CN103546356A - 一种控制通讯补偿方法 - Google Patents

一种控制通讯补偿方法 Download PDF

Info

Publication number
CN103546356A
CN103546356A CN201310470144.9A CN201310470144A CN103546356A CN 103546356 A CN103546356 A CN 103546356A CN 201310470144 A CN201310470144 A CN 201310470144A CN 103546356 A CN103546356 A CN 103546356A
Authority
CN
China
Prior art keywords
communication
bus
compensation
main control
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310470144.9A
Other languages
English (en)
Inventor
章伟杰
李杨
张文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Power Equipment Research Institute Co Ltd
Original Assignee
Shanghai Power Equipment Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Power Equipment Research Institute Co Ltd filed Critical Shanghai Power Equipment Research Institute Co Ltd
Priority to CN201310470144.9A priority Critical patent/CN103546356A/zh
Publication of CN103546356A publication Critical patent/CN103546356A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Multi Processors (AREA)

Abstract

本发明涉及一种控制通讯补偿方法,其步骤为:将主控设备与被控设备通过通讯控制总线相连,其特征在于:在主控设备与被控设备上均多扩展一个通讯补偿接口,增加一条与通讯控制总线同类型的通讯补偿总线;将主控设备与被控设备的通讯补偿接口接入通讯补偿总线,所有主控设备和被控设备均增加作为通讯补偿总线使用的通讯控制器和通讯收发器。本发明的优点是:尽可能大地保证在一个通讯周期内数据的正确性,避免由于通讯帧出错造成数据的延迟以至于影响控制系统的实时性。

Description

一种控制通讯补偿方法
技术领域
本发明涉及一种控制通讯补偿技术,用于提高工业过程控制通讯总线的实时性,属于自动控制仪表技术领域。
背景技术
传统的分散控制系统(DCS)或者可编程控制器(PLC)在控制通讯总线上无论是采用自身专用的通讯协议,或者采用满足IEEE802.3等规约为基础的通讯协议,或者采用现成国际通用的现场总线协议(如ProfiBUS DP、ModBus、CAN、FF等),由于控制通讯总线在实际应用上会挂接相当多的被通讯设备(IO卡件),同时它还有可能离柜设计,甚至处于多干扰源的恶劣环境(如与动力电源布置在一起),虽然大部分控制通讯总线在设计时为减少干扰的概率而在通讯数据包校核上采取很多措施,但仍然无法避免该帧通讯的失败,因此造成残余数据错误的概率大幅度提高。
通常地,在总线无硬件故障情况下,局部数据包的出错会被扔掉,而保持上一次通讯成功的数据包,如果同一被通讯设备的数据包连续多次通讯故障会被判定为该被通讯设备故障,对于冗余的分散控制系统(DCS)或者可编程控制器(PLC)有可能整体判定该总线有故障而切换到备用总线。这就是传统的通讯帧出错的判断机理。
而工业过程控制尤其作为保护系统使用时要求控制过程非常快(几毫秒到几百毫秒),而每次的通讯帧出错的判断机理意味着挂在该被通讯设备上的相关的控制监视对象要延迟一个周期,使控制系统的实时性降低。
发明内容
本发明要解决的技术问题是尽可能弥补无硬件故障的单一通讯帧出错造成控制系统实时性的降低。
为了解决上述技术问题,本发明的技术方案是提供了一种控制通讯补偿方法,其步骤为:
步骤1、将主控设备与被控设备通过通讯控制总线相连,其特征在于:
步骤2、在主控设备与被控设备上均多扩展一个通讯补偿接口,增加一条与通讯控制总线同类型的通讯补偿总线;
步骤3、将主控设备与被控设备的通讯补偿接口接入通讯补偿总线,所有主控设备和被控设备均增加作为通讯补偿总线使用的通讯控制器和通讯收发器;
步骤4、在所述主控设备与所述被控设备通讯过程中,若局部数据包的通讯帧出错时,则启动通讯补偿总线,主控设备通过通讯补偿总线再次获取此局部数据包后,通过定位插值的方法将原整体数据包进行恢复,使整个通讯过程在一个周期内无故障地完成。
优选地,所述主控设备采用单个控制处理器,控制处理器接入所述通讯补偿总线。
优选地,所述主控设备采用两个控制处理器,所有控制处理器均接入所述通讯补偿总线。
优选地,所述主控设备采用三个控制处理器,所有控制处理器均接入所述通讯补偿总线。
本发明的优点是:尽可能大地保证在一个通讯周期内数据的正确性,避免由于通讯帧出错造成数据的延迟以至于影响控制系统的实时性。
附图说明
图1为单机系统的一补一通讯补偿方法示意图;
图2为双机容错系统的一补二通讯补偿方法示意图;
图3为三机容错系统的一补三通讯补偿方法示意图;
图4通讯补偿过程的简易程序流程图。
具体实施方式
为使本发明更明显易懂,兹以优选实施例,并配合附图作详细说明如下。
本发明提供了一种控制通讯补偿方法,其步骤为:
步骤1、将主控设备与被控设备通过通讯控制总线相连;
步骤2、在主控设备与被控设备上均多扩展一个通讯补偿接口,增加一条与通讯控制总线同类型的通讯补偿总线;
步骤3、将主控设备与被控设备的通讯补偿接口接入通讯补偿总线,所有主控设备和被控设备均增加作为通讯补偿总线使用的通讯控制器和通讯收发器;
结合图4,步骤4、在所述主控设备与所述被控设备通讯过程中,若整体数据包中的局部数据包的通讯帧出错时,则启动通讯补偿总线,主控设备通过通讯补偿总线再次获取此局部数据包后,通过定位插值的方法将原整体数据包进行恢复,使整个通讯过程在一个周期内无故障地完成。
若主控设备采用单个控制处理器,则采用的是如图1所示的一补一的通讯补偿方法,控制处理器接入所述通讯补偿总线。
若主控设备采用两个控制处理器,则采用的是如图2所示的一补二的通讯补偿方法,所有控制处理器均接入所述通讯补偿总线。
若主控设备采用三个控制处理器,则采用的是如图3所示的一补三的通讯补偿方法,所有控制处理器均接入所述通讯补偿总线。

Claims (4)

1.一种控制通讯补偿方法,其步骤为:
步骤1、将主控设备与被控设备通过通讯控制总线相连,其特征在于:
步骤2、在主控设备与被控设备上均多扩展一个通讯补偿接口,增加一条与通讯控制总线同类型的通讯补偿总线;
步骤3、将主控设备与被控设备的通讯补偿接口接入通讯补偿总线,所有主控设备和被控设备均增加作为通讯补偿总线使用的通讯控制器和通讯收发器;
步骤4、在所述主控设备与所述被控设备通讯过程中,若整体数据包中的局部数据包的通讯帧出错时,则启动通讯补偿总线,主控设备通过通讯补偿总线再次获取此局部数据包后,通过定位插值的方法将原整体数据包进行恢复,使整个通讯过程在一个周期内无故障地完成。
2.如权利要求1所述的一种控制通讯补偿方法,其特征在于:所述主控设备采用单个控制处理器,控制处理器接入所述通讯补偿总线。
3.如权利要求1所述的一种控制通讯补偿方法,其特征在于:所述主控设备采用两个控制处理器,所有控制处理器均接入所述通讯补偿总线。
4.如权利要求1所述的一种控制通讯补偿方法,其特征在于:所述主控设备采用三个控制处理器,所有控制处理器均接入所述通讯补偿总线。
CN201310470144.9A 2013-10-10 2013-10-10 一种控制通讯补偿方法 Pending CN103546356A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310470144.9A CN103546356A (zh) 2013-10-10 2013-10-10 一种控制通讯补偿方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310470144.9A CN103546356A (zh) 2013-10-10 2013-10-10 一种控制通讯补偿方法

Publications (1)

Publication Number Publication Date
CN103546356A true CN103546356A (zh) 2014-01-29

Family

ID=49969431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310470144.9A Pending CN103546356A (zh) 2013-10-10 2013-10-10 一种控制通讯补偿方法

Country Status (1)

Country Link
CN (1) CN103546356A (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1423198A (zh) * 2001-11-29 2003-06-11 三星电子株式会社 用于有效地补偿故障信号线的数据总线装置和控制方法
CN101123487A (zh) * 2007-09-29 2008-02-13 航天东方红卫星有限公司 一种星上网络总线冗余备份的实现方法
CN101631057A (zh) * 2009-08-17 2010-01-20 北京航空航天大学 一种双余度can总线的网络控制方法
CN101807076A (zh) * 2010-05-26 2010-08-18 哈尔滨工业大学 基于profibus现场总线的具有协同热备份功能的双模冗余容错高可靠控制系统
CN101908974A (zh) * 2010-07-16 2010-12-08 北京航天发射技术研究所 Can总线双冗余热切换系统及热切换方法
CN101917317A (zh) * 2010-02-11 2010-12-15 深圳市国微电子股份有限公司 一种数据发送、接收装置及高速总线终端接口组件
CN102122157A (zh) * 2010-12-27 2011-07-13 北京建龙重工集团有限公司 保持原系统功能和性能的冗余架构控制系统和方法
CN102447603A (zh) * 2012-02-08 2012-05-09 浙江中控技术股份有限公司 基于链路状态在线实时诊断的总线冗余方法和系统
WO2013052886A2 (en) * 2011-10-05 2013-04-11 Analog Devices, Inc. Two-wire communication system for high-speed data and power distribution

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1423198A (zh) * 2001-11-29 2003-06-11 三星电子株式会社 用于有效地补偿故障信号线的数据总线装置和控制方法
CN101123487A (zh) * 2007-09-29 2008-02-13 航天东方红卫星有限公司 一种星上网络总线冗余备份的实现方法
CN101631057A (zh) * 2009-08-17 2010-01-20 北京航空航天大学 一种双余度can总线的网络控制方法
CN101917317A (zh) * 2010-02-11 2010-12-15 深圳市国微电子股份有限公司 一种数据发送、接收装置及高速总线终端接口组件
CN101807076A (zh) * 2010-05-26 2010-08-18 哈尔滨工业大学 基于profibus现场总线的具有协同热备份功能的双模冗余容错高可靠控制系统
CN101908974A (zh) * 2010-07-16 2010-12-08 北京航天发射技术研究所 Can总线双冗余热切换系统及热切换方法
CN102122157A (zh) * 2010-12-27 2011-07-13 北京建龙重工集团有限公司 保持原系统功能和性能的冗余架构控制系统和方法
WO2013052886A2 (en) * 2011-10-05 2013-04-11 Analog Devices, Inc. Two-wire communication system for high-speed data and power distribution
CN102447603A (zh) * 2012-02-08 2012-05-09 浙江中控技术股份有限公司 基于链路状态在线实时诊断的总线冗余方法和系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
莫传孟: "基于MB90F543微控制器的双CAN冗余设计", 《新器件新技术》 *

Similar Documents

Publication Publication Date Title
CN103455005B (zh) 一种控制器冗余及切换方法
CN106647613B (zh) 基于mac的plc双机冗余方法及系统
EP2490124B1 (en) Dual redundant process controller
CN104570721B (zh) 冗余控制器主从状态确定方法
US20130274900A1 (en) Alternative synchronization connections between redundant control devices
CN110879565A (zh) 双机冗余控制系统及其冗余控制/故障监测方法和装置
US11487265B2 (en) Systems and methods for simultaneous control of safety-critical and non-safety-critical processes in automation systems using master-minion functionality
US11281190B2 (en) Method for setting up a redundant communication connection, and failsafe control unit
CN107666415B (zh) Fc-ae-1553协议桥的优化方法和装置
CN104516306B (zh) 冗余的自动化系统
CN105306605B (zh) 一种双主机服务器系统
JP6265158B2 (ja) 電子機器
CN102724092A (zh) 一种Profibus-DP现场总线通信协议冗余主站
CN105334729A (zh) 铁路机务段信号控制中两台独立plc系统冗余切换方法
KR101499097B1 (ko) Mdws-600s 전용통신망과의 호환성을 갖는 데이터 게이트웨이 시스템
EP2629469A2 (en) Wireless gateway apparatus
CN104394018A (zh) 一种通信设备及主控板热备份中主备系统数据在线交换方法
CN116699964A (zh) 一种工业过程控制器冗余运行方法和系统
CN203455884U (zh) 一种门禁冗余控制系统
CN102866698A (zh) 一种分布式控制系统控制器的hmi冗余通讯方法
CN203522780U (zh) 一种控制通讯补偿结构
CN103546356A (zh) 一种控制通讯补偿方法
CN116027705A (zh) 一种可编程控制器主备切换及数据同步系统和方法
US20180039248A1 (en) Programmable logic controller, slave device, and duplex system
US20240146577A1 (en) Multifunctional network switch for use in a process-controlling automation system, and such a process-controlling automation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140129