CN103594977A - 一种软母线架设安装工艺 - Google Patents

一种软母线架设安装工艺 Download PDF

Info

Publication number
CN103594977A
CN103594977A CN201310639402.1A CN201310639402A CN103594977A CN 103594977 A CN103594977 A CN 103594977A CN 201310639402 A CN201310639402 A CN 201310639402A CN 103594977 A CN103594977 A CN 103594977A
Authority
CN
China
Prior art keywords
soft
soft bus
wire clamp
shaped wire
crimping position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310639402.1A
Other languages
English (en)
Other versions
CN103594977B (zh
Inventor
邢仁杰
魏胜虎
冯磊
陶君亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hebei Power Transmission and Transformation Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hebei Power Transmission and Transformation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Hebei Power Transmission and Transformation Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310639402.1A priority Critical patent/CN103594977B/zh
Publication of CN103594977A publication Critical patent/CN103594977A/zh
Application granted granted Critical
Publication of CN103594977B publication Critical patent/CN103594977B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Connections Effected By Soldering, Adhesion, Or Permanent Deformation (AREA)

Abstract

本发明公开了一种软母线架设安装工艺,包括施工准备、测量下料、金具安装、绝缘子串安装、T型线夹及软连引线安装、软母线悬挂、驰度测量调整、连接设备套管的步骤,其中,在T型线夹及软连引线安装步骤中,根据设计要求,测量或计算得到相关数据,并由相关数据计算出T型线夹在软母线上的压接位置,按照计算得到的压接位置将T型线夹压接到软母线上,并在压接好的T型线夹上安装软连引线的一端,软连引线的另一端用于在连接设备套管的步骤中连接到设备套管上。本发明根据软母线余量等计算出压接位置。在软母线架设之前,直接在地面上进行T型线夹的压接,避免了使用高空作业车和高空作业的危险性。

Description

一种软母线架设安装工艺
技术领域
本发明涉及一种变电站施工工艺,具体的说是一种软母线架设安装工艺。
背景技术
现有技术中,变电站软母线(也称上跨线)架设工艺工序为:施工准备、测量下料、金具安装、绝缘子串安装、软母线悬挂、驰度测量调整、引下线安装连接,架设完成后还要填写安装记录。其中所述的引下线连接是要在变电站中隔离开关、电流互感器、电压互感器等设备的垂直线上方的软母线上压接T型线夹,在用软连引线从T型线夹上引到上述变电站内的设备的套管上。目前引下线的施工都是要等到软母线架设好以后,利用高空作业车在软母线T接位置对比设备套管位置后,施工人员在高空作业车上压接T型线夹,这样做不仅浪费台班,施工人员还有高空作业的危险。
发明内容
本发明需要解决的技术问题是提供一种工艺简单、能避免施工人员高空作业危险的软母线架设安装工艺。
为解决上述技术问题,本发明所采用的技术方案是:
一种软母线架设安装工艺,包括施工准备、测量下料、金具安装、绝缘子串安装、T型线夹及软连引线安装、软母线悬挂、驰度测量调整、连接设备套管的步骤,
其中,在T型线夹及软连引线安装步骤中,T型线夹在软母线上的压接位置由下式计算得到:
L= L2/L1×A+L2-Lc-Lg
其中,
L—T型线夹的压接位置距离软母线靠近压接位置的近端的软母线长度;
L2—完成软母线架设后,T型线夹的压接位置与软母线靠近压接位置的近端所在的挂线点之间的水平距离;
L1—软母线的两端的挂线点之间的水平距离;
A—所架设的软母线在本跨内的余量,是软母线下料长度与软母线两端的挂线点之间水平距离L1之差;
Lc—软母线靠近压接位置的近端所连接的绝缘子串的长度;
Lg—软母线靠近压接位置的近端所连接的钢芯铝绞线中钢芯到钢锚孔边缘长度;
根据设计要求测量或计算得到上述计算公式的等式右侧的数据,然后计算得出计算得出等式左侧的T型线夹的压接位置距离软母线靠近压接位置的近端的软母线长度L,参照计算结果将T型线夹压接到软母线上,并在压接好的T型线夹上安装软连引线的一端,软连引线的另一端用于在连接设备套管的步骤中连接到设备套管上。
由于采用了上述技术方案,本发明取得的技术进步是:
本发明根据软母线计算公式中的余量,深入创新将压接位置在软母线随弧垂均等平均后加上接线点至压接位置的水平距离,减去绝缘子长度和钢锚(钢芯位置)长度,可计算出压接位置。在软母线架设之前,直接在地面上进行T型线夹的压接,避免了使用高空作业车和高空作业的危险性。
附图说明
图1是本发明的实施工艺原理图。
其中,1—软母线,2—绝缘子串,3—钢锚,4—T型线夹的压接位置,
L—T型线夹的压接位置距离软母线靠近压接位置的近端的软母线长度,
L2—完成软母线架设后,T型线夹的压接位置与软母线靠近压接位置的近端所在的挂线点之间的水平距离,
L1—软母线的两端的挂线点之间的水平距离,
A—所架设的软母线在本跨内的余量,是软母线下料长度与软母线两端的挂线点之间水平距离L1之差,
Lc—软母线靠近压接位置的近端所连接的绝缘子串的长度,
Lg—为软母线靠近压接位置的近端所连接的钢芯铝绞线中钢芯到钢锚孔边缘长度。
具体实施方式
下面结合附图对本发明做进一步详细说明:
软母线架设安装工艺,包括施工准备、测量下料、金具安装、绝缘子串安装、T型线夹及软连引线安装、软母线悬挂、驰度测量调整、连接设备套管的步骤。
其中,在T型线夹及软连引线安装步骤中,参见图1所示的原理图,在两座杆塔之间架设有一条软母线1,软母线1的两端分别通过钢锚3连接一绝缘子串2,两根绝缘子串2的另一端连接在对应侧杆塔的挂线点上。软母线靠近左端示意出一处需要压接T型线夹,即T型线夹的压接位置4,故此,称软母线左端为软母线靠近压接位置的近端,软母线右端则为软母线靠近压接位置的的远端。
在本步骤中,需要根据设计要求测量或计算得出一些相关数据,根据这些相关数据进行T型线夹在软母线上的压接位置计算,按照计算得到的压接位置将T型线夹压接到软母线上,并在压接好的T型线夹上安装软连引线的一端,软连引线的另一端用于在连接设备套管的步骤中连接到设备套管上。
所述的T型线夹在软母线上的压接位置由下式计算得到:
L= L2/L1×A+L2-Lc-Lg,
其中,L—为T型线夹的压接位置距离软母线靠近压接位置的近端的软母线长度,本实施例中,如图1所示,为T型线夹的压接位置4到软母线的左端的软母线长度,这里是指沿着软母线的方向顺延的长度,而不是直线距离,用于根据此长度确定具体要在哪个位置进行T型线夹的压接;
L2—为完成软母线架设后,T型线夹的压接位置与软母线靠近压接位置的近端所在的挂线点之间的水平距离,具体到本实施例,即图1中T型线夹的压接位置4到软母线的左端的挂线点之间的水平距离;
L1—为软母线的两端的挂线点之间的水平距离;
A—为所架设的软母线在本跨内的余量,是软母线下料长度与软母线两端的挂线点之间水平距离L1之差;
Lc—为软母线靠近压接位置的近端所连接的绝缘子串的长度;
Lg—为软母线靠近压接位置的近端所连接的钢芯铝绞线中钢芯到钢锚孔边缘长度。

Claims (1)

1.一种软母线架设安装工艺,其特征在于:包括施工准备、测量下料、金具安装、绝缘子串安装、T型线夹及软连引线安装、软母线悬挂、驰度测量调整、连接设备套管的步骤,
其中,在T型线夹及软连引线安装步骤中,T型线夹在软母线上的压接位置由下式计算得到:
L= L2/L1×A+L2-Lc-Lg
其中,
L—T型线夹的压接位置距离软母线靠近压接位置的近端的软母线长度;
L2—完成软母线架设后,T型线夹的压接位置与软母线靠近压接位置的近端所在的挂线点之间的水平距离;
L1—软母线的两端的挂线点之间的水平距离;
A—所架设的软母线在本跨内的余量,是软母线下料长度与软母线两端的挂线点之间水平距离L1之差;
Lc—软母线靠近压接位置的近端所连接的绝缘子串的长度;
Lg—软母线靠近压接位置的近端所连接的钢芯铝绞线中钢芯到钢锚孔边缘长度;
根据设计要求测量或计算得到上述计算公式的等式右侧的数据,然后计算得出等式左侧的T型线夹的压接位置距离软母线靠近压接位置的近端的软母线长度L,参照计算结果将T型线夹压接到软母线上,并在压接好的T型线夹上安装软连引线的一端,软连引线的另一端用于在连接设备套管的步骤中连接到设备套管上。
CN201310639402.1A 2013-12-04 2013-12-04 一种软母线架设安装工艺 Active CN103594977B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310639402.1A CN103594977B (zh) 2013-12-04 2013-12-04 一种软母线架设安装工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310639402.1A CN103594977B (zh) 2013-12-04 2013-12-04 一种软母线架设安装工艺

Publications (2)

Publication Number Publication Date
CN103594977A true CN103594977A (zh) 2014-02-19
CN103594977B CN103594977B (zh) 2016-08-17

Family

ID=50085012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310639402.1A Active CN103594977B (zh) 2013-12-04 2013-12-04 一种软母线架设安装工艺

Country Status (1)

Country Link
CN (1) CN103594977B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015143402A1 (en) 2014-03-21 2015-09-24 Quanta Associates, L.P. Flexible electrical isolation device
CN106384963A (zh) * 2016-10-27 2017-02-08 中国电力科学研究院 软母线预制用安装装置
CN106570239A (zh) * 2016-10-25 2017-04-19 中国电力科学研究院 软母线下料长度计算方法及装置
CN106786269A (zh) * 2016-12-22 2017-05-31 中国电力科学研究院 变电站扩径软母线安装方法
CN107394720A (zh) * 2017-06-18 2017-11-24 中国能源建设集团山西电力建设有限公司 变电站内架空软母线长度的简便确定方法
CN107979027A (zh) * 2017-12-25 2018-05-01 郑州东辰科技有限公司 地面压接耐张线夹的架线方法
CN108039684A (zh) * 2017-12-25 2018-05-15 郑州拽亘电子科技有限公司 一种地面压接耐张线夹的架线方法
US10651637B2 (en) 2014-03-21 2020-05-12 Quanta Associates, L.P. Flexible electrical isolation device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012050251A (ja) * 2010-08-27 2012-03-08 Tokyo Electric Power Co Inc:The 太径の既設電線の移線工法
CN103401183A (zh) * 2013-07-25 2013-11-20 国家电网公司 一种装配式架线方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012050251A (ja) * 2010-08-27 2012-03-08 Tokyo Electric Power Co Inc:The 太径の既設電線の移線工法
CN103401183A (zh) * 2013-07-25 2013-11-20 国家电网公司 一种装配式架线方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘旭锋等: "浅谈软母线安装施工措施", 《科学之友》 *
姚中天: "用近似装配法进行变电站软母线架设", 《广西电力》 *
杨毅斌: "软母线引下线安装方法的改进", 《电气化铁道》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015143402A1 (en) 2014-03-21 2015-09-24 Quanta Associates, L.P. Flexible electrical isolation device
EP3120041A4 (en) * 2014-03-21 2017-11-08 Quanta Associates, L.P. Flexible electrical isolation device
US10651637B2 (en) 2014-03-21 2020-05-12 Quanta Associates, L.P. Flexible electrical isolation device
US10770872B2 (en) 2014-03-21 2020-09-08 Quanta Associates, L.P. Flexible electrical isolation device
CN106570239A (zh) * 2016-10-25 2017-04-19 中国电力科学研究院 软母线下料长度计算方法及装置
CN106570239B (zh) * 2016-10-25 2021-04-16 中国电力科学研究院 软母线下料长度计算方法及装置
CN106384963A (zh) * 2016-10-27 2017-02-08 中国电力科学研究院 软母线预制用安装装置
CN106384963B (zh) * 2016-10-27 2020-08-11 中国电力科学研究院 软母线预制用安装装置
CN106786269A (zh) * 2016-12-22 2017-05-31 中国电力科学研究院 变电站扩径软母线安装方法
CN107394720A (zh) * 2017-06-18 2017-11-24 中国能源建设集团山西电力建设有限公司 变电站内架空软母线长度的简便确定方法
CN107979027A (zh) * 2017-12-25 2018-05-01 郑州东辰科技有限公司 地面压接耐张线夹的架线方法
CN108039684A (zh) * 2017-12-25 2018-05-15 郑州拽亘电子科技有限公司 一种地面压接耐张线夹的架线方法

Also Published As

Publication number Publication date
CN103594977B (zh) 2016-08-17

Similar Documents

Publication Publication Date Title
CN103594977A (zh) 一种软母线架设安装工艺
CN105953762B (zh) 一种用于净空距离测量的输电线路建模方法和测距装置
CN205724746U (zh) 一种用于特高压直流工程的气体绝缘式穿墙套管
CN105067853A (zh) 一种可调整长度带电安装的高压电能表
CN102810774A (zh) 一种用于电力系统的角度可调节接地线装置
ZA202205547B (en) A system for guiding a dielectric cable from phase-to-ground potential
CN205646216U (zh) 绝缘验电装设接地线辅助杆
CN103969474B (zh) 快速多用途gis局放测量传感器固定装置
CN202712459U (zh) 一种用于电力系统的角度可调节接地线装置
CN109001519B (zh) 一种带电定位电缆金属护套接地点的装置与方法
CN203707688U (zh) 一种用于自锁型铠装铝合金电缆安装的支架
CN203707716U (zh) 一种铝合金电缆在竖井内多层敷设支架
CN105388354A (zh) 一种用于过电压测量的全光学过电压传感器的安装组件
CN209486297U (zh) 一种非接触式架空线缆测高杆
CN201392761Y (zh) 一种杆上负荷开关防护遮蔽罩
CN108535611A (zh) 架空线路的感应放电距离测量装置及其测量方法
CN103806740A (zh) 插入式带电立杆方法
CN203850076U (zh) 一种穿墙套管的模拟试验支架
CN202616650U (zh) 一种gis光学电流互感器安装装置
CN203249976U (zh) 一种油-sf6 套管试验装置
KR101470932B1 (ko) 운행 차량과 변전소간의 동기화된 전력 데이터를 이용한 실시간 전차선로 임피던스 산출 시스템
CN106291050B (zh) 一种用于输电线路的光学过电压传感器的安装装置
CN206673143U (zh) 一种多功能高空试验接线钳
CN103915770A (zh) 2km-4km海拔变电站电气设备爬电距离的修正方法
CN204359987U (zh) 一种光缆分纤箱

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant