CN103631627A - Equipment configuration method, configuration-file generation method and configuration system - Google Patents
Equipment configuration method, configuration-file generation method and configuration system Download PDFInfo
- Publication number
- CN103631627A CN103631627A CN201310686573.XA CN201310686573A CN103631627A CN 103631627 A CN103631627 A CN 103631627A CN 201310686573 A CN201310686573 A CN 201310686573A CN 103631627 A CN103631627 A CN 103631627A
- Authority
- CN
- China
- Prior art keywords
- file
- configuration
- ied
- resource mapping
- configuration file
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The application discloses an equipment configuration method which is applied into the configuration process of an intelligent electronic device (IED) of an intelligent substation. The equipment configuration method comprises the following steps: receiving a CID (Configured IED Description) file of an example configuration file of the IED; carrying out configuration on the IED according to an ICD (IED configuration description) file of a capability description file in the IED, wherein the ICD file of the capability description file comprises a function configuration file, a resource mapping relation and a communication configuration file. The equipment configuration method disclosed by the application has the advantages that the resource mapping relation and the communication configuration file needed in the configuration process of the IED are preloaded into the ICD file of the capability description file, the CID file of the example configuration file only needs to be received in the configuration process, while the CID file can be derived from the substation configuration description (SCD) file by a general derivation tool, and a special derivation tool is not required for deriving the resource mapping relation and the communication configuration file from the substation configuration description (SCD) file, so that the problem handling period of the IED is shortened.
Description
Technical field
The application relates to equipment configuring technical field, more particularly, relates to a kind of equipment configuration method, configuration file generation method and configuration-system.
Background technology
Along with the raising of grid automation level, the mankind have proposed more and more higher requirement to the economy of electrical network, the feature of environmental protection, safe reliability.Setting up intelligent power supply system of new generation has become the common recognition of countries in the world.Than traditional electric power system, the intelligent grid of a new generation can make full use of modern information technologies.The communication technology and control technology, realize comprehensive fusion of energy infrastructure and information infrastructure.
China has dropped into a large amount of intelligent substation equipment.The thing followed is the allocation problem of intelligent substation IED equipment (Intelligent Electronic Device, intelligent electronic device).Than the IED equipment layoutprocedure of traditional transformer station, configuration and the debug process of intelligent substation IED equipment are more complicated.The layoutprocedure of existing intelligent substation IED equipment is adopted with the following method: IED equipment is first according to the functional configuration of oneself, according to IEC61850 normalization ICD file (IED Capability Configuration, IED ability description file).Integrator and Substation Design unit, according to logic connecting relation and the allocation of communications strategy of device, set up the SCD file (Substation Configuration Description, substation configuration description) at full station.In layoutprocedure, the technician of YouIED device fabrication manufacturer is by special-purpose derivation instrument, from SCD file, derive and generate the necessary CID file of IED equipment (Configured IED Description, device instantiation configures) and the internal resource of IED equipment shines upon, communication configuration file, be downloaded into again IED equipment, can normally move.But the derivation instrument of the required file of IED equipment is that production firm is privately owned, conventionally need the technician of production firm to operate, after widely applying for intelligent substation, the cycle that IED plant issue is processed can lengthen, be unfavorable for fast processing IED plant issue, and manual operation has strengthened substation operation maintainer's workload.
Summary of the invention
In view of this, the application provides a kind of equipment configuration method, configuration file generation method and configuration-system, be applied in the layoutprocedure of intelligent substation IED equipment and the generative process of ability description file ICD, for solving existing IED equipment layoutprocedure, need special-purpose derivation instrument to derive essential configuration file from substation configuration description file SCD, thereby increase the problem in the cycle of IED plant issue processing.
To achieve these goals, the existing scheme proposing is as follows:
An equipment configuration method, is applied to, in the layoutprocedure of intelligent substation intelligent electronic device IED, comprising:
Receive the exemplary configuration file CID file of IED equipment;
Ability description file ICD file according to described IED device interior, is configured described IED equipment, described ability description file ICD file including functional configuration file, resource mapping relation and communication configuration file.
Preferably, described exemplary configuration file CID file is specially and derives in substation configuration description file SCD file by general derivation instrument.
Preferably, described resource mapping relation and described communication configuration file are pre-loaded in the described ability description file ICD file.
Preferably, described resource mapping relation is stored in described ability description file ICD file in the mode of short address.
A kind of device configuration file generation method, is applied to the generative process of the ability description file ICD file of intelligent electronic device IED in intelligent substation, comprising:
According to the functional configuration information of IED equipment, systematic function configuration file;
According to the internal resource mapping relations information of described IED equipment, generate resource mapping relation;
According to the communication configuration information of described IED equipment, generate communication configuration file;
Described functional configuration file, described resource mapping relation and described communication configuration file are loaded in ICD model file.
An equipment configuration system, is applied to, in the layoutprocedure of intelligent substation intelligent electronic device IED, comprising:
Exemplary configuration file receiving element, for receiving the exemplary configuration file CID file of IED equipment;
Ability description file storage unit, for storing the ability description file ICD file of described IED equipment, described ability description file ICD file comprises functional configuration file, resource mapping relation and communication configuration file;
Exemplary configuration file processing unit, for according to described ability description file ICD file, described exemplary configuration file CID file being processed, and configures described IED equipment.
Preferably, described ability description file storage unit comprises:
Resource mapping relational storage subelement, for storing described resource mapping relation;
Communication configuration file stores subelement, for storing described communication configuration file;
Functional configuration file storing sub-units, for storing described functional configuration file.
Preferably, described resource mapping relation is stored in described resource mapping relational storage subelement in short address mode.
Preferably, described exemplary configuration file CID file is specially and derives in substation configuration description file SCD file by general derivation instrument.
Preferably, described resource mapping relation and described communication configuration file are pre-loaded in the described ability description file ICD file.
From above-mentioned technical scheme, can find out, the disclosed collocation method of the application, by the necessary resource mapping relation of IED equipment layoutprocedure and communication configuration file is pre-loaded in ability description file ICD, in layoutprocedure, only need to receive exemplary configuration file CID file, and CID file can be derived from substation configuration description file SCD by general derivation instrument.Said process is derived resource mapping relation and communication configuration file without the special use instrument of deriving from substation configuration description file SCD, also just without technician, use special derivation instrument, therefore shorten IED plant issue treatment cycle, be convenient to the management of extensive intelligent substation.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only some embodiment of the application, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the collocation method process flow diagram of the disclosed a kind of intelligent substation IED equipment of the embodiment of the present application;
Fig. 2 is the generation method flow diagram of the ability description file ICD file of the disclosed a kind of IED equipment of the embodiment of the present application;
Fig. 3 is the open IED equipment configuration system structural drawing of the embodiment of the present application;
Fig. 4 is the structural drawing of the disclosed IED capacity of equipment of the embodiment of the present application description document storage unit.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is clearly and completely described, obviously, described embodiment is only the application's part embodiment, rather than whole embodiment.Embodiment based in the application, those of ordinary skills are not paying all other embodiment that obtain under creative work prerequisite, all belong to the scope of the application's protection.
Embodiment 1
First, we make an explanation to the title of using in the application:
IED:(Intelligent Electronic Device, intelligent electronic device), comprise one or more processors, can receive the data from external source, or send data to outside, or the device of controlling.
ICD:(IED Capability Configuration, IED ability description file).
CID:(Configured IED Description, device instantiation configuration), IED configuration describing document is generally derived and is generated and download in IED equipment from SCD file.
SCD:(Substation Configuration Description, substation configuration description).
The present embodiment discloses a kind of equipment configuration method, is applied to particularly in the layoutprocedure of intelligent substation intelligent electronic device IED.Referring to Fig. 1, Fig. 1 is the collocation method process flow diagram of the disclosed a kind of intelligent substation IED equipment of the embodiment of the present application.
As shown in Figure 1, the method comprises:
Step 101: the exemplary configuration file CID file that receives IED equipment;
Particularly, the exemplary configuration file CID file of IED equipment is derived from substation configuration description file SCD file, in this process owing to not needing to derive resource mapping relation and communication configuration file simultaneously, therefore without the privately owned special use of the production firm of IED equipment, derive instrument, by general derivation instrument, can complete this step.Derive CID from SCD after, CID file is downloaded in IED equipment.
Step 102: the ability description file ICD file according to described IED device interior, is configured described ability description file ICD file including functional configuration file, resource mapping relation and communication configuration file to described IED equipment.
Particularly, we are loaded into the resource mapping relation of IED device interior and communication configuration file in the ability description file ICD file of IED equipment in advance, ICD file has just possessed the required complete configuration information of configuration IED equipment like this, when configuration IED equipment, only need to receive CID file can be configured IED equipment.
The disclosed collocation method of the present embodiment, by the necessary resource mapping relation of IED equipment layoutprocedure and communication configuration file is pre-loaded in ability description file ICD, in layoutprocedure, only need to receive exemplary configuration file CID file, and CID file can be derived from substation configuration description file SCD by general derivation instrument.Said process is derived resource mapping relation and communication configuration file without the special use instrument of deriving from substation configuration description file SCD, also just without technician, use special derivation instrument, therefore shorten IED plant issue treatment cycle, be convenient to the management of extensive intelligent substation.
It should be noted that, it is generally to store in the mode of short address that resource mapping closes in the ability description file ICD file that ties up to IED equipment.
Embodiment 2
The present embodiment discloses a kind of device configuration file generation method, is applied in the generative process of ability description file ICD file of IED equipment in intelligent substation.Referring to Fig. 2, Fig. 2 is the generation method flow diagram of the ability description file ICD file of the disclosed a kind of IED equipment of the embodiment of the present application.
As shown in Figure 2, the method comprises:
Step 201: according to the functional configuration information of IED equipment, systematic function configuration file;
Step 202: according to the internal resource mapping relations information of described IED equipment, generate resource mapping relation;
Step 203: according to the communication configuration information of described IED equipment, generate communication configuration file;
Step 204: described functional configuration file, described resource mapping relation and described communication configuration file are loaded in ICD model file.
The present embodiment has just merged the necessary various resource mapping relations of IED equipment operation, communication configuration file, functional configuration file etc. by the initial design stage at ICD file, without adjusting again in auto levelizer in the equipment debugging stage, also just without technician, use special-purpose derivation instrument from SCD file, to derive resource mapping relation, communication configuration file, therefore simplified layoutprocedure, the large scale investment of being convenient to intelligent substation is used.
Embodiment 3
The present embodiment discloses a kind of equipment configuration system, is applied in the layoutprocedure of intelligent substation intelligent electronic device IED.Referring to Fig. 3, Fig. 3 is the open IED equipment configuration system structural drawing of the embodiment of the present application.
As shown in Figure 3, this system comprises:
Exemplary configuration file receiving element 31, for receiving the exemplary configuration file CID file of IED equipment;
Particularly, the exemplary configuration file CID file of IED equipment is derived from substation configuration description file SCD file, in this process owing to not needing to derive resource mapping relation and communication configuration file simultaneously, therefore without the privately owned special use of the production firm of IED equipment, derive instrument, by general derivation instrument, can complete this step.Derive CID from SCD after, CID file is downloaded in IED equipment.
Ability description file storage unit 32, for storing the ability description file ICD file of described IED equipment, described ability description file ICD file comprises functional configuration file, resource mapping relation and communication configuration file;
Particularly, we are loaded into the resource mapping relation of IED device interior and communication configuration file in the ability description file storage unit 32 of IED equipment in advance, and ICD file has just possessed the required complete configuration information of configuration IED equipment like this.
Exemplary configuration file processing unit 33, for according to described ability description file ICD file, described exemplary configuration file CID file being processed, and configures described IED equipment.
The present embodiment is by pre-loaded in ability description file storage unit 32 by the necessary resource mapping relation of IED equipment layoutprocedure and communication configuration file, in layoutprocedure, only need to receive exemplary configuration file CID file, and CID file can be derived from substation configuration description file SCD by general derivation instrument.Said process is derived resource mapping relation and communication configuration file without the special use instrument of deriving from substation configuration description file SCD, also just without technician, use special derivation instrument, therefore shorten IED plant issue treatment cycle, be convenient to the management of extensive intelligent substation.
Embodiment 4
Referring to Fig. 4, Fig. 4 is the structural drawing of the disclosed IED capacity of equipment of the embodiment of the present application description document storage unit.
As shown in Figure 4, ability description file storage unit 32 can be divided into:
Resource mapping relational storage subelement 321, for storing described resource mapping relation;
Communication configuration file stores subelement 322, for storing described communication configuration file;
Functional configuration file storing sub-units 323, for storing described functional configuration file.
Wherein, resource mapping relation is generally that mode with short address is stored in resource mapping relational storage subelement 321.
Finally, also it should be noted that, in this article, relational terms such as the first and second grades is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply and between these entities or operation, have the relation of any this reality or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thereby the process, method, article or the equipment that make to comprise a series of key elements not only comprise those key elements, but also comprise other key elements of clearly not listing, or be also included as the intrinsic key element of this process, method, article or equipment.The in the situation that of more restrictions not, the key element being limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment that comprises described key element and also have other identical element.
In this instructions, each embodiment adopts the mode of going forward one by one to describe, and each embodiment stresses is the difference with other embodiment, between each embodiment identical similar part mutually referring to.
Above-mentioned explanation to the disclosed embodiments, makes professional and technical personnel in the field can realize or use the application.To the multiple modification of these embodiment, will be apparent for those skilled in the art, General Principle as defined herein can be in the situation that do not depart from the application's spirit or scope, realization in other embodiments.Therefore, the application will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.
Claims (10)
1. an equipment configuration method, is applied to, in the layoutprocedure of intelligent substation intelligent electronic device IED, it is characterized in that, comprising:
Receive the exemplary configuration file CID file of IED equipment;
Ability description file ICD file according to described IED device interior, is configured described IED equipment, described ability description file ICD file including functional configuration file, resource mapping relation and communication configuration file.
2. method according to claim 1, is characterized in that, described exemplary configuration file CID file is specially derives in substation configuration description file SCD file by general derivation instrument.
3. method according to claim 1, is characterized in that, described resource mapping relation and described communication configuration file are pre-loaded in the described ability description file ICD file.
4. method according to claim 3, is characterized in that, described resource mapping relation is stored in described ability description file ICD file in the mode of short address.
5. a device configuration file generation method, is applied to the generative process of the ability description file ICD file of intelligent electronic device IED in intelligent substation, it is characterized in that, comprising:
According to the functional configuration information of IED equipment, systematic function configuration file;
According to the internal resource mapping relations information of described IED equipment, generate resource mapping relation;
According to the communication configuration information of described IED equipment, generate communication configuration file;
Described functional configuration file, described resource mapping relation and described communication configuration file are loaded in ICD model file.
6. an equipment configuration system, is applied to, in the layoutprocedure of intelligent substation intelligent electronic device IED, it is characterized in that, comprising:
Exemplary configuration file receiving element, for receiving the exemplary configuration file CID file of IED equipment;
Ability description file storage unit, for storing the ability description file ICD file of described IED equipment, described ability description file ICD file comprises functional configuration file, resource mapping relation and communication configuration file;
Exemplary configuration file processing unit, for according to described ability description file ICD file, described exemplary configuration file CID file being processed, and configures described IED equipment.
7. system according to claim 6, is characterized in that, described ability description file storage unit comprises:
Resource mapping relational storage subelement, for storing described resource mapping relation;
Communication configuration file stores subelement, for storing described communication configuration file;
Functional configuration file storing sub-units, for storing described functional configuration file.
8. system according to claim 7, is characterized in that, described resource mapping relation is stored in described resource mapping relational storage subelement in short address mode.
9. system according to claim 6, is characterized in that, described exemplary configuration file CID file is specially derives in substation configuration description file SCD file by general derivation instrument.
10. system according to claim 6, is characterized in that, described resource mapping relation and described communication configuration file are pre-loaded in the described ability description file ICD file.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310686573.XA CN103631627B (en) | 2013-12-13 | 2013-12-13 | A kind of equipment configuration method, configuration file generation method and configuration system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310686573.XA CN103631627B (en) | 2013-12-13 | 2013-12-13 | A kind of equipment configuration method, configuration file generation method and configuration system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103631627A true CN103631627A (en) | 2014-03-12 |
CN103631627B CN103631627B (en) | 2018-01-30 |
Family
ID=50212724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310686573.XA Active CN103631627B (en) | 2013-12-13 | 2013-12-13 | A kind of equipment configuration method, configuration file generation method and configuration system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103631627B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103887878A (en) * | 2014-03-17 | 2014-06-25 | 广州供电局有限公司 | Information engineering configuration method and system for wide-area protection system |
CN104574204A (en) * | 2014-12-16 | 2015-04-29 | 国家电网公司 | Automatic identification system and method for ICD model of intelligent measurement and control device |
CN104851056A (en) * | 2015-05-26 | 2015-08-19 | 中国电力科学研究院 | Intelligent transformer station secondary system model standard library management system and method |
CN105354220A (en) * | 2015-09-29 | 2016-02-24 | 国网福建省电力有限公司 | Application method for IED user customized configuration file of intelligent transformer substation |
CN106874011A (en) * | 2017-02-28 | 2017-06-20 | 南京南瑞继保电气有限公司 | A kind of document generating method and device |
CN107958345A (en) * | 2017-12-13 | 2018-04-24 | 许继集团有限公司 | A kind of SCD file collocation method and device based on database and file fragment |
CN109446155A (en) * | 2018-11-12 | 2019-03-08 | 山东鲁能智能技术有限公司 | Intelligent station describes file and imports and exports configuration method and system |
CN109542450A (en) * | 2018-11-08 | 2019-03-29 | 国网河南省电力公司电力科学研究院 | Transformer station process layer intelligent assembly implementation method and device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080127210A1 (en) * | 2006-07-21 | 2008-05-29 | Bosold Mark J | Method of configuring intelligent electronic devices to facilitate standardized communication messages among a plurality of ieds within a network |
CN102254074A (en) * | 2011-08-04 | 2011-11-23 | 上海思源弘瑞自动化有限公司 | Automatic modeling method of intelligent transformer substation spacer |
CN102495841A (en) * | 2011-11-14 | 2012-06-13 | 深圳市华力特电气股份有限公司 | Power supply system monitoring method and related device thereof |
CN103048959A (en) * | 2011-10-13 | 2013-04-17 | Abb股份公司 | Method for configuring a control device |
-
2013
- 2013-12-13 CN CN201310686573.XA patent/CN103631627B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080127210A1 (en) * | 2006-07-21 | 2008-05-29 | Bosold Mark J | Method of configuring intelligent electronic devices to facilitate standardized communication messages among a plurality of ieds within a network |
CN101490647A (en) * | 2006-07-21 | 2009-07-22 | 施魏策尔工程实验公司 | A method of configuring intelligent electronic devices to facilitate standardized communication messages among a plurality of ieds within a network |
CN102254074A (en) * | 2011-08-04 | 2011-11-23 | 上海思源弘瑞自动化有限公司 | Automatic modeling method of intelligent transformer substation spacer |
CN103048959A (en) * | 2011-10-13 | 2013-04-17 | Abb股份公司 | Method for configuring a control device |
CN102495841A (en) * | 2011-11-14 | 2012-06-13 | 深圳市华力特电气股份有限公司 | Power supply system monitoring method and related device thereof |
Non-Patent Citations (1)
Title |
---|
卢霁明: "基于IEC61850标准的IED配置器研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103887878B (en) * | 2014-03-17 | 2016-03-02 | 广州供电局有限公司 | The information engineering collocation method of Wide area protection system and system |
CN103887878A (en) * | 2014-03-17 | 2014-06-25 | 广州供电局有限公司 | Information engineering configuration method and system for wide-area protection system |
CN104574204A (en) * | 2014-12-16 | 2015-04-29 | 国家电网公司 | Automatic identification system and method for ICD model of intelligent measurement and control device |
CN104574204B (en) * | 2014-12-16 | 2018-06-19 | 国家电网公司 | Intelligent measuring and control device ICD models automatic identification system and method |
CN104851056A (en) * | 2015-05-26 | 2015-08-19 | 中国电力科学研究院 | Intelligent transformer station secondary system model standard library management system and method |
CN105354220A (en) * | 2015-09-29 | 2016-02-24 | 国网福建省电力有限公司 | Application method for IED user customized configuration file of intelligent transformer substation |
CN105354220B (en) * | 2015-09-29 | 2018-10-23 | 国网福建省电力有限公司 | A kind of application process of intelligent substation IED equipment user's custom profiles |
CN106874011B (en) * | 2017-02-28 | 2020-06-09 | 南京南瑞继保电气有限公司 | File generation method and device |
CN106874011A (en) * | 2017-02-28 | 2017-06-20 | 南京南瑞继保电气有限公司 | A kind of document generating method and device |
CN107958345A (en) * | 2017-12-13 | 2018-04-24 | 许继集团有限公司 | A kind of SCD file collocation method and device based on database and file fragment |
CN109542450A (en) * | 2018-11-08 | 2019-03-29 | 国网河南省电力公司电力科学研究院 | Transformer station process layer intelligent assembly implementation method and device |
CN109542450B (en) * | 2018-11-08 | 2021-10-01 | 国网河南省电力公司电力科学研究院 | Method and device for realizing intelligent component of process layer of intelligent substation |
CN109446155A (en) * | 2018-11-12 | 2019-03-08 | 山东鲁能智能技术有限公司 | Intelligent station describes file and imports and exports configuration method and system |
Also Published As
Publication number | Publication date |
---|---|
CN103631627B (en) | 2018-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103631627A (en) | Equipment configuration method, configuration-file generation method and configuration system | |
CN102622463B (en) | Drawing-model uniformity based method for automatic check of design drawings | |
CN101741143B (en) | Method for realizing integral configuration of electric automation system | |
CN104198860A (en) | Electric automobile charging and discharging facility testing method and system | |
CN106021344B (en) | A kind of flexible CIME electric network model sharing method | |
CN103455554B (en) | A kind of intelligent power distribution network model base system | |
CN103729732A (en) | Distributed energy resource information modeling and information interacting method | |
CN103151840A (en) | Communication method and device of IEC (international electrotechnical commission) 61850 system and non-IEC 61850 system | |
CN110867956A (en) | Topology automatic identification system and method based on intelligent platform area | |
CN105554012A (en) | Communication unit for converting EtherCAT slave station into Canopen master station on basis of DSP (Digital Signal Processor) | |
CN103887792B (en) | A kind of low-voltage distribution network modeling method containing distributed power source | |
CN109062570A (en) | A kind of method and storage medium automatically generating drawing based on EPLAN software | |
CN103577628A (en) | Optimization method for virtual circuit design of smart substation | |
CN105205039A (en) | Customizable SCD (substation configuration description) file verification method | |
CN103150189B (en) | A kind of method to set up of intelligent electric energy meter parameter | |
CN103984540A (en) | Method and device for generating hardware interface running program | |
CN104036667A (en) | Method for realizing intelligent substation virtual terminal connection design training | |
CN110488698A (en) | One kind is open to control integrated secondary developing platform and system | |
CN102799137B (en) | Method for cross-platform transportation of programmable logic controller (PLC) software of wind power control system | |
CN104281905A (en) | Compressive power failure expert system based on condition based maintenance platform | |
CN104237697A (en) | Testing system for new energy automobile charging equipment | |
CN103419201B (en) | Multi-knuckle robot control system based on FPGA (Field Programmable Gate Array) and control method thereof | |
CN109537896B (en) | Construction site electric box intelligent arrangement method and system based on BIM | |
CN106156373A (en) | A kind of intelligent substation SCD file Explore of Unified Management Ideas and system | |
CN105469158A (en) | Improved PMU optimal configuration integer linear programming method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |