CN103612978A - Tracks for lifting parts in staggered manner by longitudinally and horizontally traveling for crane - Google Patents
Tracks for lifting parts in staggered manner by longitudinally and horizontally traveling for crane Download PDFInfo
- Publication number
- CN103612978A CN103612978A CN201310656752.9A CN201310656752A CN103612978A CN 103612978 A CN103612978 A CN 103612978A CN 201310656752 A CN201310656752 A CN 201310656752A CN 103612978 A CN103612978 A CN 103612978A
- Authority
- CN
- China
- Prior art keywords
- tracks
- cross track
- crane
- region
- long rails
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses tracks for lifting parts in a staggered manner by longitudinally and horizontally traveling for a crane. The tracks comprises two longitudinal tracks and two first horizontal tracks, wherein the two longitudinal tracks are used for the traveling of a third crane; the two first horizontal tracks are used for the traveling of a first crane; the first horizontal tracks are lower than the longitudinal tracks, and the first horizontal tracks extend to be inserted into a region positioned between the two longitudinal tracks which are adjacent to the first horizontal tracks so that a part lifted by the first crane is placed in a longitudinal track region, and the third crane lifts the part and travels in the longitudinal track region for neatening and machining. According to the invention, the crane travels along the horizontal tracks and places the part below the longitudinal tracks, then the crane positioned on the longitudinal tracks lifts the part for the neatening and the processing in the longitudinal track region, so that the transportation and transferring of the part in adjacent regions is realized, the transportation time of the part is saved, and transportation equipment for the part is omitted. The tracks disclosed by the invention are low in cost, reduce the labor intensity, enhance the production efficiency and lay the technical foundation for an enterprise on realizing normalized, automated and integrated management.
Description
Technical field
What the present invention relates to is the track of crane running, particularly be can convenient and swift transmitting workpiece between between reinforcing bar processing dispensing vehicle travel the in length and breadth track of staggered lifting part of a kind of hoisting crane.
Background technology
Deep development along with economic construction, in enterprise, processing half-blank reinforcing bar parts need to pass through a plurality of workshops, multiple working procedure just can machine, because the layout in workshop is normally divided according to processing technology or Fabricating machinery, between workshop, separate, therefore transmitting transporting semi-finished reinforcing steel bar part must be by means of lifting appliance and transport vehicle, for completing the processing of reinforcing bar product in enormous quantities, currently available technology exists auxiliary conveying equipments many, traffic cost is high, the large and inefficient defect of labour intensity.
Summary of the invention
The object of the invention is to overcome the defect of above-mentioned prior art, provide the parts of crane hanging component in a kind of adjacent zones of different in zones of different, to transmit in time, save parts haulage time and cost, reduce labor intensity, travel the in length and breadth track of staggered lifting part of a kind of hoisting crane of enhancing productivity.
The technical scheme solving the problems of the technologies described above is:
Travel the in length and breadth track of staggered lifting part of hoisting crane, comprising: two parallel long rails that form the 3rd hoisting crane operation; Form two the first parallel cross tracks of the first heavy-duty machine operation; The first cross track is lower than long rails, the first cross track extends in the region of inserting between two parallel longitudinal direction tracks that are adjacent, the parts of the first crane hanging component are put in long rails region, then operate in long rails region and arrange and process by the 3rd crane hanging component parts.
Preferred version is: also comprise two the second parallel cross tracks that form the second hoisting crane operation, the second cross track and the first cross track structure same intervals and be set up in parallel; The second cross track and the first cross track extend in the region of inserting between two parallel longitudinal direction tracks simultaneously, the parts that the first heavy-duty machine/the second hoisting crane is lifted are respectively put in long rails region, then are operated in long rails region and arranged and process by the 3rd crane hanging component parts.
Preferred version is: it is distance between the parallel long rails of :≤1/2 two that the first cross track and the second cross track extend the distance of inserting in long rails region.
The invention has the beneficial effects as follows: the present invention overcomes the deficiencies in the prior art, hoisting crane of the present invention is rail running transversely, the parts of lifting are put into long rails below, by the crane hanging component parts on long rails, in long rails region, arranged again processing, thereby realize adjacent area transportation transferring elements, save parts haulage time and transportation device, there is cost low, reduce labor intensity, enhance productivity, for enterprise realizes standardization, automation, integrated management, establish technical foundation.
Accompanying drawing explanation
Fig. 1 is front view of the present invention;
Fig. 2 is the birds-eye view of Fig. 1.
Sequence number explanation > > in < < accompanying drawing
1: the first heavy-duty machine; 1A: the first front cross track, 1B: the first rear cross track; 2: the second hoisting cranes; 2A: the second front cross track; 2B: the second rear cross track; 3: the three hoisting cranes; 3A: left side long rails; 3B: right side long rails; 5: steel column; 6: short steel column; 7: bracket; 8: first area; 9: second area; 10: the three regions; W: parts.
The specific embodiment
Below in conjunction with accompanying drawing, embodiments of the invention are described in further detail.
Fig. 1 is front view of the present invention; Fig. 2 is the birds-eye view of Fig. 1.
As shown in the figure, the invention provides travel the in length and breadth track of staggered lifting part of a kind of hoisting crane, its structure comprises: two the parallel left side long rails 3A and the right side long rails 3B that form the 3rd hoisting crane 3 operations;
Form two the first parallel front cross track 1A and the first rear cross track 1B of 1 operation of the first heavy-duty machine;
Described the first front cross track 1A and the first rear cross track 1B are lower than left side long rails 3A and right side long rails 3B, the first front cross track 1A and the first rear cross track 1B extend and insert in two the parallel left side long rails 3A and the region between the long rails 3B of right side being adjacent, the parts W of the first heavy-duty machine 1 lifting is put in left side long rails 3A and long rails 3B region, right side, then operates in left side long rails 3A and long rails 3B region, right side and arrange and process by the 3rd hoisting crane 3 lifting part W.
The present invention also comprises two the second parallel front cross track 2A and the second rear cross track 2B that forms the second hoisting crane 2 operations, the second front cross track 2A and the second rear cross track 2B and the first front cross track 1A and the first rear cross track 1B structure same intervals and be set up in parallel;
In the second front cross track 2A and the second rear cross track 2B extend the region of inserting between two parallel left side long rails 3A and right side long rails 3B with the first front cross track 1A and the first rear cross track 1B simultaneously, the parts W that the first heavy-duty machine 1, the second hoisting crane 2 are lifted is respectively put in left side long rails 3A and long rails 3B region, right side, then is operated in left side long rails 3A and long rails 3B region, right side and arranged and process by the 3rd hoisting crane 3 lifting part W.
It is distance between a :≤1/2 two parallel left side long rails 3A and right side long rails 3B that described the first front cross track 1A and the first rear cross track 1B, the second front cross track 2A and the second rear cross track 2B extend respectively the distance of inserting in left side long rails 3A and long rails 3B region, right side.
More particularly, as shown in Figure 1 and Figure 2, first area 8 and second area 9 structure same intervals and be set up in parallel, the 3rd region 10 is simultaneously in abutting connection with first area 8 and second area 9, and above-mentioned three regions are equivalent to process three workshops of half-blank reinforcing bar parts.
On 10 tops, the 3rd region, there are two parallel left side long rails 3A and right side long rails 3B, on left side long rails 3A and right side long rails 3B, slide the 3rd hoisting crane 3, left side long rails 3A and right side long rails 3B are supported on a plurality of brackets 7, and steel column 5 supports bracket 7; Terminal at the first front cross track 1A of the 3rd region 10 interior insertions and the terminal of the first rear cross track 1B and the second front cross track 2A inserting and the second rear cross track 2B is supported by the short steel column 6 lower than steel column 5 respectively, between the 3rd interior above-mentioned track in region 10, forms staggered floor.
In first area, two the first parallel front cross track 1A and the first rear cross track 1B are arranged at 8 tops, on the first front cross track 1A and the first rear cross track 1B, slide the first heavy-duty machine 1.
On second area 9 tops, there are two the second parallel front cross track 2A and the second rear cross track 2B, on the second front cross track 2A and the second rear cross track 2B, slide the second hoisting crane 1.
The first front cross track 1A in first area 8 and the first rear cross track 1B, the second front cross track 2A in second area 9 and the second rear cross track 2B are arranged on respectively the strong point support that is same as short steel column 6 height on steel column 5; The first front cross track 1A and the first rear cross track 1B, the second front cross track 2A and the second rear cross track 2B also can be supported on a plurality of brackets 7, and this bracket 7(figure does not show) be arranged on the strong point that is same as short steel column 6 height on steel column 5.
The process that the present invention is lifted to transfer unit W below describes:
As mentioned above, between the 3rd interior above-mentioned track in region 10, form staggered floor, the first heavy-duty machine 1 and the second hoisting crane 2 in first area 8 and second area 9 operations can be transported to parts W lifting in the 3rd region 10 respectively, by the first transverse shifting of the 3rd hoisting crane 3 lifting part W of the 3rd region 10 interior operations, avoided again the first front cross track 1A and the first rear cross track 1B of insertion, the second front cross track 2A and the second rear cross track 2B, again along not inserting the first front cross track 1A and the first rear cross track 1B in the 3rd region 10, second half space moving-member W of the second front cross track 2A and the second rear cross track 2B, as required in the processing and sorting of the 3rd complete cheek W in region 10.
Equally, from the parts W in the 3rd region 10, also can transmit respectively the processing and sorting that is transported to first area 8 and the interior complete cheek W of second area 9 according to above-mentioned contrary transportation route; Or from the parts W in first area 8, according to above-mentioned transportation route, transmit be respectively transported in second area 9, the processing and sorting of the 3rd interior complete cheek W in region 10.
Above-mentioned the first front cross track 1A and the first rear cross track 1B, the second front cross track 2A and the second rear cross track 2B difference vertical left side long rails 3A and right side long rails 3B.
Due to existing staggered floor between three region inner orbits of the present invention, exist again crisscrossly, the parts of lifting function in adjacent zones of different are lifted in time transmit to have transported processing and sorting.
Claims (3)
1. the hoisting crane track for staggered lifting part that travels in length and breadth, is characterized in that, comprising:
Form two parallel long rails (3A, 3B) of the 3rd hoisting crane (3) operation;
Form two first parallel cross tracks (1A, 1B) of the first heavy-duty machine (1) operation;
The first cross track (1A, 1B) is lower than long rails (3A, 3B), the first cross track (1A, 1B) extends in the region of inserting between two the parallel longitudinal direction tracks (3A, 3B) that are adjacent, the parts (W) of the first heavy-duty machine (1) lifting are put in long rails (3A, 3B) region, then operate in long rails (3A, 3B) region and arrange and process by the 3rd hoisting crane (3) lifting part (W).
2. according to travel the in length and breadth track of staggered lifting part of a kind of hoisting crane described in claim 1, it is characterized in that, also comprise two the second parallel cross tracks (2A, 2B) that form the second hoisting crane (2) operation, the second cross track (2A, 2B) and the first cross track (1A, 1B) structure same intervals and be set up in parallel; The second cross track (2A, 2B) and the first cross track (1A, 1B) extend in the region of inserting between two parallel longitudinal direction tracks (3A, 3B) simultaneously, the parts (W) that the first heavy-duty machine (1)/second hoisting crane (2) lifts are respectively put in long rails (3A, 3B) region, then operate in long rails (3A, 3B) region and arrange and process by the 3rd hoisting crane (3) lifting part (W).
3. according to travel the in length and breadth track of staggered lifting part of a kind of hoisting crane described in claim 1 or 2, it is characterized in that, it is distance between a :≤1/2 two parallel long rails (3A, 3B) that the first cross track (1A, 1B) and the second cross track (2A, 2B) extend the distance of inserting in long rails (3A, 3B) region.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310656752.9A CN103612978B (en) | 2013-12-05 | 2013-12-05 | A kind of hoisting crane travels the track of staggered lifting part in length and breadth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310656752.9A CN103612978B (en) | 2013-12-05 | 2013-12-05 | A kind of hoisting crane travels the track of staggered lifting part in length and breadth |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103612978A true CN103612978A (en) | 2014-03-05 |
CN103612978B CN103612978B (en) | 2015-08-19 |
Family
ID=50163708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310656752.9A Active CN103612978B (en) | 2013-12-05 | 2013-12-05 | A kind of hoisting crane travels the track of staggered lifting part in length and breadth |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103612978B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109455618A (en) * | 2018-12-25 | 2019-03-12 | 北京碧水源科技股份有限公司 | The MBR film group device lifting system in underground sewage disposal system factory film workshop and its application |
CN113738411A (en) * | 2021-06-16 | 2021-12-03 | 南京业恒达智能系统股份有限公司 | Hydraulic support assembly line and assembly method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08120938A (en) * | 1994-10-26 | 1996-05-14 | Hazama Gumi Ltd | Point mechanism |
JP2001278575A (en) * | 2000-03-30 | 2001-10-10 | Shinko Electric Co Ltd | Method and device for attaching and detaching ceiling carrier, and device and structure for connecting parting rails |
JP2002003150A (en) * | 2000-06-28 | 2002-01-09 | Kajima Corp | Carrying equipment |
CN200958013Y (en) * | 2006-09-25 | 2007-10-10 | 重庆宗申技术开发研究有限公司 | Workpiece controller of coupled production line |
CN201010437Y (en) * | 2007-02-12 | 2008-01-23 | 白文奎 | Gantry crane rail-transferring and parallel-moving mechanism |
CN201587808U (en) * | 2009-10-30 | 2010-09-22 | 上海振华重工(集团)股份有限公司 | Track system for moving ship unloaders |
CN201670654U (en) * | 2010-08-17 | 2010-12-15 | 中冶建工有限公司 | Vertically intersect gantry crane rail with conversion device |
JP5074903B2 (en) * | 2007-11-30 | 2012-11-14 | 株式会社キトー | Cargo handling suspension and cargo handling equipment |
CN203653075U (en) * | 2013-12-05 | 2014-06-18 | 建科机械(天津)股份有限公司 | Track of crane for interlacing lifting part by driving longitudinally and horizontally |
-
2013
- 2013-12-05 CN CN201310656752.9A patent/CN103612978B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08120938A (en) * | 1994-10-26 | 1996-05-14 | Hazama Gumi Ltd | Point mechanism |
JP2001278575A (en) * | 2000-03-30 | 2001-10-10 | Shinko Electric Co Ltd | Method and device for attaching and detaching ceiling carrier, and device and structure for connecting parting rails |
JP2002003150A (en) * | 2000-06-28 | 2002-01-09 | Kajima Corp | Carrying equipment |
CN200958013Y (en) * | 2006-09-25 | 2007-10-10 | 重庆宗申技术开发研究有限公司 | Workpiece controller of coupled production line |
CN201010437Y (en) * | 2007-02-12 | 2008-01-23 | 白文奎 | Gantry crane rail-transferring and parallel-moving mechanism |
JP5074903B2 (en) * | 2007-11-30 | 2012-11-14 | 株式会社キトー | Cargo handling suspension and cargo handling equipment |
CN201587808U (en) * | 2009-10-30 | 2010-09-22 | 上海振华重工(集团)股份有限公司 | Track system for moving ship unloaders |
CN201670654U (en) * | 2010-08-17 | 2010-12-15 | 中冶建工有限公司 | Vertically intersect gantry crane rail with conversion device |
CN203653075U (en) * | 2013-12-05 | 2014-06-18 | 建科机械(天津)股份有限公司 | Track of crane for interlacing lifting part by driving longitudinally and horizontally |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109455618A (en) * | 2018-12-25 | 2019-03-12 | 北京碧水源科技股份有限公司 | The MBR film group device lifting system in underground sewage disposal system factory film workshop and its application |
CN109455618B (en) * | 2018-12-25 | 2020-09-25 | 北京碧水源科技股份有限公司 | Hoisting system for MBR (Membrane bioreactor) membrane module in membrane workshop of buried sewage treatment plant and application of hoisting system |
CN113738411A (en) * | 2021-06-16 | 2021-12-03 | 南京业恒达智能系统股份有限公司 | Hydraulic support assembly line and assembly method |
Also Published As
Publication number | Publication date |
---|---|
CN103612978B (en) | 2015-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103086134A (en) | Automatic double-layer conveying device on logistics transport line | |
CN106458443A (en) | Overhead storage system and method for storing loads in overhead space | |
RU2014145304A (en) | METHOD AND EQUIPMENT FOR CASTING OF CONCRETE PRODUCTS | |
CN203653075U (en) | Track of crane for interlacing lifting part by driving longitudinally and horizontally | |
CN103612978B (en) | A kind of hoisting crane travels the track of staggered lifting part in length and breadth | |
CN108249146A (en) | Material intelligent handling system | |
CN105460483A (en) | Logistics transfer assisting device | |
CN206425711U (en) | Multi-vehicle-type shares welding and assembling production lines structure | |
CN105366555A (en) | Quayside container crane | |
CN203669879U (en) | Down-hole hydraulic support assembling chamber | |
CN203612557U (en) | Tray conveying device | |
CN104828506A (en) | Rail transport structure | |
CN105414392A (en) | Continuous reshaping device | |
CN201010437Y (en) | Gantry crane rail-transferring and parallel-moving mechanism | |
CN207524499U (en) | Beam-type steel roll transport apparatus between different level production line | |
CN203997118U (en) | A kind of yarn transportation device with compression function | |
CN105937194A (en) | Sleeper for separate starting of small shield and use method of sleeper | |
CN202201451U (en) | Conveying trolley | |
CN105293016A (en) | Formed coke blank arrangement and arraying device | |
CN203095047U (en) | Logistics conveyor | |
CN202805406U (en) | Improved production line of centrifugal pile | |
CN105735686A (en) | Super large combined workshop and plane arrangement method | |
CN204823043U (en) | Partial shipment and movement system of cooling package | |
CN204980162U (en) | Instrument desk closes partial shipment and transportation operation platform of piece | |
CN204528478U (en) | A kind of rail transport structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |