CN103605558A - Plant-grid communication method for power system machine-grid coordination simulation model - Google Patents

Plant-grid communication method for power system machine-grid coordination simulation model Download PDF

Info

Publication number
CN103605558A
CN103605558A CN201310535764.6A CN201310535764A CN103605558A CN 103605558 A CN103605558 A CN 103605558A CN 201310535764 A CN201310535764 A CN 201310535764A CN 103605558 A CN103605558 A CN 103605558A
Authority
CN
China
Prior art keywords
rtds
power
grid
electrical network
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310535764.6A
Other languages
Chinese (zh)
Other versions
CN103605558B (en
Inventor
阚伟民
廖宏楷
肖小清
陈世和
陈迅
陈晓科
冯永新
温志勇
金格
罗嘉
胡玉岚
谭金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Power Technology Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN201310535764.6A priority Critical patent/CN103605558B/en
Publication of CN103605558A publication Critical patent/CN103605558A/en
Application granted granted Critical
Publication of CN103605558B publication Critical patent/CN103605558B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A plant-grid communication method for a power system machine-grid coordination simulation model includes: S1, a plant power system simulator transmits output mechanical power PM of a steam turbine to a grid RTDS (real-time digital simulator) through a communication interface; S2, the grid RTDS calculates generator rotor speed omega, generator output power PE and generator end power U; S3, the grid RTDS transmits the data obtained in the step 2 to the grid power system simulator through the communication interface. The method has the advantages that machine-grid joint simulation for a thermal power plant power system and a grid system can be realized, a machine-grid coordination lab platform can be built, features of the power plant and the power grid are studied, and the mutual influence between power plant control equipment, such as speed regulator, and electric control equipment such as an excitation regulator and relay protection is analyzed.

Description

The means of communication in electric system machine net Coordination Simulation Model between power plant and electrical network
Technical field
The present invention relates to the communication means between a kind of realistic model, especially relate to the means of communication between power plant and electrical network in a kind of electric system machine net Coordination Simulation Model.It is exactly particularly the data interactive method between power plant's power system emulator and electrical network Real Time Digital Simulator RTDS.
Background technology
In the evolution of electric system, electric system simulation is being brought into play extremely important effect always.Utilize emulation to study the feasibility of Future Power System project, the performance in prognoses system future and the bottleneck that may exist.Emulation can be analyzed the actual failure condition occurring in electrical network equally effectively, and formulates correct protection and limitation measure.Utilize emulation also can be optimized electrical network, economy and the reliability of the operation of raising system effectively.
Electric system simulation is to set up corresponding model according to original electric system, and calculates and test, dynamic behaviour and the operation characteristic of research electric system in special time.Electric system simulation can be placed on the operation of complication system in laboratory and carry out, and has good controllability, without advantages such as destructiveness and economy.Electrical network Real Time Digital Simulator RTDS is as electro-magnetic transient real-time analysis instrument, and simulation accuracy is high, and speed is fast, can accomplish the emulation that becomes more meticulous.For the complex network that contains high-power high-tension power electronic devices, electrical network Real Time Digital Simulator RTDS is strong emulation tool.
Shortage due to current power plants and grid coordination emulation platform, cause electrical network Real Time Digital Simulator RTDS analogue system and power plant's power system emulator to work alone respectively, can not complete communication and then realize factory's net associative simulation, lack the real-time of data and the authenticity of emulation.
Therefore, electric system needs to realize the platform tools that machine net is coordinated emulation, and the present invention joins together both by means of communication, and then carries out system emulation analysis and calculating, realizes factory's net associative simulation.This can provide for the Accurate Model of thermal power plant's power system data and can with digital simulation device RTDS associative simulation, have more practical significance.
Summary of the invention
Technical matters to be solved by this invention, put forward exactly the means of communication between power plant and electrical network in a kind of electric system machine net Coordination Simulation Model of arch, realize the data interaction between power plant's power system emulator and electrical network Real Time Digital Simulator RTDS, and the real-time of data and the authenticity of emulation are all effectively guaranteed, realize factory's net associative simulation.
Solve the problems of the technologies described above, the technical solution adopted in the present invention is:
Means of communication in electric system machine net Coordination Simulation Model between power plant and electrical network, is characterized in that: comprise the following steps:
S1 power plant power system emulator is steam turbine output mechanical power P mby communication interface, send to electrical network Real Time Digital Simulator RTDS;
S2 electrical network Real Time Digital Simulator RTDS calculates generator amature rotational speed omega, generator electromotive power output P according to formula (1), formula (2) and formula (3) eand generator end electricity U;
ω = dθ dt - - - ( 1 )
P E = P M - T J ω 0 · dω dt - - - ( 2 )
U = P E I - - - ( 3 )
In formula, T jfor the inertia time constant of genset, the mechanical angle displacement that θ is rotor, t is the time, I is dynamo current;
S3 electrical network Real Time Digital Simulator RTDS sends to power plant's power system emulator by step S2 gained by communication interface;
Communication interface between described electrical network Real Time Digital Simulator RTDS and power plant's power system emulator, specifically by the GTNET card of analog to digital conversion or digital-to-analog conversion A/D-D/A card or RTDS, realize, the data interaction of RTDS analogue system and external device is undertaken by RTDS/GTNET card, adopts DNP3.0 (Distributed Network Protocol) stipulations; On original RTDS model basis, build DNP model, and be each DNP model binding RTDS-DNP point mapped file.
The communications and data of realizing between thermal power plant's power system and RTDS digital simulation device by said method exchanges, thus realize factory's net associative simulation and analyze power plant's opertaing devices such as speed regulator and the electrical control gear such as field regulator, relay protection between influence each other.
Compared with prior art, the invention has the beneficial effects as follows: a communication difficult problem that has solved current factory net associative simulation, make it to be applied to factory's net associative simulation, can overcome a difficult problem for the ruuning situation of simulating grid and power plant separately, realize better the emulation of electrical network and power plant's operation conditions, there is higher reliability and authenticity.
Accompanying drawing explanation
Fig. 1 is the interface schematic diagram between electrical network Real Time Digital Simulator RTDS and power plant's power system emulator;
Fig. 2 is synchronous generator interface schematic diagram in electrical network Real Time Digital Simulator RTDS;
Fig. 3 is the GTNET-DNP model for communicating by letter of building on electrical network Real Time Digital Simulator RTDS model basis;
Fig. 4 is the pusher side machine torque T that generates electricity in embodiment mchange curve;
Fig. 5 is the change curve of generator amature rotational speed omega in embodiment;
Fig. 6 is the change curve of three-phase current in embodiment.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
Referring to Fig. 1, the means of communication in electric system machine net Coordination Simulation Model of the present invention between power plant and electrical network, comprise the following steps:
S1 power plant power system emulator is steam turbine output mechanical power P mby communication interface, send to electrical network Real Time Digital Simulator RTDS;
S2 electrical network Real Time Digital Simulator RTDS calculates generator amature rotational speed omega, generator electromotive power output P according to formula (1), formula (2) and formula (3) eand generator end electricity U;
ω = dθ dt - - - ( 1 )
P E = P M - T J ω 0 · dω dt - - - ( 2 )
U = P E I - - - ( 3 )
In formula, T jfor the inertia time constant of genset, the mechanical angle displacement that θ is rotor, t is the time, I is dynamo current;
S3 electrical network Real Time Digital Simulator RTDS sends to power plant's power system emulator by step S2 gained by communication interface;
Communication interface between described electrical network Real Time Digital Simulator RTDS and power plant's power system emulator, specifically by the GTNET card of analog to digital conversion or digital-to-analog conversion A/D-D/A card or RTDS, realize, the data interaction of RTDS analogue system and external device is undertaken by RTDS/GTNET card, adopts DNP3.0 (Distributed Network Protocol) stipulations.
Referring to Fig. 3, for realizing the mutual of RTDS and software platform place workstation and communicating by letter, need on original RTDS model basis, build DNP model, and be that each DNP model is bound RTDS-DNP point mapped file.
Generator and steam turbine in electric system link together by rotor, and power plant's power system emulator calculates steam turbine output mechanical power P m, sending to the generator model in RTDS, RTDS calculates generator amature rotational speed omega, generator electromotive power output P eafter giving power plant's power system emulator.If Fig. 2 is the generator interface model of RTDS, the mechanical output P that it provides for receiving thermal power plant's power system m, and can be to the electromagnetic power P of power system side reaction generator eand the rotational speed omega of generator.
The data interaction of RTDS analogue system and external device is undertaken by RTDS/GTNET card, employing be DNP3.0 stipulations.For realizing the mutual of RTDS and software platform place workstation, on original RTDS model basis, build DNP model, and be each DNP model binding RTDS-DNP point mapped file.The GTNET card of RTDS is for testing the smart machines such as digital protection, to design specially, supports DNP3.0 stipulations, and a GTNET card can be communicated by letter by while and outside 5 intelligent apparatus.
Machine net based on unified is coordinated lab platform and can to the characteristic of power plant and electrical network, be studied simultaneously, analyzes influencing each other between the electrical control gears such as power plant's opertaing devices such as speed regulator and field regulator, relay protection.
For utilizing the simulation example of above-mentioned thermal power plant and electrical network Real Time Digital Simulator interface, example carries out the emulation of transmission line of electricity generation singlephase earth fault to one machine infinity bus system below.
The mechanical output P of the steam turbine output of thermal power plant mby the interface between electrical network Real Time Digital Simulator RTDS and power plant's power system emulator, be sent to electrical network Real Time Digital Simulator RTDS generator module, with machine torque T mform act on generator amature, the rotor speed ω of electrical network Real Time Digital Simulator RTDS side generator is sent to thermal power plant's power system side by the interface between electrical network Real Time Digital Simulator RTDS and power plant's power system emulator simultaneously, for power system side, carry out speed regulating control, maintain turbine rotor rotating speed and keep constant.
Simulation result is as shown in Fig. 4, Fig. 5 and Fig. 6.Wherein Fig. 4 is generating pusher side machine torque T mchange curve; Fig. 5 is the change curve of generator amature rotational speed omega; Fig. 6 is the change curve of transmission line malfunction side three-phase current.
From simulation result, machine net is coordinated analogue system can stable operation, simulation result can embody the operation conditions of practical power systems, and thermal power plant and electrical network Real Time Digital Simulator interface operational excellence can realize the associative simulation of thermal power plant and electrical network Real Time Digital Simulator RTDS preferably.

Claims (1)

1. means of communication between power plant and electrical network in electric system machine net Coordination Simulation Model, is characterized in that: comprise the following steps:
S1 power plant power system emulator is steam turbine output mechanical power P mby communication interface, send to electrical network Real Time Digital Simulator RTDS;
S2 electrical network Real Time Digital Simulator RTDS calculates generator amature rotational speed omega, generator electromotive power output P according to formula (1), (2) and (3) eand generator end electricity U;
ω = dθ dt - - - ( 1 )
P E = P M - T J ω 0 · dω dt - - - ( 2 )
U = P E I - - - ( 3 )
In formula, T jfor the inertia time constant of genset, the mechanical angle displacement that θ is rotor, t is the time, I is dynamo current;
S3 electrical network Real Time Digital Simulator RTDS sends to power plant's power system emulator by step S2 gained by communication interface;
Communication interface between described electrical network Real Time Digital Simulator RTDS and power plant's power system emulator, realizes by the GTNET card of analog to digital conversion or digital-to-analog conversion A/D-D/A card or RTDS; The data interaction of RTDS analogue system and external device is undertaken by RTDS/GTNET card, adopts DNP3.0 stipulations; On original RTDS model basis, build DNP model, and be each DNP model binding RTDS-DNP point mapped file.
CN201310535764.6A 2013-11-01 2013-11-01 The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model Active CN103605558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310535764.6A CN103605558B (en) 2013-11-01 2013-11-01 The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310535764.6A CN103605558B (en) 2013-11-01 2013-11-01 The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model

Publications (2)

Publication Number Publication Date
CN103605558A true CN103605558A (en) 2014-02-26
CN103605558B CN103605558B (en) 2016-08-24

Family

ID=50123787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310535764.6A Active CN103605558B (en) 2013-11-01 2013-11-01 The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model

Country Status (1)

Country Link
CN (1) CN103605558B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103809465A (en) * 2014-02-27 2014-05-21 华北电力大学 Simulation machine of thermal power generating unit and hydroelectric power generating unit and communication interface of real time digital simulator (RTDS)
CN104049543A (en) * 2014-06-26 2014-09-17 南方电网科学研究院有限责任公司 Real-time simulation platform for researching direct-current isolated island operation machine-network coordination characteristic
CN104572247A (en) * 2014-12-10 2015-04-29 南方电网科学研究院有限责任公司 Hybrid real-time simulation method based on RTDS (real time digital simulator)
CN105259781A (en) * 2015-09-25 2016-01-20 上海交通大学 Electric power system mixed simulation system for different types of real-time digital simulation apparatuses
CN109507512A (en) * 2018-12-21 2019-03-22 南方电网科学研究院有限责任公司 A kind of relay protection data transmission system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101826128A (en) * 2010-04-09 2010-09-08 南方电网技术研究中心 Electromagnetic transient and electromechanical transient hybrid simulation method based on real time digital simulator
WO2011103680A1 (en) * 2010-02-26 2011-09-01 Master Dhiren J Electronic control system for a machine
CN102968519A (en) * 2012-10-15 2013-03-13 广东电网公司电力科学研究院 Model of electronic current transformer with hollow coil in electrical system and modeling method thereof
CN103235223A (en) * 2013-04-24 2013-08-07 国电联合动力技术有限公司 Micro grid experimental testing platform on basis of RTDS (Real Time Digital System)

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011103680A1 (en) * 2010-02-26 2011-09-01 Master Dhiren J Electronic control system for a machine
CN101826128A (en) * 2010-04-09 2010-09-08 南方电网技术研究中心 Electromagnetic transient and electromechanical transient hybrid simulation method based on real time digital simulator
CN102968519A (en) * 2012-10-15 2013-03-13 广东电网公司电力科学研究院 Model of electronic current transformer with hollow coil in electrical system and modeling method thereof
CN103235223A (en) * 2013-04-24 2013-08-07 国电联合动力技术有限公司 Micro grid experimental testing platform on basis of RTDS (Real Time Digital System)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103809465A (en) * 2014-02-27 2014-05-21 华北电力大学 Simulation machine of thermal power generating unit and hydroelectric power generating unit and communication interface of real time digital simulator (RTDS)
CN103809465B (en) * 2014-02-27 2016-04-20 华北电力大学 The communication interface of a kind of thermoelectricity and Hydropower Unit replicating machine and RTDS
CN104049543A (en) * 2014-06-26 2014-09-17 南方电网科学研究院有限责任公司 Real-time simulation platform for researching direct-current isolated island operation machine-network coordination characteristic
CN104572247A (en) * 2014-12-10 2015-04-29 南方电网科学研究院有限责任公司 Hybrid real-time simulation method based on RTDS (real time digital simulator)
CN105259781A (en) * 2015-09-25 2016-01-20 上海交通大学 Electric power system mixed simulation system for different types of real-time digital simulation apparatuses
CN105259781B (en) * 2015-09-25 2018-09-11 上海交通大学 Electric system hybrid simulation system for different type real-timedigital simulation device
CN109507512A (en) * 2018-12-21 2019-03-22 南方电网科学研究院有限责任公司 A kind of relay protection data transmission system and method

Also Published As

Publication number Publication date
CN103605558B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN103680238B (en) A kind of intelligent substation Hybrid Simulation Training System for Industry
CN103020385B (en) Based on RTDS electrical network 500kV major network modeling and simulating system
CN102592003B (en) Data exchange method for electromechanical and electromagnetic transient hybrid simulation
CN103605558A (en) Plant-grid communication method for power system machine-grid coordination simulation model
CN106650072A (en) Detecting system and method for virtual synchronous generator grid connection based on hardware-in-the-loop simulation
CN202110440U (en) Direct-drive wind-driven generator frequency-variable controller closed loop test system
CN103439967A (en) Closed loop test system of flexible direct current transmission control protection system
CN104423373A (en) Closed-loop test system of flexible direct current transmission system control and protection system
CN105470950A (en) Permanent-magnet direct-drive wind power plant electromagnetic transient equivalent modeling method for fault analysis
CN104865847A (en) Testing system for ring-digital and physical mixed real-time power simulation and test method thereof
CN103678900B (en) A kind of network decoupling calculation method for regional distribution network real-time simulation
CN208721998U (en) Intelligent substation station level Acceptance Test System based on panorama emulation
CN105527858A (en) Hardware-in-the-loop simulation system for automatic generation control in smart grid
CN113741218A (en) Comprehensive real-time simulation platform for large wind turbine generator
CN103760893A (en) Closed-loop testing system and method for frequency adaptability of alternating-current control protective device
CN101719678B (en) No-load cutting-in modeling and experimental method of double-fed type wind-driven generator
CN203630997U (en) Intelligent substation hybrid simulation training system
Nguyen et al. Integration of SCADA services and power-hardware-in-the-loop technique in cross-infrastructure holistic tests of cyber-physical energy systems
CN103984239A (en) WAMS-based multi-FACTS coordination control digital-analog mixing simulation platform
CN102818953A (en) Wind condition simulation system and method for realizing wind condition simulation system on wind turbine generator test bed
Salehi et al. Design and implementation of laboratory-based smart power system
Wang et al. Architecture and application of real-time co-simulation platform for cyber-physical power system
Ilamparithi et al. On the use of real lime simulators tor the lest and validation of protection and control systems of micro grids and smart grids
Zhao et al. Modeling and Real-time simulation of wind farm
Abdelmalak et al. Real-Time EMT-Phasor co-simulation modeling for large-scale power grids: Challenges and solutions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD.

Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee before: Electrical Power Research Institute of Guangdong Power Grid Corporation

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20171114

Address after: 510655, No. fifth, No. 146-150, Whampoa Avenue, Tianhe District, Guangdong, Guangzhou

Patentee after: Guangdong Electric Power Research Institute of energy technology limited liability company

Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000

Patentee after: China Southern Power Grid Power Technology Co.,Ltd.

Address before: 510655 5th floor, no.146-150, Huangpu Avenue Middle Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee before: GUANGDONG ELECTRIC POWER SCIENCE RESEARCH INSTITUTE ENERGY TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address