CN103616284A - Method for detecting structural glue line of hollow glass panel of existing hidden framing curtain wall in field - Google Patents

Method for detecting structural glue line of hollow glass panel of existing hidden framing curtain wall in field Download PDF

Info

Publication number
CN103616284A
CN103616284A CN201310581501.9A CN201310581501A CN103616284A CN 103616284 A CN103616284 A CN 103616284A CN 201310581501 A CN201310581501 A CN 201310581501A CN 103616284 A CN103616284 A CN 103616284A
Authority
CN
China
Prior art keywords
glue
line
structure glue
loading blocks
gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310581501.9A
Other languages
Chinese (zh)
Other versions
CN103616284B (en
Inventor
姜迎秋
金立赞
冷超群
郝晓丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Testing And Certification Shanghai Co ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Original Assignee
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Building and Construction Co Ltd MCC Group, China Jingye Engineering Corp Ltd filed Critical Central Research Institute of Building and Construction Co Ltd MCC Group
Priority to CN201310581501.9A priority Critical patent/CN103616284B/en
Publication of CN103616284A publication Critical patent/CN103616284A/en
Application granted granted Critical
Publication of CN103616284B publication Critical patent/CN103616284B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for detecting a structural glue line of a hollow glass panel of an existing hidden framing curtain wall in field. The method comprises the following steps: step a, exposing the structural glue line in a hollow interlayer of the hollow glass panel in a selected detection region; step b, hollowing out the exposed part of the structural glue line by sections to form a dispersed glue section with the two ends which are adjacently connected with a hollowed-out gap; and step c, carrying out a field extrusion force loading test on the dispersed glue section in the hollowed-out gap to deform the dispersed glue section in the hollow interlayer until the dispersed glue section is cracked or is stripped and damaged on a bonding interface. According to the method, a bonding condition of structural glue is detected in a sectioned hollowing-out process and a measurement result of the structural glue line can be obtained by the extrusion force loading test. Furthermore, a space limit caused by a hollow crack can also be overcome without detaching the hollow glass panel, so that the normal utilization of buildings is prevented from being influenced by detection and the detection is easy to operate.

Description

The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection
Technical field
The present invention relates to the security detection technique of existing frame concealed curtain wall, be particularly related to the method for structure glue-line of the double glazing panel of the existing frame concealed curtain wall of a kind of Site Detection, wherein, related " existing " frame concealed curtain wall of the method refers to the frame concealed curtain wall after GB is checked and accepted, and the method detects mainly for the structure stress deformation performance (abbreviation structural behaviour) of structure glue-line.
Background technology
Double glazing panel, is normally accompanied gas (inert gas or air) interlayer and makes in centre by layer glass plate body, fluid sealant (comprising moisture absorption molecular sieve) sealing is established at edge conventionally, the exchange of gas and atmosphere in isolated interlayer.For the double glazing panel for frame concealed curtain wall, edge, except filling above-mentioned fluid sealant, is also provided with the structure glue (for example structural silicone adhesive) existing with glue-line form, to guarantee that between layer glass plate body, construction bonds is reliable.If but the bonding effect of structure glue is due to former thereby inefficacies such as colloid are aging, can cause double glazing panel generation flaggy to come off, use safety with regard to entail dangers to thus.
Therefore, according to existing the 4th section of 12.2.2 article regulation of national standard < < Glass Curtain Wall Projects technical manual > > JGJ102-2003: curtain wall engineering was used after 10 years should carry out to the structure glue of this project different parts the sampling check of adhesive property; After this should within every 3 years, check once.
Yet, for the structure glue-line in the hollow crack of double glazing panel, test, conventionally need to dismantle at the scene double glazing panel, and then carry out the detection of various means, like this, not only detect required workload larger, and limited to normal use generation considerable influence, the usable range of buildings.And, because the structure glue-line of double glazing panel is positioned at its hollow crack, thereby how realizes easily accurately detecting and also become one and have a difficult problem to be solved.
Summary of the invention
In view of this, the invention provides the method for structure glue-line of the double glazing panel of the existing frame concealed curtain wall of a kind of Site Detection, the method comprises:
Step a, the described structure glue in the hollow sandwich of described double glazing panel is sewn on to selected surveyed area place exposes;
Step b, the part of the exposure of described structure glue-line is carried out to segmentation empty, to form two ends in abutting connection with the discrete glue section of emptying gap;
Step c, in the described gap of emptying, described discrete glue section is carried out to on-the-spot extruding force load test, described discrete glue section is deformed until rupture or bonding interface stripping damage occurs in described hollow sandwich.
Alternatively, described step b further empties the described structure glue of check by described segmentation and is sewn on the structural behaviour check situation in described hollow sandwich.
Alternatively, described structural behaviour check situation comprises that the bonding interface of emptying released part of described structure glue-line destroys situation, or colloid cohesion destroys situation.
Alternatively, described step c further records the structural behaviour measurement result that described on-the-spot extruding force loads test.
Alternatively, described structural behaviour measurement result comprises the extruding force loaded value that described on-the-spot tensile test adopts, and the distortion of described glue-line fragment and destruction form.
Alternatively, described step a makes described structure glue be sewn on described surveyed area place to expose by remove joint seal glue between two adjacent described double glazing panels at described surveyed area.
Alternatively, described step b utilizes graver and tweezers to realize described segmentation to empty.
Alternatively, described step c utilizes the loading blocks of emptying described in being embedded in gap to realize described on-the-spot extruding force and loads test.
Alternatively, described between described discrete glue section and the body part of described structure glue-line one of two described loading blocks, empty in gap, described step c utilize stretching pliers between two described loading blocks, apply make two described loading blocks mutually away from expanding extruding power; Or two described loading blocks lay respectively at described in two of outside of two described discrete glue sections that are separated from each other and empty in gap, described step c utilizes clamp to apply and make two described loading blocks close clamping extruding force mutually two described loading blocks.
Alternatively, described structure glue-line consists of structural silicone adhesive.
As above visible, the present invention implements to expose by the structure glue-line in the hollow crack to hollow face glass and segmentation is emptied, to form two ends in abutting connection with the discrete glue section of emptying gap, then by discrete glue section being implemented to on-the-spot extruding force in the hollow crack at double glazing panel, load test, thereby can by segmentation, empty the structural behaviour check situation of procedure inspection structure glue, can also load the structural behaviour measurement result that thermometrically obtains structure glue-line by extruding force.And the present invention, without dismounting double glazing panel, also can overcome the space constraint of bringing in hollow crack, thereby can avoid detection to affect the normal use of buildings, and the detection easy operating making.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of method of structure glue-line performance of the double glazing panel of the existing frame concealed curtain wall of Site Detection in the embodiment of the present invention;
Fig. 2 is the example schematic of a kind of existing frame concealed curtain wall of the applicable realization of flow process as shown in Figure 1 detection;
Fig. 3 is the A-A diagrammatic cross-section in Fig. 2;
Fig. 4 is the B-B diagrammatic cross-section in Fig. 2;
Fig. 5 is the local enlarged diagram in C place in the Fig. 4 when utilizing that flow process is in surveyed area exposed structure glue-line as shown in Figure 1;
Fig. 6 is the structural representation of the D-D face in Fig. 5;
Fig. 7 be E-E face in Fig. 5 through flow process as shown in Figure 1 to structure glue-line segmentation empty the structural representation while forming discrete glue section;
The schematic diagram of Fig. 8 when one in Fig. 7 discrete glue section being utilized stretching pliers to apply extruding force to load test according to flow process as shown in Figure 1.
The schematic diagram of Fig. 9 when two in Fig. 7 discrete glue sections being utilized clamp to apply extruding force to load test simultaneously according to flow process as shown in Figure 1.
Embodiment
For making object of the present invention, technical scheme and advantage clearer, referring to the accompanying drawing embodiment that develops simultaneously, the present invention is described in more detail.
Fig. 1 is the schematic flow sheet of method of structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection in the embodiment of the present invention.As shown in Figure 1, in the embodiment of the present invention, the method for the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection comprises:
Step 101, is sewn on selected surveyed area place by the structure glue in the hollow sandwich of double glazing panel and exposes.In practical application, for there being the situation of joint seal glue between adjacent two double glazing panels, this step can make structure glue be sewn on surveyed area place to expose by remove joint seal glue between two adjacent double glazing panels at surveyed area.
Step 102, carries out to the part of the exposure of structure glue-line the discrete glue section that segmentation is emptied, emptied gap to form two ends adjacency.In practical application, this step can be utilized the instruments such as graver and tweezers to realize segmentation and empty, and for example, first utilizes graver that the part of the exposure of structure glue-line is cut into strip or block broken section and then with tweezers, each broken section is drawn out one by one.
Wherein, by the segmentation in this step, empty process, can check the bonding situation of structure glue-line and glass plate, bonding situation described herein can comprise that adhesive surface destroys situation and/or glue cohesion destroys situation, the degree that adhesive surface destroys is lower, or glue cohesion destructiveness is higher, can think that the check situation of structural behaviour is better.
Step 103, empties the gap location of emptying of formation in segmentation, the discrete glue section that segmentation is emptied to formation is carried out on-the-spot extruding force and loaded test, discrete glue section is deformed in hollow sandwich until rupture or bonding interface stripping damage occurs.In practical application, this step can be utilized and be embedded in the loading blocks of emptying in gap and realize on-the-spot extruding force and load test.
Wherein, by the extruding force in this step, load test, can obtain for example extruding force loaded value, and the distortion of discrete glue section and destruction form isostructuralism energy measurement result, and structural behaviour measurement result is given to record, for load-bearing capacity and the deformation performance of analytical structure glue-line.
So far, one-time detection flow process finishes.Wherein, " inspection " in one-time detection flow process can realize by step 103 by step 102 realization, " survey ".
As above visible, the embodiment of the present invention implements to expose by the structure glue-line in the hollow crack to hollow face glass and segmentation is emptied, to form two ends in abutting connection with the discrete glue section of emptying gap, then by discrete glue section being implemented to on-the-spot extruding force in the hollow crack at double glazing panel, load test, thereby can empty by segmentation the structural behaviour check situation of procedure inspection structure glue, realize " inspection " in detecting, can also load the structural behaviour measurement result that thermometrically obtains structure glue-line by extruding force, realize " survey " in detecting.And the embodiment of the present invention, without dismounting double glazing panel, also can overcome the space constraint of bringing in hollow crack, thereby can avoid detection to affect the normal use of buildings, and the detection easy operating making.
In actual applications, said method goes for any frame concealed curtain wall.Below, a kind of frame concealed curtain wall of take is as shown in Figure 2 example, these methods are illustrated.
Referring to Fig. 2 (Fig. 2 is the front elevation of looking from the front of frame concealed curtain wall), and in conjunction with Fig. 3 (back side of the corresponding frame concealed curtain wall of the upside of Fig. 3, the front of the corresponding frame concealed curtain wall of downside) and Fig. 4 (back side of the corresponding frame concealed curtain wall in left side of Fig. 4, the front of right side correspondence frame concealed curtain wall):
Frame concealed curtain wall 10 has mutually orthogonal many columns 11 and crossbeam 12, and the rubber blanket 13(thickness that is positioned at the junction of column 11 and crossbeam 12 is generally 2mm), wherein, mutually orthogonal column 11 and crossbeam 12 to form a plurality of be by tempered glass material, to be configured to example with double glazing panel 20 for laying this example of double glazing panel 20() grid area;
Every double glazing panel 20 is by structural silicone adhesive, to be configured to example with structure glue-line 40 by this example of structure glue-line 40() be bonded in that to pay this example of frame 30(be by aluminum alloy materials, to be configured to example to pay a frame 30);
The frame 30 of paying that every double glazing panel 20 bonds is fixed on column 11 and the crossbeam 12 around place grid area by desk connector 31 and stainless steel screw 32;
Space between every two adjacent double glazing panels 20 is filled by joint seal glue 41, and the sidepiece of the structure glue-line 40 that every double glazing panel 20 bonds towards these double glazing panel 20 inner sides covered by dual face seals glue 42;
And, the two-layer plate body 21 of every double glazing panel 20 is by structural silicone adhesive, to be configured to example with structure glue-line 50 by this example of structure glue-line 50(in the hollow crack 22 between the two) mutually bond, and the structure glue-line 50 of every double glazing panel 20 is covered by molecular sieve sealing strip 60 towards the sidepiece of these double glazing panel 20 inner sides.
Frame concealed curtain wall 10 based on thering is said structure, the process of detection is as follows:
First, refer to Fig. 5 and Fig. 6 and in conjunction with Fig. 2 to Fig. 4, selected surveyed area 100, and remove the joint seal glue 41 at surveyed area 100 places, the joint seal glue 41 being eliminated represents to be designated the profile line of E in Fig. 6, makes structure glue-line 50 be exposed to selected surveyed area 100 from the side of the hollow crack 22 between the two-layer plate body 21 of the double glazing panel 20 at its place;
Secondly, refer to Fig. 7 and in conjunction with Fig. 2 to Fig. 6, utilizing the instruments such as graver, tweezers that structure glue-line 50 is carried out to segmentation empties, to form two ends in abutting connection with the discrete glue section 500 of emptying gap F, and in emptying process the bonding situation of the two-layer plate body 21 of the colloid in interrecord structure glue-line 50 and double glazing panel 20;
Then, refer to Fig. 8, and in conjunction with Fig. 2 to Fig. 7, empty gap F and be embedded in two loading blocks 80 for one between a discrete glue section 500 and the body part of structure glue-line 50, and utilize stretching pliers between two loading blocks 80, load make two loading blocks 80 mutually away from expanding extruding power (direction of expanding extruding power is as shown in the arrow line in Fig. 8), , the loading blocks 80 of body part of contact structures glue-line 50 of take is the expansion strong point, another loading blocks 80 that contacts discrete glue section 500 of take promotes discrete glue section 500 as expansion sticking point, discrete glue section 500 is deformed in hollow crack 20, until fracture or generation bonding interface stripping damage,
Or, also can be referring to Fig. 9, and in conjunction with Fig. 2 to Fig. 7, in two of the outside of two discrete glue sections 500 that are separated from each other, empty and in the F of gap, embed respectively two loading blocks 80, and utilize clamp to make the mutual close clamping extruding force of two loading blocks 80 (direction of clamping extruding force is as shown in the arrow line in Fig. 9) in the loading of the outside of two loading blocks 80, , two loading blocks 80 that contact respectively two discrete glue sections 500 of take are that clamping sticking point promotes two discrete glue sections 500, at least one in two discrete glue sections 500 deformed in hollow crack 20, until fracture or generation bonding interface stripping damage.
The foregoing is only preferred embodiment of the present invention, in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of making, be equal to replacement, improvement etc., within all should being included in the scope of protection of the invention.

Claims (10)

1. a method for the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection, is characterized in that, described method comprises:
Step a, the described structure glue in the hollow sandwich of described double glazing panel is sewn on to selected surveyed area place exposes;
Step b, the part of the exposure of described structure glue-line is carried out to segmentation empty, to form two ends in abutting connection with the discrete glue section of emptying gap;
Step c, in the described gap of emptying, described discrete glue section is carried out to on-the-spot extruding force load test, described discrete glue section is deformed until rupture or bonding interface stripping damage occurs in described hollow sandwich.
2. method according to claim 1, is characterized in that, described step b further empties the described structure glue of check by described segmentation and is sewn on the structural behaviour check situation in described hollow sandwich.
3. method according to claim 2, is characterized in that, described structural behaviour check situation comprises that the bonding interface of emptying released part of described structure glue-line destroys situation, and colloid cohesion destroys situation.
4. method according to claim 1, is characterized in that, described step c further records the structural behaviour measurement result that described on-the-spot extruding force loads test.
5. method according to claim 4, is characterized in that, described structural behaviour measurement result comprises the extruding force loaded value that described on-the-spot tensile test adopts, and the distortion of described glue-line fragment and destruction form.
6. method according to claim 1, is characterized in that, described step a makes described structure glue be sewn on described surveyed area place to expose by remove joint seal glue between two adjacent described double glazing panels at described surveyed area.
7. method according to claim 1, is characterized in that, described step b utilizes graver and tweezers to realize described segmentation and empties.
8. method according to claim 1, is characterized in that, the loading blocks of emptying described in described step c utilization is embedded in gap realizes described on-the-spot extruding force loading test.
9. method according to claim 8, is characterized in that,
Described between described discrete glue section and the body part of described structure glue-line one of two described loading blocks, empty in gap, described step c utilize stretching pliers between two described loading blocks, apply make two described loading blocks mutually away from expanding extruding power;
Or two described loading blocks lay respectively at described in two of outside of two described discrete glue sections that are separated from each other and empty in gap, described step c utilizes clamp to apply and make two described loading blocks close clamping extruding force mutually two described loading blocks.
10. method according to claim 1, is characterized in that, described structure glue-line consists of structural silicone adhesive.
CN201310581501.9A 2013-11-19 2013-11-19 The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection Active CN103616284B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310581501.9A CN103616284B (en) 2013-11-19 2013-11-19 The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310581501.9A CN103616284B (en) 2013-11-19 2013-11-19 The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection

Publications (2)

Publication Number Publication Date
CN103616284A true CN103616284A (en) 2014-03-05
CN103616284B CN103616284B (en) 2015-11-18

Family

ID=50166990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310581501.9A Active CN103616284B (en) 2013-11-19 2013-11-19 The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection

Country Status (1)

Country Link
CN (1) CN103616284B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510226A (en) * 2015-12-08 2016-04-20 中国建材检验认证集团股份有限公司 Method and device for testing bonding property of second-time sealant of hollow glass
CN107216025A (en) * 2017-07-19 2017-09-29 安徽云融信息技术有限公司 A kind of glass-cutting detecting system and detection method
CN107352785A (en) * 2017-07-19 2017-11-17 安徽云融信息技术有限公司 A kind of glass processing detecting system and detection method
CN107388997A (en) * 2017-07-19 2017-11-24 安徽云融信息技术有限公司 A kind of glass detection device and detection method
CN108627455A (en) * 2018-04-25 2018-10-09 郑州中原思蓝德高科股份有限公司 A kind of test method of thermoplasticity spacer bar and outer course glue sticking performance
CN109406390A (en) * 2018-11-28 2019-03-01 航天科工防御技术研究试验中心 A kind of detection method and its equipment of coating interface bond strength

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3974608A (en) * 1975-10-23 1976-08-17 Multuloc Corporation Panel wall construction
CN101806712A (en) * 2010-03-19 2010-08-18 厦门市建筑工程检测中心有限公司 On-site testing method for tensile adhesive strength of existing curtain wall structural silicone sealant
CN102053062A (en) * 2010-12-08 2011-05-11 中国建筑科学研究院 Structural adhesive on-site detection method and device
CN102954935A (en) * 2011-08-29 2013-03-06 中国建筑科学研究院 On-spot detection device of mechanical properties is glued to existing glass curtain wall structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3974608A (en) * 1975-10-23 1976-08-17 Multuloc Corporation Panel wall construction
CN101806712A (en) * 2010-03-19 2010-08-18 厦门市建筑工程检测中心有限公司 On-site testing method for tensile adhesive strength of existing curtain wall structural silicone sealant
CN102053062A (en) * 2010-12-08 2011-05-11 中国建筑科学研究院 Structural adhesive on-site detection method and device
CN102954935A (en) * 2011-08-29 2013-03-06 中国建筑科学研究院 On-spot detection device of mechanical properties is glued to existing glass curtain wall structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
林宏雄 等: "建筑用胶黏剂结构安全性能检测技术研究进展", 《润滑与密封》 *
王骅 等: "既有玻璃幕墙粘结安全性能现场检测技术探讨", 《中国建筑防水》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510226A (en) * 2015-12-08 2016-04-20 中国建材检验认证集团股份有限公司 Method and device for testing bonding property of second-time sealant of hollow glass
CN107216025A (en) * 2017-07-19 2017-09-29 安徽云融信息技术有限公司 A kind of glass-cutting detecting system and detection method
CN107352785A (en) * 2017-07-19 2017-11-17 安徽云融信息技术有限公司 A kind of glass processing detecting system and detection method
CN107388997A (en) * 2017-07-19 2017-11-24 安徽云融信息技术有限公司 A kind of glass detection device and detection method
CN107388997B (en) * 2017-07-19 2019-08-30 安徽云融信息技术有限公司 A kind of glass detection device and detection method
CN107352785B (en) * 2017-07-19 2019-08-30 安徽云融信息技术有限公司 A kind of glass processing detection system and detection method
CN107216025B (en) * 2017-07-19 2019-08-30 安徽云融信息技术有限公司 A kind of glass-cutting detection system and detection method
CN108627455A (en) * 2018-04-25 2018-10-09 郑州中原思蓝德高科股份有限公司 A kind of test method of thermoplasticity spacer bar and outer course glue sticking performance
CN108627455B (en) * 2018-04-25 2020-12-15 郑州中原思蓝德高科股份有限公司 Method for testing bonding performance of thermoplastic spacing bar and outer channel adhesive
CN109406390A (en) * 2018-11-28 2019-03-01 航天科工防御技术研究试验中心 A kind of detection method and its equipment of coating interface bond strength

Also Published As

Publication number Publication date
CN103616284B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN103616284B (en) The method of the structure glue-line of the double glazing panel of the existing frame concealed curtain wall of Site Detection
Memari et al. Seismic behavior of curtain walls containing insulating glass units
CN105510226A (en) Method and device for testing bonding property of second-time sealant of hollow glass
Van Linden et al. Watertightness performance of face-sealed versus drained window-wall interfaces
CN204386354U (en) Partition board door head board fixer
Bedon et al. Shear glass panels with point-fixed mechanical connections: Finite-Element numerical investigation and buckling design recommendations
CN103604618B (en) The method of the structure glue-line of the face glass auxiliary frame of the existing frame concealed curtain wall of Site Detection
Memari et al. Seismic performance of two-side structural silicone glazing systems
CN205936279U (en) Steel fire prevention flat -open window
Bedon et al. Numerical Analysis of TGU Windows under Blast-Glass-Shard Outlook
CN203412149U (en) Built-in auxiliary frame mounting system for hollow glass
CN210917890U (en) Mounting structure for curtain wall glass
US10458134B2 (en) Structural repair and remote monitoring system and method
CN210369385U (en) Heat insulation board for building external wall heat insulation
CN202969654U (en) Novel closed exposed frame pillar component
Iker et al. Secondary stresses induced by shear movement in structural glazing sealants
Dias et al. Investigation of hybrid steel‐glass beams with adhesive silicone shear connection
Alev et al. Airtightness improvement solutions for log wall joints
Hagl Bonded Point-Supports: Understanding Today–Optimizing for the Future
KR102372862B1 (en) A waterproof sheet capable of testing the joint area and its manufacturing method
CN104405044B (en) Attachment structure of steel pipe column and concrete frame and attaching method thereof
CN203412147U (en) Wedge insertion type connecting system for internal-corner and external-corner auxiliary frame pressure plates of hidden framing glass curtain wall
CN211080607U (en) Waterproof material for building
Guan Evaluation of Structural Performance of Aged Structural Glazing Sealant
Van Linden et al. Tape as a means to ensure air-and watertightness of building joints: experimental assessment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160621

Address after: 100088 Beijing city Haidian District Xitucheng Road No. 33

Patentee after: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Patentee after: CHINA JINGYE ENGINEERING Co.,Ltd.

Patentee after: CHINA METALLURGICAL CONSTRUCTION RESEARCH INSTITUTE (SHANGHAI) CO.,LTD.

Address before: 100088 Beijing city Haidian District Xitucheng Road No. 33

Patentee before: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Patentee before: CHINA JINGYE ENGINEERING Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20230728

Address after: 33 Xitucheng Road, Haidian District, Beijing 100082

Patentee after: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Patentee after: CHINA JINGYE ENGINEERING Co.,Ltd.

Patentee after: MCC testing and certification (Shanghai) Co.,Ltd.

Address before: 100088 Beijing city Haidian District Xitucheng Road No. 33

Patentee before: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Patentee before: CHINA JINGYE ENGINEERING Co.,Ltd.

Patentee before: CHINA METALLURGICAL CONSTRUCTION RESEARCH INSTITUTE (SHANGHAI) CO.,LTD.

TR01 Transfer of patent right