CN103603343B - 一种深基础施工支架 - Google Patents
一种深基础施工支架 Download PDFInfo
- Publication number
- CN103603343B CN103603343B CN201310546924.7A CN201310546924A CN103603343B CN 103603343 B CN103603343 B CN 103603343B CN 201310546924 A CN201310546924 A CN 201310546924A CN 103603343 B CN103603343 B CN 103603343B
- Authority
- CN
- China
- Prior art keywords
- stake cylinder
- double helix
- deep foundation
- stake
- construction support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明涉及一种施工用地桩,特别涉及一种深基础的施工支架;包括有倒锥形钻头、与倒锥形钻头固定连接的桩筒以及设置在桩筒外壁的螺旋片,所述螺旋片为双螺旋片,其螺旋升角为15°,所述桩筒位于相邻螺旋片间设有均匀分布的孔,桩筒内壁设置有与螺旋片方向相反的螺旋连续凸起,桩筒安装到位后其内部浇注有混凝土;采用本发明技术方案的深基础施工支架,节约金属、施工方便、防止沉降,可长久使用。
Description
技术领域
本发明涉及一种施工用地桩,特别涉及一种深基础的施工支架。
背景技术
在现代建筑中,建筑地基均需要由地基桩构成,其是建筑物承重以及稳固的关键。其施工一般是采用先打桩,再捆扎钢筋灌注混凝土的做法,但是这种做法比较繁琐,施工周期长,费时费力。此外还有部分锥型的金属地桩,其钻头与锥体均由铸造或焊接构成,金属地桩打入地下后不再取出,直接作为桩体使用。
上述的两大类型地桩虽然能够在一定程度上满足施工的要求,但针对于部分潮湿松软环境地基都存在一定的问题,传统的先打装后浇注的方法,不但面临传统的复杂工序,还需要处理塌陷和护壁等额外工作;而金属椎型地桩面临腐蚀风险,一旦腐蚀就容易导致地基桩不稳,此外金属椎型地桩的壁做得较厚,使用成本较高。
发明内容
本发明要解决的技术问题是:提供一种节约金属、施工方便、防止沉降,可长久使用的深基础施工支架。
为了解决上述技术问题,本发明提供一种深基础施工支架,包括有倒锥形钻头、与钻头固定连接的桩筒以及设置在桩筒外壁的螺旋片,所述螺旋片为双螺旋片,其螺旋升角为15°,所述桩筒位于相邻双螺旋片间设有均匀分布的孔,桩筒内壁设置有与双螺旋片方向相反的螺旋连续凸起,桩筒安装到位后其内部浇注有混凝土。
采用上述技术方案的深基础施工支架具有如下优点:由于采用双螺旋片,且其螺旋升角为15°,实验得知此时旋进的阻力较小,而双螺旋片的存在增大了与地基的接触面积,尽量防止沉降和偏转,桩筒内壁设置有与双螺旋片方向相反的螺旋连续凸起,使桩筒内外都形成类似筋板的支撑,这大幅提高了桩筒在旋进过程中的抗扭转变形能力,可以将桩筒的厚度降低,从而节省桩筒的钢材耗用量,此外由于桩筒位于相邻螺旋片间设有均匀分布的孔,桩筒安装到位后其内部浇注有混凝土,一方面混凝土在自身重力和振捣的作用下可以通过这些孔流到桩筒外的地基中并在桩筒外壁形成保护层,使潮湿松软地基凝固结实,避免沉降,而留在桩筒内的混凝土凝固后,由于螺旋连续凸起嵌入混凝土中,大大增强了混凝土与桩筒的一体性,使得最终成型的深基础施工支架结构耐压能力大幅提高,相比于传统的金属椎型地桩其耐腐蚀能力提高。
作为优选方案,为了防止旋进过程中泥土堵塞桩筒上的孔,所述孔的外部设有帽罩,帽罩的开口方向与双螺旋片的旋进方向相反。
作为优选方案,为了方便桩筒的旋进,同时节约双螺旋片的安装成本,所述桩筒上部设置有旋转固定连接件,所述双螺旋片设置在桩筒下方三分之一处。
作为优选方案,为了方便桩筒的旋进以及之后的连接承载使用,所述旋转固定连接件为圆盘,圆盘下方设置有筋板,其同时作为旋进连接和桩基使用连接部件。
附图说明
图1是本发明实施例深基础施工支架的结构示意图。
具体实施方式
下面结合附图和实施例对本发明技术方案进一步说明:
如图1所示,本发明提供一种深基础施工支架,包括有倒锥形钻头1、与倒锥形钻头1焊接固定的桩筒2以及焊接在桩筒2外壁的螺旋片,所述螺旋片为双螺旋片3,其螺旋升角为15°,双螺旋片3设置在桩筒2下方三分之一位置,桩筒2上部焊接有圆盘6,圆盘6下方设置有筋板,其同时作为旋进连接和桩基使用连接部件使用,桩筒2位于相邻螺旋片3间设有均匀分布的孔,孔的外部设有帽罩4,帽罩4的开口方向与双螺旋片3的旋进方向相反,桩筒2内壁设置有与双螺旋片3方向相反的螺旋连续凸起5,桩筒2安装到位后其内部浇注有混凝土。
由于采用双螺旋片3,且其螺旋升角为15°,实验得知此时旋进的阻力较小,而双螺旋片3的存在增大了与地基的接触面积,可以有效防止沉降和偏转,桩筒2内壁设置的与双螺旋片3方向相反的螺旋连续凸起5,使桩筒2内、外都形成类似筋板的支撑,这大幅提高了桩筒2在旋进过程中的抗扭转变形能力,可以将桩筒2的厚度降低,从而节省桩筒2的钢材耗用量,此外由于桩筒2位于相邻螺旋片间设有均匀分布的孔,桩筒2安装到位后其内部浇注混凝土,一方面混凝土在自身重力和振捣的作用下可以通过这些孔流到桩筒2外的地基中并在桩筒2外壁形成保护层,使潮湿松软地基凝固结实,避免沉降,而留在桩筒2内的混凝土凝固后,由于螺旋连续凸起嵌入混凝土中,大大增强了混凝土与桩筒2的一体性,使得最终成型的深基础施工支架结构耐压能力大幅提高。
以上所述的仅是本发明的优选实施方式之一,应当指出,对于本领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干变形和改进,比如孔和帽罩也可以通过斜向钻的孔来代替,双螺旋片3的外边缘还可以根据实际情况开设刃部,钻头部分也可加设拨片或者切刃,这些也应该视为本发明的保护范围,这些都不会影响本发明实施的效果和专利的实用性。
Claims (4)
1.一种深基础施工支架,包括有倒锥形钻头、与倒锥形钻头固定连接的桩筒以及设置在桩筒外壁的螺旋片,其特征在于:所述螺旋片为双螺旋片,其螺旋升角为15°,所述桩筒位于相邻双螺旋片间设有均匀分布的孔,桩筒内壁设置有与双螺旋片方向相反的螺旋连续凸起,桩筒安装到位后其内部浇注有混凝土。
2.根据权利要求1所述的深基础施工支架,其特征在于:所述孔的外部设有帽罩,帽罩的开口方向与双螺旋片的旋进方向相反。
3.根据权利要求1或2所述的深基础施工支架,其特征在于:所述桩筒上部设置有旋转固定连接件,所述双螺旋片设置在桩筒下方三分之一处。
4.根据权利要求3所述的深基础施工支架,其特征在于:所述旋转固定连接件为圆盘,圆盘下方设置有筋板,其同时作为旋进连接和桩基使用连接部件。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310546924.7A CN103603343B (zh) | 2013-11-07 | 2013-11-07 | 一种深基础施工支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310546924.7A CN103603343B (zh) | 2013-11-07 | 2013-11-07 | 一种深基础施工支架 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103603343A CN103603343A (zh) | 2014-02-26 |
CN103603343B true CN103603343B (zh) | 2016-01-13 |
Family
ID=50121598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310546924.7A Expired - Fee Related CN103603343B (zh) | 2013-11-07 | 2013-11-07 | 一种深基础施工支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103603343B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105568962B (zh) * | 2015-12-16 | 2018-01-26 | 重庆广播电视大学 | 一种新型自进式多孔注浆桩及其注浆施工方法 |
CN114482114A (zh) * | 2022-01-28 | 2022-05-13 | 天津大学 | 一种基于固定支架的螺旋桩-筒复合基础结构及其施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201172818Y (zh) * | 2008-04-03 | 2008-12-31 | 庄大伟 | 螺旋钻地桩 |
CN101289856A (zh) * | 2008-06-10 | 2008-10-22 | 孙在伟 | 锥型金属地桩及其安装施工方法 |
JP2013133628A (ja) * | 2011-12-26 | 2013-07-08 | Asahi Kasei Construction Materials Co Ltd | 接続治具及び複合杭の施工方法 |
CN102720191A (zh) * | 2012-04-29 | 2012-10-10 | 湖南天利恩泽太阳能科技有限公司 | 螺旋式地桩 |
CN202865833U (zh) * | 2012-09-26 | 2013-04-10 | 黄骅市龙祥工业有限公司 | 可拼接式螺旋地桩 |
-
2013
- 2013-11-07 CN CN201310546924.7A patent/CN103603343B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103603343A (zh) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234055B (zh) | 一种预制桩后注浆装置及其工艺 | |
CN204370469U (zh) | 一种钻孔桩长腿导管架海上风机基础 | |
CN206916753U (zh) | 一种地下连续墙及其接缝处的止水结构 | |
CN201713812U (zh) | 一种水中钻孔桩基护筒 | |
CN103603343B (zh) | 一种深基础施工支架 | |
CN102071687B (zh) | 钻孔桩护筒制作方法 | |
CN102220764B (zh) | 深基坑支护体系的施工方法 | |
CN104314105B (zh) | 地下室外墙板与现浇扶壁柱的连接竖向拼缝结构及施工方法 | |
CN203939061U (zh) | 一种顶管工具管进出洞止水装置 | |
CN206035045U (zh) | 一种内包塑料预制装配式地下粮仓 | |
CN2714628Y (zh) | 提高现浇混凝土薄壁管桩承载力的灌浆装置 | |
CN204125963U (zh) | 一种通信塔钢管桩基础 | |
CN105544551B (zh) | 一种超长灌注桩快速下放钢筋笼的施工方法 | |
CN106567397B (zh) | 深基坑地下水的控制方法及控制装置 | |
CN203939025U (zh) | 内活瓣式桩靴 | |
CN202672139U (zh) | 预制钢筋混凝土方桩 | |
CN103089161B (zh) | 一种仰角钻孔反注浆固管工艺 | |
CN201933496U (zh) | 一种软粘土地基处理新型桩尖 | |
CN206035048U (zh) | 一种内外包塑料预制装配式地下粮仓 | |
CN202073101U (zh) | 一种兼顾挡土和止水功能的围护结构 | |
CN206143767U (zh) | 一种均载式地螺丝 | |
CN206035047U (zh) | 一种外包塑料预制装配式地下粮仓 | |
CN206035046U (zh) | 一种内外均包塑料阶梯状预制装配式地下粮仓 | |
CN206035050U (zh) | 一种插槽式内包塑料预制仓壁地下粮仓 | |
CN104074187A (zh) | 内活瓣式桩靴及施工使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160113 Termination date: 20161107 |