CN103573303A - 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组 - Google Patents

采用过热度控制主蒸汽管道疏水阀的火电厂发电机组 Download PDF

Info

Publication number
CN103573303A
CN103573303A CN201310559741.9A CN201310559741A CN103573303A CN 103573303 A CN103573303 A CN 103573303A CN 201310559741 A CN201310559741 A CN 201310559741A CN 103573303 A CN103573303 A CN 103573303A
Authority
CN
China
Prior art keywords
steam
main steam
drain valve
main
generator set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310559741.9A
Other languages
English (en)
Other versions
CN103573303B (zh
Inventor
江剑
付焕兴
杨强
贺清辉
李良川
王旭东
周宇彬
吕代富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Original Assignee
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group filed Critical Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority to CN201310559741.9A priority Critical patent/CN103573303B/zh
Publication of CN103573303A publication Critical patent/CN103573303A/zh
Application granted granted Critical
Publication of CN103573303B publication Critical patent/CN103573303B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Turbines (AREA)

Abstract

本发明公开了一种采用过热度控制主蒸汽管道疏水阀的火电厂发电机组,包括贮水罐,贮水罐里面的水经过汽水分离器分离之后,水回流到贮水罐,蒸汽依次经过棚顶过热器、低温过热器、屏式过热器、高温过热器之后通过主蒸汽管道导向汽轮机高压缸,主蒸汽管道上设置主汽调节阀、主汽阀,所述主蒸汽管道上还设置疏水阀和汽机主汽阀入口温度测点,汽水分离器上设置汽水分离器出口温度测点,汽机主汽阀入口温度测点和汽水分离器出口温度测点将采集的温度信号输入DCS系统处理,DCS系统处理之后对疏水阀输出控制信号。本发明有益效果:通过靠近汽机主汽阀入口的蒸汽温度与汽水分离器出口蒸汽温度之差来对主蒸汽管道进行控制,时间把握更精确,使用更加安全。

Description

采用过热度控制主蒸汽管道疏水阀的火电厂发电机组
技术领域
本发明涉及发电机组技术领域,特别是一种采用过热度控制主蒸汽管道疏水阀的火电厂发电机组。
背景技术
在汽轮发电机组的启动过程中,通常情况下,机组负荷升至10%的额定负荷或其它设定值时关闭中压调门之前的汽机本体疏水阀,升至20%或其它设定值的额定负荷时关闭中压调门之后的汽机本体疏水阀。反之,在停机过程中,机组负荷降至20%的额定负荷或其它设定值时开启中压调门之后的汽机本体疏水阀,降至10%的额定负荷或其它设定值时开启中压调门之前的汽机本体疏水阀。可见,汽机本体疏水阀的启闭控制信号是机组的负荷。
受汽机本体疏水阀启闭控制方式的影响,目前,超(超)临界机组在设计时也顺其自然地用机组的设定负荷(一般是10%的额定负荷)来控制两大蒸汽管道(主蒸汽及再热热段蒸汽,以下同)疏水阀的启闭。两大蒸汽管道疏水阀的启闭由机组负荷来控制时,虽然控制方式简单,但是此种设计控制措施较为粗放。在机组启动和停机期间(特别是甩负荷时)会有大量高温蒸汽排入疏水扩容器,可能使之发生过热鼓包现象;机组启停时,低温蒸汽有可能返回汽缸危及超(超)临界机组安全;过多蒸汽热量直接进入凝汽器,也很不利于节能减排。这些问题在高参数大容量机组上体现得更加明显。
据上述介绍可知,主蒸汽管道疏水阀的启闭由机组负荷来控制不尽合理,特别是大容量高参数机组,更有安全隐患。
再者,因为主蒸汽管道金属储存的热量较多,故而其自然散热冷却需要的时间相当长,若再考虑到保温材料储存的热量时,冷却时间会更长。因此,除主蒸汽管道发生意外进水事故外,机组停运之后需要经过相当长的一段时间,主蒸汽管道中才会出现积水(即主蒸汽凝结水),这也说明主蒸汽管道疏水阀的启闭其实是没有必要用机组负荷来控制的。
发明内容
本发明的发明目的在于:针对上述存在的问题,提供一种采用过热度控制主蒸汽管道疏水阀的火电厂发电机组,对主蒸汽管道的疏水阀用过热度来控制,准确性高,也更加安全。
本发明采用的技术方案是这样的:一种采用过热度控制主蒸汽管道疏水阀的火电厂发电机组,包括贮水罐、汽水分离器和汽轮机高压缸,贮水罐里面的水经过汽水分离器分离之后,水回流到贮水罐,而蒸汽则依次经过棚顶过热器、低温过热器、屏式过热器、高温过热器之后,通过主蒸汽管道导向汽轮机高压缸,主蒸汽管道上设置主汽调节阀、主汽阀,所述主蒸汽管道上还设置疏水阀和汽机主汽阀入口温度测点,汽水分离器上设置汽水分离器出口温度测点,汽机主汽阀入口温度测点和汽水分离器出口温度测点将采集的温度信号输入DCS系统处理,DCS系统处理之后对疏水阀输出控制信号。
综上所述,由于采用了上述技术方案,本发明的有益效果是:通过主蒸汽管道内靠近汽机主汽阀入口的蒸汽温度与汽水分离器出口蒸汽温度之差来对主蒸汽管道进行控制,对于时间的把握更加精确,使用起来也更加安全。
附图说明
图1是本发明实施例的原理框图。
图中标记:1为主汽调节阀,2为主汽阀,3为疏水阀,4为汽机主汽阀入口温度测点,5为汽水分离器出口温度测点,6为DCS系统。
具体实施方式
下面结合附图,对本发明作详细的说明。
实施例:如图1所示,一种采用过热度控制主蒸汽管道疏水阀的火电厂发电机组,包括贮水罐、汽水分离器和汽轮机高压缸,贮水罐里面的水经过汽水分离器分离之后,水回流到贮水罐,而蒸汽则依次经过棚顶过热器、低温过热器、屏式过热器、高温过热器之后,通过主蒸汽管道导向汽轮机高压缸,主蒸汽管道上设置主汽调节阀1、主汽阀2,所述主蒸汽管道上还设置疏水阀3和汽机主汽阀入口温度测点4,汽水分离器上设置汽水分离器出口温度测点5,汽机主汽阀入口温度测点4和汽水分离器出口温度测点5将采集的温度信号输入DCS系统6处理,DCS系统6处理之后对疏水阀3输出控制信号。
本实施例中采用主蒸汽管道内靠近汽机主汽阀2入口的蒸汽温度与直流锅炉的汽水分离器出口蒸汽温度之差来控制。
在发电机组启动过程中,当两处的蒸汽温度之差大于50~60℃时,即蒸汽具有约50~60℃的过热度,主蒸汽管道上的疏水阀3自动关闭。
在发电机组正常停机过程中,当两处的蒸汽温度之差小于60~50℃时,自动开启主蒸汽管道上的疏水阀3。
汽轮机高压缸跳闸时,除因急需检修主蒸汽管道的零部件而开启疏水阀3之外,其他情况没有必要开启疏水阀3。这样有利于储存主蒸汽管道内的蒸汽及其热量,减缓主蒸汽管道的冷却速度,缩短发电机组再启动时主蒸汽管道的暖管时间及发电机组的启动时间。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (1)

1.一种采用过热度控制主蒸汽管道疏水阀的火电厂发电机组,包括贮水罐、汽水分离器和汽轮机高压缸,贮水罐里面的水经过汽水分离器分离之后,水回流到贮水罐,而蒸汽则依次经过棚顶过热器、低温过热器、屏式过热器、高温过热器之后,通过主蒸汽管道导向汽轮机高压缸,主蒸汽管道上设置主汽调节阀(1)、主汽阀(2),其特征在于:所述主蒸汽管道上还设置疏水阀(3)和汽机主汽阀入口温度测点(4),汽水分离器上设置汽水分离器出口温度测点(5),汽机主汽阀入口温度测点(4)和汽水分离器出口温度测点(5)将采集的温度信号输入DCS系统(6)处理,DCS系统(6)处理之后对疏水阀(3)输出控制信号。
CN201310559741.9A 2013-11-12 2013-11-12 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组 Active CN103573303B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310559741.9A CN103573303B (zh) 2013-11-12 2013-11-12 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310559741.9A CN103573303B (zh) 2013-11-12 2013-11-12 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组

Publications (2)

Publication Number Publication Date
CN103573303A true CN103573303A (zh) 2014-02-12
CN103573303B CN103573303B (zh) 2015-10-28

Family

ID=50045938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310559741.9A Active CN103573303B (zh) 2013-11-12 2013-11-12 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组

Country Status (1)

Country Link
CN (1) CN103573303B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105043159A (zh) * 2015-07-24 2015-11-11 东方电气集团东方锅炉股份有限公司 一种蒸汽冷却器爆管监控系统及其监控方法
CN110822285A (zh) * 2019-11-15 2020-02-21 龙岩烟草工业有限责任公司 蒸汽输送系统及方法
CN112303610A (zh) * 2020-10-30 2021-02-02 西安热工研究院有限公司 一种停机不停炉运行方式下回收高能水的运行系统及方法
CN112922683A (zh) * 2021-02-23 2021-06-08 华电浙江龙游热电有限公司 一种火力发电机组全厂疏水阀组的顺控方法
CN113074026A (zh) * 2021-04-02 2021-07-06 杭州华电半山发电有限公司 一种汽轮机高压缸进汽管道疏水阀的控制方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5790719A (en) * 1980-11-28 1982-06-05 Toshiba Corp Control method of steam temperature
CN101725381A (zh) * 2008-10-30 2010-06-09 通用电气公司 用于发电设备的蒸汽管道的快速加热的设备和方法
JP2012137450A (ja) * 2010-12-28 2012-07-19 Hitachi-Ge Nuclear Energy Ltd 熱併給原子力発電システム
JP2013011252A (ja) * 2011-06-30 2013-01-17 Toshiba Corp 発電プラント及びその運転方法
CN203531978U (zh) * 2013-11-12 2014-04-09 中国电力工程顾问集团西南电力设计院 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5790719A (en) * 1980-11-28 1982-06-05 Toshiba Corp Control method of steam temperature
CN101725381A (zh) * 2008-10-30 2010-06-09 通用电气公司 用于发电设备的蒸汽管道的快速加热的设备和方法
JP2012137450A (ja) * 2010-12-28 2012-07-19 Hitachi-Ge Nuclear Energy Ltd 熱併給原子力発電システム
JP2013011252A (ja) * 2011-06-30 2013-01-17 Toshiba Corp 発電プラント及びその運転方法
CN203531978U (zh) * 2013-11-12 2014-04-09 中国电力工程顾问集团西南电力设计院 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105043159A (zh) * 2015-07-24 2015-11-11 东方电气集团东方锅炉股份有限公司 一种蒸汽冷却器爆管监控系统及其监控方法
CN105043159B (zh) * 2015-07-24 2017-11-07 东方电气集团东方锅炉股份有限公司 一种蒸汽冷却器爆管监控系统及其监控方法
CN110822285A (zh) * 2019-11-15 2020-02-21 龙岩烟草工业有限责任公司 蒸汽输送系统及方法
CN112303610A (zh) * 2020-10-30 2021-02-02 西安热工研究院有限公司 一种停机不停炉运行方式下回收高能水的运行系统及方法
CN112922683A (zh) * 2021-02-23 2021-06-08 华电浙江龙游热电有限公司 一种火力发电机组全厂疏水阀组的顺控方法
CN112922683B (zh) * 2021-02-23 2023-10-20 华电浙江龙游热电有限公司 一种火力发电机组全厂疏水阀组的顺控方法
CN113074026A (zh) * 2021-04-02 2021-07-06 杭州华电半山发电有限公司 一种汽轮机高压缸进汽管道疏水阀的控制方法
CN113074026B (zh) * 2021-04-02 2023-02-21 杭州华电半山发电有限公司 一种汽轮机高压缸进汽管道疏水阀的控制方法

Also Published As

Publication number Publication date
CN103573303B (zh) 2015-10-28

Similar Documents

Publication Publication Date Title
CN103573303B (zh) 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组
CN106838865B (zh) 一种完全热电解耦的抽汽供热电站系统及工作方法
CN103633644B (zh) 电网冲击负荷自动平衡装置及方法
CN103953915A (zh) 高压加热器回收二次再热锅炉启动疏水工质和热量的方法
CN208477398U (zh) 一种高精度二级冷却高低温控制机
CN108104888A (zh) 一种基于调频旁路的电网调频系统及方法
CN203531978U (zh) 采用过热度控制主蒸汽管道疏水阀的火电厂发电机组
CN105019957B (zh) 高效回热系统及方法
CN209369880U (zh) 一种核电机组压水堆超温保护系统
CN210948813U (zh) 一种防止供热汽轮机进冷汽的自动疏水系统
CN105276564A (zh) 超(超)临界机组无除氧器回热系统
CN203531976U (zh) 采用过热度控制再热蒸汽管道上疏水阀的火电厂发电机组
CN103573304B (zh) 采用过热度控制再热蒸汽管道上疏水阀的火电厂发电机组
CN205842621U (zh) 汽温变化速率实时监控系统
US20130312416A1 (en) Steam rankine plant
CN104456519A (zh) 一种用于二次再热机组的新型高效给水回热系统
CN208367556U (zh) 可直接冷却且安全性能高的过热水控温系统
RU109898U1 (ru) Система аварийного расхолаживания
CN206741326U (zh) 一种使用热电偶进行水位控制的疏水收集器
CN209013169U (zh) 一种集成式无容器蒸汽发生器
CN206801630U (zh) 一种用于大型汽轮发电机组的旁路热能回收系统
CN207673379U (zh) 一种切除低压缸供热的冷却系统
CN104913287A (zh) 直流锅炉启停过程中防止过热器大量进水的控制方法
CN205191541U (zh) 低容量外置式蒸汽冷却器给水系统
Gao et al. Alarm root cause analysis for water level monitoring in high and low pressure heaters of power plants

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 610021 Dongfeng Road, Chengdu, Sichuan, No. 18, No.

Applicant after: China Power Engineering Consulting Group Southwest Electric Power Design Institute Co., Ltd.

Address before: 610021 Dongfeng Road, Chengdu, Sichuan, No. 18, No.

Applicant before: Southwest Electric Power Design Institute of China Power Engineering Consulting Group Corporation

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION TO: CHINA POWER ENGINEERING CONSULTING GROUP SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant