CN103605558B - The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model - Google Patents
The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model Download PDFInfo
- Publication number
- CN103605558B CN103605558B CN201310535764.6A CN201310535764A CN103605558B CN 103605558 B CN103605558 B CN 103605558B CN 201310535764 A CN201310535764 A CN 201310535764A CN 103605558 B CN103605558 B CN 103605558B
- Authority
- CN
- China
- Prior art keywords
- rtds
- electrical network
- power plant
- power
- real time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Control Of Eletrric Generators (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310535764.6A CN103605558B (en) | 2013-11-01 | 2013-11-01 | The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310535764.6A CN103605558B (en) | 2013-11-01 | 2013-11-01 | The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103605558A CN103605558A (en) | 2014-02-26 |
CN103605558B true CN103605558B (en) | 2016-08-24 |
Family
ID=50123787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310535764.6A Active CN103605558B (en) | 2013-11-01 | 2013-11-01 | The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103605558B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103809465B (en) * | 2014-02-27 | 2016-04-20 | 华北电力大学 | The communication interface of a kind of thermoelectricity and Hydropower Unit replicating machine and RTDS |
CN104049543A (en) * | 2014-06-26 | 2014-09-17 | 南方电网科学研究院有限责任公司 | Real-time simulation platform for researching direct-current isolated island operation machine-network coordination characteristic |
CN104572247A (en) * | 2014-12-10 | 2015-04-29 | 南方电网科学研究院有限责任公司 | Hybrid real-time simulation method based on RTDS (real time digital simulator) |
CN105259781B (en) * | 2015-09-25 | 2018-09-11 | 上海交通大学 | Electric system hybrid simulation system for different type real-timedigital simulation device |
CN109507512A (en) * | 2018-12-21 | 2019-03-22 | 南方电网科学研究院有限责任公司 | A kind of relay protection data transmission system and method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101826128A (en) * | 2010-04-09 | 2010-09-08 | 南方电网技术研究中心 | Electromagnetic transient and electromechanical transient hybrid simulation method based on real time digital simulator |
CN102968519A (en) * | 2012-10-15 | 2013-03-13 | 广东电网公司电力科学研究院 | Model of electronic current transformer with hollow coil in electrical system and modeling method thereof |
CN103235223A (en) * | 2013-04-24 | 2013-08-07 | 国电联合动力技术有限公司 | Micro grid experimental testing platform on basis of RTDS (Real Time Digital System) |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120331459A1 (en) * | 2010-02-26 | 2012-12-27 | Master Dhiren J | Electronic Control System for a Machine |
-
2013
- 2013-11-01 CN CN201310535764.6A patent/CN103605558B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101826128A (en) * | 2010-04-09 | 2010-09-08 | 南方电网技术研究中心 | Electromagnetic transient and electromechanical transient hybrid simulation method based on real time digital simulator |
CN102968519A (en) * | 2012-10-15 | 2013-03-13 | 广东电网公司电力科学研究院 | Model of electronic current transformer with hollow coil in electrical system and modeling method thereof |
CN103235223A (en) * | 2013-04-24 | 2013-08-07 | 国电联合动力技术有限公司 | Micro grid experimental testing platform on basis of RTDS (Real Time Digital System) |
Also Published As
Publication number | Publication date |
---|---|
CN103605558A (en) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103605558B (en) | The means of communication between power plant and electrical network in power system machine net Coordination Simulation Model | |
CN104330980B (en) | A kind of micro-capacitance sensor emulation test system based on RT LAB | |
CN105550115B (en) | Wind electric converter controller test approach based on dSPACE | |
CN103970128A (en) | On-line real-time simulation testing system of wind generating set controller | |
CN103439967A (en) | Closed loop test system of flexible direct current transmission control protection system | |
CN103020385A (en) | RTDS-based 500-Kv major network modeling simulation systems for power network | |
CN103678900B (en) | A kind of network decoupling calculation method for regional distribution network real-time simulation | |
CN113741218A (en) | Comprehensive real-time simulation platform for large wind turbine generator | |
Meng et al. | Design and implementation of hardware‐in‐the‐loop simulation system for testing control and operation of DC microgrid with multiple distributed generation units | |
Jalili-Marandi et al. | A real-time dynamic simulation tool for transmission and distribution power systems | |
CN105404720A (en) | Hardware-in-loop simulation based wind power unit modeling method | |
Pak et al. | Real-time simulation of a wind energy system based on the doubly-fed induction generator | |
Gonzalez-Longatt et al. | Solution of ac/dc power flow on a multiterminal HVDC system: Illustrative case supergrid phase I | |
CN101533428A (en) | Electro-magnetic transient off-line non-real time parallel simulation system and simulation method | |
Martinez et al. | Tools for analysis and design of distributed resources—Part IV: Future trends | |
CN107544456A (en) | A kind of wind power control system function and information security test system and device based on RTDS | |
CN105527858A (en) | Hardware-in-the-loop simulation system for automatic generation control in smart grid | |
Li et al. | Digital real-time co-simulation platform of refined wind energy conversion system | |
CN205721145U (en) | A kind of dynamic real-time simulator test model device of dual feedback wind power generation system | |
Parizad et al. | Real-time simulator and offline/online closed-loop test bed for power system modeling and development | |
Bani-Ahmed et al. | Development of real-time hardware-in-the-loop platform for complex microgrids | |
CN103810915B (en) | Regulation and control integrative simulation method and system | |
Østergaard et al. | Real time Intelligent Control Laboratory (RT-ICL) of PowerLabDK for smart grid technology development | |
Abdelmalak et al. | PSS/E to RSCAD model conversion for large power grids: Challenges and solutions | |
CN102818953B (en) | Wind condition simulation system and method for realizing wind condition simulation system on wind turbine generator test bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Patentee after: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD. Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Patentee before: Electrical Power Research Institute of Guangdong Power Grid Corporation |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171114 Address after: 510655, No. fifth, No. 146-150, Whampoa Avenue, Tianhe District, Guangdong, Guangzhou Patentee after: Guangdong Electric Power Research Institute of energy technology limited liability company Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Patentee before: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD. |
|
TR01 | Transfer of patent right | ||
CP03 | Change of name, title or address |
Address after: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000 Patentee after: China Southern Power Grid Power Technology Co.,Ltd. Address before: 510655 5th floor, no.146-150, Huangpu Avenue Middle Road, Tianhe District, Guangzhou City, Guangdong Province Patentee before: GUANGDONG ELECTRIC POWER SCIENCE RESEARCH INSTITUTE ENERGY TECHNOLOGY Co.,Ltd. |
|
CP03 | Change of name, title or address |