CN103572695A - Damping and isolation support provided with pre-biasing devices - Google Patents

Damping and isolation support provided with pre-biasing devices Download PDF

Info

Publication number
CN103572695A
CN103572695A CN201310540622.9A CN201310540622A CN103572695A CN 103572695 A CN103572695 A CN 103572695A CN 201310540622 A CN201310540622 A CN 201310540622A CN 103572695 A CN103572695 A CN 103572695A
Authority
CN
China
Prior art keywords
connecting rod
reaction frame
steel plate
hole
isolation support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310540622.9A
Other languages
Chinese (zh)
Inventor
刘进章
叶明坤
何家荣
罗秋清
黄光宇
潘图春
李世军
李建波
梁莹莹
卢红波
熊高波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Orient Engineering Rubber Products Co Ltd
Original Assignee
Liuzhou Orient Engineering Rubber Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Orient Engineering Rubber Products Co Ltd filed Critical Liuzhou Orient Engineering Rubber Products Co Ltd
Priority to CN201310540622.9A priority Critical patent/CN103572695A/en
Publication of CN103572695A publication Critical patent/CN103572695A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

A damping and isolation support provided with pre-biasing devices comprises a support and the pre-biasing devices mounted on two sides of the support; each pre-biasing device comprises a counter-force frame, an auxiliary plate, a jack and a connection rod; installation screw holes and connection rod through holes allowing the connection rods to pass through are formed in the counter-force frames and the auxiliary plates; the counter-force frames are mounted on one connection steel plate of the support through screws; the auxiliary plates are mounted on the other connection steel plate of the support through bolts; the connection rods penetrate through the connection rod through holes in the counter-force frames and the auxiliary plates transversely; each jack is mounted at the middle part of a connection rod between one counter-force frame or one auxiliary plate or is mounted at one end of a connection rod located on the outer side of an auxiliary plate; and the counter-force frames and the auxiliary plates produce relative displacement in a horizontal direction under the action of the jacks. The damping and isolation support is scientific in design, simple in structure and convenient to assemble and disassemble; no large-scale power equipment is required to be used, and pre-biasing of the damping and isolation support can be realized; and pre-biasing elements of the support can be used repeatedly, and the cost is reduced.

Description

Vibration absorption and isolation support with prebias device
Technical field
The present invention relates to a kind of bridge vibration absorption and isolation support, relate in particular to a kind of vibration absorption and isolation support with prebias device.
Background technology
Vibration absorption and isolation support is widely used in bridge construction engineering, and existing vibration absorption and isolation support is not all with prebias member, does not also carry out prebias before installation, thereby exists following not enough:
1. because variations in temperature bridge produces, expand with heat and contract with cold, may there is off normal in bearing when temperature is closed up in design, and the monitoring of vibration absorption and isolation support performance is made troubles;
2., while being steel box girder for beam body, because expanding with heat and contract with cold of producing of the foozle of steel case beam and temperature may occur that off normal appears in the installing hole on steel case beam, cause difficulty to installation and the replacing of vibration absorption and isolation support.
Summary of the invention
The technical problem to be solved in the present invention is: provide can carry out before a kind of installation prebias with the vibration absorption and isolation support with prebias device, to overcome the existing deficiency of above-mentioned prior art.
The technical scheme that the present invention takes is: a kind of vibration absorption and isolation support with prebias device, the prebias device that comprises bearing and be arranged on bearing both sides, described prebias device comprises reaction frame, accessory plate, jack and connecting rod, the connecting rod through hole that described reaction frame and accessory plate are provided with installation screw and pass for connecting rod, described reaction frame is arranged on bearing wherein on a junction steel plate by screw, described accessory plate is arranged on another junction steel plate of bearing by screw, described connecting rod crosses the connecting rod through hole on reaction frame and accessory plate, described jack or be arranged on reaction frame and accessory plate between connecting rod middle part, or be arranged on the connecting rod one end that is positioned at accessory plate outside, described reaction frame and accessory plate produce the relative displacement of horizontal direction under the effect of jack.
Its further technical scheme is: the position that described connecting rod is positioned at the connecting rod through hole one or both ends of reaction frame and accessory plate is provided with setscrew nut.
Its further technical scheme is: described reaction frame is an inverse-T-shaped steel plate consisting of horizontal sides and upstanding edge, described installation screw is located at the horizontal sides of "T"-shaped steel plate, described connecting rod through hole is located at the upstanding edge of "T"-shaped steel plate, described connecting rod through hole or formed by the sleeve pipe being connected on upstanding edge, or directly open the top at upstanding edge.
Its further technical scheme be: described accessory plate is one " L " shape right angle steel plate, described installation screw is located at respectively two right-angle sides of right angle steel plate, described connecting rod through hole is driveed the right-angle side at right angle steel plate, the axis of connecting rod through hole is to parallel with this right-angle side, described connecting rod is through the connecting rod through hole of reaction frame and right angle steel plate, described jack is arranged on the connecting rod one end that is positioned at steel plate outside, right angle, and described reaction frame and right angle steel plate produce the relative displacement of horizontal direction under the effect of jack.
Its further another technical scheme be: described accessory plate be structure identical with reaction frame fall reaction frame, described connecting rod crosses reaction frame and falls the connecting rod through hole of reaction frame, the connecting rod middle part that described jack is arranged on reaction frame and falls between reaction frame, described reaction frame and the reaction frame that falls produce the relative displacement of horizontal direction under the effect of jack.
Owing to adopting technique scheme, the present invention's the vibration absorption and isolation support with prebias member has following beneficial effect:
1. adopt the present invention's the vibration absorption and isolation support with prebias device, when installing, bearing can first give vibration absorption and isolation support pre-partially certain displacement according to field condition, guarantee vibration absorption and isolation support energy return when temperature is closed up in design, there is not off normal, not only be beneficial to the monitoring to vibration absorption and isolation support performance, and can avoid may occurring that due to foozle and the expanding with heat and contract with cold of temperature generation of steel case beam off normal appears in the installing hole on steel case beam, cause difficulty to installation and the replacing of vibration absorption and isolation support, when particularly beam body is steel box girder;
2. the vibration absorption and isolation support with prebias device that uses the present invention is without the prebias of employing large-sized power plant and can realize vibration absorption and isolation support, and susceptor design science is simple in structure, easy installation and removal, and its prebias member is reusable, can reduce costs.
Below in conjunction with drawings and Examples, the technical characterictic of the present invention's the vibration absorption and isolation support with prebias device is further described.
Accompanying drawing explanation
Fig. 1~Fig. 2: the vibration absorption and isolation support structural representation with prebias device of the embodiment of the present invention one (prebias state):
Fig. 1-front view, the top view of Fig. 2-Fig. 1;
Fig. 3~Fig. 4: the vibration absorption and isolation support structural representation with prebias device of the embodiment of the present invention two (prebias state):
Fig. 3-front view, the top view of Fig. 4-Fig. 3;
Fig. 5~Fig. 6: reaction frame structural representation with well:
Fig. 5-front view, the left view of Fig. 6-Fig. 5;
Fig. 7~Fig. 8: reaction frame structural representation not with well:
Fig. 7-front view, the top view of Fig. 8-Fig. 7;
Fig. 9~Figure 11: " L " shape right angle steel plate structural representation:
Fig. 9-front view, the left view of Figure 10-Fig. 9, the top view of Figure 11-Fig. 9.
In figure:
1-upper junction steel plate, 2-bearing, 3-lower junction steel plate, 4-setscrew nut, 5-reaction frame, 51-connecting rod through hole, 52-installation screw, 53-baffle plate, 54-sleeve pipe, 6-connecting rod, 7-screw, 8-right angle steel plate, 81-connecting rod through hole, 82-installation screw, 9-jack.
The specific embodiment
embodiment mono-
A kind of vibration absorption and isolation support with prebias device, the prebias device that comprises bearing and be arranged on bearing front side and rear side, described prebias device comprises reaction frame 5, accessory plate, jack 9 and connecting rod 6, the connecting rod through hole that described reaction frame and accessory plate are provided with installation screw and pass for connecting rod, described reaction frame 5 is an inverse-T-shaped steel plate consisting of horizontal sides and upstanding edge, described installation screw 52 is located at the horizontal sides of "T"-shaped steel plate, described connecting rod through hole 51 is located at the upstanding edge of "T"-shaped steel plate, by the sleeve pipe 54 being connected on upstanding edge by baffle plate 53, formed, described reaction frame 5 is arranged on the lower junction steel plate 3 of bearing by screw 7.
Described accessory plate is one " L " shape right angle steel plate 8, two right-angle sides of described right angle steel plate are respectively equipped with installation screw 82, on one right-angle side of described right angle steel plate, have connecting rod through hole 81, the axis of described connecting rod through hole is parallel with this right-angle side, described right angle steel plate is arranged on the right angle of upper junction steel plate 1 by screw 7, by the installation screw on right angle steel plate two right-angle sides respectively with bearing on two right-angle sides of junction steel plate 1 be connected and fixed, described connecting rod 6 is through the connecting rod through hole 51 and 81 of reaction frame 5 and right angle steel plate 8, the position that connecting rod is positioned at connecting rod through hole 51 two ends of reaction frame is provided with setscrew nut 4, the position that connecting rod is positioned at connecting rod through hole 81 one end, inner side of right angle steel plate is provided with setscrew nut 4, described jack 9 is arranged on the connecting rod one end that is positioned at steel plate outside, right angle, described reaction frame and right angle steel plate produce the relative displacement of horizontal direction under the effect of jack.
embodiment bis-
A kind of vibration absorption and isolation support with prebias device, the prebias device that comprises bearing and be arranged on bearing front side and rear side, described prebias device comprises reaction frame 5, accessory plate, jack 9 and connecting rod 6, the connecting rod through hole that described reaction frame and accessory plate are provided with installation screw and pass for connecting rod, described reaction frame is an inverse-T-shaped steel plate consisting of horizontal sides and upstanding edge, described installation screw is located at the horizontal sides of "T"-shaped steel plate, described connecting rod through hole 51 is located at the upstanding edge of "T"-shaped steel plate, by the sleeve pipe 54 being connected on upstanding edge by baffle plate 53, formed, described reaction frame is arranged on the lower junction steel plate 3 of bearing by screw 7.
Described accessory plate is the reaction frame that structure is identical with reaction frame 5, the described reaction frame that falls is crossed on the upper junction steel plate 1 that screw 7 is arranged on bearing, described connecting rod 6 crosses reaction frame and falls the connecting rod through hole of reaction frame, the position that connecting rod is positioned at connecting rod through hole 51 two ends of reaction frame is provided with setscrew nut 4, and the position that connecting rod is positioned at down the connecting rod through hole two ends of reaction frame is provided with setscrew nut 4.
The connecting rod middle part that described jack 9 is arranged on reaction frame and falls between reaction frame, described reaction frame and the reaction frame that falls produce the relative displacement of horizontal direction under the effect of jack.
Above-described embodiment one and embodiment bis-are preferably one of embodiments of the present invention.
In above-described embodiment one and embodiment bis-, general two covers that adopt of described prebias device, symmetry is arranged on the ,Huo left and right sides, both sides, bearing front and back, to guarantee the displacement of upper and lower junction steel plate keeping parallelism;
On reaction frame upstanding edge, by baffle plate splicing sleeve, as connecting rod through hole object, be in order to reduce the thickness of reaction frame.
Conversion as above-described embodiment one and embodiment bis-:
1. described in, prebias device also can be only with a set of, but the displacement parallelism of junction steel plate does not adopt the good of two covers up and down;
2. described in, the installation site of reaction frame and accessory plate also can exchange, and reaction frame is arranged on junction steel plate, and accessory plate is arranged on lower junction steel plate;
3. the connecting rod through hole described on reaction frame also can directly be opened on the upstanding edge of "T"-shaped steel plate, but requires steel plate to have enough thickness.
The installation and application of the present invention's the vibration absorption and isolation support with prebias device:
(1) at Pier Design position, hold the preformed hole that junction steel plate under vibration absorption and isolation support is installed successfully;
(2) start jack, utilize reaction frame as support, to accessory plate, apply the thrust of horizontal direction, drive upper and lower junction steel plate to produce relative displacement, reach behind design position, by the setscrew nut on connecting rod, the relative position of reaction frame and accessory plate is locked;
(3) upper junction steel plate and case beam are connected firmly, lower junction steel plate is fastened on bridge pier preformed hole, and pour into a mould epoxy mortar;
(4), after epoxy mortar solidifies, remove the prebias device of bearing.

Claims (5)

1. the vibration absorption and isolation support with prebias device, it is characterized in that: described vibration absorption and isolation support comprises bearing (2) and the prebias device that is arranged on bearing both sides, described prebias device comprises reaction frame (5), accessory plate, jack (9) and connecting rod (6), the connecting rod through hole that described reaction frame and accessory plate are provided with installation screw and pass for connecting rod, described reaction frame is arranged on bearing wherein on a junction steel plate by screw, described accessory plate is arranged on another junction steel plate of bearing by screw, described connecting rod crosses the connecting rod through hole on reaction frame and accessory plate, described jack or be arranged on reaction frame and accessory plate between connecting rod middle part, or be arranged on the connecting rod one end that is positioned at accessory plate outside, described reaction frame and accessory plate produce the relative displacement of horizontal direction under the effect of jack.
2. the vibration absorption and isolation support with prebias device according to claim 1, is characterized in that: the position that described connecting rod is positioned at the connecting rod through hole one or both ends of reaction frame and accessory plate is provided with setscrew nut (4).
3. the vibration absorption and isolation support with prebias device according to claim 1 and 2, it is characterized in that: described reaction frame (5) is an inverse-T-shaped steel plate consisting of horizontal sides and upstanding edge, described installation screw (52) is located at the horizontal sides of "T"-shaped steel plate, described connecting rod through hole (51) is located at the upstanding edge of "T"-shaped steel plate, described connecting rod through hole or form or directly open the top at upstanding edge by being connected to sleeve pipe (54) on upstanding edge.
4. the vibration absorption and isolation support with prebias device according to claim 3, it is characterized in that: described accessory plate is one " L " shape right angle steel plate (8), described installation screw is located at respectively two right-angle sides of right angle steel plate, described connecting rod through hole (81) is driveed the right-angle side at right angle steel plate, the axis of connecting rod through hole is parallel with this right-angle side, described connecting rod (6) is through the connecting rod through hole of reaction frame and right angle steel plate, described jack (9) is arranged on the connecting rod one end that is positioned at steel plate outside, right angle, described reaction frame (5) and right angle steel plate (8) produce the relative displacement of horizontal direction under the effect of jack.
5. the vibration absorption and isolation support with prebias device according to claim 3, it is characterized in that: described accessory plate is the reaction frame that structure is identical with reaction frame, described connecting rod crosses reaction frame and falls the connecting rod through hole of reaction frame, the connecting rod middle part that described jack is arranged on reaction frame and falls between reaction frame, described reaction frame and the reaction frame that falls produce the relative displacement of horizontal direction under the effect of jack.
CN201310540622.9A 2013-07-23 2013-11-05 Damping and isolation support provided with pre-biasing devices Pending CN103572695A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310540622.9A CN103572695A (en) 2013-07-23 2013-11-05 Damping and isolation support provided with pre-biasing devices

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201320440220.7 2013-07-23
CN201320440220 2013-07-23
CN201310540622.9A CN103572695A (en) 2013-07-23 2013-11-05 Damping and isolation support provided with pre-biasing devices

Publications (1)

Publication Number Publication Date
CN103572695A true CN103572695A (en) 2014-02-12

Family

ID=50045352

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201310540622.9A Pending CN103572695A (en) 2013-07-23 2013-11-05 Damping and isolation support provided with pre-biasing devices
CN201320692199.XU Expired - Lifetime CN203593951U (en) 2013-07-23 2013-11-05 Seismic mitigation and absorption support with pre-bias devices

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201320692199.XU Expired - Lifetime CN203593951U (en) 2013-07-23 2013-11-05 Seismic mitigation and absorption support with pre-bias devices

Country Status (1)

Country Link
CN (2) CN103572695A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306194A (en) * 2013-06-16 2013-09-18 柳州东方工程橡胶制品有限公司 Prebias device for bridge seismic reduction and isolation support and method for performing prebias by utilizing prebias device
CN105648918A (en) * 2016-01-14 2016-06-08 中铁大桥局集团第四工程有限公司 Deviation device and construction method thereof
CN106437181A (en) * 2016-09-09 2017-02-22 国网江苏省电力公司经济技术研究院 Splicing seam adjusting device for steel structure assembling
CN108894101A (en) * 2018-08-14 2018-11-27 广东省交通规划设计研究院股份有限公司 The pre- inclined application method for adjusting component, bridge pad and bridge pad
CN109235244A (en) * 2018-10-24 2019-01-18 株洲时代新材料科技股份有限公司 A kind of regulating device for bridge pad
CN110886246A (en) * 2019-12-18 2020-03-17 无锡圣丰建筑新材料有限公司 Hole site deviation replacing device for shock insulation support

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07127018A (en) * 1993-10-29 1995-05-16 Bridgestone Corp Rubber bearing material aligning method
JPH07180114A (en) * 1993-12-24 1995-07-18 Ohbayashi Corp Shearing deformation correction device of seismic isolation bearing
JP2003041514A (en) * 2001-07-30 2003-02-13 Kawaguchi Metal Industries Co Ltd Deformation-imparting device for elastic bearing
JP2004232274A (en) * 2003-01-29 2004-08-19 Yokohama Rubber Co Ltd:The Retaining structure for adjustment of strain of rubber elastic supporter and method for adjusting strain by using it
JP2008127775A (en) * 2006-11-17 2008-06-05 Bridgestone Corp Strain adjusting implement and strain adjusting method
CN102808375A (en) * 2012-09-11 2012-12-05 天津市市政工程设计研究院 Hinge structure of steel pier column of portal frame platform bridge and bearing platform and construction method thereof
CN203383140U (en) * 2013-06-16 2014-01-08 柳州东方工程橡胶制品有限公司 Prebiasing device of bridge seismic isolation and reduction support

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07127018A (en) * 1993-10-29 1995-05-16 Bridgestone Corp Rubber bearing material aligning method
JPH07180114A (en) * 1993-12-24 1995-07-18 Ohbayashi Corp Shearing deformation correction device of seismic isolation bearing
JP2003041514A (en) * 2001-07-30 2003-02-13 Kawaguchi Metal Industries Co Ltd Deformation-imparting device for elastic bearing
JP2004232274A (en) * 2003-01-29 2004-08-19 Yokohama Rubber Co Ltd:The Retaining structure for adjustment of strain of rubber elastic supporter and method for adjusting strain by using it
JP2008127775A (en) * 2006-11-17 2008-06-05 Bridgestone Corp Strain adjusting implement and strain adjusting method
CN102808375A (en) * 2012-09-11 2012-12-05 天津市市政工程设计研究院 Hinge structure of steel pier column of portal frame platform bridge and bearing platform and construction method thereof
CN203383140U (en) * 2013-06-16 2014-01-08 柳州东方工程橡胶制品有限公司 Prebiasing device of bridge seismic isolation and reduction support

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306194A (en) * 2013-06-16 2013-09-18 柳州东方工程橡胶制品有限公司 Prebias device for bridge seismic reduction and isolation support and method for performing prebias by utilizing prebias device
CN105648918A (en) * 2016-01-14 2016-06-08 中铁大桥局集团第四工程有限公司 Deviation device and construction method thereof
CN106437181A (en) * 2016-09-09 2017-02-22 国网江苏省电力公司经济技术研究院 Splicing seam adjusting device for steel structure assembling
CN106437181B (en) * 2016-09-09 2019-04-02 国家电网公司 Steel structure assembling adjusts device with piece
CN108894101A (en) * 2018-08-14 2018-11-27 广东省交通规划设计研究院股份有限公司 The pre- inclined application method for adjusting component, bridge pad and bridge pad
CN108894101B (en) * 2018-08-14 2021-04-27 广东省交通规划设计研究院股份有限公司 Pre-deviation adjusting assembly, bridge support and using method of bridge support
CN109235244A (en) * 2018-10-24 2019-01-18 株洲时代新材料科技股份有限公司 A kind of regulating device for bridge pad
CN110886246A (en) * 2019-12-18 2020-03-17 无锡圣丰建筑新材料有限公司 Hole site deviation replacing device for shock insulation support
CN110886246B (en) * 2019-12-18 2024-04-26 无锡圣丰建筑新材料有限公司 Hole position deviation device is changed to shock insulation support

Also Published As

Publication number Publication date
CN203593951U (en) 2014-05-14

Similar Documents

Publication Publication Date Title
CN103572695A (en) Damping and isolation support provided with pre-biasing devices
CN102071796A (en) Template for construction
CN201362979Y (en) Reinforcing structure for power transmission iron tower
CN211499309U (en) Combined shear wall template
CN102071802B (en) Template for construction
CN202592314U (en) Double-fed wind-driven generator bearing assembly and disassembly tool
CN214301271U (en) Ladder stand device capable of installing embedded part by utilizing hollow pier template
CN214574616U (en) Assembled concrete-filled steel tube combined frame structure
CN203904838U (en) Novel bracket structure for construction of box girders of soft soil foundation sites of high speed rail
CN202380404U (en) Pot type rubber bearing mortar template
CN209779681U (en) Corner combined steel mould supporting device
CN206220472U (en) A kind of bracing means for improving bracing members stability of strutting system
CN213774463U (en) Wall body is pour and is used assembled aluminum mould board
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN219887564U (en) Building templates convenient to form removal
CN211030510U (en) Prefabricated case roof beam inner formword
CN212897607U (en) Tower type supporting truss
CN208718160U (en) A kind of heat insulation integrated plate of steel wire net rack three-dimensional inner support structure
CN203393724U (en) Filling block for support system
CN207646870U (en) A kind of beam-to-column connection node of dismounting easy to install
CN219394186U (en) Compact box-type transformer substation
CN211250713U (en) Prestressed concrete tubular pile production auxiliary device
CN211590613U (en) Movable clamp for PC component mould
CN216428000U (en) City viaduct vase mound bent cap does not have support construction equipment
CN203462753U (en) Large steel formwork for double-layer reinforced concrete plate wall cavity construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Jinzhang

Inventor after: Li Jianbo

Inventor after: Liang Yingying

Inventor after: Lu Hongbo

Inventor after: Xiong Gaobo

Inventor after: Su Quanke

Inventor after: Meng Fanchao

Inventor after: Ye Mingkun

Inventor after: He Jiarong

Inventor after: Luo Qiuqing

Inventor after: Huang Guangyu

Inventor after: Pan Tuchun

Inventor after: Li Shijun

Inventor before: Liu Jinzhang

Inventor before: Lu Hongbo

Inventor before: Xiong Gaobo

Inventor before: Ye Mingkun

Inventor before: He Jiarong

Inventor before: Luo Qiuqing

Inventor before: Huang Guangyu

Inventor before: Pan Tuchun

Inventor before: Li Shijun

Inventor before: Li Jianbo

Inventor before: Liang Yingying

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU JINZHANG YE MINGKUN HE JIARONG LUO QIUQING HUANG GUANGYU PAN TUCHUN LI SHIJUN LI JIANBO LIANG YINGYING LU HONGBO XIONG GAOBO TO: LIU JINZHANG SU QUANKE MENG FANCHAO YE MINGKUN HE JIARONG LUO QIUQING HUANG GUANGYU PAN TUCHUN LI SHIJUN LI JIANBO LIANG YINGYING LU HONGBO XIONG GAOBO

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140212