CN103560401A - Phase change method of insulating tube buses - Google Patents

Phase change method of insulating tube buses Download PDF

Info

Publication number
CN103560401A
CN103560401A CN201310556349.9A CN201310556349A CN103560401A CN 103560401 A CN103560401 A CN 103560401A CN 201310556349 A CN201310556349 A CN 201310556349A CN 103560401 A CN103560401 A CN 103560401A
Authority
CN
China
Prior art keywords
buses
phase
insulation tubes
commutation
phase change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310556349.9A
Other languages
Chinese (zh)
Other versions
CN103560401B (en
Inventor
毛华
耿芳
王笑一
马力
曲家陟
张来
范伟
马林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310556349.9A priority Critical patent/CN103560401B/en
Publication of CN103560401A publication Critical patent/CN103560401A/en
Application granted granted Critical
Publication of CN103560401B publication Critical patent/CN103560401B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Bus-Bars (AREA)

Abstract

The invention relates to a phase change method of insulating tube buses. The phase change method of the insulating tube buses comprises the steps that (1) a run layout plan of the insulating tube buses to be laid is made according to the layout of a main transformer and inflatable switch cabinets, and (2) according to electric connection situations, a phase change design is carried out in a space range meeting phase change requirements, wherein phase change design is carried out in a space not less than 80cm above three-phase insulating tube buses A, B and C, and the sideward three-phase insulating tube buses A and C are selected from the three-phase insulating tube buses A, B and C to carry out phase change. The phase change method of the insulating tube buses meets the wiring requirements when two rows of the inflatable switch cabinets are arranged face to face, due to the fact that the insulating tube buses are bent at an angle in a specific range, it is ensured that the carrying capacity, heating and deformation of the insulating tube buses are in a reasonable range, and normal use of the insulating tube buses is not affected.

Description

A kind of buses of insulation tubes phase change method
Technical field
The invention belongs to the buses of insulation tubes commutation technology in generating, power transformation and distribution technique field, particularly a kind of buses of insulation tubes phase change method.
Background technology
Buses of insulation tubes is power distribution equipment important in the transformer station of rising in recent years, in electric power system, plays an important role.Be generally used for being subject to the situation that total current is larger in 35kV, 10kV electric power system.Application buses of insulation tubes, not only can improve the ampacity of conductor, can also solve the three-phase currents such as conventional flexible conductor, the cable unbalanced drawback that distributes.But, buses of insulation tubes also emerges the problem that some conventional wires do not have in application process, because conventional wires is generally steel reinforced aluminium conductor or cable, its two ends all have certain flexibility when being connected with transformer, switch cubicle, can change trend and layout according to the flexible arrangement of transformer, switch cubicle, mutually corresponding to guarantee A, B, the C three-phase of wire and transformer, switch cubicle.Because buses of insulation tubes belongs to hard conductor to a certain extent, in actual arrangement, just have problems, as, when switch cubicle adopts inflatable switch cabinet and power distribution equipment is indoor when being biserial and arranging face-to-face, because busbar arrangement in inflatable switch cabinet is certain, during towards gas-filling cabinet, its busbar arrangement is determined, A, B, C from left to right, can not change.Therefore, when gas-filling cabinet is arranged face-to-face, the A of two row gas-filling cabinets, B, C three-phase are not corresponding one by one, and buses of insulation tubes from main transformer side, come to be connected to gas-filling cabinet be subject to master switch side, in the mode of connection, require the female pair branches that need of one group of insulated tube that come, two gas-filling cabinets corresponding to Qie Shuan branch are arranged face-to-face,, when same listing, do not go wrong.If put in order and be as the criterion with the bus of one of them gas-filling cabinet, will inevitably cause buses of insulation tubes and opposite row to be subject to the bus erection sequence of total gas-filling cabinet inconsistent.Therefore, the present invention proposes the buses of insulation tubes phase change method that a kind of practicality is stronger.
Summary of the invention
The object of the invention is to for the deficiencies in the prior art, a kind of buses of insulation tubes phase change method is provided.
The present invention solves its technical problem and takes following technical scheme to realize:
A phase change method, comprises that step is as follows:
(1), according to the layout of main transformer, inflatable switch cabinet, formulate the arrangement that moves towards that buses of insulation tubes lays;
(2), according to electrical connection situation, in the spatial dimension with commutation condition, carry out commutation design; Concrete grammar is:
1. select A, B, C three phase isolated pipe bus top has the place that is not less than 80cm space and carries out commutation design;
2. choose A, B, the A on side in C three phase isolated pipe bus, two of C carry out commutation, and as shown in Fig. 1 or 2, the concrete grammar of commutation is:
I, chooses A, definite bending part everywhere separately on C buses of insulation tubes, and every two bending part center position intervals are greater than 50cm;
II, by A, the first fold crook alignment of C two-phase buses of insulation tubes, by A, the upwards bending of obtuse angle that two exposed insulated tube bus-bar ducts of C two-phase are spent with 135 degree-150, wherein a C starts the second bending part after extending upward mutually 40cm, with the same angle horizontal direction of turning back, and with the obtuse angle of 135 degree-150 degree, be folded in the horizontal direction the buses of insulation tubes direction of opposite side A phase, in the middle of C phase buses of insulation tubes strides across, B phase top position arrives after the 3rd place's bending point of top, the original position of opposite side A phase buses of insulation tubes, original direction of turning back in the same way again, be folded to below simultaneously, when C phase buses of insulation tubes extends downward the plan position approach of B phase buses of insulation tubes, namely everywhere during bending point, go back to again and B phase buses of insulation tubes arrangement position in the same way, wherein another root A phase buses of insulation tubes adopts the mode mutually same with C after four bendings, to turn back to the opposite side of B phase buses of insulation tubes after extending upward 80cm,
III, wraps buses of insulation tubes screen in all buses of insulation tubes conductors outside, and commutation is complete.
And the arrangement that moves towards that the bus of described step (1) lays specifically comprises: while having cable interlayer, utilize the cable bearer of cable interlayer, make full use of the layout of moving towards of existing cable bearer during layout, independent suspension bracket is set while being necessary.
And, in the 1. step of described step (2), determine that the another kind of scheme in commutation space is, choose three phase isolated pipe bus upper and lower and respectively there is the place that is not less than 40cm space and carry out commutation design;
And, the concrete grammar of described another kind of commutation scheme is: the mode that wherein C phase buses of insulation tubes still keeps up and bends, extend upward the horizontal direction of turning back after 40cm, and the opposite side of B phase buses of insulation tubes in the middle of finally getting back to, A phase buses of insulation tubes side is selected the mode of bending downwards, to the horizontal direction of turning back after downward-extension 40cm, and the opposite side of B phase buses of insulation tubes in the middle of finally getting back to.
And, described A, on C two-phase buses of insulation tubes, the knuckle angle of all bending parts is identical.
Advantage of the present invention and good effect are
1, the present invention proposes a kind of buses of insulation tubes phase change method, utilize the space of buses of insulation tubes to arrange trend, at buses of insulation tubes, lay the design of carrying out three-phase commutation in the process of path.In needs commutation place, buses of insulation tubes inner wire is upwards bent after certain angle along space, then lay along former trend, then wrap the female screen of insulated tube at conductor skin, to realize commutation scheme.Thereby guaranteed that the buses of insulation tubes of coming from transformer has A, B, C and C, B, two kinds of layout characteristics of A, meets wiring requirement while arranged face-to-face by total inflatable switch cabinet biserial.
2, buses of insulation tubes phase change method of the present invention is owing to adopting the angle of particular range to bend, and therefore, for the ampacity of buses of insulation tubes, heating and deformation are all guaranteed in the reasonable scope, do not affect the normal practicality of buses of insulation tubes.
Accompanying drawing explanation
Fig. 1 is the front view during commutation of three phase isolated pipe bus in the inventive method;
Fig. 2 is the vertical view of Fig. 1.
Embodiment
Below in conjunction with accompanying drawing, the embodiment of the present invention is further described, following examples are descriptive, are not determinate, can not limit protection scope of the present invention with this.
A phase change method, comprises that step is as follows:
(1) according to the layout of main transformer, inflatable switch cabinet, formulate the arrangement that moves towards that buses of insulation tubes lays, while having cable interlayer, utilize the cable bearer of cable interlayer, the layout of moving towards that makes full use of existing cable bearer during layout, arranges independent suspension bracket while being necessary.
(2) according to the actual conditions of electrical connection, in the spatial dimension with commutation condition, carry out commutation design; Concrete grammar is:
1. select A, B, C three phase isolated pipe bus top has the place that is not less than 80cm space and carries out commutation design;
2. choose A, B, the A on side in C three phase isolated pipe bus, two of C carry out commutation, and as shown in Fig. 1 or 2, the concrete grammar of commutation is:
I, chooses A, definite bending part everywhere separately on C buses of insulation tubes, and every two bending part center position intervals are greater than 50cm;
II, by A, the first fold crook alignment of C two-phase buses of insulation tubes, by A, the upwards bending of obtuse angle that two exposed insulated tube bus-bar ducts of C two-phase are spent with 135 degree-150, wherein a C starts the second bending part after extending upward mutually 40cm, with the same angle horizontal direction of turning back, and with the obtuse angle of 135 degree-150 degree, be folded in the horizontal direction the buses of insulation tubes direction of opposite side A phase, in the middle of C phase buses of insulation tubes strides across, B phase top position arrives after the 3rd place's bending point of top, the original position of opposite side A phase buses of insulation tubes, original direction of turning back in the same way again, be folded to below simultaneously, when C phase buses of insulation tubes extends downward the plan position approach of B phase buses of insulation tubes, namely everywhere during bending point, go back to again and B phase buses of insulation tubes arrangement position in the same way, wherein another root A phase buses of insulation tubes adopts the mode mutually same with C after four bendings, to turn back to the opposite side of B phase buses of insulation tubes after extending upward 80cm,
III, wraps buses of insulation tubes screen in all buses of insulation tubes conductors outside, and commutation is complete.
In specific embodiment of the invention, as A, B, the another embodiment of C three phase isolated pipe bus commutation, can choose three phase isolated pipe bus upper and lower respectively has the place that is not less than 40cm space and carries out commutation design, in above-mentioned commutation 2. in step in the concrete steps of III, buses of insulation tubes mode of bending that still keeps up wherein, extend upward the horizontal direction of turning back after 40cm, and finally get back to the opposite side of intermediate insulation pipe bus, another root insulated tube bus bar side is selected the mode of bending downwards, to the horizontal direction of turning back after downward-extension 40cm, and finally get back to the opposite side of intermediate insulation pipe bus.
In specific embodiment of the invention, described A, on C two-phase buses of insulation tubes, the knuckle of all bending parts is identical.

Claims (5)

1. a buses of insulation tubes phase change method, is characterized in that comprising that step is as follows:
(1), according to the layout of main transformer, inflatable switch cabinet, formulate the arrangement that moves towards that buses of insulation tubes lays;
(2), according to electrical connection situation, in the spatial dimension with commutation condition, carry out commutation design; Concrete grammar is:
1. select A, B, C three phase isolated pipe bus top has the place that is not less than 80cm space and carries out commutation design;
2. choose A, B, the A on side in C three phase isolated pipe bus, two of C carry out commutation, and as shown in Fig. 1 or 2, the concrete grammar of commutation is:
I, chooses A, definite bending part everywhere separately on C buses of insulation tubes, and every two bending part center position intervals are greater than 50cm;
II, by A, the first fold crook alignment of C two-phase buses of insulation tubes, by A, the upwards bending of obtuse angle that two exposed insulated tube bus-bar ducts of C two-phase are spent with 135 degree-150, wherein a C starts the second bending part after extending upward mutually 40cm, with same angle in the horizontal direction of turning back, and with the obtuse angle of 135 degree-150 degree, be folded in the horizontal direction the buses of insulation tubes direction of opposite side A phase, realize the commutation of C phase space, in the middle of C phase buses of insulation tubes strides across, B phase top position arrives after the 3rd place's bending point of top, the original position of opposite side A phase buses of insulation tubes, original direction of turning back in the same way again, be folded to below simultaneously, when C phase buses of insulation tubes extends downward the plan position approach of B phase buses of insulation tubes, namely everywhere during bending point, go back to again and B phase buses of insulation tubes arrangement position in the same way, wherein another root A phase buses of insulation tubes adopts the mode mutually same with C after four bendings, to turn back to the opposite side of B phase buses of insulation tubes after extending upward 80cm,
III, finally wraps buses of insulation tubes screen in all buses of insulation tubes conductors outside, and commutation is complete.
2. buses of insulation tubes phase change method according to claim 1, it is characterized in that: the arrangement that moves towards that the bus of described step (1) lays specifically comprises: while having cable interlayer, utilize the cable bearer of cable interlayer, the layout of moving towards that makes full use of existing cable bearer during layout, arranges independent suspension bracket while being necessary.
3. buses of insulation tubes phase change method according to claim 1, it is characterized in that: the another kind of scheme of determining commutation space in the 1. step of described step (2) is, choose three phase isolated pipe bus upper and lower and respectively there is the place that is not less than 40cm space and carry out commutation design.
4. buses of insulation tubes phase change method according to claim 3, it is characterized in that: the concrete grammar of described another kind of commutation scheme is: the mode that wherein C phase buses of insulation tubes still keeps up and bends, extend upward the horizontal direction of turning back after 40cm, and the opposite side of B phase buses of insulation tubes in the middle of finally getting back to, A phase buses of insulation tubes side is selected the mode of bending downwards, to the horizontal direction of turning back after downward-extension 40cm, and the opposite side of B phase buses of insulation tubes in the middle of finally getting back to.
5. according to the buses of insulation tubes phase change method described in claim 1 to 4 any one, it is characterized in that: described A, on C two-phase buses of insulation tubes, the knuckle angle of all bending parts is identical.
CN201310556349.9A 2013-11-11 2013-11-11 A kind of buses of insulation tubes phase change method Active CN103560401B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310556349.9A CN103560401B (en) 2013-11-11 2013-11-11 A kind of buses of insulation tubes phase change method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310556349.9A CN103560401B (en) 2013-11-11 2013-11-11 A kind of buses of insulation tubes phase change method

Publications (2)

Publication Number Publication Date
CN103560401A true CN103560401A (en) 2014-02-05
CN103560401B CN103560401B (en) 2015-12-09

Family

ID=50014595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310556349.9A Active CN103560401B (en) 2013-11-11 2013-11-11 A kind of buses of insulation tubes phase change method

Country Status (1)

Country Link
CN (1) CN103560401B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106159688A (en) * 2016-07-11 2016-11-23 新疆特变电工自控设备有限公司 A kind of 12kV switch cubicle group back-to-back
CN111129892A (en) * 2019-11-28 2020-05-08 平高集团有限公司 Three-phase conductor adapter

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04299006A (en) * 1991-03-27 1992-10-22 Toshiba Corp Gas insulation switchgear
JP2000261917A (en) * 1999-03-12 2000-09-22 Toshiba Corp Apparatus for electric power
CN201994563U (en) * 2010-12-13 2011-09-28 北京北开电气股份有限公司 AC phase change conductor in tank body assembled by porcelain bushing
CN202856167U (en) * 2012-11-19 2013-04-03 山东达驰阿尔发电气有限公司 Phase-switching transferring box for common-box busbar
CN203119311U (en) * 2013-01-11 2013-08-07 山东泰开高压开关有限公司 Bilateral protection-bus-contact three-in-one semi-closed combined electric appliance
CN203278145U (en) * 2013-06-04 2013-11-06 辽宁北辰电力设备有限公司 Commutation device for DC excitation enclosed busbar

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04299006A (en) * 1991-03-27 1992-10-22 Toshiba Corp Gas insulation switchgear
JP2000261917A (en) * 1999-03-12 2000-09-22 Toshiba Corp Apparatus for electric power
CN201994563U (en) * 2010-12-13 2011-09-28 北京北开电气股份有限公司 AC phase change conductor in tank body assembled by porcelain bushing
CN202856167U (en) * 2012-11-19 2013-04-03 山东达驰阿尔发电气有限公司 Phase-switching transferring box for common-box busbar
CN203119311U (en) * 2013-01-11 2013-08-07 山东泰开高压开关有限公司 Bilateral protection-bus-contact three-in-one semi-closed combined electric appliance
CN203278145U (en) * 2013-06-04 2013-11-06 辽宁北辰电力设备有限公司 Commutation device for DC excitation enclosed busbar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106159688A (en) * 2016-07-11 2016-11-23 新疆特变电工自控设备有限公司 A kind of 12kV switch cubicle group back-to-back
CN111129892A (en) * 2019-11-28 2020-05-08 平高集团有限公司 Three-phase conductor adapter

Also Published As

Publication number Publication date
CN103560401B (en) 2015-12-09

Similar Documents

Publication Publication Date Title
JP2006271021A (en) Gas insulated switchgear
CN202019137U (en) Bus bridge frame with commutation function
CN202026064U (en) Single-double hybrid power transmission line transposition tower with auxiliary arm
CN103560401B (en) A kind of buses of insulation tubes phase change method
CN109066320B (en) HGIS equipment applied to double-bus outgoing line
CN203690844U (en) Sleeve and tubular bus-bar crossover over-current fitting for 800kV converter station
CN203871806U (en) Air-insulated bus duct
CN103066545B (en) A kind of Novel high-voltage overhead intensive type busbar distribution system
CN104466851A (en) Tubular bus duct structure
CN208015086U (en) Main transformer low-pressure side main breaker circuit arrangement based on vertical arrangement busbar
CN208939337U (en) A kind of high-tension switch gear
CN109659851B (en) 750kV same-tower four-circuit transmission line linear tower type and phase sequence selection method and device thereof
CN202650673U (en) Auto-branch electric wire and cable
CN207691206U (en) A kind of inflatable ring main unit using Hard link outlet method
CN202957556U (en) Novel high-voltage aerial intensive type bus arrangement system
JP4790524B2 (en) Gas insulated switchgear
CN202678737U (en) Joint structure of PASS combined electric apparatus and tubular busbars
CN204243574U (en) Line type structure between a kind of advancing equipment
CN207368427U (en) A kind of connection busbar for being used to get in touch with cabinet
KR101557305B1 (en) Shape and arrangement structure of conductor bus-bar for bus duct
CN205070288U (en) Outlet structure of GIS equipment
CN218919987U (en) Single-interval three-circuit outlet arrangement structure of HGIS power distribution device
CN104577928B (en) Three-phase aerial condutor
CN208738618U (en) Distribution structure applied to double-bus outlet
CN203445574U (en) Cable system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant