CN103560401B - A kind of buses of insulation tubes phase change method - Google Patents
A kind of buses of insulation tubes phase change method Download PDFInfo
- Publication number
- CN103560401B CN103560401B CN201310556349.9A CN201310556349A CN103560401B CN 103560401 B CN103560401 B CN 103560401B CN 201310556349 A CN201310556349 A CN 201310556349A CN 103560401 B CN103560401 B CN 103560401B
- Authority
- CN
- China
- Prior art keywords
- buses
- insulation tubes
- phase
- commutation
- insulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009413 insulation Methods 0.000 title claims abstract description 95
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000009472 formulation Methods 0.000 claims abstract description 4
- 239000000203 mixture Substances 0.000 claims abstract description 4
- 238000005452 bending Methods 0.000 claims description 36
- 239000004020 conductor Substances 0.000 claims description 9
- 239000011229 interlayer Substances 0.000 claims description 6
- 238000010438 heat treatment Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Installation Of Bus-Bars (AREA)
Abstract
The present invention relates to a kind of buses of insulation tubes phase change method, comprising step has: (1), according to the layout of main transformer, inflatable switch cabinet, what formulation buses of insulation tubes laid moves towards arrangement; (2) according to electrical connection situation, in the spatial dimension with commutation condition, commutation design is carried out; 1. select A, above B, C three phase isolated pipe bus, there is the place being not less than 80cm space and carry out commutation design; 2. choose A, the A on side in B, C three phase isolated pipe bus, C two carries out commutation.Buses of insulation tubes phase change method of the present invention, meet wiring requirement when arranging face-to-face by total inflatable switch cabinet biserial, bend owing to adopting the angle of particular range, therefore for the ampacity of buses of insulation tubes, heating and deformation are all guaranteed in the reasonable scope, do not affect the normal use of buses of insulation tubes.
Description
Technical field
The invention belongs to the buses of insulation tubes commutation technology, particularly a kind of buses of insulation tubes phase change method in generating, power transformation and distribution technique field.
Background technology
Buses of insulation tubes is power distribution equipment important in the transformer station of rising in recent years, plays an important role in electric power system.Be generally used for situation larger by total current in 35kV, 10kV electric power system.Application buses of insulation tubes, not only can improve the ampacity of conductor, can also solve the three-phase currents such as conventional flexible conductor, cable and to distribute unbalanced drawback.But, buses of insulation tubes also emerges the problem that some conventional wires do not have in application process, because conventional wires is generally steel reinforced aluminium conductor or cable, its two ends all have certain flexibility when being connected with transformer, switch cubicle, trend and layout can be changed, to ensure that wire is mutually corresponding with A, B, C three-phase of transformer, switch cubicle according to the flexible arrangement of transformer, switch cubicle.Because buses of insulation tubes belongs to hard conductor to a certain extent, just have problems in actual arrangement, as, when adopting inflatable switch cabinet when switch cubicle and arrange face-to-face in biserial in power distribution equipment indoor, because busbar arrangement in inflatable switch cabinet is certain, during towards gas-filling cabinet, its busbar arrangement is determined, i.e. A, B, C from left to right, can not exchange.Therefore, when gas-filling cabinet is arranged face-to-face, A, B, C three-phase of two row gas-filling cabinets is not one_to_one corresponding, and buses of insulation tubes come from main transformer side to be connected to gas-filling cabinet by master switch side, when one group of insulated tube mother that the mode of connection requires needs two branch, and two gas-filling cabinets corresponding to two branch are arranged face-to-face, time not on same row, namely go wrong.Be as the criterion if put in order with the bus of one of them gas-filling cabinet, then the bus erection sequence that buses of insulation tubes and opposite will inevitably be caused to arrange by total gas-filling cabinet is inconsistent.Therefore, the present invention proposes the buses of insulation tubes phase change method that a kind of practicality is stronger.
Summary of the invention
The object of the invention is to for the deficiencies in the prior art, a kind of buses of insulation tubes phase change method is provided.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of buses of insulation tubes phase change method, comprises step as follows:
(1) according to the layout of main transformer, inflatable switch cabinet, what formulation buses of insulation tubes laid moves towards arrangement;
(2) according to electrical connection situation, in the spatial dimension with commutation condition, commutation design is carried out; Concrete grammar is:
1. select A, above B, C three phase isolated pipe bus, there is the place being not less than 80cm space and carry out commutation design;
2. choose A, the A on side in B, C three phase isolated pipe bus, C two carries out commutation, and as shown in the figures 1 and 2, the concrete grammar of commutation is:
I, chooses A, the bending part that C buses of insulation tubes is determined separately everywhere, and every two bending part center position intervals are greater than 50cm;
II, by A, first bending part alignment of C two-phase buses of insulation tubes, by A, the exposed two insulated tube bus-bar ducts of C two-phase upwards bend with the obtuse angle of 135 degree of-150 degree, the second bending part is started after wherein a C phase upwards extends 40cm, with same angle recursion level direction, and the buses of insulation tubes direction of opposite side A phase is folded in the horizontal direction with the obtuse angle of 135 degree of-150 degree, when after the 3rd place's bending point that C phase buses of insulation tubes strides across above the arrival original position of opposite side A phase buses of insulation tubes, middle B phase top position, to turn back in the same way more original direction, be folded to below simultaneously, when C phase buses of insulation tubes extends downward the plan position approach of B phase buses of insulation tubes, namely during the point of bending everywhere, go back to again and B phase buses of insulation tubes arrangement position in the same way, adopt the mode same with C phase after four bendings, turn back to the opposite side of B phase buses of insulation tubes after wherein another root A phase buses of insulation tubes upwards extends 80cm,
III, outside all buses of insulation tubes conductors, wrap buses of insulation tubes screen, commutation is complete.
And the arrangement that moves towards that the bus of described step (1) lays specifically comprises: when having cable interlayer, utilize the cable bearer of cable interlayer, what make full use of existing cable bearer during layout moves towards layout, arranges independent suspension bracket when being necessary.
And, determine in the 1. step of described step (2) that the another kind of scheme in commutation space is, choose three phase isolated pipe bus upper and lower and respectively there is the place being not less than 40cm space carry out commutation design;
And, the concrete grammar of described another kind of commutation scheme is: wherein C phase buses of insulation tubes still keep up bending mode, upwards recursion level direction after extension 40cm, and finally get back to the opposite side of middle B phase buses of insulation tubes, the mode of bending is downwards selected in A phase buses of insulation tubes side, recursion level direction after downward-extension 40cm, and the opposite side finally getting back to middle B phase buses of insulation tubes.
And the knuckle angle of all bending parts is identical on described A, C two-phase buses of insulation tubes.
Advantage of the present invention and good effect are
1, the present invention proposes a kind of buses of insulation tubes phase change method, namely utilize the space of buses of insulation tubes to arrange trend, lay the design carrying out three-phase commutation in path process at buses of insulation tubes.After buses of insulation tubes inner wire is upwards bent certain angle along space by needs commutation place, then lay along former trend, then wrap the female screen of insulated tube, to realize commutation scheme at conductor skin.Thus ensure that the buses of insulation tubes of coming from transformer has A, B, C and C, B, A two kinds arranges characteristic, meet wiring requirement when arranging face-to-face by total inflatable switch cabinet biserial.
2, buses of insulation tubes phase change method of the present invention bends owing to adopting the angle of particular range, and therefore for the ampacity of buses of insulation tubes, heating and deformation are all guaranteed in the reasonable scope, do not affect the normal practicality of buses of insulation tubes.
Accompanying drawing explanation
Front view when Fig. 1 is three phase isolated pipe bus commutation in the inventive method;
Fig. 2 is the vertical view of Fig. 1.
Embodiment
Be further described the embodiment of the present invention below in conjunction with accompanying drawing, following examples are descriptive, are not determinate, can not limit protection scope of the present invention with this.
A kind of buses of insulation tubes phase change method, comprises step as follows:
(1) according to the layout of main transformer, inflatable switch cabinet, what formulation buses of insulation tubes laid moves towards arrangement, when having cable interlayer, utilizes the cable bearer of cable interlayer, what make full use of existing cable bearer during layout moves towards layout, arranges independent suspension bracket when being necessary.
(2) according to the actual conditions of electrical connection, in the spatial dimension with commutation condition, commutation design is carried out; Concrete grammar is:
1. select A, above B, C three phase isolated pipe bus, there is the place being not less than 80cm space and carry out commutation design;
2. choose A, the A on side in B, C three phase isolated pipe bus, C two carries out commutation, and as shown in the figures 1 and 2, the concrete grammar of commutation is:
I, chooses A, the bending part that C buses of insulation tubes is determined separately everywhere, and every two bending part center position intervals are greater than 50cm;
II, by A, first bending part alignment of C two-phase buses of insulation tubes, by A, the exposed two insulated tube bus-bar ducts of C two-phase upwards bend with the obtuse angle of 135 degree of-150 degree, the second bending part is started after wherein a C phase upwards extends 40cm, with same angle recursion level direction, and the buses of insulation tubes direction of opposite side A phase is folded in the horizontal direction with the obtuse angle of 135 degree of-150 degree, when after the 3rd place's bending point that C phase buses of insulation tubes strides across above the arrival original position of opposite side A phase buses of insulation tubes, middle B phase top position, to turn back in the same way more original direction, be folded to below simultaneously, when C phase buses of insulation tubes extends downward the plan position approach of B phase buses of insulation tubes, namely during the point of bending everywhere, go back to again and B phase buses of insulation tubes arrangement position in the same way, adopt the mode same with C phase after four bendings, turn back to the opposite side of B phase buses of insulation tubes after wherein another root A phase buses of insulation tubes upwards extends 80cm,
III, outside all buses of insulation tubes conductors, wrap buses of insulation tubes screen, commutation is complete.
In specific embodiment of the invention, as A, B, the another embodiment of C three phase isolated pipe bus commutation, three phase isolated pipe bus upper and lower can be chosen respectively there is the place being not less than 40cm space carry out commutation design, in above-mentioned commutation 2. step II concrete steps in, wherein buses of insulation tubes still keeps up the mode of bending, upwards recursion level direction after extension 40cm, and finally get back to the opposite side of intermediate insulation pipe bus, another root insulated tube bus bar side selects the mode of bending downwards, recursion level direction after downward-extension 40cm, and finally get back to the opposite side of intermediate insulation pipe bus.
In specific embodiment of the invention, on described A, C two-phase buses of insulation tubes, the knuckle of all bending parts is identical.
Claims (3)
1. a buses of insulation tubes phase change method, is characterized in that comprising step as follows:
(1) according to the layout of main transformer, inflatable switch cabinet, what formulation buses of insulation tubes laid moves towards arrangement;
(2) according to electrical connection situation, in the spatial dimension with commutation condition, commutation design is carried out; Concrete grammar is:
1. select A, above B, C three phase isolated pipe bus, there is the place being not less than 80cm space and carry out commutation design;
2. choose A, the A on side in B, C three phase isolated pipe bus, C two carries out commutation, and the concrete grammar of commutation is:
I, chooses A, the bending part that C buses of insulation tubes is determined separately everywhere, and each the bending part central point on A buses of insulation tubes and the interval between each bending part central point of C buses of insulation tubes are greater than 50cm;
II, by A, first bending part alignment of C two-phase buses of insulation tubes, by A, the exposed two insulated tube bus-bar ducts of C two-phase upwards bend with the obtuse angle of 135 degree of-150 degree, the second bending part is started after wherein a C phase upwards extends 40cm, second bending part is with same angle recursion level direction again, and be folded to former A phase buses of insulation tubes direction with the obtuse angle of 135 degree of-150 degree in the horizontal direction, realize the commutation of C phase space, after C phase buses of insulation tubes strides across the 3rd place's bending point that middle B phase top position arrives above former A phase buses of insulation tubes position, to turn back the initial direction of former A phase buses of insulation tubes with the obtuse angle of 135 degree of-150 degree in horizontal direction again, simultaneously, the obtuse angle sentencing 135 degree of-150 degree at the 3rd place's bending point is folded to below, when C phase buses of insulation tubes extends downward the plan position approach of B phase buses of insulation tubes, namely during the point of bending everywhere, go back to again and B phase buses of insulation tubes arrangement position in the same way, wherein, adopt the mode same with C phase buses of insulation tubes after four bendings, turn back to the former C phase buses of insulation tubes side of B phase buses of insulation tubes after another root A phase buses of insulation tubes upwards extends 80cm,
III, finally outside all buses of insulation tubes conductors, wrap buses of insulation tubes screen, commutation is complete;
The concrete grammar of commutation or be: 3. select A, B, C three phase isolated pipe bus upper and lower respectively has the place being not less than 40cm space and carries out commutation design, 2. A is chosen with above-mentioned steps, B, the A on side in C three phase isolated pipe bus, C two carries out commutation, choose A, the bending part that C buses of insulation tubes is determined separately everywhere, each bending part central point on A buses of insulation tubes and the interval between each bending part central point of C buses of insulation tubes are greater than 50cm, the C phase buses of insulation tubes commutation method of II step during wherein 2. C phase buses of insulation tubes still keeps above-mentioned steps, and the mode of bending is downwards selected in A phase buses of insulation tubes side, recursion level direction after downward-extension 40cm, adopt the mode same with C phase buses of insulation tubes after four bendings, turn back to the former C phase buses of insulation tubes side of B phase buses of insulation tubes again, finally outside all buses of insulation tubes conductors, wrap buses of insulation tubes screen, commutation is complete.
2. buses of insulation tubes phase change method according to claim 1, it is characterized in that: the arrangement that moves towards that the bus of described step (1) lays specifically comprises: when having cable interlayer, utilize the cable bearer of cable interlayer, what make full use of existing cable bearer during layout moves towards layout.
3. buses of insulation tubes phase change method according to claim 1, is characterized in that: on described A, C two-phase buses of insulation tubes, the knuckle angle of all bending parts is identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310556349.9A CN103560401B (en) | 2013-11-11 | 2013-11-11 | A kind of buses of insulation tubes phase change method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310556349.9A CN103560401B (en) | 2013-11-11 | 2013-11-11 | A kind of buses of insulation tubes phase change method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103560401A CN103560401A (en) | 2014-02-05 |
CN103560401B true CN103560401B (en) | 2015-12-09 |
Family
ID=50014595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310556349.9A Active CN103560401B (en) | 2013-11-11 | 2013-11-11 | A kind of buses of insulation tubes phase change method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103560401B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106159688A (en) * | 2016-07-11 | 2016-11-23 | 新疆特变电工自控设备有限公司 | A kind of 12kV switch cubicle group back-to-back |
CN111129892B (en) * | 2019-11-28 | 2021-05-14 | 平高集团有限公司 | Three-phase conductor adapter |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2535103B2 (en) * | 1991-03-27 | 1996-09-18 | 株式会社東芝 | Gas insulated switchgear |
JP2000261917A (en) * | 1999-03-12 | 2000-09-22 | Toshiba Corp | Apparatus for electric power |
CN201994563U (en) * | 2010-12-13 | 2011-09-28 | 北京北开电气股份有限公司 | AC phase change conductor in tank body assembled by porcelain bushing |
CN202856167U (en) * | 2012-11-19 | 2013-04-03 | 山东达驰阿尔发电气有限公司 | Phase-switching transferring box for common-box busbar |
CN203119311U (en) * | 2013-01-11 | 2013-08-07 | 山东泰开高压开关有限公司 | Bilateral protection-bus-contact three-in-one semi-closed combined electric appliance |
CN203278145U (en) * | 2013-06-04 | 2013-11-06 | 辽宁北辰电力设备有限公司 | Commutation device for DC excitation enclosed busbar |
-
2013
- 2013-11-11 CN CN201310556349.9A patent/CN103560401B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103560401A (en) | 2014-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202019137U (en) | Bus bridge frame with commutation function | |
CN202026064U (en) | Single-double hybrid power transmission line transposition tower with auxiliary arm | |
CN103560401B (en) | A kind of buses of insulation tubes phase change method | |
TW200906018A (en) | Gas insulation switching apparatus | |
CN203690844U (en) | Sleeve and tubular bus-bar crossover over-current fitting for 800kV converter station | |
CN109066320B (en) | HGIS equipment applied to double-bus outgoing line | |
CN204068136U (en) | Solid insulation transfer bus and gas-insulated switchgear | |
CN203014185U (en) | Line connecting structure for crossed matching of incoming lines and outgoing lines of 500kV power distribution device | |
CN103066545B (en) | A kind of Novel high-voltage overhead intensive type busbar distribution system | |
CN208015086U (en) | Main transformer low-pressure side main breaker circuit arrangement based on vertical arrangement busbar | |
CN208939337U (en) | A kind of high-tension switch gear | |
CN201312059Y (en) | 35KV bus bar structure of transformer substation autotransformer lower voltage side delta connection | |
CN201018238Y (en) | Length adjustable bus connection structure | |
CN207691206U (en) | A kind of inflatable ring main unit using Hard link outlet method | |
CN203774631U (en) | High-voltage distribution device with dual circuit breakers in single bus sectionalizing mode | |
CN202474660U (en) | Electric energy distributor for low-voltage draw-out switching equipment | |
CN102185424A (en) | Bus of motor | |
CN202034698U (en) | Heavy current metal armored draw-out type switch cabinet | |
CN202957556U (en) | Novel high-voltage aerial intensive type bus arrangement system | |
CN202650673U (en) | Auto-branch electric wire and cable | |
CN202678737U (en) | Joint structure of PASS combined electric apparatus and tubular busbars | |
CN207368427U (en) | A kind of connection busbar for being used to get in touch with cabinet | |
CN204243574U (en) | Line type structure between a kind of advancing equipment | |
CN202772435U (en) | Solid insulating coupler breaking cabinet bus system | |
KR101557305B1 (en) | Shape and arrangement structure of conductor bus-bar for bus duct |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |