831A CN201310580941.2A CN201310580941A CN103661831A CN 103661831 A CN103661831 A CN 103661831A CN 201310580941 A CN201310580941 A CN 201310580941A CN 103661831 A CN103661831 A CN 103661831A
Authority
CN
China
Prior art keywords
anchor
tubing string
tug
bow
guide part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310580941.2A
Other languages
Chinese (zh)
Other versions
CN103661831B (en
Inventor
刘林伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHENJIANG SHIPYARD (GROUP) CO Ltd
Original Assignee
JIANGSU ZHENJIANG SHIPYARD (GROUP) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHENJIANG SHIPYARD (GROUP) CO Ltd filed Critical JIANGSU ZHENJIANG SHIPYARD (GROUP) CO Ltd
Priority to CN201310580941.2A priority Critical patent/CN103661831B/en
Publication of CN103661831A publication Critical patent/CN103661831A/en
Application granted granted Critical
Publication of CN103661831B publication Critical patent/CN103661831B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a full circle swinging tug with two anchor windlasses on the bow. The full circle swinging tug with the two anchor windlasses on the bow comprises an abrasion-proof cable bridge, cable piles and the two anchor windlasses. The abrasion-proof cable bridge is arranged on the center line of a main deck on the front edge of the bow of the tug. The two anchor windlasses are symmetrically arranged on the two sides, away from the bulwark for no less than 700mm, of the center line of the main deck on the bow of the tug and distributed in a splayed shape, the closing up end of the splayed shape faces toward the bow of the tug. The cable piles are arranged between the abrasion-proof cable bridge and the anchor windlasses, and the distance between each cable pile and the corresponding windlass is smaller than the distance between the cable pile and the abrasion-proof cable bridge. Cable guide holes are formed in the cable piles, and the centers of the cable guide holes and the interlayers of main rotary drums of the anchor windlasses are located in the same horizontal plane. Each cable pile is provided with a guide part, and the outer side of the end of the guide part is tangent with the plane of a baffle on the inner side of the main rotary drum of the corresponding anchor windlass. The full circle swinging tug solves the problem that a tug cannot work when only one anchor windlass is arranged on the tug and has a fault, abrasion to cables in reversed towing operation is further reduced, and therefore maintenance cost is lower and safety degree is higher.

Description

Bow has the Z-drive tug of two anchor winches
Technical field
The present invention relates to a kind of Z-drive tug, relate in particular to the Z-drive tug that a kind of bow has two anchor winches, belong to Marine engineering technical field.
Background technology
If Z-drive tug anchor winch when reality is used of single anchor winch breaks down, cannot work, bow arranges two anchor winches, and two anchor winches can be standby each other.
Summary of the invention
Goal of the invention: the present invention is broken down having solved single anchor winch, in the time of cannot work problem, have also reduced the wearing and tearing of hawser in towing astern operation, makes that maintenance cost is lower, degree of safety is higher.
Technical scheme: bow of the present invention has the Z-drive tug of two anchor winches, comprises abrasionproof cable bridge, checking bollard and two anchor winches, and abrasionproof cable bridge is arranged on the line of centers of ship bow part leading edge main deck; Two anchor winches are symmetricly set on ship bow part main deck line of centers both sides, apart from bulwark, are not less than 700mm place, and are splayed distribution, and splay closing in end face is to stem; Checking bollard is between abrasionproof cable bridge and anchor winch, and the distance between checking bollard and anchor winch is less than the distance between checking bollard and abrasionproof cable bridge; On checking bollard, be equiped with mooring pipe, the interlayer of the center of mooring pipe and anchor winch master rotor is positioned at same level; Checking bollard has guide part, and the inner side baffle plane of the outside of guide part end and anchor winch master rotor is tangent.Described checking bollard is preferably four post checking bollards, comprises the first guide part consisting of the first vertical tubing string, the second vertical tubing string and the first horizontal tubing string; The support portion that the second vertical tubing string, the 3rd vertical tubing string and the second horizontal tubing string form; The second guide part that the 3rd vertical tubing string, the 4th vertical tubing string and the 3rd horizontal tubing string form; Described support portion is perpendicular to main deck line of centers, and the first guide part, the second guide part and main deck line of centers have angle; Described mooring pipe is installed on the second horizontal tubing string of support portion.Further, the level height of the described first horizontal tubing string, the 3rd horizontal tubing string is higher than the level height of mooring pipe; The first horizontal tubing string, the 3rd horizontal tubing string have played the effect of location for hawser, limit hawser and can not jump out guide part and damage master rotor baffle plate.Preferably, described mooring pipe inside face is coated with stainless steel layer.Described the first guide part, the second guide part surface are coated with stainless steel layer.
Beneficial effect: the present invention is broken down having solved single anchor winch, in the time of cannot work problem, have also reduced the wearing and tearing of hawser in towing astern operation, makes that maintenance cost is lower, degree of safety is higher.Two anchor winches are splayed and are symmetricly set on ship bow part main deck line of centers both sides, and hawser is able to go out to poly-inclination angle in main deck line of centers cable to the guide part arranging on checking bollard; The inner side baffle plane of the outside of guide part end and anchor winch master rotor is tangent, and that has limited hawser goes out cable angle, is easy to controlling of boats and ships, has protected windlass master rotor two side shields; Checking bollard has also played the effect of heaving pile simultaneously, and the part that tubing string exceeds can store a part of towing cable.Retain with bulwark the passage that is not less than 700mm, be convenient to the current of crewman; The interlayer of the center of mooring pipe and anchor winch master rotor is placed in to same level, reduces hawser through the friction of mooring pipe; Towboat is between operational period, having very large work-hours is pushing tow operation, the other side's planking is arrived in the haulage gear arranging for fear of ship bow part scratch when pushing tow operation, produce extra unnecessary cost, distance setting between checking bollard and anchor winch is less than to the distance between checking bollard and abrasionproof cable bridge, and the hawser extending from mooring pipe does not contact with any structure of bow except abrasionproof cable bridge, avoids the wearing and tearing of hawser.
Accompanying drawing explanation
Fig. 1 is birds-eye view of the present invention;
Fig. 2 is schematic diagram of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing and instantiation, the present invention is described in detail.
As shown in Figure 1, 2, bow of the present invention has the Z-drive tug of two anchor winches, comprises abrasionproof cable bridge 1, checking bollard 2 and two anchor winches 3, and abrasionproof cable bridge 1 is arranged on the line of centers of ship bow part leading edge main deck; Two anchor winches 3 are symmetricly set on ship bow part main deck line of centers both sides, apart from bulwark, are not less than 700mm place, and are splayed distribution, and splay closing in end face is to stem; Checking bollard 2 is between abrasionproof cable bridge 1 and anchor winch 3, and the distance between checking bollard 2 and anchor winch 3 is less than the distance between checking bollard 2 and abrasionproof cable bridge 1; Described checking bollard 2 is four post checking bollards, comprises the first guide part consisting of the first vertical tubing string 8 of vertical tubing string 7, second and the first horizontal tubing string 9; The support portion that the second vertical tubing string the 8, the 3rd vertical tubing string 10 and the second horizontal tubing string 11 form; The second guide part that the 3rd vertical tubing string the 10, the 4th vertical tubing string 12 and the 3rd horizontal tubing string 13 form; Described support portion is perpendicular to main deck line of centers, and the first guide part, the second guide part and main deck line of centers have angle; And the first guide part, the second guide part surface are coated with stainless steel layer; Interior side shield 6 planes of two anchor winch 3 master rotors 5 respectively with the first vertical tubing string 7 of the first guide part end, the 4th vertical tubing string 12 outsides of the second guide part end are tangent; On the second horizontal tubing string 11 of support portion, be equiped with mooring pipe 4, the interlayer of the center of mooring pipe 4 and anchor winch 3 master rotors 5 is positioned at same level; The level height of the first horizontal tubing string 9, the 3rd horizontal tubing string 13 is higher than the level height of mooring pipe 4; Limit hawser and can not jump out the baffle plate 6 that leads tubing string and damage master rotor 5.Mooring pipe 4 inside faces are coated with stainless steel layer.

Claims (5)

1. bow has a Z-drive tug for two anchor winches, it is characterized in that, comprises abrasionproof cable bridge (1), checking bollard (2) and anchor winch (3), and abrasionproof cable bridge (1) is arranged on the line of centers of ship bow part leading edge main deck; Anchor winch (3) is symmetricly set on ship bow part main deck line of centers both sides, apart from bulwark, is not less than 700mm place, is splayed and distributes, and splay closing in end face is to stem; Checking bollard (2) is between abrasionproof cable bridge (1) and anchor winch (3), and the distance between checking bollard (2) and anchor winch (3) is less than the distance between checking bollard (2) and abrasionproof cable bridge (1); On checking bollard (2), be equiped with mooring pipe (4), the interlayer of the center of mooring pipe (4) and anchor winch (3) master rotor (5) is positioned at same level; Checking bollard (2) has guide part, and interior side shield (6) plane of the outside of guide part end and anchor winch (3) master rotor (5) is tangent.
2. bow according to claim 1 has the Z-drive tug of two anchor winches, it is characterized in that, described checking bollard is four post checking bollards, comprises the first guide part consisting of the first vertical tubing string (7), the second vertical tubing string (8) and the first horizontal tubing string (9); The support portion that the second vertical tubing string (8), the 3rd vertical tubing string (10) and the second horizontal tubing string (11) form; The second guide part that the 3rd vertical tubing string (10), the 4th vertical tubing string (12) and the 3rd horizontal tubing string (13) form; Described support portion is perpendicular to main deck line of centers, and the first guide part, the second guide part and main deck line of centers have angle; Described mooring pipe (4) is installed on the second horizontal tubing string (11) of support portion.
3. bow according to claim 2 has the Z-drive tug of two anchor winches, it is characterized in that, the level height of the described first horizontal tubing string (9), the 3rd horizontal tubing string (13) is higher than the level height of mooring pipe (4).
4. bow according to claim 1 has the Z-drive tug of two anchor winches, it is characterized in that, described mooring pipe (4) inside face is coated with stainless steel layer.
5. bow according to claim 1 has the Z-drive tug of two anchor winches, it is characterized in that, described the first guide part, the second guide part surface are coated with stainless steel layer.
CN201310580941.2A 2013-11-18 2013-11-18 Bow has the Z-drive tug of two anchor winch Active CN103661831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310580941.2A CN103661831B (en) 2013-11-18 2013-11-18 Bow has the Z-drive tug of two anchor winch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310580941.2A CN103661831B (en) 2013-11-18 2013-11-18 Bow has the Z-drive tug of two anchor winch

Publications (2)

Publication Number Publication Date
CN103661831A true CN103661831A (en) 2014-03-26
CN103661831B CN103661831B (en) 2016-03-02

Family

ID=50300853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310580941.2A Active CN103661831B (en) 2013-11-18 2013-11-18 Bow has the Z-drive tug of two anchor winch

Country Status (1)

Country Link
CN (1) CN103661831B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104097744A (en) * 2014-06-17 2014-10-15 武昌船舶重工集团有限公司 Bulwark of special tugboat and linear dressing method thereof
CN113386902A (en) * 2021-07-29 2021-09-14 广船国际有限公司 Mooring method and mooring system of ship and ship
CN114919692A (en) * 2022-06-28 2022-08-19 江苏省镇江船厂(集团)有限公司 Full-rotation towboat cable pressing device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001048083A (en) * 1999-08-03 2001-02-20 Kayaba Ind Co Ltd Mooring equipment
CN2711040Y (en) * 2004-06-07 2005-07-20 李振国 Multiple ships combination towboat
CN101094788A (en) * 2004-11-03 2007-12-26 欧洲智能有限公司 Tug with movable towing installation
CN101249876A (en) * 2008-04-08 2008-08-27 山东诚基工程建设有限公司 Disanchor equipment and ship craft having the same
JP2009269683A (en) * 2008-04-30 2009-11-19 Os System Kk Rope winch for tugboat
JP2011219239A (en) * 2010-04-12 2011-11-04 Os System Kk Winch for tugboat
CN202279211U (en) * 2011-10-27 2012-06-20 中国国际海运集装箱(集团)股份有限公司 Layout structure for anchoring and mooring fittings of container ship
CN203714157U (en) * 2013-11-18 2014-07-16 江苏省镇江船厂(集团)有限公司 Full-rotation tugboat with two anchor winches at fore body

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001048083A (en) * 1999-08-03 2001-02-20 Kayaba Ind Co Ltd Mooring equipment
CN2711040Y (en) * 2004-06-07 2005-07-20 李振国 Multiple ships combination towboat
CN101094788A (en) * 2004-11-03 2007-12-26 欧洲智能有限公司 Tug with movable towing installation
CN101249876A (en) * 2008-04-08 2008-08-27 山东诚基工程建设有限公司 Disanchor equipment and ship craft having the same
JP2009269683A (en) * 2008-04-30 2009-11-19 Os System Kk Rope winch for tugboat
JP2011219239A (en) * 2010-04-12 2011-11-04 Os System Kk Winch for tugboat
CN202279211U (en) * 2011-10-27 2012-06-20 中国国际海运集装箱(集团)股份有限公司 Layout structure for anchoring and mooring fittings of container ship
CN203714157U (en) * 2013-11-18 2014-07-16 江苏省镇江船厂(集团)有限公司 Full-rotation tugboat with two anchor winches at fore body

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104097744A (en) * 2014-06-17 2014-10-15 武昌船舶重工集团有限公司 Bulwark of special tugboat and linear dressing method thereof
CN104097744B (en) * 2014-06-17 2016-08-17 武昌船舶重工集团有限公司 The bulwark of a kind of extraordinary towboat and line style method for trimming thereof
CN113386902A (en) * 2021-07-29 2021-09-14 广船国际有限公司 Mooring method and mooring system of ship and ship
CN114919692A (en) * 2022-06-28 2022-08-19 江苏省镇江船厂(集团)有限公司 Full-rotation towboat cable pressing device
CN114919692B (en) * 2022-06-28 2024-03-01 江苏省镇江船厂(集团)有限公司 Full-rotation towboat cable pressing device

Also Published As

Publication number Publication date
CN103661831B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN102381440B (en) Guide chain device
CN102161374A (en) Chain brake device
CN102381455A (en) Unilateral positioning method for secondary docking of ship in dock
KR20150018818A (en) Azimuth Friction free Towing point
CN205150165U (en) Ship's fix anchor system
CN210000500U (en) A mooring arrangement suitable for limited deck space
KR20130010481A (en) Icebreaking vessel and method of breaking ice
RU2427860C1 (en) Complex for towing outboard seismic equipment
CN104828219A (en) Movable rubber fender device used for ship-to-ship barge transport operation
CN103661831A (en) Full circle swinging tug with two anchor windlasses on bow
CN105523143A (en) Ship bow anchoring and mooring device and ship
CN203714157U (en) Full-rotation tugboat with two anchor winches at fore body
CN103661813B (en) The method for arranging of the two anchor winch of Z-drive tug bow
KR20140120150A (en) mooring device and method using magnetic force
KR20180038700A (en) Ship mooring system with turning mooring post and mooring method using it
WO2012101104A1 (en) A system for storage, deployment and retrieval of elongated flexible members
CN109159853B (en) Self-adaptive mooring device for offshore shallow water area
JP6949690B2 (en) Floating body mooring method and floating body
CN203878535U (en) Bridge anti-collision device
CN102361315B (en) Three synchronous laying construction method of underground cable in sea area
CN211405292U (en) Pre-laying anchor cable system composition of long-distance sandbank section
CN108438153A (en) A kind of cable ship moving device
KR20130081643A (en) Icebreaking vessel and method of breaking ice
CN203581342U (en) Full circle swinging type tugboat with towing device arranged on bow
KR101519540B1 (en) Drill ship having the arrangement structure of mooring apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant