CN103615145A - 配电安装横担防扭提升支架 - Google Patents

配电安装横担防扭提升支架 Download PDF

Info

Publication number
CN103615145A
CN103615145A CN201310559905.8A CN201310559905A CN103615145A CN 103615145 A CN103615145 A CN 103615145A CN 201310559905 A CN201310559905 A CN 201310559905A CN 103615145 A CN103615145 A CN 103615145A
Authority
CN
China
Prior art keywords
lower supporting
plate
supporting plate
baffle plate
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310559905.8A
Other languages
English (en)
Other versions
CN103615145B (zh
Inventor
黄赛军
任树伟
任学恩
宋庆东
杨留声
张松刚
王丽萍
蒋磊
黄琳
陈治海
杨鑫
王焕新
王旭鹏
李恒
陈均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Henan Electric Power Co Zhengzhou Power Supply Co
Zhengzhou Xianghe Group Co ltd
State Grid Corp of China SGCC
Original Assignee
ZHENGZHOU XIANGHE GROUP ELECTRIC POWER INSTALLATION Co Ltd
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU XIANGHE GROUP ELECTRIC POWER INSTALLATION Co Ltd, State Grid Corp of China SGCC, Zhengzhou Power Supply Co of Henan Electric Power Co, Zhengzhou Huali Information Technology Co Ltd filed Critical ZHENGZHOU XIANGHE GROUP ELECTRIC POWER INSTALLATION Co Ltd
Priority to CN201310559905.8A priority Critical patent/CN103615145B/zh
Publication of CN103615145A publication Critical patent/CN103615145A/zh
Application granted granted Critical
Publication of CN103615145B publication Critical patent/CN103615145B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

本发明公开了一种配电安装横担防扭提升支架,它含有两个支撑板,所述支撑板由上支撑板和下支撑板连接而成,并且,所述上支撑板和下支撑板的板面相互垂直,两个所述上支撑板的上端通过支撑板螺栓固定连接,两个所述下支撑板的下端分别设置一个卡板,所述挡板上设置有卡槽,所述下支撑板上固定一个挡板螺栓,所述挡板螺栓与挡板的上端连接,所述挡板的下部遮挡所述卡槽,所述挡板的板面与所述下支撑板的板面同向。本发明将各类横担固定于支架中,无论横担出于任何工作场合,都处于固定状态,从而达到方便施工、提高安全性的目的。

Description

配电安装横担防扭提升支架
 
技术领域:
本发明涉及一种电力系统横担安装辅助工具,特别是涉及一种配电安装横担防扭提升支架。 
背景技术:
以往配电变压器的附件安装过程中,因无防止横担旋转、起吊的专用工具,上下传递过程中因绑扎不牢,绳扣结扎错误等因素时常发生横担和电器元件跌落的现象。同时也有因材料组装完毕后,起吊时横担发生扭曲而产生安装困难的现象。由于城市配电设备安装现场环境复杂,多在人口集密区,不规范的作业方式存在很大的安全隐患,很容易导致安全事故的发生。
发明内容:
本发明所要解决的技术问题是:克服现有技术的不足,提供一种结构简单、使用方便且安全性好的配电安装横担防扭提升支架。
本发明的技术方案是:一种配电安装横担防扭提升支架,含有两个支撑板,所述支撑板由上支撑板和下支撑板连接而成,并且,所述上支撑板和下支撑板的板面相互垂直,两个所述上支撑板的上端通过支撑板螺栓固定连接,两个所述下支撑板的下端分别设置一个卡板,所述挡板上设置有卡槽,所述下支撑板上固定一个挡板螺栓,所述挡板螺栓与挡板的上端连接,所述挡板的下部遮挡所述卡槽,所述挡板的板面与所述下支撑板的板面同向。
所述上支撑板和下支撑板由同一个钢板扭曲而成,或者,上支撑板和下支撑板由两个钢板焊接而成。所述下支撑板上设置有凹槽,所述挡板螺栓的内端插在所述凹槽中且焊接固定,所述挡板与下支撑板之间设置有垫片,所述垫片套在所述挡板螺栓上。所述卡板的宽度大于所述下支撑板的宽度;所述上支撑板的长度大于下支撑板的长度。
 
本发明的有益效果是:
1、本发明将各类横担固定于支架中,无论横担出于任何工作场合,都处于固定状态,从而达到方便施工、提高安全性的目的。
2、本发明下支撑板和上支撑板由一个钢板弯折而成,强度高,另外,挡板上端固定在螺栓上,既能转动又能固定,防挡效果好,安全性好。
3、本发明卡板与下支撑板焊接固定,能够减少下支撑板的整体宽度,降低材料成本。
4、本发明防扭牢固、安装快捷、安全可靠、高效实用,广泛应用于配电线路、变压器台架各类横担的安装工作中,易于推广实施,具有良好的经济效益。
附图说明:
图1为配电安装横担防扭提升支架的结构示意图;
图2为图1中A向视图。
具体实施方式:
实施例:参见图1和图2,图中,1-卡板,2-卡槽,3-挡板,4-挡板螺栓,5-下支撑板,6-上支撑板,7-支撑板螺栓。
配电安装横担防扭提升支架含有两个支撑板,其中:支撑板由上支撑板6和下支撑板5连接而成,并且,上支撑板6和下支撑板5的板面相互垂直,两个上支撑板6的上端通过支撑板螺栓7固定连接,两个下支撑板5的下端分别设置一个卡板1,挡板3上设置有卡槽2,下支撑板5上固定一个挡板螺栓4,挡板螺栓4与挡板3的上端连接,挡板3的下部遮挡卡槽2,挡板3的板面与下支撑板5的板面同向。
上支撑板6和下支撑板5由同一个钢板扭曲而成,或者,上支撑板6和下支撑板5由两个钢板焊接而成,根据需要确定。
下支撑板5上设置有凹槽,挡板螺栓4的内端插在凹槽中且焊接固定,挡板3与下支撑板5之间设置有垫片,垫片套在挡板螺栓4上。卡板1的宽度大于下支撑板5的宽度;上支撑板6的长度大于下支撑板5的长度。
本发明可用于任何需要使用配电安装横担防扭、起吊工作中,从根本上解决各类配电线路各类横担在起吊、安装过程中发生旋转、跌落的目的。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质所作的任何简单修改,均仍属于本发明技术方案的范围内。

Claims (4)

1.一种配电安装横担防扭提升支架,含有两个支撑板,其特征是:所述支撑板由上支撑板和下支撑板连接而成,并且,所述上支撑板和下支撑板的板面相互垂直,两个所述上支撑板的上端通过支撑板螺栓固定连接,两个所述下支撑板的下端分别设置一个卡板,所述挡板上设置有卡槽,所述下支撑板上固定一个挡板螺栓,所述挡板螺栓与挡板的上端连接,所述挡板的下部遮挡所述卡槽,所述挡板的板面与所述下支撑板的板面同向。
2.根据权利要求1所述的配电安装横担防扭提升支架,其特征是:所述上支撑板和下支撑板由同一个钢板扭曲而成,或者,上支撑板和下支撑板由两个钢板焊接而成。
3.根据权利要求1所述的配电安装横担防扭提升支架,其特征是:所述下支撑板上设置有凹槽,所述挡板螺栓的内端插在所述凹槽中且焊接固定,所述挡板与下支撑板之间设置有垫片,所述垫片套在所述挡板螺栓上。
4.根据权利要求1所述的配电安装横担防扭提升支架,其特征是:所述卡板的宽度大于所述下支撑板的宽度;所述上支撑板的长度大于下支撑板的长度。
CN201310559905.8A 2013-11-12 2013-11-12 配电安装横担防扭提升支架 Active CN103615145B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310559905.8A CN103615145B (zh) 2013-11-12 2013-11-12 配电安装横担防扭提升支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310559905.8A CN103615145B (zh) 2013-11-12 2013-11-12 配电安装横担防扭提升支架

Publications (2)

Publication Number Publication Date
CN103615145A true CN103615145A (zh) 2014-03-05
CN103615145B CN103615145B (zh) 2016-04-27

Family

ID=50165860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310559905.8A Active CN103615145B (zh) 2013-11-12 2013-11-12 配电安装横担防扭提升支架

Country Status (1)

Country Link
CN (1) CN103615145B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10353436A1 (de) * 2003-11-15 2005-06-23 Hochtief Ag Aufklappbare Arbeitsbühne
CN201199612Y (zh) * 2008-03-28 2009-02-25 安徽省电力公司滁州供电公司 10kV配电线路绝缘横担提升器
CN201999631U (zh) * 2011-03-11 2011-10-05 中煤平朔煤业有限责任公司 油桶吊装工具
CN202704816U (zh) * 2012-07-26 2013-01-30 安徽鲁班钢构有限公司 可调式h型钢吊具
CN202808165U (zh) * 2012-09-29 2013-03-20 辽宁铭鹏防爆起重机有限公司 一种钢包吊梁
CN203640376U (zh) * 2013-11-12 2014-06-11 国家电网公司 配电安装横担防扭提升支架

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10353436A1 (de) * 2003-11-15 2005-06-23 Hochtief Ag Aufklappbare Arbeitsbühne
CN201199612Y (zh) * 2008-03-28 2009-02-25 安徽省电力公司滁州供电公司 10kV配电线路绝缘横担提升器
CN201999631U (zh) * 2011-03-11 2011-10-05 中煤平朔煤业有限责任公司 油桶吊装工具
CN202704816U (zh) * 2012-07-26 2013-01-30 安徽鲁班钢构有限公司 可调式h型钢吊具
CN202808165U (zh) * 2012-09-29 2013-03-20 辽宁铭鹏防爆起重机有限公司 一种钢包吊梁
CN203640376U (zh) * 2013-11-12 2014-06-11 国家电网公司 配电安装横担防扭提升支架

Also Published As

Publication number Publication date
CN103615145B (zh) 2016-04-27

Similar Documents

Publication Publication Date Title
CN204754274U (zh) 输电线路砼杆加固装置
CN203755706U (zh) 杯口基础插入式钢柱水平定位夹具
CN203526818U (zh) 实用型多功能电焊机保护篮
CN201944421U (zh) 电缆绝缘支架
CN203640376U (zh) 配电安装横担防扭提升支架
CN204152216U (zh) 一种钢结构施工通用的装配式操作平台
CN203108026U (zh) 高压母线安全带悬挂支架
CN204947504U (zh) 一种配变台架进出线管卡
CN103615145A (zh) 配电安装横担防扭提升支架
CN204732751U (zh) 变压器有载调压开关检修工具
CN207069448U (zh) 一种便于拆卸的支柱绝缘子定位装置
CN202992391U (zh) 一种电缆桥架用侧边转动槽式垂直三通
CN104242214A (zh) 大截面电缆敷设横臂式安装的通用固定装置
CN203813320U (zh) 带电更换220kV窄基塔耐张绝缘子串用工具
CN204199438U (zh) 一种双边檩托
CN202940543U (zh) 一种高压电缆固定装置
CN204517340U (zh) 一种施工工地过线装置
CN203394548U (zh) 单体液压支柱防倒装置
CN205231576U (zh) 拆装半高层布局隔离开关的辅助装置
CN203932846U (zh) 小型导线放线架
CN202769051U (zh) 一种电缆桥架的槽式直角转动四通
CN204700195U (zh) 一种钢筋弯曲机盛料装置
CN204144862U (zh) 可采用地电位安装的分流线夹
CN204287241U (zh) 6-10kv避雷器现场试验支架
CN202769048U (zh) 一种电缆桥架用梯式单转动四通

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Chen Zhihai

Inventor after: Chen Jun

Inventor after: Li Heng

Inventor after: Wang Xupeng

Inventor after: Zhang Hailiang

Inventor after: Wang Liping

Inventor after: Yang Shuzhao

Inventor after: Zhao Jianyong

Inventor after: Song Qingdong

Inventor after: Huang Saijun

Inventor after: Ren Shuwei

Inventor after: Huang Lin

Inventor after: Wang Huanxin

Inventor before: Huang Saijun

Inventor before: Chen Zhihai

Inventor before: Yang Xin

Inventor before: Wang Huanxin

Inventor before: Wang Xupeng

Inventor before: Li Heng

Inventor before: Chen Jun

Inventor before: Ren Shuwei

Inventor before: Ren Xueen

Inventor before: Song Qingdong

Inventor before: Yang Liusheng

Inventor before: Zhang Songgang

Inventor before: Wang Liping

Inventor before: Jiang Lei

Inventor before: Huang Lin

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160315

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: ZHENGZHOU XIANGHE GROUP ELECTRIC POWER INSTALLATION Co.,Ltd.

Applicant after: STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY Co.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: ZHENGZHOU HUALI INFORMATION TECHNOLOGY Co.,Ltd.

Applicant before: HUNAN ELECTRIC POWER COMPANY, ZHENGZHOU POWER SUPPLY Co.

Applicant before: ZHENGZHOU XIANGHE GROUP ELECTRIC POWER INSTALLATION Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chen Zhihai

Inventor after: Chen Jun

Inventor after: Li Heng

Inventor after: Wang Xupeng

Inventor after: Zhang Hailiang

Inventor after: Wang Liping

Inventor after: Yang Shuzhao

Inventor after: Zhao Jianyong

Inventor after: Song Qingdong

Inventor after: Huang Saijun

Inventor after: Ren Shuwei

Inventor after: Huang Lin

Inventor after: Wang Huanxin

Inventor before: Chen Zhihai

Inventor before: Chen Jun

Inventor before: Li Heng

Inventor before: Wang Xupeng

Inventor before: Zhang Hailiang

Inventor before: Wang Liping

Inventor before: Yang Shuzhao

Inventor before: Zhao Jianyong

Inventor before: Song Qingdong

Inventor before: Huang Saijun

Inventor before: Ren Shuwei

Inventor before: Huang Lin

Inventor before: Wang Huanxin

COR Change of bibliographic data
CB03 Change of inventor or designer information

Inventor after: Chen Zhihai

Inventor after: Chen Jun

Inventor after: Li Heng

Inventor after: Wang Xupeng

Inventor after: Zhang Hailiang

Inventor after: Wang Liping

Inventor after: Yang Shuzhao

Inventor after: Zhao Jianyong

Inventor after: Song Qingdong

Inventor after: Huang Saijun

Inventor after: Ren Shuwei

Inventor after: Huang Lin

Inventor after: Wang Huanxin

Inventor before: Chen Zhihai

Inventor before: Chen Jun

Inventor before: Li Heng

Inventor before: Wang Xupeng

Inventor before: Zhang Hailiang

Inventor before: Wang Liping

Inventor before: Yang Shuzhao

Inventor before: Zhao Jianyong

Inventor before: Song Qingdong

Inventor before: Huang Saijun

Inventor before: Ren Shuwei

Inventor before: Huang Lin

Inventor before: Wang Huanxin

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20231025

Address after: 100033 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Patentee after: State Grid Corporation of China

Patentee after: ZHENGZHOU XIANGHE GROUP Co.,Ltd.

Patentee after: STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY Co.

Address before: 100033 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Patentee before: State Grid Corporation of China

Patentee before: ZHENGZHOU XIANGHE GROUP ELECTRIC POWER INSTALLATION Co.,Ltd.

Patentee before: STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY Co.

TR01 Transfer of patent right