CN103616284B - The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection - Google Patents

The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection Download PDF

Info

Publication number
CN103616284B
CN103616284B CN201310581501.9A CN201310581501A CN103616284B CN 103616284 B CN103616284 B CN 103616284B CN 201310581501 A CN201310581501 A CN 201310581501A CN 103616284 B CN103616284 B CN 103616284B
Authority
CN
China
Prior art keywords
glue
structure glue
line
double glazing
glazing panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310581501.9A
Other languages
Chinese (zh)
Other versions
CN103616284A (en
Inventor
姜迎秋
金立赞
冷超群
郝晓丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Testing And Certification Shanghai Co ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Original Assignee
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Building and Construction Co Ltd MCC Group, China Jingye Engineering Corp Ltd filed Critical Central Research Institute of Building and Construction Co Ltd MCC Group
Priority to CN201310581501.9A priority Critical patent/CN103616284B/en
Publication of CN103616284A publication Critical patent/CN103616284A/en
Application granted granted Critical
Publication of CN103616284B publication Critical patent/CN103616284B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the method for the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of a kind of Site Detection, the method comprises: step a, the described structure glue in the hollow sandwich of described double glazing panel is sewn on selected surveyed area place and exposes; Step b, segmentation is carried out to the part of the exposure of described structure glue-line empty, adjoin to form two ends the discrete glue section emptying gap; Step c, on-the-spot extruding force is carried out to described discrete glue section load test in described gap of emptying, described discrete glue section is deformed in described hollow sandwich until to rupture or in bonding interface stripping damage.The present invention empties the bonding situation of procedure inspection structure glue by segmentation, can also load the measurement result that thermometrically obtains structure glue-line by extruding force.And the present invention, without the need to dismantling double glazing panel, also can overcome the space constraint brought in hollow crack, thus can avoid detecting the normal use affecting buildings, and the detection made is easy to operation.

Description

The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection
Technical field
The present invention relates to the security detection technique of existing frame concealed curtain wall, in particular to the method for the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of a kind of Site Detection, wherein, " existing " frame concealed curtain wall involved by the method refers to the frame concealed curtain wall after GB is checked and accepted, further, the method detects mainly for the structure stress deformation performance (abbreviation structural behaviour) of structure glue-line.
Background technology
Double glazing panel, normally accompanies gas (inert gas or air) interlayer by layer glass plate body in centre and makes, and edge establishes fluid sealant (comprising moisture absorption molecular sieve) to seal usually, the exchange of gas and air in isolated interlayer.For the double glazing panel for frame concealed curtain wall, edge, except filling above-mentioned fluid sealant, is also provided with the structure glue (such as structural silicone adhesive) existed with glue-line form, to ensure that between layer glass plate body, construction bonds is reliable.If but the bonding effect of structure glue lost efficacy due to reasons such as colloid are aging, then double glazing panel generation flaggy can be caused to come off, thus with regard to entail dangers to use safety.
Therefore, according to existing national standard " Glass Curtain Wall Projects technical manual " the 4th section of JGJ102-2003 12.2.2 article regulation: the sampling check that adhesive property should be carried out after curtain wall engineering uses 10 years to the structure glue of this project different parts; After this should check once for every 3 years.
But, structure glue-line in the hollow crack of double glazing panel is tested, usually need to dismantle double glazing panel at the scene, and then carry out the detection of various means, like this, not only detect required workload comparatively large, and limited to normal the uses generation considerable influence of buildings, usable range.And the structure glue-line due to double glazing panel is positioned at its hollow crack, thus how realizes easily accurately detecting and also become one and have a difficult problem to be solved.
Summary of the invention
In view of this, the invention provides the method for the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of a kind of Site Detection, the method comprises:
Step a, the described structure glue in the hollow sandwich of described double glazing panel is sewn on selected surveyed area place and exposes;
Step b, segmentation is carried out to the part of the exposure of described structure glue-line empty, adjoin to form two ends the discrete glue section emptying gap;
Step c, described empty gap to described discrete glue section carry out on-the-spot extruding force load test, described discrete glue section is deformed until rupture or bonding interface stripping damage occurs in described hollow sandwich.
Alternatively, described step b empties the described structure glue of inspection further by described segmentation and is sewn on structure and property detection situation in described hollow sandwich.
Alternatively, the bonding interface emptying released part that described structure and property detection situation comprises described structure glue-line destroys situation, or colloid Cohesive failure situation.
Alternatively, described step c records the structural behaviour measurement result that described on-the-spot extruding force loads test further.
Alternatively, described structural behaviour measurement result comprises the extruding force loaded value that described on-the-spot tensile test adopts, and the distortion of described glue-line fragment and damage-form.
Alternatively, described step a makes described structure glue be sewn on the exposure of described surveyed area place by the joint seal glue removed at described surveyed area between two pieces of adjacent described double glazing panels.
Alternatively, described step b utilizes graver and tweezers to realize described segmentation to empty.
Alternatively, described step c utilize be embedded in described in the loading blocks emptied in gap realize described on-the-spot extruding force and load test.
Alternatively, empty in gap described between described discrete glue section and the body part of described structure glue-line one of two described loading blocks, described step c utilize stretching pliers to apply between two described loading blocks to make two described loading blocks mutually away from expanding extruding power; Or empty in gap described in two that two described loading blocks lay respectively at the outside of the described discrete glue section that two are separated from each other, described step c utilizes clamp two described loading blocks to be applied to the clamping extruding force making two described loading blocks close to each other.
Alternatively, described structure glue-line is made up of structural silicone adhesive.
As above visible, the present invention is by emptying the structure glue-line enforcement exposure in the hollow crack of hollow face glass and segmentation, the discrete glue section emptying gap is adjoined to form two ends, then test is loaded by implementing on-the-spot extruding force to discrete glue section in the hollow crack of double glazing panel, thus the structure and property detection situation of procedure inspection structure glue can be emptied by segmentation, can also load by extruding force the structural behaviour measurement result that thermometrically obtains structure glue-line.And the present invention, without the need to dismantling double glazing panel, also can overcome the space constraint brought in hollow crack, thus can avoid detecting the normal use affecting buildings, and the detection made is easy to operation.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the method for the structure glue-line performance of the double glazing panel of the existing frame concealed curtain wall of Site Detection in the embodiment of the present invention;
Fig. 2 is suitable for flow process as shown in Figure 1 to realize the example schematic of a kind of existing frame concealed curtain wall detected;
Fig. 3 is the A-A diagrammatic cross-section in Fig. 2;
Fig. 4 is the B-B diagrammatic cross-section in Fig. 2;
Fig. 5 is the C place close-up schematic view in the Fig. 4 when utilizing that flow process is in surveyed area exposed structure glue-line as shown in Figure 1;
Fig. 6 is the structural representation in the D-D face in Fig. 5;
To be E-E face in Fig. 5 emptying through flow process as shown in Figure 1 the structural representation forming discrete glue section to Fig. 7 to the segmentation of structure glue-line;
Fig. 8 is according to schematic diagram when flow process utilizes the loading of stretching pliers applying extruding force to test to the discrete glue section of in Fig. 7 as shown in Figure 1.
Fig. 9 is the schematic diagram utilizing clamp simultaneously to apply when extruding force loads test to the discrete glue section of two in Fig. 7 according to flow process as shown in Figure 1.
Embodiment
For making object of the present invention, technical scheme and advantage clearly understand, to develop simultaneously embodiment referring to accompanying drawing, the present invention is described in more detail.
Fig. 1 is the schematic flow sheet of the method for the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection in the embodiment of the present invention.As shown in Figure 1, in the embodiment of the present invention, the method for the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection comprises:
Step 101, is sewn on selected surveyed area place and exposes by the structure glue in the hollow sandwich of double glazing panel.In practical application, for the situation that there is joint seal glue between adjacent two pieces of double glazing panels, this step can make structure glue be sewn on the exposure of surveyed area place by the joint seal glue removed at surveyed area between two pieces of adjacent double glazing panels.
Step 102, carries out segmentation to the part of the exposure of structure glue-line and empties, adjoins to form two ends the discrete glue section emptying gap.In practical application, this step can utilize the instrument such as graver and tweezers to realize segmentation and empty, and such as, first utilizes graver the part of the exposure of structure glue-line be cut into strip or bulk broken section and then draw out each broken section one by one with tweezers.
Wherein, process is emptied by the segmentation in this step, the bonding situation of structure glue-line and glass plate can be checked, bonding situation described herein can comprise adhesive surface and destroy situation and/or glue Cohesive failure situation, the degree that adhesive surface destroys is lower, or glue Cohesive failure degree is higher, can think that the inspection situation of structural behaviour is better.
Step 103, that empties formation in segmentation empties gap location, and the discrete glue section emptying formation to segmentation is carried out on-the-spot extruding force and loaded test, discrete glue section is deformed in hollow sandwich until rupture or bonding interface stripping damage occurs.In practical application, this step can utilize be embedded in the loading blocks emptied in gap realize on-the-spot extruding force load test.
Wherein, load test by extruding force in this step, such as extruding force loaded value can be obtained, and the distortion of discrete glue section and damage-form isostructuralism energy measurement result, and structural behaviour measurement result is given record, for load-bearing capacity and the deformation performance of analytical structure glue-line.
So far, one-time detection flow process terminates.Wherein, " inspection " in one-time detection flow process can be realized by step 102, " survey " then can be realized by step 103.
As above visible, the embodiment of the present invention is by emptying the structure glue-line enforcement exposure in the hollow crack of hollow face glass and segmentation, the discrete glue section emptying gap is adjoined to form two ends, then test is loaded by implementing on-the-spot extruding force to discrete glue section in the hollow crack of double glazing panel, thus the structure and property detection situation of procedure inspection structure glue can be emptied by segmentation, namely " inspection " in detecting is realized, can also load by extruding force the structural behaviour measurement result that thermometrically obtains structure glue-line, namely realize " survey " in detecting.And the embodiment of the present invention, without the need to dismantling double glazing panel, also can overcome the space constraint brought in hollow crack, thus can avoid detecting the normal use affecting buildings, and the detection made is easy to operation.
In actual applications, said method goes for any frame concealed curtain wall.Below, for a kind of frame concealed curtain wall as shown in Figure 2, these methods are illustrated.
See Fig. 2 (Fig. 2 is the front elevation of looking from the front of frame concealed curtain wall), and the front of the back side of the corresponding frame concealed curtain wall in the upside of composition graphs 3(Fig. 3, the corresponding frame concealed curtain wall in downside) and Fig. 4 (back side of the corresponding frame concealed curtain wall in left side of Fig. 4, the front of the corresponding frame concealed curtain wall in right side):
Frame concealed curtain wall 10 has mutually orthogonal many columns 11 and crossbeam 12, and the rubber blanket 13(thickness of the junction being positioned at column 11 and crossbeam 12 is generally 2mm), wherein, it is be configured to example with double glazing panel 20 by tempered glass materials for laying this example of double glazing panel 20(that mutually orthogonal column 11 and crossbeam 12 are formed multiple) grid area;
Every block double glazing panel 20 is be configured to example with structure glue-line 40 by structural silicone adhesive by this example of structure glue-line 40() be bonded in pay this example of frame 30(be with pay a frame 30 be configured to example by aluminum alloy materials);
What every block double glazing panel 20 bondd pay frame 30 is fixed on column 11 around place grid area and crossbeam 12 by desk connector 31 and stainless steel screw 32;
Space between every two pieces of adjacent hollow face glasss 20 is seam sealed glue 41 and fills, and the structure glue-line 40 that every block double glazing panel 20 bonds is covered towards the sidepiece inside this double glazing panel 20 by dual face seals glue 42;
And, the two-layer plate body 21 of every block double glazing panel 20 is be configured to example with structure glue-line 50 by structural silicone adhesive by this example of structure glue-line 50(in hollow crack 22 therebetween) mutually bond, and the structure glue-line 50 of every block double glazing panel 20 is covered towards the sidepiece inside this double glazing panel 20 by molecular sieve sealing strip 60.
Based on the frame concealed curtain wall 10 with said structure, the process of detection is as follows:
First, refer to Fig. 5 and Fig. 6 and composition graphs 2 to Fig. 4, selected surveyed area 100, and remove the joint seal glue 41 at surveyed area 100 place, the joint seal glue 41 be eliminated represents with the profile line being designated E in figure 6, makes structure glue-line 50 be exposed to selected surveyed area 100 from the side of the hollow crack 22 between the two-layer plate body 21 of the double glazing panel 20 at its place;
Secondly, refer to Fig. 7 and composition graphs 2 to Fig. 6, utilize the instrument such as graver, tweezers that structure glue-line 50 is carried out segmentation to empty, the discrete glue section 500 emptying gap F is adjoined to form two ends, and the bonding situation of two-layer plate body 21 at the colloid emptied in process in interrecord structure glue-line 50 and double glazing panel 20;
Then, refer to Fig. 8, and composition graphs 2 to Fig. 7, empty gap F for one between a discrete glue section 500 and the body part of structure glue-line 50 and be embedded in two pieces of loading blocks 80, and utilize stretching pliers to load between two pieces of loading blocks 80 to make two loading blocks 80 mutually away from expanding extruding power (direction of expanding extruding power is as shown in the arrow line in Fig. 8), namely, with the body part of contact structures glue-line 50 loading blocks 80 for the expansion strong point, discrete glue section 500 is promoted for expanding sticking point with another loading blocks 80 contacting discrete glue section 500, discrete glue section 500 is deformed in hollow crack 20, until fracture or generation bonding interface stripping damage,
Or, also can see Fig. 9, and composition graphs 2 to Fig. 7, empty in the F of gap in two of the outside of two discrete glue sections 500 be separated from each other and embed two loading blocks 80 respectively, and utilize the clamping extruding force (direction of clamping extruding force is as shown in the arrow line in Fig. 9) that clamp makes two loading blocks 80 close to each other in the loading of the outside of two loading blocks 80, namely, two discrete glue sections 500 are promoted for clamping sticking point with two loading blocks 80 contacting two discrete glue sections 500 respectively, at least one making in two discrete glue sections 500 deforms in hollow crack 20, until fracture or generation bonding interface stripping damage.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment made, equivalent replacement, improvement etc., all should be included within the scope of protection of the invention.

Claims (10)

1. a method for the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection, is characterized in that, described method comprises:
Step a, the described structure glue in the hollow sandwich of described double glazing panel is sewn on selected surveyed area place and exposes;
Step b, segmentation is carried out to the part of the exposure of described structure glue-line empty, adjoin to form two ends the discrete glue section emptying gap;
Step c, on-the-spot extruding force is carried out to described discrete glue section load test in described gap of emptying, described discrete glue section is deformed in described hollow sandwich, until fracture or bonding interface stripping damage occurs.
2. method according to claim 1, is characterized in that, described step b empties the described structure glue of inspection further by described segmentation and is sewn on structure and property detection situation in described hollow sandwich.
3. method according to claim 2, is characterized in that, the bonding interface emptying released part that described structure and property detection situation comprises described structure glue-line destroys situation, and colloid Cohesive failure situation.
4. method according to claim 1, is characterized in that, described step c records the structural behaviour measurement result that described on-the-spot extruding force loads test further.
5. method according to claim 4, is characterized in that, described structural behaviour measurement result comprises described on-the-spot extruding force and loads the extruding force loaded value that test adopts, and the distortion of described discrete glue section and damage-form.
6. method according to claim 1, is characterized in that, described step a makes described structure glue be sewn on the exposure of described surveyed area place by the joint seal glue removed at described surveyed area between two pieces of adjacent described double glazing panels.
7. method according to claim 1, is characterized in that, described step b utilizes graver and tweezers to realize described segmentation and empties.
8. method according to claim 1, is characterized in that, described in described step c utilization is embedded in, the loading blocks emptied in gap realizes described on-the-spot extruding force and loads test.
9. method according to claim 8, is characterized in that,
Empty in gap described between described discrete glue section and the body part of described structure glue-line one of two described loading blocks, described step c utilize stretching pliers to apply between two described loading blocks to make two described loading blocks mutually away from expanding extruding power;
Or empty in gap described in two that two described loading blocks lay respectively at the outside of the described discrete glue section that two are separated from each other, described step c utilizes clamp two described loading blocks to be applied to the clamping extruding force making two described loading blocks close to each other.
10. method according to claim 1, is characterized in that, described structure glue-line is made up of structural silicone adhesive.
CN201310581501.9A 2013-11-19 2013-11-19 The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection Active CN103616284B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310581501.9A CN103616284B (en) 2013-11-19 2013-11-19 The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310581501.9A CN103616284B (en) 2013-11-19 2013-11-19 The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection

Publications (2)

Publication Number Publication Date
CN103616284A CN103616284A (en) 2014-03-05
CN103616284B true CN103616284B (en) 2015-11-18

Family

ID=50166990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310581501.9A Active CN103616284B (en) 2013-11-19 2013-11-19 The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection

Country Status (1)

Country Link
CN (1) CN103616284B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510226A (en) * 2015-12-08 2016-04-20 中国建材检验认证集团股份有限公司 Method and device for testing bonding property of second-time sealant of hollow glass
CN107216025B (en) * 2017-07-19 2019-08-30 安徽云融信息技术有限公司 A kind of glass-cutting detection system and detection method
CN107388997B (en) * 2017-07-19 2019-08-30 安徽云融信息技术有限公司 A kind of glass detection device and detection method
CN107352785B (en) * 2017-07-19 2019-08-30 安徽云融信息技术有限公司 A kind of glass processing detection system and detection method
CN108627455B (en) * 2018-04-25 2020-12-15 郑州中原思蓝德高科股份有限公司 Method for testing bonding performance of thermoplastic spacing bar and outer channel adhesive
CN109406390A (en) * 2018-11-28 2019-03-01 航天科工防御技术研究试验中心 A kind of detection method and its equipment of coating interface bond strength

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3974608A (en) * 1975-10-23 1976-08-17 Multuloc Corporation Panel wall construction
CN101806712A (en) * 2010-03-19 2010-08-18 厦门市建筑工程检测中心有限公司 On-site testing method for tensile adhesive strength of existing curtain wall structural silicone sealant
CN102053062A (en) * 2010-12-08 2011-05-11 中国建筑科学研究院 Structural adhesive on-site detection method and device
CN102954935A (en) * 2011-08-29 2013-03-06 中国建筑科学研究院 On-spot detection device of mechanical properties is glued to existing glass curtain wall structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3974608A (en) * 1975-10-23 1976-08-17 Multuloc Corporation Panel wall construction
CN101806712A (en) * 2010-03-19 2010-08-18 厦门市建筑工程检测中心有限公司 On-site testing method for tensile adhesive strength of existing curtain wall structural silicone sealant
CN102053062A (en) * 2010-12-08 2011-05-11 中国建筑科学研究院 Structural adhesive on-site detection method and device
CN102954935A (en) * 2011-08-29 2013-03-06 中国建筑科学研究院 On-spot detection device of mechanical properties is glued to existing glass curtain wall structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
建筑用胶黏剂结构安全性能检测技术研究进展;林宏雄 等;《润滑与密封》;20110228;第36卷(第2期);120-124 *
既有玻璃幕墙粘结安全性能现场检测技术探讨;王骅 等;《中国建筑防水》;20131010(第14期);26-29、33 *

Also Published As

Publication number Publication date
CN103616284A (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN103616284B (en) The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection
Machalická et al. Adhesive joints in glass structures: effects of various materials in the connection, thickness of the adhesive layer, and ageing
Baird et al. Experimental and numerical study of U-shape flexural plate (UFP) dissipators
Quaresimin et al. Stress intensity factors and strain energy release rates in single lap bonded joints in composite materials
Bedon et al. Exploratory numerical analysis of SG-laminated reinforced glass beam experiments
Blyberg et al. Adhesive joints for structural timber/glass applications: Experimental testing and evaluation methods
Hidallana-Gamage et al. Numerical modelling and analysis of the blast performance of laminated glass panels and the influence of material parameters
Amaro et al. Taper’s angle influence on the structural integrity of single-lap bonded joints
Valarinho et al. Numerical simulation of the flexural behaviour of composite glass-GFRP beams using smeared crack models
CN105510226A (en) Method and device for testing bonding property of second-time sealant of hollow glass
US20170191304A1 (en) Compliant hermetic seal system for flat glass panel assembly
Prabhu et al. Uniaxial tensile failure of multi-core asymmetric sandwich composite structures with bonded repair
Elbelbisi et al. Influence of panels size on the static and dynamic performance of laminated glass panels
Bedon et al. Shear glass panels with point-fixed mechanical connections: Finite-Element numerical investigation and buckling design recommendations
Memari et al. Seismic performance of two-side structural silicone glazing systems
Fragiacomo et al. Experimental and numerical behaviour of cross-laminated timber floors in fire conditions
CN103604618B (en) The method of the structure glue-line of the face glass auxiliary frame of the existing frame concealed curtain wall of Site Detection
JP4941838B2 (en) Double glazing
Shetty et al. Failure probability of laminated architectural glazing due to combined loading of wind and debris impact
CN205384216U (en) Adhesion strength and coefficient of friction's test device between measurement building material
Bedon et al. Exploratory Finite-Element investigation and assessment of standardized design buckling criteria for two-side linear adhesively supported glass panels under in-plane shear loads
CN202388869U (en) High-barrier composite membrane for vacuum insulated panel
Silvestru et al. Investigations on linear silicone joints for glass-metal elements with composite structural behavior
Iker et al. Secondary stresses induced by shear movement in structural glazing sealants
Krour et al. Influence of the lamination on the redundancy of a horizontally layered glass element and analysis of the debonding of the adhesive interlayer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160621

Address after: 100088 Beijing city Haidian District Xitucheng Road No. 33

Patentee after: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Patentee after: CHINA JINGYE ENGINEERING Co.,Ltd.

Patentee after: CHINA METALLURGICAL CONSTRUCTION RESEARCH INSTITUTE (SHANGHAI) CO.,LTD.

Address before: 100088 Beijing city Haidian District Xitucheng Road No. 33

Patentee before: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Patentee before: CHINA JINGYE ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230728

Address after: 33 Xitucheng Road, Haidian District, Beijing 100082

Patentee after: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Patentee after: CHINA JINGYE ENGINEERING Co.,Ltd.

Patentee after: MCC testing and certification (Shanghai) Co.,Ltd.

Address before: 100088 Beijing city Haidian District Xitucheng Road No. 33

Patentee before: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Patentee before: CHINA JINGYE ENGINEERING Co.,Ltd.

Patentee before: CHINA METALLURGICAL CONSTRUCTION RESEARCH INSTITUTE (SHANGHAI) CO.,LTD.