CN103628484B - 土岩地质深基坑反向对接施工方法 - Google Patents

土岩地质深基坑反向对接施工方法 Download PDF

Info

Publication number
CN103628484B
CN103628484B CN201210300250.8A CN201210300250A CN103628484B CN 103628484 B CN103628484 B CN 103628484B CN 201210300250 A CN201210300250 A CN 201210300250A CN 103628484 B CN103628484 B CN 103628484B
Authority
CN
China
Prior art keywords
foundation ditch
lithosphere
superstructure
reversed beam
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210300250.8A
Other languages
English (en)
Other versions
CN103628484A (zh
Inventor
杨前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201210300250.8A priority Critical patent/CN103628484B/zh
Publication of CN103628484A publication Critical patent/CN103628484A/zh
Application granted granted Critical
Publication of CN103628484B publication Critical patent/CN103628484B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本发明涉及深基坑施工,尤其涉及土岩地质的深基坑施工方法。一种土岩地质深基坑反向对接施工方法,它包括下列步骤:步骤一,基坑上部的土方开挖至基坑下部的岩石层;步骤二,岩石层上部结构与反梁施工,上部结构与反梁浇筑为同一整体,内圈结构设置结构预留钢筋,外圈反梁设置锚固钢筋;步骤三,土方回填,基坑内已施工的结构外围回填土方;步骤四,基坑下部岩石层爆破;步骤五,岩石层爆破开挖至底层后,自下而上进行下部结构施工,施工至顶部和已完成施工的上部结构进行对接。本发明操作简便快捷,提高施工安全性。

Description

土岩地质深基坑反向对接施工方法
技术领域
本发明涉及深基坑施工,尤其涉及土岩地质的深基坑施工方法。
背景技术
深基坑施工遇到上半部为土层下半部为岩石层的地质条件时,上半部采取土方开挖,下半部采岩石层需采取爆破,爆破工程从方案编制、审批、公安部门审查、爆破材料的选取等各项工作周期相对比较长,而爆破时产生的振动会影响上半部开挖基坑土方边坡的稳定,按照常规施工结构需待基坑开挖到底部时,由下向上施工,按此方法进行施工会出现施工周期长、施工环境安全系数小等缺点。
发明内容
本发明旨在解决上述缺陷,提供一种土岩地质深基坑反向对接施工方法。本发明操作简便快捷,提高施工安全性。
为解决上述问题,本发明一种土岩地质深基坑反向对接施工方法,它包括下列步骤:
步骤一,基坑上部的土方开挖至基坑下部的岩石层;
步骤二,岩石层上部结构与反梁施工,上部结构与反梁浇筑为同一整体,内圈结构设置结构预留钢筋,外圈反梁设置锚固钢筋;
步骤三,土方回填,基坑内已施工的结构外围回填土方;
步骤四,基坑下部岩石层爆破;
步骤五,岩石层爆破开挖至底层后,自下而上进行下部结构施工,施工至顶部和已完成施工的上部结构进行对接。
所述的土岩地质深基坑反向对接施工方法,所述步骤二,在设置岩层上部结构与反梁前,先浇筑一层混凝土垫层,面层处理好后根据上部结构与反梁锚固钢筋位置在混凝土垫层的面层上做好标记,然后进行打孔,打孔后将结构预留钢筋插入。
本发明的预留钢筋定位准确,不会出现偏移。本发明操作简便快捷,提高基坑爆破施工的安全性,并能提高工作效率。
附图说明
下面结合附图对本发明作进一步的说明:
图1为本发明示意图;
图2为所述反梁和预埋钢筋示意图。
具体实施方式
如图1和图2所示,本发明一种土岩地质深基坑反向对接施工方法,它包括下列步骤:
步骤一,基坑上部的土方开挖至基坑下部的岩石层3;
步骤二,岩石层上部结构1施工;岩石层上部结构1与反梁2施工,上部结构与反梁浇筑为同一整体,内圈结构设置结构预留钢筋4,外圈反梁设置锚固钢筋5;
步骤三,土方回填,基坑内已施工的结构外围回填土方;
步骤四,基坑下部岩石层爆破;
步骤五,岩石层爆破开挖至底层后,自下而上进行下部结构施工,施工至顶部和已完成施工的上部结构1进行对接。
所述的土岩地质深基坑反向对接施工方法,所述步骤二,在设置岩层上部结构与反梁前,先浇筑一层混凝土垫层,面层处理好后根据上部结构与反梁钢筋位置在混凝土垫层的面层上做好标记,然后进行打孔,打孔后将结构预留钢筋插入。

Claims (2)

1.一种土岩地质深基坑反向对接施工方法,其特征在于,它包括下列步骤:
步骤一,基坑上部的土方开挖至基坑下部的岩石层;
步骤二,岩石层上部结构与反梁施工,上部结构与反梁浇筑为同一整体,内圈结构设置结构预留钢筋,外圈反梁设置锚固钢筋;
步骤三,土方回填,基坑内已施工的结构外围回填土方;
步骤四,基坑下部岩石层爆破;
步骤五,岩石层爆破开挖至底层后,自下而上进行下部结构施工,施工至顶部和已完成施工的上部结构进行对接。
2.根据权利要求1所述的土岩地质深基坑反向对接施工方法,其特征在于,所述步骤二,在设置岩石层上部结构与反梁前,先浇筑一层混凝土垫层,混凝土垫层的面层处理好后根据上部结构与反梁锚固钢筋位置在该面层上做好标记,然后进行打孔,打孔后将结构预留钢筋插入。
CN201210300250.8A 2012-08-22 2012-08-22 土岩地质深基坑反向对接施工方法 Active CN103628484B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210300250.8A CN103628484B (zh) 2012-08-22 2012-08-22 土岩地质深基坑反向对接施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210300250.8A CN103628484B (zh) 2012-08-22 2012-08-22 土岩地质深基坑反向对接施工方法

Publications (2)

Publication Number Publication Date
CN103628484A CN103628484A (zh) 2014-03-12
CN103628484B true CN103628484B (zh) 2016-03-30

Family

ID=50209911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210300250.8A Active CN103628484B (zh) 2012-08-22 2012-08-22 土岩地质深基坑反向对接施工方法

Country Status (1)

Country Link
CN (1) CN103628484B (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1279319A (zh) * 1999-06-29 2001-01-10 陈星� 一种地下室全逆作施工方法
CN201172826Y (zh) * 2008-03-28 2008-12-31 中船第九设计研究院工程有限公司 深基坑围护墙挡土加固结构
CN102409683A (zh) * 2011-08-12 2012-04-11 天津二十冶建设有限公司 漩流井半逆作施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1279319A (zh) * 1999-06-29 2001-01-10 陈星� 一种地下室全逆作施工方法
CN201172826Y (zh) * 2008-03-28 2008-12-31 中船第九设计研究院工程有限公司 深基坑围护墙挡土加固结构
CN102409683A (zh) * 2011-08-12 2012-04-11 天津二十冶建设有限公司 漩流井半逆作施工方法

Also Published As

Publication number Publication date
CN103628484A (zh) 2014-03-12

Similar Documents

Publication Publication Date Title
EA201800133A1 (ru) Способ строительства городского тоннеля неглубокого залегания в богатом водами карстовом грунте с использованием консольной бурильной машины
CN202559361U (zh) 一种预制高强混凝土薄壁钢管桩基坑支护结构
CN103437339A (zh) 岩溶地层地下连续墙槽壁附近溶洞封闭的施工方法
CN102505704A (zh) 软弱地质竖井中大型沉井施工方法
CN102704480B (zh) 前端振动钢护筒处理桩基超厚流沙层施工方法
CN104131565A (zh) 一种逆作土方正作开挖的施工方法
CN103397634A (zh) 一种锁扣钢管桩围堰的锚固施工方法
CN104695433A (zh) 一种砂性地基中沥青涂层桩的施工方法
CN103967001A (zh) 冲孔桩成孔施工方法
CN104750940B (zh) 一种地下采场胶结充填体强度动态设计方法
CN105545315A (zh) 盾构法隧道施工中加固开挖面土层的常压换刀方法
CN103628484B (zh) 土岩地质深基坑反向对接施工方法
CN104594367B (zh) 一种组合式围堰结构及施工方法
JP2010522289A (ja) 送電鉄塔の基礎を施工するための岩盤発破方法
CN203049570U (zh) 深埋圆形薄壁空心阻滑桩
CN103276706A (zh) 引水隧洞斜(竖)井段防渗结构的施工方法
CN104389609A (zh) 一种无爆破机械开挖法
CN104612164A (zh) 一种劲性复合围护结构施工方法
CN202830971U (zh) 土岩地质深基坑爆破施工的钢筋反梁
CN201924369U (zh) 一种沉井倾斜纠偏装置
CN202359564U (zh) 一种拱形钢板桩支护结构
CN204163085U (zh) 钻孔灌注桩基坑支护
CN206681736U (zh) 采空区防护治理系统
CN103410141A (zh) 矿山排土场上的成桩工艺
CN104895095A (zh) 一种加固深水基坑钢板桩围堰的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant