CN103574598B - 一种循环流化床机组协调前馈控制系统 - Google Patents

一种循环流化床机组协调前馈控制系统 Download PDF

Info

Publication number
CN103574598B
CN103574598B CN201310550742.7A CN201310550742A CN103574598B CN 103574598 B CN103574598 B CN 103574598B CN 201310550742 A CN201310550742 A CN 201310550742A CN 103574598 B CN103574598 B CN 103574598B
Authority
CN
China
Prior art keywords
module
change
feedforward
bed temperature
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310550742.7A
Other languages
English (en)
Other versions
CN103574598A (zh
Inventor
贾峰生
张缠保
段秋刚
于秀兰
杜艳生
周策
倪子俊
戴光
温武
张志刚
白东海
孙昌文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310550742.7A priority Critical patent/CN103574598B/zh
Publication of CN103574598A publication Critical patent/CN103574598A/zh
Application granted granted Critical
Publication of CN103574598B publication Critical patent/CN103574598B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种循环流化床机组协调前馈控制系统,解决了循环流化床锅炉主控超调的问题。包括加法模块(M5)、减法模块(M1)和PID控制模块(M2),根据燃料量的变化引起床温的变化,床温的变化很快会在主汽压力的变化趋势上得到明显的反应。在锅炉主控制器引入床温变化率的前馈,在变负荷过程中由于煤量的变化会引起床温的变化,如果没有该前馈作用时由于主汽压力的滞后,经常出现锅炉主控过调,导致煤量过多进而引起主汽压力的过大波动,引入该前馈控制可以使煤量在床温变化量很大时及时回调锅炉主控,使锅炉给煤量的变化在可控范围内,实现了主汽压力的稳定控制,进而实现机组的稳定控制。

Description

一种循环流化床机组协调前馈控制系统
技术领域
本发明涉及一种循环流化床锅炉发电机组的自动优化控制系统。
背景技术
目前,随着经济的发展和人们消费水平的提高,生活用电的比重加大,煤作为一次能源消耗越来越高,循环流化床作为一种洁净发电技术越来越受到人们的重视,这几年循环流化床机组发展的步伐明显加快,投产的机组越来越多。当循环流化床机组投入协调控制模式时,机组主汽压力的稳定控制是协调控制的关键所在,而循环流化床锅炉压力反应滞后比较大,因此压力的控制问题更为突出。常规锅炉主控调节主汽压力,汽机调节机组负荷,由于循环流化床锅炉燃烧系统滞后严重,各个变量之间互相影响,从燃料变化到主汽压力反应时间大约在10-15分钟,而常规PID控制无法有效控制大滞后系统,因此存在锅炉主控的超调问题。
发明内容
本发明提供了一种循环流化床机组协调前馈控制系统,解决了循环流化床锅炉主控超调的技术问题。
一种循环流化床机组协调前馈控制系统,包括加法模块、减法模块和PID控制模块,主汽压力测试端Pt与减法模块的第一输入端I1连接,压力设定器的输出端SP与减法模块的第二输入端I2连接;减法模块输出端O1与PID模块的输入端I3连接;PID控制模块的输出端O2与加法模块的第一输入端I6连接;加法模块的输出端O5与循环流化床机组协调控制系统的前馈输入端连接。循环流化床的床温变化信号输出端△T与一阶滞后模块的输入端I4连接;一阶滞后模块的输出端O3与函数模块的输入端I5连接;函数模块的输出端O4与加法模块的第二输入端I7连接。
本发明将前馈控制运用在循环流化床的协调控制系统中,由于快速的控制了机组总给煤量和机组送风量,确保机组燃烧系统的平稳燃烧,从而保证了主汽压力的平稳控制。
附图说明:
图1是本发明的结构示意图。
具体实施方式:
一种循环流化床机组协调前馈控制系统,包括加法模块M5、减法模块M1和PID控制模块M2,主汽压力测试端Pt与减法模块M1的第一输入端I1连接,压力设定器的输出端SP与减法模块M1的第二输入端I2连接;减法模块M1输出端O1与PID模块M2的输入端I3连接;PID控制模块M2的输出端O2与加法模块M5的第一输入端I6连接;加法模块M5的输出端O5与循环流化床机组协调控制系统的前馈输入端连接。循环流化床的床温变化信号输出端△T与一阶滞后模块M3的输入端I4连接;一阶滞后模块M3的输出端O3与函数模块M4的输入端I5连接;函数模块M4的输出端O4与加法模块M5的第二输入端I7连接。
本发明根据燃料量的变化很快引起床温的变化,床温的变化很快会在主汽压力的变化趋势上得到明显的反应。在锅炉主控制器引入床温变化率的前馈,在变负荷过程中由于煤量的变化会引起床温的变化,如果没有该前馈作用时由于主汽压力的滞后,经常出现锅炉主控过调,导致煤量过多进而引起主汽压力的过大波动,引入该前馈控制可以使煤量在床温变化量很大时及时回调锅炉主控,使锅炉给煤量的变化在可控范围内,实现主汽压力的稳定控制,进而实现机组稳定控制。

Claims (1)

1.一种循环流化床机组协调前馈控制系统,包括加法模块(M5)、减法模块(M1)和PID控制模块(M2),其特征在于,主汽压力测试端Pt与减法模块(M1)的第一输入端I1连接,压力设定器的输出端SP与减法模块(M1)的第二输入端I2连接;减法模块(M1)输出端O1与PID控制模块(M2)的输入端I3连接;PID控制模块(M2)的输出端O2与加法模块(M5)的第一输入端I6连接;加法模块(M5)的输出端O5与循环流化床机组协调控制系统的前馈输入端连接;循环流化床的床温变化信号输出端△T与一阶滞后模块(M3)的输入端I4连接;一阶滞后模块(M3)的输出端O3与函数模块(M4)的输入端I5连接;函数模块(M4)的输出端O4与加法模块(M5)的第二输入端I7连接;在锅炉主控制器引入床温变化率的前馈。
CN201310550742.7A 2013-11-09 2013-11-09 一种循环流化床机组协调前馈控制系统 Active CN103574598B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310550742.7A CN103574598B (zh) 2013-11-09 2013-11-09 一种循环流化床机组协调前馈控制系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310550742.7A CN103574598B (zh) 2013-11-09 2013-11-09 一种循环流化床机组协调前馈控制系统

Publications (2)

Publication Number Publication Date
CN103574598A CN103574598A (zh) 2014-02-12
CN103574598B true CN103574598B (zh) 2015-11-04

Family

ID=50046948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310550742.7A Active CN103574598B (zh) 2013-11-09 2013-11-09 一种循环流化床机组协调前馈控制系统

Country Status (1)

Country Link
CN (1) CN103574598B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104793610B (zh) * 2015-05-08 2017-10-13 华北电力科学研究院有限责任公司 协调系统前馈控制器参数的确定方法及装置
CN106123005B (zh) * 2016-06-23 2017-12-22 国网新疆电力公司电力科学研究院 燃煤机组锅炉前馈的给煤量预控制方法
CN106524141B (zh) * 2016-08-24 2019-04-19 华北电力大学 一种亚临界循环流化床锅炉机组快速变负荷控制方法
CN107559816B (zh) * 2017-09-20 2019-10-15 中国神华能源股份有限公司 循环流化床机组的控制方法和装置、存储介质、处理器
CN113975947A (zh) * 2021-09-30 2022-01-28 山西河坡发电有限责任公司 一种火电厂动态叠加脱硫控制方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2711539Y (zh) * 2003-07-16 2005-07-20 北京和利时系统工程股份有限公司 循环流化床锅炉燃烧自动调节系统
CN1844739A (zh) * 2006-04-11 2006-10-11 中控科技集团有限公司 一种循环流化床锅炉负荷串级燃烧控制系统及方法
CN101922708A (zh) * 2010-06-01 2010-12-22 广东电网公司电力科学研究院 一种基于强化燃烧的大型循环流化床机组协调控制装置
CN102563598A (zh) * 2012-01-31 2012-07-11 山东电力研究院 超临界机组锅炉主控优化控制方法
CN103216826A (zh) * 2013-04-02 2013-07-24 国家电网公司 循环流化床锅炉发电机组的主汽压力自适应预估器
CN203223900U (zh) * 2013-04-09 2013-10-02 国家电网公司 采用预估前馈控制的大型发电机组的锅炉主控制系统

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS591913A (ja) * 1982-06-24 1984-01-07 Kawasaki Heavy Ind Ltd 流動層を備える燃焼炉の燃料流量制御方法
JPS62106219A (ja) * 1985-11-05 1987-05-16 Babcock Hitachi Kk 流動層火炉ドラフトの振れ防止装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2711539Y (zh) * 2003-07-16 2005-07-20 北京和利时系统工程股份有限公司 循环流化床锅炉燃烧自动调节系统
CN1844739A (zh) * 2006-04-11 2006-10-11 中控科技集团有限公司 一种循环流化床锅炉负荷串级燃烧控制系统及方法
CN101922708A (zh) * 2010-06-01 2010-12-22 广东电网公司电力科学研究院 一种基于强化燃烧的大型循环流化床机组协调控制装置
CN102563598A (zh) * 2012-01-31 2012-07-11 山东电力研究院 超临界机组锅炉主控优化控制方法
CN103216826A (zh) * 2013-04-02 2013-07-24 国家电网公司 循环流化床锅炉发电机组的主汽压力自适应预估器
CN203223900U (zh) * 2013-04-09 2013-10-02 国家电网公司 采用预估前馈控制的大型发电机组的锅炉主控制系统

Also Published As

Publication number Publication date
CN103574598A (zh) 2014-02-12

Similar Documents

Publication Publication Date Title
CN103574598B (zh) 一种循环流化床机组协调前馈控制系统
CN102734795B (zh) 单床、无外置床的循环流化床自适应煤质变化协调控制方法
CN106094740B (zh) 一种基于过热器蓄热前馈的火电机组负荷控制方法
CN101488022B (zh) 火电机组锅炉汽轮机协调系统的先进控制方法
CN101509656B (zh) 一种超临界直流炉综合型协调控制方法
CN103216827B (zh) 一种循环流化床锅炉快速稳定负荷控制方法
CN103499102A (zh) 一种定向控制火力发电机组入炉燃料量的方法
CN102654751A (zh) 基于非线性控制和模糊控制的协调控制方法
CN102084303A (zh) 用于使用模型预测控制器来优化化学循环燃烧装置的设备
CN106019929B (zh) 双进双出直吹式制粉系统协调控制方法
CN102425790B (zh) 一种循环流化床锅炉在线优化自学习控制方法
CN102109172A (zh) 超临界及超超临界机组燃水比控制方法
CN203175626U (zh) 一种火电机组功频调节系统
CN105588122A (zh) 一种应用于循环流化床锅炉的燃料控制方法及系统
CN103955193A (zh) 直接能量平衡策略前馈控制方法
CN103248045A (zh) 不确定电力系统等速滑模负荷频率控制器设计方法
CN105889910B (zh) 一种循环流化床锅炉的新型agc控制方法
CN203223900U (zh) 采用预估前馈控制的大型发电机组的锅炉主控制系统
CN103216826B (zh) 循环流化床锅炉发电机组的主汽压力自适应预估方法
CN103512021B (zh) 一种母管制锅炉负荷精确调节控制方法
CN106897819B (zh) 一种循环流化床机组变负荷过程中给煤量合理性检测方法及系统
JP2017036721A5 (zh)
CN104566352A (zh) 带指令调节器的循环流化床锅炉一次风机控制方法及系统
CN104482662A (zh) 一种生物燃气供导热油锅炉控制系统装置及其控制方法
CN204404554U (zh) 一种生物燃气供导热油锅炉控制系统装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant