CN103590342B - The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge - Google Patents
The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge Download PDFInfo
- Publication number
- CN103590342B CN103590342B CN201210291623.XA CN201210291623A CN103590342B CN 103590342 B CN103590342 B CN 103590342B CN 201210291623 A CN201210291623 A CN 201210291623A CN 103590342 B CN103590342 B CN 103590342B
- Authority
- CN
- China
- Prior art keywords
- getting
- anchor chain
- anchor
- crab
- shackle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge, including: being arranged on the system of getting off and get off the detachable crab-bolt mechanism of both sides, car body front end, described crab-bolt mechanism includes: shackle under shackle on anchor chain, anchor pole, anchor nut, anchor chain, anchor chain;Wherein, described anchor pole upper end is connected with the lower end of described anchor chain by shackle under described anchor chain;Described anchor pole lower end is threaded, is connected with described anchor nut;Respectively welding one piece of otic placode with holes in the both sides, vehicle frame main beam front end of the system of getting off, described otic placode with holes is connected with described anchor chain upper end by shackle on described anchor chain.The present invention utilizes deadweight and the hanging beam hole thereof of frame beams of concrete, being anchored at beam car front end by crab-bolt mechanism sets a roof beam in place on head, thus reached the system of getting off when bridge formation unit is set a roof beam in place and will not occur to tumble backward, ensure that the pitch metacentric stability of the system of getting off, there is features simple structure, performance safety, the advantage of cost economy.
Description
Technical field
The present invention relates to technical field of engineering machinery, especially relate to the getting off of bridge formation unit of a kind of anti-hypsokinesis
System and utilize its method carrying out building bridge.
Background technology
Bridge formation unit is mainly made up of the system of getting on the bus and the system of getting off.System of getting on the bus mainly by bridge owner's structure and
Beam-hanging traveling crane forms, and system of getting off is held concurrently by tire type beam conveying vehicle and worked as.Get on the bus and the system of getting off complement one another use,
Its step set a roof beam in place is as follows:
1st step, is shown in that Fig. 1-1, the bridge machine system of getting on the bus become back boom feeding beam state, and rear end walking supporting leg is backward
Tilting, load-bearing rear support leg shrinks, and system of getting off (i.e. tire type beam conveying vehicle) ships beams of concrete from rear
And it being sent into below system back boom of getting on the bus, this process is referred to as " feeding beam ".
2nd step, is shown in Fig. 1-2, and after beam car feeding beam puts in place, system of getting on the bus load-bearing rear support leg falls to prop up and stands on
On the horizontal bearing beam in rear portion of system of getting off, and connect.
3rd step, is shown in that Fig. 1-3, former the portable supporting leg stood on middle bridge pier are advanced to front square pier Zhi Li,
Making Bridge Erector become two straddle mounting beam-like states, beams of concrete is sling from beam car by two overhead traveling cranes.
4th step, is shown in Fig. 1-4, on two beam-hanging traveling crane handling beams of concretes of system of getting on the bus to bridge opening position
Side.
5th step, is shown in Fig. 1-5, and two beam-hanging traveling cranes of system of getting on the bus beam that fallen by beams of concrete is in place.
Said process the 3rd, 4 steps, two supporting legs one of Bridge Erector stand on front square pier, a Zhi Li
On the horizontal bearing beam in the rear portion of the system of getting off.Just from beam car, lift by crane concrete when forward and backward beam-hanging traveling crane simultaneously
Liang Shi, the load capacity on the horizontal bearing beam in beam car rear portion reaches maximum, and beam car front end is as being loaded
Bearing capacity on the horizontal bearing beam of the front fulcrum of beams of concrete is but delivered on bridge main beam by front hanging beam dolly,
Now (former the portable supporting leg stood on middle bridge pier is advanced to the horizontal bearing beam in beam car front end vanishing load
Front square pier Zhi Li).Then, the instant load state of tire type beam conveying vehicle be front light after weight, extremely uneven,
There is the possibility tumbled backward around rear end in vehicle.
Summary of the invention
The present invention provides the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilizes it to carry out the method built bridge,
The problem that during in order to solve to build a bridge in prior art, the system of getting off may be tumbled backward.
For reaching above-mentioned purpose, the present invention provides the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis, including: set
Putting the detachable crab-bolt mechanism of both sides, car body front end of getting off in the system of getting off, described crab-bolt mechanism includes: anchor chain,
Shackle under shackle on anchor pole, anchor nut, anchor chain, anchor chain;Wherein, described anchor is passed through in described anchor pole upper end
Under chain, shackle is connected with the lower end of described anchor chain;Described anchor pole lower end is threaded, is connected with described anchor nut;
Respectively welding one piece of otic placode with holes in the both sides, vehicle frame main beam front end of the system of getting off, described otic placode with holes is by described
On anchor chain, shackle is connected with described anchor chain upper end.
Further, system of getting off described in also includes:
Bracket, concave surface packing ring and convex surface packing ring, wherein, be sleeved on described bracket on described anchor pole, refill
It is connected with described anchor nut after upper described concave surface packing ring and convex surface packing ring.
The present invention also provides for a kind of utilizing the above-mentioned system of getting off to carry out the method built bridge, and comprises the steps:
Step S101, the bridge machine system of getting on the bus becomes back boom feeding beam state, and rear end walking supporting leg tilts backward, holds
Weight rear support leg shrinks, and system of getting off ships beams of concrete and is sent into below system back boom of getting on the bus from rear;
Step S102, when get off system feeding beam para-position time, make the system of getting off vehicle frame main beam both sides install mounting or dismounting
Align with the hanging beam hole, both sides, front set a roof beam in place in the position of formula crab-bolt mechanism;
Step S103, pierces into the hanging beam hole, both sides set a roof beam in place, with under anchor chain by the anchor pole of detachable crab-bolt mechanism
Anchor pole upper end is connected by shackle with the anchor chain lower end installed in the both sides, vehicle frame main beam front end of the system of getting off
Get up;Again the anchor pole lower end pierced in hanging beam hole is connected with anchor nut, completes whole anchoring operation,
Start handling beams of concrete, and the beam that falls is in place.
The present invention has the beneficial effect that:
The present invention utilizes deadweight and the hanging beam hole thereof of frame beams of concrete, by crab-bolt mechanism by beam car front end
It is anchored at and sets a roof beam in place on head, thus reached the system of getting off when bridge formation unit is set a roof beam in place and will not occur to tumble backward,
Ensure that the pitch metacentric stability of the system of getting off, there is features simple structure, performance safety, the advantage of cost economy.
Accompanying drawing explanation
Fig. 1-1~1-5 is the process schematic of existing girder erection by bridging machine;
Fig. 2 is the knot of the crab-bolt mechanism of the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis in the embodiment of the present invention
Structure schematic diagram;
Fig. 3 is the A direction view of Fig. 2.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the present invention is further elaborated.Should be appreciated that this
Specific embodiment described by place, only in order to explain the present invention, does not limit the present invention.
For reaching above-mentioned purpose, the embodiment of the present invention be the technical scheme is that the tire of the system of getting off
Formula is got off car body front end and being tied with special detachable crab-bolt mechanism between frame beams of concrete beam head,
Make to set a roof beam in place after generation is on car body when starting and go all out to be resisted by the deadweight of frame beams of concrete;That is to say will
The car body front end of tire type beam conveying vehicle is anchored on frame beams of concrete beam head, and anchoring mechanism system utilizes dexterously
Set a roof beam in place original hanging beam hole reach detachable anchoring purpose.
Concrete technical measures are to manufacture and design two set detachable crab-bolt mechanisms to be hingedly connected to beam car car body master
Both sides, beam front end, enable the position of detachable crab-bolt mechanism and car body main beam pivot at beam car feeding beam
Para-position is just alignd with original hanging beam hole on frame beams of concrete head after stopping, and then anchor pole is penetrated hanging beam
Hole, anchor nut of screwing on.Crab-bolt mechanism still falls within flexible anchor Chain System, and non-rigid anchor pole generally
Structure, the most only can produce pulling force, will not produce moment of flexure, and mechanical behavior is good.
As shown in Figure 2,3, the present embodiments relate to the system of getting off of the bridge formation unit of a kind of anti-hypsokinesis,
Including: it is arranged on the system of getting off and gets off the detachable crab-bolt mechanism of both sides, car body front end, described crab-bolt mechanism master
Including: anchor chain 1, anchor pole 2, bracket 3, concave surface packing ring 4, convex surface packing ring 5, anchor nut 6, anchor
Shackle 1-2 under shackle 1-1, anchor chain on chain;Wherein, anchor pole 2 upper end is forged into snakehead eye plate, passes through anchor chain
Lower shackle 1-2 is connected with the lower end of anchor chain 1;Anchor pole 2 lower end is threaded, and bracket 3 is packed into anchor pole 2,
It is connected with anchor nut 6 after adding upper recess surface packing ring 4 and convex surface packing ring 5, just constitutes a special dress
Chai Shi crab-bolt mechanism.One piece of otic placode 9-1 with holes is respectively welded in the both sides, vehicle frame main beam 9 front end of the system of getting off,
With shackle 1-1 on anchor chain, anchor chain 1 upper end is connected, then detachable crab-bolt mechanism is just arranged on the system of getting off
The both sides of vehicle frame main beam 9 front end.
The system of getting off of above-mentioned bridge formation unit carries out the method built bridge, and comprises the steps:
Step S101, the bridge machine system of getting on the bus becomes back boom feeding beam state, and rear end walking supporting leg tilts backward, holds
Weight rear support leg shrinks, and system of getting off i.e. tire type beam conveying vehicle ships beams of concrete be sent into get on the bus from rear and is
Below system back boom, this process is referred to as " feeding beam ".
Step S102, when beam car feeding beam para-position, should make beam car is also the system of getting off of bridge formation unit
The both sides, front end of vehicle frame main beam 9 install the position of detachable crab-bolt mechanism just with set a roof beam in place 8 both sides, front
Align in hanging beam hole 7, as shown in Figure 2,3;
Step S103, the anchor pole 2 of detachable crab-bolt mechanism is pierced into set a roof beam in place 8 hanging beam hole, both sides 7, use
Under anchor chain, shackle 1-2 by anchor pole 2 upper end and installs in the both sides, vehicle frame main beam 9 front end of the system of getting off
Anchor chain 1 lower end couples together, then anchor pole 2 lower end pierced in hanging beam hole 7 is packed into bracket 3, concave surface
Packing ring 4, convex surface packing ring 5 and anchor nut 6, i.e. complete whole anchoring operation.So, when getting on the bus it is
When the beam-hanging traveling crane of system lifts by crane beams of concrete from beam car, beam car just can never be occurred to tumble backward
Phenomenon, and ensure that the pitch metacentric stability that beam car that is bridge formation unit are got off.
As can be seen from the above-described embodiment, the present invention utilizes deadweight and the hanging beam hole thereof of frame beams of concrete, logical
Cross crab-bolt mechanism to be anchored at beam car front end and set a roof beam in place on head, thus reached to get off when bridge formation unit is set a roof beam in place
System will not occur to tumble backward, it is ensured that the pitch metacentric stability of system of getting off, have features simple structure, performance safety,
The advantage of cost economy, is that a kind of high-speed railway is accompanied with bridge formation unit general inside and outside frame, tunnel, is state
An inside and outside pioneering new technique.
Obviously, those skilled in the art can carry out various change and modification without deviating from this to the present invention
Bright spirit and scope.So, if the present invention these amendment and modification belong to the claims in the present invention and
Within the scope of its equivalent technologies, then the present invention is also intended to comprise these change and modification.
Claims (3)
1. the system of getting off of the bridge formation unit of an anti-hypsokinesis, it is characterised in that including: be arranged on and get off
System is got off the detachable crab-bolt mechanism of both sides, car body front end, and described crab-bolt mechanism includes: anchor chain, anchor pole,
Shackle under shackle on anchor nut, anchor chain, anchor chain;Wherein, described anchor pole upper end is unloaded by under described anchor chain
Button is connected with the lower end of described anchor chain;Described anchor pole lower end is threaded, is connected with described anchor nut;Under
One piece of otic placode with holes is respectively welded in the both sides, vehicle frame main beam front end of car system, and described otic placode with holes passes through described anchor chain
Upper shackle is connected with described anchor chain upper end.
The system of getting off of the bridge formation unit of anti-hypsokinesis the most as claimed in claim 1, it is characterised in that institute
State the system of getting off also to include:
Bracket, concave surface packing ring and convex surface packing ring, wherein, be sleeved on described bracket on described anchor pole, refill
It is connected with described anchor nut after upper described concave surface packing ring and convex surface packing ring.
3. utilizing the system of getting off described in claim 1 or 2 to carry out the method built bridge, its feature exists
In, comprise the steps:
Step S101, the bridge machine system of getting on the bus becomes back boom feeding beam state, and rear end walking supporting leg tilts backward, holds
Weight rear support leg shrinks, and system of getting off ships beams of concrete and is sent into below system back boom of getting on the bus from rear;
Step S102, when get off system feeding beam para-position time, make the system of getting off vehicle frame main beam both sides install mounting or dismounting
Align with the hanging beam hole, both sides, front set a roof beam in place in the position of formula crab-bolt mechanism;
Step S103, pierces into the hanging beam hole, both sides set a roof beam in place, with under anchor chain by the anchor pole of detachable crab-bolt mechanism
Anchor pole upper end is connected by shackle with the anchor chain lower end installed in the both sides, vehicle frame main beam front end of the system of getting off
Get up;Again the anchor pole lower end pierced in hanging beam hole is connected with anchor nut, completes whole anchoring operation,
Start handling beams of concrete, and the beam that falls is in place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210291623.XA CN103590342B (en) | 2012-08-16 | 2012-08-16 | The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210291623.XA CN103590342B (en) | 2012-08-16 | 2012-08-16 | The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103590342A CN103590342A (en) | 2014-02-19 |
CN103590342B true CN103590342B (en) | 2016-09-14 |
Family
ID=50080645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210291623.XA Active CN103590342B (en) | 2012-08-16 | 2012-08-16 | The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103590342B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10219627A (en) * | 1997-02-07 | 1998-08-18 | Kawada Kensetsu Kk | Pc girder erection device |
CN1514066A (en) * | 2003-05-13 | 2004-07-21 | 中铁工程机械研究设计院 | Light rail communication PC rail beam conveying and mounting equipment and construction method |
CN2675729Y (en) * | 2003-12-19 | 2005-02-02 | 秦皇岛市北戴河通联路桥机械有限公司 | Double guiding-beam bridge-laying machine for high-speed railway |
CN2732820Y (en) * | 2005-04-21 | 2005-10-12 | 路桥集团第二公路工程局 | Main truss cradle rear-anchor switching device |
CN101736694A (en) * | 2008-11-24 | 2010-06-16 | 中铁十六局集团有限公司 | Technology of front-nose-girder anchor support of 900 bridge erecting machine for passenger railway line |
CN201817772U (en) * | 2010-09-29 | 2011-05-04 | 北京万桥兴业机械有限公司 | Slewing device for turning bridge erecting equipment |
-
2012
- 2012-08-16 CN CN201210291623.XA patent/CN103590342B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10219627A (en) * | 1997-02-07 | 1998-08-18 | Kawada Kensetsu Kk | Pc girder erection device |
CN1514066A (en) * | 2003-05-13 | 2004-07-21 | 中铁工程机械研究设计院 | Light rail communication PC rail beam conveying and mounting equipment and construction method |
CN2675729Y (en) * | 2003-12-19 | 2005-02-02 | 秦皇岛市北戴河通联路桥机械有限公司 | Double guiding-beam bridge-laying machine for high-speed railway |
CN2732820Y (en) * | 2005-04-21 | 2005-10-12 | 路桥集团第二公路工程局 | Main truss cradle rear-anchor switching device |
CN101736694A (en) * | 2008-11-24 | 2010-06-16 | 中铁十六局集团有限公司 | Technology of front-nose-girder anchor support of 900 bridge erecting machine for passenger railway line |
CN201817772U (en) * | 2010-09-29 | 2011-05-04 | 北京万桥兴业机械有限公司 | Slewing device for turning bridge erecting equipment |
Also Published As
Publication number | Publication date |
---|---|
CN103590342A (en) | 2014-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205114903U (en) | Demolition structure of tower crane counter weight | |
CN106978784B (en) | A kind of Long span highway suspension bridge Demolition Construction method | |
CN103449301B (en) | Overturning and lifting method for major-diameter superheavy end socket | |
CN103075025A (en) | Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building | |
CN108116983B (en) | A kind of heavy stay column sets main shaft hanging method and lifting auxiliary device | |
CN205500610U (en) | Handling system of low latitude group | |
CN103590342B (en) | The system of getting off of the bridge formation unit of a kind of anti-hypsokinesis and utilize its method carrying out building bridge | |
CN207090788U (en) | A kind of special tie-beam for being used for two cranes and synchronously lifting | |
CN203475323U (en) | Half-range open type movable working trolley | |
CN205556008U (en) | Clamping device and tunnel bow member operation car | |
CN202201683U (en) | Hydraulic residue soil bucket tipping device | |
CN208200156U (en) | A kind of combined electric underhung crane | |
CN207047703U (en) | A kind of beam piece prestressed stretch-draw jack easy device in place | |
CN107521717B (en) | Large-unbalance-load full-wing force display hanger | |
CN105645275A (en) | Cable hoisting crane and construction method thereof | |
CN202558454U (en) | Simple hanging bracket for loading test of dual-hook bridge type crane | |
CN102660926B (en) | Hole passing-through method capable of reducing counter force of rear landing leg and used for segmental splicing walking bridge girder erection machine | |
CN103590336B (en) | Can the bridge formation unit of the self-service equilibrium of load-bearing and utilize its method carrying out building bridge | |
CN203037439U (en) | Falling-prevention object performance-test apparatus for large-scale mining self-discharging vehicle cabin | |
CN105970988B (en) | The construction method of elevator sidewall reinforcing bar is installed in raft foundation | |
CN103264953B (en) | Butt-joint adjusting device of steel bar cage | |
CN203319500U (en) | Reinforcing cage abutting-joint adjusting device | |
CN108059088B (en) | Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine | |
CN205634685U (en) | Cable crane hoist | |
CN204751892U (en) | Rolling mill speed reducer special lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160526 Address after: 066004 No. 3 Tianshan Road, Qinhuangdao economic and Technological Development Zone, Hebei, China Applicant after: QINHUANGDAO TIANYE TOLIAN HEAVY INDUSTRY CO., LTD. Address before: 066004 No. 3 Tianshan Road, Qinhuangdao economic and Technological Development Zone, Hebei, China Applicant before: Qinhuangdao Tianye Tolian Heavy Industry Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |