CN103590342B - The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge - Google Patents

The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge Download PDF

Info

Publication number
CN103590342B
CN103590342B CN201210291623.XA CN201210291623A CN103590342B CN 103590342 B CN103590342 B CN 103590342B CN 201210291623 A CN201210291623 A CN 201210291623A CN 103590342 B CN103590342 B CN 103590342B
Authority
CN
China
Prior art keywords
getting
anchor chain
anchor
crab
shackle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210291623.XA
Other languages
Chinese (zh)
Other versions
CN103590342A (en
Inventor
王金祥
黄耀怡
李彬
田凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Original Assignee
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Tianye Tolian Heavy Industry Co Ltd filed Critical Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority to CN201210291623.XA priority Critical patent/CN103590342B/en
Publication of CN103590342A publication Critical patent/CN103590342A/en
Application granted granted Critical
Publication of CN103590342B publication Critical patent/CN103590342B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge, including: being arranged on the system of getting off and get off the detachable crab-bolt mechanism of both sides, car body front end, described crab-bolt mechanism includes: shackle under shackle on anchor chain, anchor pole, anchor nut, anchor chain, anchor chain;Wherein, described anchor pole upper end is connected with the lower end of described anchor chain by shackle under described anchor chain;Described anchor pole lower end is threaded, is connected with described anchor nut;Respectively welding one piece of otic placode with holes in the both sides, vehicle frame main beam front end of the system of getting off, described otic placode with holes is connected with described anchor chain upper end by shackle on described anchor chain.The present invention utilizes deadweight and the hanging beam hole thereof of frame beams of concrete, being anchored at beam car front end by crab-bolt mechanism sets a roof beam in place on head, thus reached the system of getting off when bridge formation unit is set a roof beam in place and will not occur to tumble backward, ensure that the pitch metacentric stability of the system of getting off, there is features simple structure, performance safety, the advantage of cost economy.

Description

The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge
Technical field
The present invention relates to technical field of engineering machinery, especially relate to the getting off of bridge formation unit of a kind of anti-hypsokinesis System and utilize its method carrying out building bridge.
Background technology
Bridge formation unit is mainly made up of the system of getting on the bus and the system of getting off.System of getting on the bus mainly by bridge owner's structure and Beam-hanging traveling crane forms, and system of getting off is held concurrently by tire type beam conveying vehicle and worked as.Get on the bus and the system of getting off complement one another use, Its step set a roof beam in place is as follows:
1st step, is shown in that Fig. 1-1, the bridge machine system of getting on the bus become back boom feeding beam state, and rear end walking supporting leg is backward Tilting, load-bearing rear support leg shrinks, and system of getting off (i.e. tire type beam conveying vehicle) ships beams of concrete from rear And it being sent into below system back boom of getting on the bus, this process is referred to as " feeding beam ".
2nd step, is shown in Fig. 1-2, and after beam car feeding beam puts in place, system of getting on the bus load-bearing rear support leg falls to prop up and stands on On the horizontal bearing beam in rear portion of system of getting off, and connect.
3rd step, is shown in that Fig. 1-3, former the portable supporting leg stood on middle bridge pier are advanced to front square pier Zhi Li, Making Bridge Erector become two straddle mounting beam-like states, beams of concrete is sling from beam car by two overhead traveling cranes.
4th step, is shown in Fig. 1-4, on two beam-hanging traveling crane handling beams of concretes of system of getting on the bus to bridge opening position Side.
5th step, is shown in Fig. 1-5, and two beam-hanging traveling cranes of system of getting on the bus beam that fallen by beams of concrete is in place.
Said process the 3rd, 4 steps, two supporting legs one of Bridge Erector stand on front square pier, a Zhi Li On the horizontal bearing beam in the rear portion of the system of getting off.Just from beam car, lift by crane concrete when forward and backward beam-hanging traveling crane simultaneously Liang Shi, the load capacity on the horizontal bearing beam in beam car rear portion reaches maximum, and beam car front end is as being loaded Bearing capacity on the horizontal bearing beam of the front fulcrum of beams of concrete is but delivered on bridge main beam by front hanging beam dolly, Now (former the portable supporting leg stood on middle bridge pier is advanced to the horizontal bearing beam in beam car front end vanishing load Front square pier Zhi Li).Then, the instant load state of tire type beam conveying vehicle be front light after weight, extremely uneven, There is the possibility tumbled backward around rear end in vehicle.
Summary of the invention
The present invention provides the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilizes it to carry out the method built bridge, The problem that during in order to solve to build a bridge in prior art, the system of getting off may be tumbled backward.
For reaching above-mentioned purpose, the present invention provides the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis, including: set Putting the detachable crab-bolt mechanism of both sides, car body front end of getting off in the system of getting off, described crab-bolt mechanism includes: anchor chain, Shackle under shackle on anchor pole, anchor nut, anchor chain, anchor chain;Wherein, described anchor is passed through in described anchor pole upper end Under chain, shackle is connected with the lower end of described anchor chain;Described anchor pole lower end is threaded, is connected with described anchor nut; Respectively welding one piece of otic placode with holes in the both sides, vehicle frame main beam front end of the system of getting off, described otic placode with holes is by described On anchor chain, shackle is connected with described anchor chain upper end.
Further, system of getting off described in also includes:
Bracket, concave surface packing ring and convex surface packing ring, wherein, be sleeved on described bracket on described anchor pole, refill It is connected with described anchor nut after upper described concave surface packing ring and convex surface packing ring.
The present invention also provides for a kind of utilizing the above-mentioned system of getting off to carry out the method built bridge, and comprises the steps:
Step S101, the bridge machine system of getting on the bus becomes back boom feeding beam state, and rear end walking supporting leg tilts backward, holds Weight rear support leg shrinks, and system of getting off ships beams of concrete and is sent into below system back boom of getting on the bus from rear;
Step S102, when get off system feeding beam para-position time, make the system of getting off vehicle frame main beam both sides install mounting or dismounting Align with the hanging beam hole, both sides, front set a roof beam in place in the position of formula crab-bolt mechanism;
Step S103, pierces into the hanging beam hole, both sides set a roof beam in place, with under anchor chain by the anchor pole of detachable crab-bolt mechanism Anchor pole upper end is connected by shackle with the anchor chain lower end installed in the both sides, vehicle frame main beam front end of the system of getting off Get up;Again the anchor pole lower end pierced in hanging beam hole is connected with anchor nut, completes whole anchoring operation, Start handling beams of concrete, and the beam that falls is in place.
The present invention has the beneficial effect that:
The present invention utilizes deadweight and the hanging beam hole thereof of frame beams of concrete, by crab-bolt mechanism by beam car front end It is anchored at and sets a roof beam in place on head, thus reached the system of getting off when bridge formation unit is set a roof beam in place and will not occur to tumble backward, Ensure that the pitch metacentric stability of the system of getting off, there is features simple structure, performance safety, the advantage of cost economy.
Accompanying drawing explanation
Fig. 1-1~1-5 is the process schematic of existing girder erection by bridging machine;
Fig. 2 is the knot of the crab-bolt mechanism of the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis in the embodiment of the present invention Structure schematic diagram;
Fig. 3 is the A direction view of Fig. 2.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the present invention is further elaborated.Should be appreciated that this Specific embodiment described by place, only in order to explain the present invention, does not limit the present invention.
For reaching above-mentioned purpose, the embodiment of the present invention be the technical scheme is that the tire of the system of getting off Formula is got off car body front end and being tied with special detachable crab-bolt mechanism between frame beams of concrete beam head, Make to set a roof beam in place after generation is on car body when starting and go all out to be resisted by the deadweight of frame beams of concrete;That is to say will The car body front end of tire type beam conveying vehicle is anchored on frame beams of concrete beam head, and anchoring mechanism system utilizes dexterously Set a roof beam in place original hanging beam hole reach detachable anchoring purpose.
Concrete technical measures are to manufacture and design two set detachable crab-bolt mechanisms to be hingedly connected to beam car car body master Both sides, beam front end, enable the position of detachable crab-bolt mechanism and car body main beam pivot at beam car feeding beam Para-position is just alignd with original hanging beam hole on frame beams of concrete head after stopping, and then anchor pole is penetrated hanging beam Hole, anchor nut of screwing on.Crab-bolt mechanism still falls within flexible anchor Chain System, and non-rigid anchor pole generally Structure, the most only can produce pulling force, will not produce moment of flexure, and mechanical behavior is good.
As shown in Figure 2,3, the present embodiments relate to the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis, Including: it is arranged on the system of getting off and gets off the detachable crab-bolt mechanism of both sides, car body front end, described crab-bolt mechanism master Including: anchor chain 1, anchor pole 2, bracket 3, concave surface packing ring 4, convex surface packing ring 5, anchor nut 6, anchor Shackle 1-2 under shackle 1-1, anchor chain on chain;Wherein, anchor pole 2 upper end is forged into snakehead eye plate, passes through anchor chain Lower shackle 1-2 is connected with the lower end of anchor chain 1;Anchor pole 2 lower end is threaded, and bracket 3 is packed into anchor pole 2, It is connected with anchor nut 6 after adding upper recess surface packing ring 4 and convex surface packing ring 5, just constitutes a special dress Chai Shi crab-bolt mechanism.One piece of otic placode 9-1 with holes is respectively welded in the both sides, vehicle frame main beam 9 front end of the system of getting off, With shackle 1-1 on anchor chain, anchor chain 1 upper end is connected, then detachable crab-bolt mechanism is just arranged on the system of getting off The both sides of vehicle frame main beam 9 front end.
The system of getting off of above-mentioned bridge formation unit carries out the method built bridge, and comprises the steps:
Step S101, the bridge machine system of getting on the bus becomes back boom feeding beam state, and rear end walking supporting leg tilts backward, holds Weight rear support leg shrinks, and system of getting off i.e. tire type beam conveying vehicle ships beams of concrete be sent into get on the bus from rear and is Below system back boom, this process is referred to as " feeding beam ".
Step S102, when beam car feeding beam para-position, should make beam car is also the system of getting off of bridge formation unit The both sides, front end of vehicle frame main beam 9 install the position of detachable crab-bolt mechanism just with set a roof beam in place 8 both sides, front Align in hanging beam hole 7, as shown in Figure 2,3;
Step S103, the anchor pole 2 of detachable crab-bolt mechanism is pierced into set a roof beam in place 8 hanging beam hole, both sides 7, use Under anchor chain, shackle 1-2 by anchor pole 2 upper end and installs in the both sides, vehicle frame main beam 9 front end of the system of getting off Anchor chain 1 lower end couples together, then anchor pole 2 lower end pierced in hanging beam hole 7 is packed into bracket 3, concave surface Packing ring 4, convex surface packing ring 5 and anchor nut 6, i.e. complete whole anchoring operation.So, when getting on the bus it is When the beam-hanging traveling crane of system lifts by crane beams of concrete from beam car, beam car just can never be occurred to tumble backward Phenomenon, and ensure that the pitch metacentric stability that beam car that is bridge formation unit are got off.
As can be seen from the above-described embodiment, the present invention utilizes deadweight and the hanging beam hole thereof of frame beams of concrete, logical Cross crab-bolt mechanism to be anchored at beam car front end and set a roof beam in place on head, thus reached to get off when bridge formation unit is set a roof beam in place System will not occur to tumble backward, it is ensured that the pitch metacentric stability of system of getting off, have features simple structure, performance safety, The advantage of cost economy, is that a kind of high-speed railway is accompanied with bridge formation unit general inside and outside frame, tunnel, is state An inside and outside pioneering new technique.
Obviously, those skilled in the art can carry out various change and modification without deviating from this to the present invention Bright spirit and scope.So, if the present invention these amendment and modification belong to the claims in the present invention and Within the scope of its equivalent technologies, then the present invention is also intended to comprise these change and modification.

Claims (3)

1. the system of getting off of the bridge formation unit of an anti-hypsokinesis, it is characterised in that including: be arranged on and get off System is got off the detachable crab-bolt mechanism of both sides, car body front end, and described crab-bolt mechanism includes: anchor chain, anchor pole, Shackle under shackle on anchor nut, anchor chain, anchor chain;Wherein, described anchor pole upper end is unloaded by under described anchor chain Button is connected with the lower end of described anchor chain;Described anchor pole lower end is threaded, is connected with described anchor nut;Under One piece of otic placode with holes is respectively welded in the both sides, vehicle frame main beam front end of car system, and described otic placode with holes passes through described anchor chain Upper shackle is connected with described anchor chain upper end.
The system of getting off of the bridge formation unit of anti-hypsokinesis the most as claimed in claim 1, it is characterised in that institute State the system of getting off also to include:
Bracket, concave surface packing ring and convex surface packing ring, wherein, be sleeved on described bracket on described anchor pole, refill It is connected with described anchor nut after upper described concave surface packing ring and convex surface packing ring.
3. utilizing the system of getting off described in claim 1 or 2 to carry out the method built bridge, its feature exists In, comprise the steps:
Step S101, the bridge machine system of getting on the bus becomes back boom feeding beam state, and rear end walking supporting leg tilts backward, holds Weight rear support leg shrinks, and system of getting off ships beams of concrete and is sent into below system back boom of getting on the bus from rear;
Step S102, when get off system feeding beam para-position time, make the system of getting off vehicle frame main beam both sides install mounting or dismounting Align with the hanging beam hole, both sides, front set a roof beam in place in the position of formula crab-bolt mechanism;
Step S103, pierces into the hanging beam hole, both sides set a roof beam in place, with under anchor chain by the anchor pole of detachable crab-bolt mechanism Anchor pole upper end is connected by shackle with the anchor chain lower end installed in the both sides, vehicle frame main beam front end of the system of getting off Get up;Again the anchor pole lower end pierced in hanging beam hole is connected with anchor nut, completes whole anchoring operation, Start handling beams of concrete, and the beam that falls is in place.
CN201210291623.XA 2012-08-16 2012-08-16 The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge Active CN103590342B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210291623.XA CN103590342B (en) 2012-08-16 2012-08-16 The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210291623.XA CN103590342B (en) 2012-08-16 2012-08-16 The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge

Publications (2)

Publication Number Publication Date
CN103590342A CN103590342A (en) 2014-02-19
CN103590342B true CN103590342B (en) 2016-09-14

Family

ID=50080645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210291623.XA Active CN103590342B (en) 2012-08-16 2012-08-16 The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge

Country Status (1)

Country Link
CN (1) CN103590342B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10219627A (en) * 1997-02-07 1998-08-18 Kawada Kensetsu Kk Pc girder erection device
CN1514066A (en) * 2003-05-13 2004-07-21 中铁工程机械研究设计院 Light rail communication PC rail beam conveying and mounting equipment and construction method
CN2675729Y (en) * 2003-12-19 2005-02-02 秦皇岛市北戴河通联路桥机械有限公司 Double guiding-beam bridge-laying machine for high-speed railway
CN2732820Y (en) * 2005-04-21 2005-10-12 路桥集团第二公路工程局 Main truss cradle rear-anchor switching device
CN101736694A (en) * 2008-11-24 2010-06-16 中铁十六局集团有限公司 Technology of front-nose-girder anchor support of 900 bridge erecting machine for passenger railway line
CN201817772U (en) * 2010-09-29 2011-05-04 北京万桥兴业机械有限公司 Slewing device for turning bridge erecting equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10219627A (en) * 1997-02-07 1998-08-18 Kawada Kensetsu Kk Pc girder erection device
CN1514066A (en) * 2003-05-13 2004-07-21 中铁工程机械研究设计院 Light rail communication PC rail beam conveying and mounting equipment and construction method
CN2675729Y (en) * 2003-12-19 2005-02-02 秦皇岛市北戴河通联路桥机械有限公司 Double guiding-beam bridge-laying machine for high-speed railway
CN2732820Y (en) * 2005-04-21 2005-10-12 路桥集团第二公路工程局 Main truss cradle rear-anchor switching device
CN101736694A (en) * 2008-11-24 2010-06-16 中铁十六局集团有限公司 Technology of front-nose-girder anchor support of 900 bridge erecting machine for passenger railway line
CN201817772U (en) * 2010-09-29 2011-05-04 北京万桥兴业机械有限公司 Slewing device for turning bridge erecting equipment

Also Published As

Publication number Publication date
CN103590342A (en) 2014-02-19

Similar Documents

Publication Publication Date Title
CN205114903U (en) Demolition structure of tower crane counter weight
CN106978784B (en) A kind of Long span highway suspension bridge Demolition Construction method
CN103449301B (en) Overturning and lifting method for major-diameter superheavy end socket
CN103075025A (en) Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building
CN108116983B (en) A kind of heavy stay column sets main shaft hanging method and lifting auxiliary device
CN205500610U (en) Handling system of low latitude group
CN103590342B (en) The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge
CN207090788U (en) A kind of special tie-beam for being used for two cranes and synchronously lifting
CN203475323U (en) Half-range open type movable working trolley
CN205556008U (en) Clamping device and tunnel bow member operation car
CN202201683U (en) Hydraulic residue soil bucket tipping device
CN208200156U (en) A kind of combined electric underhung crane
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN107521717B (en) Large-unbalance-load full-wing force display hanger
CN105645275A (en) Cable hoisting crane and construction method thereof
CN202558454U (en) Simple hanging bracket for loading test of dual-hook bridge type crane
CN102660926B (en) Hole passing-through method capable of reducing counter force of rear landing leg and used for segmental splicing walking bridge girder erection machine
CN103590336B (en) Can the bridge formation unit of the self-service equilibrium of load-bearing and utilize its method carrying out building bridge
CN203037439U (en) Falling-prevention object performance-test apparatus for large-scale mining self-discharging vehicle cabin
CN105970988B (en) The construction method of elevator sidewall reinforcing bar is installed in raft foundation
CN103264953B (en) Butt-joint adjusting device of steel bar cage
CN203319500U (en) Reinforcing cage abutting-joint adjusting device
CN108059088B (en) Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine
CN205634685U (en) Cable crane hoist
CN204751892U (en) Rolling mill speed reducer special lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160526

Address after: 066004 No. 3 Tianshan Road, Qinhuangdao economic and Technological Development Zone, Hebei, China

Applicant after: QINHUANGDAO TIANYE TOLIAN HEAVY INDUSTRY CO., LTD.

Address before: 066004 No. 3 Tianshan Road, Qinhuangdao economic and Technological Development Zone, Hebei, China

Applicant before: Qinhuangdao Tianye Tolian Heavy Industry Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant