CN103602769A - Construction method for translation and replacement of blast furnace top air-tight box device - Google Patents

Construction method for translation and replacement of blast furnace top air-tight box device Download PDF

Info

Publication number
CN103602769A
CN103602769A CN201310612944.XA CN201310612944A CN103602769A CN 103602769 A CN103602769 A CN 103602769A CN 201310612944 A CN201310612944 A CN 201310612944A CN 103602769 A CN103602769 A CN 103602769A
Authority
CN
China
Prior art keywords
translation
airtight box
crossbeam
tight box
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310612944.XA
Other languages
Chinese (zh)
Inventor
李国明
姜利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201310612944.XA priority Critical patent/CN103602769A/en
Publication of CN103602769A publication Critical patent/CN103602769A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a construction method for translation and replacement of a blast furnace top air-tight box device, and belongs to the technical field of construction of blast furnaces. The construction method comprises the following steps: manufacturing two translation girders, dismantling a material distribution chute, a connecting bolt of an air-tight box, a connecting pipe and an upper pup joint after shutdown of the blast furnace, heightening the air-tight box by about 1m by using four 20-ton chain blocks, penetrating the two translation girders, passing the center of the blast furnace by 2m, coating butter on tracks of the translation girders, placing the air-tight box on the girders, arranging one set of power device of a hoisting machine on an eight-angle platform, translating out the air-tight box by utilizing traction force of the hoisting machine, and moving the air-tight box to the position to which a furnace top crown block can be hoisted; when the new air-tight box is mounted, the direction which is opposite to that of a pulley block arranged in dismantling is used, and then the new air-tight box can be translated to the place. The construction method has the advantages of playing a great role in protecting an interface of an upper flange and a lower flange, solving the difficult problem that the air-tight box can not be directly dismantled by the furnace top crown block, performing replacement by utilizing a translation technology and avoiding the phenomenon of pulling by force; and facilities are simple, safe and high-efficient.

Description

A kind of constructional method of sliding and replacing blast furnace roof airtight box equipment
Technical field
The invention belongs to blast furnace technical field of construction, particularly a kind of constructional method of sliding and replacing blast furnace roof airtight box equipment, is applicable to for the construction of blast furnace maintenance airtight box quick-replaceable, and narrow space, cannot vertical lifting etc. construction.
Background technology
Blast furnace top equipment airtight box, it is one of blast furnace top equipment important component part, it plays the sealing function of blast furnace ironmaking feeding system, owing to being subject to for a long time the impact of furnace high-temperature, high pressure, the tightness of airtight box is easy to be affected, when serious, affect blast furnace and produce, so just need to complete at short notice dismounting, the installation work of airtight box.
The about 40T of blast furnace top equipment airtight box gross weight, 3.6 meters of diameters, high 2.5 meters, it is positioned at (approximately 40 meters of positions) on blast furnace hole steel ring, furnace roof overhead traveling crane can not directly be sling it, and the dismounting of airtight box, installation work are generally to carry out during blast furnace maintenance, how airtight box dismounting, installation work is completed smoothly, and to try one's best the time more than more piece for other operations, the problem that present technique need to solve just.
Because airtight box tonnage is heavy, volume is large, especially upper and lower flange-interface place will protect, and furnace roof overhead traveling crane can not directly hang installation site again.We have adopted the mode of airtight box translation to complete its dismounting, installation work, with windlass, tackleblock, translation crossbeam, airtight box are moved to fire door center, just can solve the difficult problem that cannot use the lifting of furnace roof overhead traveling crane.Its facility is simple, safety, efficiently, do not damage existing equipment, is a kind of best operating technique of replacing.
Summary of the invention
The object of the present invention is to provide a kind of constructional method of sliding and replacing blast furnace roof airtight box equipment; especially upper and lower flange-interface place plays a very good protection; having solved furnace roof overhead traveling crane can not directly remove a difficult problem is installed airtight box; utilize translation technology to change; avoided the phenomenon of stretching the meaning; its facility is simple, safety, efficient, is a kind of best operating technique of replacing.
Construction procedure of the present invention is as follows:
(1) making of translation crossbeam:
Translation crossbeam 1 is formed by joist steel and track welding, i.e. joist steel top flange plate welded rails, and translation crossbeam is the principal facility of airtight box in translation process, is that airtight box utilizes the form that reduces friction to make its translation in the above on translation crossbeam 1;
(2) remove airtight box appurtenances:
Remove airtight box parts and comprise top sub, flange bolt, the various pipelines of connection, distributor chute, during dismounting, each interface will protect;
(3) translation facility is set:
The most important link of airtight box translation, translation facility is set exactly, it is the technological core of integral translation, being the key that realizes translation airtight box, is the center of whole construction process, the installation of translation crossbeam, to carry out in anistree position of platform, extended to fire door place, the good channel-section steel of translation crossbeam bottom pad, backing plate (for levelling), and be welded and fixed; In the middle of two crossbeams, with channel-section steel, carry out lateral brace; The setting of translation hoisting facilities, arranges one, windlass, goes out door guide roller, leading sheave, tackleblock; Old airtight box is put on translation crossbeam, and has been tied wireline, above the crossbeam of translation simultaneously, coat butter;
(4) airtight box translation:
Start windlass, old airtight box is shifted out slowly, move on to the position that furnace roof overhead traveling crane can lift, it is hung out from translation crossbeam, in translation process, notice that the wireline of tackleblock, guide deflection sheave has or not fast knot phenomenon, note the variation of the tightening force of fast line simultaneously; Utilize furnace roof overhead traveling crane to put it on translation crossbeam 2 new airtight box 7, reset tackleblock 5 reverse, shift-in is with to shift out process identical; New airtight box 7 is moved on to furnace roof center, with 4 20 tons of jacks, played, extract translation crossbeam 1 out, new airtight box 7 is put into fire door place slowly, just complete more changing jobs of airtight box.
The invention has the advantages that: other construction operation, without any impact, guaranteeing to have accelerated construction speed on safe basis, has been improved to working efficiency, and solution cannot be used a difficult problem for furnace roof overhead traveling crane lifting; Adopt present technique, solved a difficult problem for airtight box finished product protection, improved setting accuracy, in the progress of assurance, guaranteed construction quality; This technology less investment, easy to operate, durable.
Accompanying drawing explanation
Fig. 1 is that old airtight box is removed translation schematic diagram.Wherein, translation crossbeam 1, windlass 2, go out door guide roller 3, leading sheave 4, tackleblock 5, old airtight box 6.
The new airtight box of Fig. 2 is installed translation schematic diagram.Wherein, new airtight box 7, tackleblock 5 Opposite direction connections.
Specific implementation method
Below in conjunction with embodiment of the present invention is described shown in specific implementation method and figure:
1, the making of translation crossbeam
Translation crossbeam 1 is formed by joist steel and track welding, i.e. joist steel top flange plate welded rails, and translation crossbeam 1 is the principal facility of airtight box in translation process, is that airtight box utilizes the form that reduces friction to make its translation in the above on translation crossbeam 1.
2, remove airtight box appurtenances
Remove airtight box parts and comprise top sub, flange bolt, the various pipelines of connection, distributor chute, during dismounting, each interface will protect.
3, translation facility is set
The most important link of airtight box translation, translation facility is set exactly, it is the technological core of integral translation, being the key that realizes translation airtight box, is the center of whole construction process, the installation of translation crossbeam, to carry out in anistree position of platform, extended to fire door place, the good channel-section steel of translation crossbeam bottom pad, backing plate (for levelling), and be welded and fixed; In the middle of two crossbeams, with channel-section steel, carry out lateral brace; The setting of translation hoisting facilities, arranges 2 one, windlass, goes out door guide roller 3, leading sheave 4, tackleblock 5; Old airtight box 6 is put on translation crossbeam 1, and has been tied wireline, above the crossbeam of translation simultaneously, coat butter.
4, airtight box translation
Start windlass, old airtight box is shifted out slowly, move on to the position that furnace roof overhead traveling crane can lift, it is hung out from translation crossbeam, in translation process, notice that the wireline of tackleblock, guide deflection sheave has or not fast knot phenomenon, note the variation of the tightening force of fast line simultaneously; Utilize furnace roof overhead traveling crane to put it on translation crossbeam 1 new airtight box 7, reset tackleblock 5(reverse), shift-in is with to shift out process identical; New airtight box 7 is moved on to furnace roof center, with 4 20 tons of jacks, played, extract translation crossbeam 1 out, new airtight box 7 is put into fire door place slowly, just complete more changing jobs of airtight box.

Claims (1)

1. a constructional method for sliding and replacing blast furnace roof airtight box equipment, is characterized in that, construction procedure is:
1) making of translation crossbeam:
Translation crossbeam (1) is formed by joist steel and track welding, i.e. joist steel top flange plate welded rails, and translation crossbeam is the principal facility of airtight box in translation process, is that airtight box makes its translation in the above in the upper form that reduces friction of utilizing of translation crossbeam (1);
2) remove airtight box appurtenances:
Remove airtight box parts and comprise top sub, flange bolt, the various pipelines of connection, distributor chute, during dismounting, each interface will protect;
3) translation facility is set:
The most important link of airtight box translation, translation facility is set exactly, it is the technological core of integral translation, being the key that realizes translation airtight box, is the center of whole construction process, the installation of translation crossbeam, to carry out in anistree position of platform, extended to fire door place, the good channel-section steel of translation crossbeam bottom pad, backing plate (for levelling), and be welded and fixed; In the middle of two crossbeams, with channel-section steel, carry out lateral brace; The setting of translation hoisting facilities, arranges (2) one, windlass, goes out door guide roller (3), leading sheave (4), tackleblock (5); Old airtight box (6) is put into translation crossbeam (1) upper, and has been tied wireline, above the crossbeam of translation simultaneously, coat butter;
4) airtight box translation:
Start windlass, old airtight box is shifted out slowly, move on to the position that furnace roof overhead traveling crane can lift, it is hung out from translation crossbeam, in translation process, notice that the wireline of tackleblock, guide deflection sheave has or not fast knot phenomenon, note the variation of the tightening force of fast line simultaneously; Utilize furnace roof overhead traveling crane to put it to translation crossbeam (2) new airtight box (7) upper, reset tackleblock (5) reverse, shift-in is with to shift out process identical; New airtight box (7) is moved on to furnace roof center, with 4 20 tons of jacks, played, extract translation crossbeam (1) out, new airtight box (7) is put into fire door place slowly, just complete more changing jobs of airtight box.
CN201310612944.XA 2013-11-27 2013-11-27 Construction method for translation and replacement of blast furnace top air-tight box device Pending CN103602769A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310612944.XA CN103602769A (en) 2013-11-27 2013-11-27 Construction method for translation and replacement of blast furnace top air-tight box device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310612944.XA CN103602769A (en) 2013-11-27 2013-11-27 Construction method for translation and replacement of blast furnace top air-tight box device

Publications (1)

Publication Number Publication Date
CN103602769A true CN103602769A (en) 2014-02-26

Family

ID=50121032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310612944.XA Pending CN103602769A (en) 2013-11-27 2013-11-27 Construction method for translation and replacement of blast furnace top air-tight box device

Country Status (1)

Country Link
CN (1) CN103602769A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105316449A (en) * 2014-07-29 2016-02-10 宝山钢铁股份有限公司 Method for lifting integrated petticoat and water seal cylinder of converter
CN105483302A (en) * 2015-12-04 2016-04-13 中国一冶集团有限公司 Installing construction method for large blast furnace top valve box
CN113441923A (en) * 2021-06-18 2021-09-28 中天钢铁集团有限公司 Quick dismounting device of dephosphorization machine
CN115386670A (en) * 2022-08-26 2022-11-25 北京首钢股份有限公司 Blast furnace blow-off valve replacing device and replacing method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202157076U (en) * 2011-06-17 2012-03-07 南京梅山冶金发展有限公司 Trolley special for replacing air tight box of blast furnace
CN203143964U (en) * 2013-01-02 2013-08-21 河北钢铁股份有限公司承德分公司 Device for quickly changing blast furnace air-tight box

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202157076U (en) * 2011-06-17 2012-03-07 南京梅山冶金发展有限公司 Trolley special for replacing air tight box of blast furnace
CN203143964U (en) * 2013-01-02 2013-08-21 河北钢铁股份有限公司承德分公司 Device for quickly changing blast furnace air-tight box

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王裕博等: "高炉本体炉顶设备更换", 《科技与生活》 *
高志刚等: "5#高炉气密箱更换方案的优化选取", 《邯钢科技》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105316449A (en) * 2014-07-29 2016-02-10 宝山钢铁股份有限公司 Method for lifting integrated petticoat and water seal cylinder of converter
CN105483302A (en) * 2015-12-04 2016-04-13 中国一冶集团有限公司 Installing construction method for large blast furnace top valve box
CN113441923A (en) * 2021-06-18 2021-09-28 中天钢铁集团有限公司 Quick dismounting device of dephosphorization machine
CN115386670A (en) * 2022-08-26 2022-11-25 北京首钢股份有限公司 Blast furnace blow-off valve replacing device and replacing method thereof

Similar Documents

Publication Publication Date Title
CN102139832B (en) Gantry crane device with lengthways and transverse traveling functions and hoisting method
CN103602769A (en) Construction method for translation and replacement of blast furnace top air-tight box device
CN203979647U (en) A kind of detachable recycling guide rail pipe perforator
CN203834914U (en) Automatic lifting stacking platform
CN104818858A (en) Indoor heavy electric cabinet lifting method
CN107502690A (en) A kind of point of device and replacing options with integral replacing last furnace shell
CN108374351B (en) Simple hoisting device and method for dismantling box girder bailey pieces
CN107009502A (en) Screw synchronization of jacking up automatically controls demolding of track slab machine
CN103342321A (en) Integral replacing and hoisting method of steam generator of in-service nuclear power plant
CN206447894U (en) A kind of blast furnace gun machine slew gear equipment integral replacement device
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN108015519A (en) The drawing process covered in blast furnace
CN201990401U (en) Gate-type lifting device with vertically and horizontally-travelling functions
CN205099290U (en) Saddle arm jacking device is changed to continuous casting revolving platform floating bearing
CN210596129U (en) Mud gun slewing mechanism replacing device
CN202296886U (en) Hoisting device for installing oversized radial gate of hydropower station
CN104528506B (en) Mine hoist and unhooking test method thereof
CN208347716U (en) A kind of nonpetroleum well site preventer installs board migration device
CN207997252U (en) A kind of heat exchanger displacement tooling
CN105672910B (en) Oil pipe traction lifting Aided Machine
CN202659248U (en) Self-propelled tunnel drilling jumbo
CN206338037U (en) A kind of well workover self-balancing derrick
CN105236320A (en) Jacking device for replacing saddle arm of rotating bearing of continuous casting rotating table and construction method of jacking device
CN204265216U (en) Large-scale component lifting special balancing suspender
CN215404323U (en) Blast furnace tuyere platform hoisting hole cover plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140226