CN103641045A - Hoisting tool - Google Patents

Hoisting tool Download PDF

Info

Publication number
CN103641045A
CN103641045A CN201310671324.3A CN201310671324A CN103641045A CN 103641045 A CN103641045 A CN 103641045A CN 201310671324 A CN201310671324 A CN 201310671324A CN 103641045 A CN103641045 A CN 103641045A
Authority
CN
China
Prior art keywords
shaft
axle
backing plate
hoisting tool
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310671324.3A
Other languages
Chinese (zh)
Inventor
薛瑞泉
刘铁成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN ZHONGZHONG METAL STRUCTURE CO Ltd
Original Assignee
TIANJIN ZHONGZHONG METAL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN ZHONGZHONG METAL STRUCTURE CO Ltd filed Critical TIANJIN ZHONGZHONG METAL STRUCTURE CO Ltd
Priority to CN201310671324.3A priority Critical patent/CN103641045A/en
Publication of CN103641045A publication Critical patent/CN103641045A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention provides a hoisting tool used for hoisting workpieces. A shaft sleeve set comprises a shaft, a first base plate, a second base plate, a first screw and a bolt; a hanging ring sleeve set comprises a steel wire rope which is connected with a lifting lug of a workpiece; an embedded part comprises a cross beam; the shaft sleeve set is installed on the embedded part, the front end of the shaft penetrates into the hole of the embedded part from one side, the other side of the shaft is fastened through the second base plate and the bolt, the embedded part is provided with a cushion block supporting the shaft, and the first base plate is installed at the rear end of the shaft and fastened through the first screw; the hanging ring set is wound at the rear end of the shaft through the steel wire rope and close to the position of the fires base plate. The workpiece is pulled up with the help of manpower, and it is guaranteed that the other procedure is carried out orderly. According to the hoisting tool, the shaft can be smoothly installed on a vertical plate of the cross beam, meanwhile the other procedure can be assisted by means of the lever principle of the shaft, dangling supply of the workpiece is completed, smooth operation of installation of the next procedure is guaranteed, work efficiency is promoted, and a safe working environment is enhanced.

Description

A kind of hoisting tool
Technical field
The present invention relates to a kind of hoisting tool, especially a kind of can be on built-in fitting installation shaft, and hoisting tool suspension ring being risen by steel rope.
Background technology
At present, in the fitter's shop of factory, there is such step, axle need to be arranged on the riser of crossbeam, but due to crossbeam and riser be all hung in aerial, if engineering worker aloft ascending stair complete this work, really danger coefficient is very large, this just needs the mechanism of a set of hoisting tool that this work is completed, and hoisting tool can not only be arranged on axle on the riser of crossbeam smoothly, the lever principle that can also use axle simultaneously, auxiliary another operation, completes the unsettled supply of hanger.
Summary of the invention
The problem to be solved in the present invention is to provide a kind of hoisting tool.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of hoisting tool, for workpiece is sling, comprises axle sleeve group, suspension ring cover group and built-in fitting;
Described axle sleeve group comprises axle, the first backing plate, the second backing plate, the first screw and bolt;
Described suspension ring cover group comprises steel rope, and steel rope is connected with the hanger of workpiece;
Described built-in fitting comprises crossbeam;
Described axle sleeve group is arranged on described built-in fitting, the front end of axle penetrates the hole of built-in fitting from a side, the second backing plate and bolted for opposite side, and this built-in fitting is provided with the cushion block that supports described axle, described the first backing plate is arranged on the rear end of axle, and uses the first screw fastening;
Described suspension ring cover group is the rear end around described axle by described steel rope, near the position of the first backing plate.
Described crossbeam comprises 1 base and a plurality of riser, and riser is evenly distributed on base according to certain distance, and with base weld together.
As preferably, the socket bolt that the described bolt that the front end of described axle is used is M56.
As preferably, the mounting hole on described axle and described riser adopts free-running fit.
As preferably, described the first backing plate minimum thickness must not be lower than 2mm.
As preferably, there are 4 through holes the bottom surface of described hanger.
Advantage and good effect that the present invention has are: adopt technique scheme, by axle being arranged on the built-in fitting on roof, by steel rope, workpiece is sling, do not having the composing room of overhead traveling crane to carry out the assembling of workpiece, overcome the adverse environment of erecting stage to the impact of assembling, promoted work efficiency.
Accompanying drawing explanation
Fig. 1 is the birds-eye view of hoisting tool.
Fig. 2 is the side schematic view of built-in fitting.
In figure: 1, axle 2, the first backing plate 3, the second backing plate 4, the first screw 5, bolt 6, steel rope 7, hanger 8, the second screw 9, cushion block 10, riser 11, base
The specific embodiment
Below in conjunction with the drawings and the specific embodiments, the invention will be further described.
As shown in Fig. 1 or 2, the present invention includes axle sleeve group, suspension ring cover group and built-in fitting;
Axle sleeve group comprises axle 1, the first backing plate 2, the second backing plate 3, the first screws 4 and bolts 5;
Suspension ring cover group comprises steel rope 6, and steel rope 6 is connected with the hanger 7 of workpiece, fastening with outside workpiece by the second screw 8;
Built-in fitting comprises crossbeam;
Axle sleeve group is arranged on built-in fitting, and the front end of axle 1 penetrates the hole of riser 10 from a side, and opposite side is fastening with the second backing plate 3 and bolt 5, this built-in fitting is provided with the cushion block 9 that supports described axle 1, as the fulcrum of power, the first backing plate 2 is arranged on the rear end of axle 1, and fastening with the first screw 4;
Suspension ring cover group is the rear end around axle 1 by steel rope 6, near the position of the first backing plate 2.
Crossbeam comprises 1 base 11 and a plurality of riser 10, riser 10 according to 2m uniformly at intervals on base 11, and with base 11 weld togethers.
The front end of axle 1 is used the socket bolt 5 of M56.
Axle 1 adopts free-running fit with the mounting hole on riser 10.
Working process of the present invention is: first built-in fitting is embedded in the roof of composing room, the front end of axle 1 is penetrated to the hole of riser 10 from a side, opposite side is fastening with the second backing plate 3 and bolt 5, the top of the base cross members of axle 1 is provided with cushion block 9, the position of cushion block 9 is near the rear end of axle 1, in order to the fulcrum as power; Again by the fastening rear end that the first backing plate 2 is arranged on to axle 1 of the first screw 4; Steel rope 6 one end are around the hanger 7 of workpiece, the other end is walked around axle 1 and is held by engineering worker, when this workman pulls at steel rope 6, separately there is workman's level to hold the hanger 7 of workpiece, make workpiece steadily increase, after rising to predetermined setting height(from bottom), steel rope 6 is fixing, carry out the erection work of subsequent processing.
Above embodiment has been described in detail the present invention, but described content is only preferred embodiment of the present invention, can not be considered to for limiting practical range of the present invention.All equalization variations of doing according to the present patent application scope and improvement etc., within all should still belonging to patent covering scope of the present invention.

Claims (5)

1. a hoisting tool, for workpiece is sling, is characterized in that: comprise axle sleeve group, suspension ring cover group and built-in fitting;
Described axle sleeve group comprises axle, the first backing plate, the second backing plate, the first screw and bolt;
Described suspension ring cover group comprises steel rope, and steel rope is connected with the hanger of workpiece;
Described built-in fitting comprises crossbeam;
Described axle sleeve group is arranged on described built-in fitting, the front end of axle penetrates the hole of built-in fitting from a side, the second backing plate and bolted for opposite side, and this built-in fitting is provided with the cushion block that supports described axle, described the first backing plate is arranged on the rear end of axle, and uses the first screw fastening;
Described suspension ring cover group is the rear end around described axle by described steel rope, near the position of the first backing plate.
2. hoisting tool according to claim 1, is characterized in that: described crossbeam comprises 1 base and a plurality of riser, and riser is evenly distributed on base according to certain distance, and with base weld together.
3. hoisting tool according to claim 1, adjusts according to intensity of force, it is characterized in that: described bolt adopts the socket bolt of M56.
4. hoisting tool according to claim 1, adjusts according to intensity of force, it is characterized in that: described the first backing plate minimum thickness must not be lower than 2mm.
5. hoisting tool according to claim 1, is characterized in that: there are 4 through holes the bottom surface of described hanger.
CN201310671324.3A 2013-12-10 2013-12-10 Hoisting tool Pending CN103641045A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310671324.3A CN103641045A (en) 2013-12-10 2013-12-10 Hoisting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310671324.3A CN103641045A (en) 2013-12-10 2013-12-10 Hoisting tool

Publications (1)

Publication Number Publication Date
CN103641045A true CN103641045A (en) 2014-03-19

Family

ID=50246383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310671324.3A Pending CN103641045A (en) 2013-12-10 2013-12-10 Hoisting tool

Country Status (1)

Country Link
CN (1) CN103641045A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107546930A (en) * 2017-10-17 2018-01-05 安徽安凯汽车股份有限公司 A kind of electric machine stator iron assembly hoisting tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107546930A (en) * 2017-10-17 2018-01-05 安徽安凯汽车股份有限公司 A kind of electric machine stator iron assembly hoisting tool
CN107546930B (en) * 2017-10-17 2023-06-27 安徽安凯汽车股份有限公司 Motor stator iron core assembly lifting tool

Similar Documents

Publication Publication Date Title
CN201381166Y (en) Hanging-point adjustable transverse hanging beam
CN201417657Y (en) Installation device of indoor transformer
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN104675179B (en) Jack up head tower installation hanger device and head tower construction method
CN104836161A (en) Hanger frame of fixed-steering pulley
CN103318745B (en) A kind of lightweight special hanger and installation method thereof
CN204850516U (en) A horizontal lifeline system for steel construction factory building
CN103641045A (en) Hoisting tool
CN203639094U (en) Hoisting tool
CN204590640U (en) A kind of prefabricated concrete structure longitudinal reinforcement location adjustment jig
CN204675726U (en) Purlin lifting auxiliary device
CN102996897A (en) Special device for installing air hose
CN103138189B (en) A kind of examining and repairing power disconnecting switch special hoisting bar
CN105347202A (en) Balance hoisting device for powerhouse roof parapet wall
CN204737704U (en) Be used for special hanging flower basket of wiping line installation
CN104032944A (en) Suspension frame construction platform device
CN104806001B (en) The sliding safe operation platform of elevator guide rail and construction method
CN104340847B (en) The nut mounting device of rolling mill screwdown device and method
JP2014084199A (en) Method for installing overhead crane
CN207453450U (en) A kind of pedal extension rod
CN205772813U (en) For 40 tons of door machines built-in decelerator remove and install one suspender
CN204826704U (en) A horizontal lifeline system for steel construction factory building
CN105923506B (en) A kind of combined type underground work transport of remote control lift and communication system
CN204905824U (en) Wire rope circle cable plastics dolly
CN204457048U (en) Self lift type head tower installation hanger device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140319