CN103557029A - 一种由无底柱分段崩落法向上向水平分层充填法过渡的方法 - Google Patents

一种由无底柱分段崩落法向上向水平分层充填法过渡的方法 Download PDF

Info

Publication number
CN103557029A
CN103557029A CN201310588072.8A CN201310588072A CN103557029A CN 103557029 A CN103557029 A CN 103557029A CN 201310588072 A CN201310588072 A CN 201310588072A CN 103557029 A CN103557029 A CN 103557029A
Authority
CN
China
Prior art keywords
isolation strip
sublevel caving
back production
transition
sill pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310588072.8A
Other languages
English (en)
Other versions
CN103557029B (zh
Inventor
刘艳章
邓磊
王其飞
叶义成
柯丽华
张丙涛
张群
赵卫
石志军
刘洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201310588072.8A priority Critical patent/CN103557029B/zh
Publication of CN103557029A publication Critical patent/CN103557029A/zh
Application granted granted Critical
Publication of CN103557029B publication Critical patent/CN103557029B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

本发明涉及一种由无底柱分段崩落法向上向水平分层充填法过渡的方法。其技术方案是:在矿区的紧邻崩落区(1)下面的一个阶段中,将所述阶段划分为隔离带(2)和回采区(3),所述阶段的上部为隔离带(2),所述阶段的下部为回采区(3)。所述阶段的开采顺序是,先开采回采区,后开采隔离带(2)。所述阶段的开采方法是,回采区(3)采用上向水平分层充填法,隔离带(2)采用无底柱分段崩落法。所述隔离带(2)的厚度是无底柱分段崩落法分段高度的1倍或2倍。所述后开采隔离带(2)是指回采区(3)的充填体终凝后,再开采隔离带(2)。本发明具有能降低矿石的损失率、减小贫化率、保护地表植被和生态环境,改善采场的通风条件和回采简单的特点。

Description

一种由无底柱分段崩落法向上向水平分层充填法过渡的方法
技术领域
本发明属于采矿技术领域。具体涉及一种由无底柱分段崩落法向上向水平分层充填法过渡的方法。
背景技术
上世纪,我国90%以上的大中型地下矿山采用高效低成本的无底柱分段崩落法开采。在无底柱分段崩落法中,随回采工作面的推进同时崩落围岩充满采空区,从而实现地压管理和控制地压。在使用无底柱分段崩落法时随着围岩和矿石的崩落,会造成地表不同程度的沉降或塌陷,严重地破坏了地表植被和生态环境;同时造成废石的混入率增加,矿石的损失贫化增大,采场的通风条件差。近几年,随着国家对环境保护和土地使用等各方面的重视,采用充填法替代崩落法回采地下矿石已经成为采矿技术发展的必然趋势。
经过无底柱分段崩落法多年的开采,在矿区的表层已形成上百米甚至几百米的松散岩体,形成崩落区。在用充填法开采回采区时,在崩落区和回采区之间留一定厚度的矿石,该部分的矿石被永久留在地下,不能回收,减少了资源的利用率,增大了矿石的损失率,而且充填法回采的工艺复杂。
发明内容
本发明旨在克服现有技术缺陷,目的是提供一种由无底柱分段崩落法向上向水平分层充填法过渡的方法,该方法降低了矿石的损失率、减小贫化率,保护了地表植被和生态环境,改善了采场的通风条件,回采简单。
为实现上述目的,本发明采用的技术方案是:在矿区的紧邻崩落区(1)下面的一个阶段中,将所述阶段划分为隔离带(2)和回采区(3),所述阶段的上部为隔离带(2),所述阶段的下部为回采区(3)。
所述阶段的开采顺序是,先开采回采区,后开采隔离带(2)。
所述阶段的开采方法是,回采区(3)采用上向水平分层充填法,隔离带(2)采用无底柱分段崩落法。
所述隔离带(2)的厚度是无底柱分段崩落法分段高度的1倍或2倍。
所述后开采隔离带(2)是指回采区(3)的充填体终凝后,再开采隔离带(2)。
由于采用上述技术方案,本发明的有益效果是:
隔离带能简单地实现由无底柱分段崩落法向上向水平分层充填法的过渡。
在隔离带下采用充填法开采矿石,提高了矿石回收率,降低了损失率和贫化率。
利用无底柱分段崩落法开采隔离带,回收了隔离带中的矿石,减少了矿石的损失率。
利用无底柱分段崩落法回采隔离带,其回采工艺简单。
利用充填法开采矿石减小了对地表的破坏,减小了对地表植被的破坏,保护了环境。
用充填法开采矿石,使采场的通风条件得到了极大的改善。
因此,本发明具有能降低矿石的损失率、减小贫化率、保护地表植被和生态环境,改善采场的通风条件和回采简单的特点。
附图说明
图1为本发明的一种隔离带2和回采区3的划分示意图。
具体实施方式
下面结合附图和具体实施方式对发明做进一步的说明,并非对其保护范围的限制。
实施例1
一种由无底柱分段崩落法向上向水平分层充填法过渡的方法。该方法如图1所示,在矿区的紧邻崩落区1下面的一个阶段中,将所述阶段划分为隔离带2和回采区3,所述阶段的上部为隔离带2,所述阶段的下部为回采区3。
所述阶段的开采顺序是,先开采回采区,后开采隔离带2。
所述阶段的开采方法是,回采区3采用上向水平分层充填法,隔离带2采用无底柱分段崩落法。
所述隔离带2的厚度是无底柱分段崩落法分段高度的1倍。
所述后开采隔离带2是指回采区3的充填体终凝后,再开采隔离带2。
实施例2
一种由无底柱分段崩落法向上向水平分层充填法过渡的方法。该方法如图1所示,在矿区的紧邻崩落区1下面的一个阶段中,将所述阶段划分为隔离带2和回采区3,所述阶段的上部为隔离带2,所述阶段的下部为回采区3。
所述阶段的开采顺序是,先开采回采区,后开采隔离带2。
所述阶段的开采方法是,回采区3采用上向水平分层充填法,隔离带2采用无底柱分段崩落法。
所述隔离带2的厚度是无底柱分段崩落法分段高度的2倍。
所述后开采隔离带2是指回采区3的充填体终凝后,再开采隔离带2。
本具体实施方式与现有技术相比具有如下积极效果:
隔离带2能简单地实现由无底柱分段崩落法向上向水平分层充填法的过渡。
在隔离带2下采用充填法开采矿石,提高了矿石回收率,降低了损失率和贫化率。
利用无底柱分段崩落法开采隔离带2,回收了隔离带2中的矿石,减少了矿石的损失率。
利用无底柱分段崩落法回采隔离带2,其回采工艺简单。
利用充填法开采矿石减小了对地表的破坏,减小了对地表植被的破坏,保护了环境。
用充填法开采矿石,使采场的通风条件得到了极大的改善。
因此,本发明具有能降低矿石的损失率、减小贫化率、保护地表植被和生态环境,改善采场的通风条件和回采简单的特点。

Claims (3)

1.一种由无底柱分段崩落法向上向水平分层充填法过渡的方法,其特征在于所述方法是:在矿区的紧邻崩落区(1)下面的一个阶段中,将所述阶段划分为隔离带(2)和回采区(3),所述阶段的上部为隔离带(2),所述阶段的下部为回采区(3);
所述阶段的开采顺序是,先开采回采区,后开采隔离带(2);所述阶段的开采方法是,回采区(3)采用上向水平分层充填法,隔离带(2)采用无底柱分段崩落法。
2.据权利要求1所述由无底柱分段崩落法向上向水平分层充填法过渡的方法,其特征在于所述隔离带(2)的厚度是无底柱分段崩落法分段高度的1倍或2倍。
3.据权利要求1所述由无底柱分段崩落法向上向水平分层充填法过渡的方法,其特征在于所述后开采隔离带(2)是指回采区(3)的充填体终凝后,再开采隔离带(2)。
CN201310588072.8A 2013-11-21 2013-11-21 一种由无底柱分段崩落法向上向水平分层充填法过渡的方法 Expired - Fee Related CN103557029B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310588072.8A CN103557029B (zh) 2013-11-21 2013-11-21 一种由无底柱分段崩落法向上向水平分层充填法过渡的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310588072.8A CN103557029B (zh) 2013-11-21 2013-11-21 一种由无底柱分段崩落法向上向水平分层充填法过渡的方法

Publications (2)

Publication Number Publication Date
CN103557029A true CN103557029A (zh) 2014-02-05
CN103557029B CN103557029B (zh) 2015-09-30

Family

ID=50011364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310588072.8A Expired - Fee Related CN103557029B (zh) 2013-11-21 2013-11-21 一种由无底柱分段崩落法向上向水平分层充填法过渡的方法

Country Status (1)

Country Link
CN (1) CN103557029B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105673012A (zh) * 2016-01-02 2016-06-15 武汉科技大学 一种采充结合连续开采的阶段矿房采矿法
CN105863640A (zh) * 2016-04-05 2016-08-17 武汉科技大学 一种保安矿柱和同水平矿体同步开采的联合采矿法
CN108825238A (zh) * 2018-05-31 2018-11-16 西北矿冶研究院 一种由无底柱分段崩落采矿法转分段空场采矿法的方法
CN114000882A (zh) * 2021-11-03 2022-02-01 金川集团股份有限公司 一种同一采区崩落法与充填法协同开采方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3588175A (en) * 1969-04-15 1971-06-28 Atlantic Richfield Co Methods for mining deep thick oil shale deposits
CN101737052B (zh) * 2009-12-28 2012-09-05 河北邯邢矿冶设计院有限公司 一种分段充填采矿方法
CN103089266B (zh) * 2012-12-18 2014-12-10 鞍钢集团矿业公司 露天转地下过渡期无底柱分段空场崩落采矿方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105673012A (zh) * 2016-01-02 2016-06-15 武汉科技大学 一种采充结合连续开采的阶段矿房采矿法
CN105673012B (zh) * 2016-01-02 2018-08-21 武汉科技大学 一种采充结合连续开采的阶段矿房采矿法
CN105863640A (zh) * 2016-04-05 2016-08-17 武汉科技大学 一种保安矿柱和同水平矿体同步开采的联合采矿法
CN108825238A (zh) * 2018-05-31 2018-11-16 西北矿冶研究院 一种由无底柱分段崩落采矿法转分段空场采矿法的方法
CN114000882A (zh) * 2021-11-03 2022-02-01 金川集团股份有限公司 一种同一采区崩落法与充填法协同开采方法

Also Published As

Publication number Publication date
CN103557029B (zh) 2015-09-30

Similar Documents

Publication Publication Date Title
CN102080526B (zh) 地面煤层顶板顺层水平压裂井抽采瓦斯方法
CN103557002B (zh) 一种盘区机械化集中溜井上向水平分层充填采矿法
CN105240013B (zh) 长壁开采n00工法
CN103498696B (zh) 一种从顶板巷道注浆充填压实采空区充填体的方法
CN104632219B (zh) 厚煤层大采高沿空留巷方法
CN103821515B (zh) 一种对拉工作面充填采煤工艺
CN104314570B (zh) 长厚矿体挂帮矿回收及露天转地下过渡期的开采方法
CN103590830B (zh) 多矿体露天地下时空同步开采方法
CN103967493B (zh) 一种缓倾斜薄矿体矿柱采矿法
CN101824985B (zh) 煤矿保护煤柱的无煤柱开采方法
CN103758560B (zh) 一种多重递进保护层分组区域瓦斯治理方法
CN104712358A (zh) 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法
CN103147761A (zh) 一种缓倾斜松软顶板薄矿床充填采矿方法
CN103557029B (zh) 一种由无底柱分段崩落法向上向水平分层充填法过渡的方法
WO2016086602A1 (zh) 一种近距煤层群保水开采方法
CN104088640B (zh) 一种深部矿体采充空间隔离的采矿法
CN105178962A (zh) 长壁开采110工法
CN103161492A (zh) 一种基于上覆岩层裂隙壳的瓦斯抽采钻孔布置方法
CN103498680A (zh) 提高综放工作面初采期间顶煤回收率的方法
CN103982137A (zh) 一种煤矿井下水力压裂钻孔方位角设计方法
CN106089292A (zh) 一种高瓦斯煤层大直径控制孔导控水力压裂增透消突方法
CN103953346A (zh) 一种无煤柱开采方法
CN107939401A (zh) 一种特厚煤层分层间隔充填采煤方法
CN104343453A (zh) 一种缓倾斜中厚矿床充填采矿方法
CN109915144B (zh) 一种大倾角分叉煤层综放转综采连续推进开采方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20161121

CF01 Termination of patent right due to non-payment of annual fee