CN103544571A - 一种系统工作流程异常监测方法 - Google Patents

一种系统工作流程异常监测方法 Download PDF

Info

Publication number
CN103544571A
CN103544571A CN201310529168.7A CN201310529168A CN103544571A CN 103544571 A CN103544571 A CN 103544571A CN 201310529168 A CN201310529168 A CN 201310529168A CN 103544571 A CN103544571 A CN 103544571A
Authority
CN
China
Prior art keywords
monitoring system
configuration
workflow
working
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310529168.7A
Other languages
English (en)
Inventor
郑安刚
陈昊
巫钟兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID METERING CENTER
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201310529168.7A priority Critical patent/CN103544571A/zh
Publication of CN103544571A publication Critical patent/CN103544571A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及一种系统工作流程异常监测方法,所述方法包括(1)构建组态监测系统;(2)将工作流程预设规则到组态监测系统中;(3)服务器获取设备管理系统中工作流程目前所处环节;(4)服务器将环节信息及工作流程推送给组态监测系统;(5)组态监测系统根据预设规则判断是否异常。本发明工作流程的异常判断由服务器端转移到了客户端,避免了服务器端及设备管理系统受到干扰时无法判断环节是否正常的风险,而且由于客户端组态监测系统规则可定义,可适应灵活多变的业务流程。

Description

一种系统工作流程异常监测方法
技术领域
本发明属于监测技术,具体讲涉及一种系统工作流程异常监测方法。
背景技术
在业务应用系统中,往往存在众多的工作流程,如在自动化仓储系统中,出库任务的工作流程包括确定货物位置、巷道机运行到货物位置处、巷道机将货物从货架上取出、巷道机将货物送到流水线上、流水线将货物按照一定的路径送到出口等多个环节。而且,这些环节一般来说还需要在客户PC上进行监控。根据不同的出库任务,某些环节可以精简或环节的顺序可能不同。在这种情况下,如何有效地监测工作流程是否正常是极为重要的。
目前的工作流程监测方法是实时采集工作流程所处的环节,或任务进入各环节时由各环节自行上报,然后在客户端PC上进行展视。这种监测方法仅具备展示功能,而不具备发现异常功能,仅能如实地反映目前工作流程所处的环节,至于说当前的环节是否是流程规定的环节则无法确定。
发明内容
针对现有技术的不足,本发明提供一种系统工作流程异常监测方法,本发明利用在组态中设定规则的方法来对工作流程进行展示及异常监测,并根据规则来确定工作流程是否正常。
组态软件,又称组态监控软件。译自英文SCADA,即Supervisory Control and DataAcquisition(数据采集与监视控制)。它是指一些数据采集与过程控制的专用软件。它们处在自动控制系统监控层一级的软件平台和开发环境,使用灵活的组态方式,为用户提供快速构建工业自动控制系统监控功能的、通用层次的软件工具。
“组态(Configure)”的含义是“配置”、“设定”、“设置”等意思,是指用户通过类似“搭积木”的简单方式来完成自己所需要的软件功能,而不需要编写计算机程序,也就是所谓的“组态”。“监控(Supervisory Control)”,即“监视和控制”,是指通过计算机信号对自动化设备或过程进行监视、控制和管理。
本发明的目的是采用下述技术方案实现的:
一种系统工作流程异常监测方法,其改进之处在于,所述方法包括
(1)构建组态监测系统;
(2)将工作流程预设规则到组态监测系统中;
(3)服务器获取设备管理系统中工作流程目前所处环节;
(4)服务器将环节信息及工作流程推送给组态监测系统;
(5)组态监测系统根据预设规则判断是否异常。
优选的,所述步骤(1)包括通过组态软件平台构建组态监测系统。
优选的,所述步骤(2)包括根据不同的工作流程设定不同的流程规则保存于组态监测系统中。
优选的,所述步骤(3)包括服务器每隔一段时间从设备管理系统中获取当前工作流程并判断所处环节。
优选的,所述步骤(4)包括服务器在工作流程执行过程中将执行的工作流程及目前的环节发送至组态监测系统。
优选的,所述步骤(5)包括组态监测系统根据获取的环节状态及工作流程并结合针对这一工作流程制定的规则判断当前工作流程是否正常。
优选的,所述步骤(5)包括判断结果给出正常或不正常提示;正常则返回步骤(3);不正常则报警。
与现有技术比,本发明的有益效果为:
1、本发明客户端的监测不仅仅具有展示功能,还具有监测工作流程是否异常的功能。
2、本发明异常的发现并非是由服务器告知的,而是由监测客户端自行主动发现的。
3、本发明工作流程的异常判断由服务器端转移到了客户端,避免了服务器端及设备管理系统受到干扰时无法判断环节是否正常的风险。
4、本发明由于客户端组态监测系统规则可定义,可适应灵活多变的业务流程和业务规则。
附图说明
图1为本发明提供一种系统工作流程异常监测方法的流程图。
图2为本发明提供的一种系统工作流程异常监测方法结构图。
具体实施方式
实施例
本发明的结构图如附图2所示,本发明包括有任务执行机构、任务控制机构和任务监测机构。
下面结合附图1对本发明进行具体描述。
(1)构建组态监测系统。
以计量设备仓储管理系统为例,通过组态软件平台构建专用的组态监测系统;
(2)将工作流程规则设定到上一步构建的组态监测系统中。
以出库工作为例,出库工作环节包括:
a、确定货物位置;
b、巷道机运行到货物位置处;
c、巷道机将货物从货架上取出;
d、巷道机将货物送到流水线上;
e、流水线将货物按照一定的路径送到出口等。
假定这些工作环节顺序为a->b->c->d->e,另外,在环节e,流水线的路径假设为p1->p2->p3。
将上述规则存入到构建的组态中。
(3)服务器获取工作流程目前所处环节。
假定目前服务器启动了一个出库任务,开始进行第一个环节a,服务器通过设备管理系统获取需出库的货物位置,后续环节b、c、d、e则交给设备管理系统执行,服务器每隔一段时间从设备管理系统中获取一次巷道机、货物等的位置;
(4)服务器将环节信息及工作流程推送给组态监测系统。
服务器获取到巷道机、货物等的位置后,判断处在哪一个环节。并将判断出的环节信息推送到客户端的组态监测系统中;
(5)组态监测系统根据预设规则判断是否异常。
由于设备管理系统执行任务可能受到干扰或出错,而有些错误是设备管理系统无法判断的,服务器收到这些信息后如实地反映到客户端组态监测系统,组态监测系统除了展示目前工作流程所处的环节处,还可根据预先设定的规则进行判断,确定工作流程是否存在异常。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。

Claims (7)

1.一种系统工作流程异常监测方法,其特征在于,所述方法包括
(1)构建组态监测系统;
(2)将工作流程预设规则到组态监测系统中;
(3)服务器获取设备管理系统中工作流程目前所处环节;
(4)服务器将环节信息及工作流程推送给组态监测系统;
(5)组态监测系统根据预设规则判断是否异常。
2.如权利要求1所述的一种系统工作流程异常监测方法,其特征在于,所述步骤(1)包括通过组态软件平台构建组态监测系统。
3.如权利要求1所述的一种系统工作流程异常监测方法,其特征在于,所述步骤(2)包括根据不同的工作流程设定不同的流程规则保存于组态监测系统中。
4.如权利要求1所述的一种系统工作流程异常监测方法,其特征在于,所述步骤(3)包括服务器每隔一段时间从设备管理系统中获取当前工作流程并判断所处环节。
5.如权利要求1所述的一种系统工作流程异常监测方法,其特征在于,所述步骤(4)包括服务器在工作流程执行过程中将执行的工作流程及目前的环节发送至组态监测系统。
6.如权利要求1所述的一种系统工作流程异常监测方法,其特征在于,所述步骤(5)包括组态监测系统根据获取的环节状态及工作流程并结合针对这一工作流程制定的规则判断当前工作流程是否正常。
7.如权利要求1所述的一种系统工作流程异常监测方法,其特征在于,所述步骤(5)包括判断结果给出正常或不正常提示;正常则返回步骤(3);不正常则报警。
CN201310529168.7A 2013-10-31 2013-10-31 一种系统工作流程异常监测方法 Pending CN103544571A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310529168.7A CN103544571A (zh) 2013-10-31 2013-10-31 一种系统工作流程异常监测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310529168.7A CN103544571A (zh) 2013-10-31 2013-10-31 一种系统工作流程异常监测方法

Publications (1)

Publication Number Publication Date
CN103544571A true CN103544571A (zh) 2014-01-29

Family

ID=49968004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310529168.7A Pending CN103544571A (zh) 2013-10-31 2013-10-31 一种系统工作流程异常监测方法

Country Status (1)

Country Link
CN (1) CN103544571A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378273A (zh) * 2019-07-12 2019-10-25 深圳前海微众银行股份有限公司 一种监测作业流程的方法和装置
CN114852575A (zh) * 2022-05-31 2022-08-05 三一汽车制造有限公司 一种立库、用于立库的物料出库方法及装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004017698A1 (de) * 2004-04-10 2005-11-10 Abb Patent Gmbh SCADA-System
CN101201593A (zh) * 2007-11-08 2008-06-18 浙江中控技术股份有限公司 一种组态方法及控制系统
CN101393442A (zh) * 2008-10-24 2009-03-25 南京分析仪器厂有限公司 一种基于opc通讯技术的cems监控方法
CN101989087A (zh) * 2010-09-26 2011-03-23 中国石油化工股份有限公司 工业化加工渣油的在线实时故障监测与诊断的系统装置
CN102059256A (zh) * 2010-11-26 2011-05-18 首钢总公司 一种用于高线轧机的设备运行和工艺量状态监测系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004017698A1 (de) * 2004-04-10 2005-11-10 Abb Patent Gmbh SCADA-System
CN101201593A (zh) * 2007-11-08 2008-06-18 浙江中控技术股份有限公司 一种组态方法及控制系统
CN101393442A (zh) * 2008-10-24 2009-03-25 南京分析仪器厂有限公司 一种基于opc通讯技术的cems监控方法
CN101989087A (zh) * 2010-09-26 2011-03-23 中国石油化工股份有限公司 工业化加工渣油的在线实时故障监测与诊断的系统装置
CN102059256A (zh) * 2010-11-26 2011-05-18 首钢总公司 一种用于高线轧机的设备运行和工艺量状态监测系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张国辉: "可重构远程诊断系统理论与技术研究", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 *
王春生: "基于组态王的MPS监控系统设计", 《电气技术与自动化》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378273A (zh) * 2019-07-12 2019-10-25 深圳前海微众银行股份有限公司 一种监测作业流程的方法和装置
CN114852575A (zh) * 2022-05-31 2022-08-05 三一汽车制造有限公司 一种立库、用于立库的物料出库方法及装置
CN114852575B (zh) * 2022-05-31 2023-10-17 三一汽车制造有限公司 一种立库、用于立库的物料出库方法及装置

Similar Documents

Publication Publication Date Title
JP7561176B2 (ja) プロセス制御資産管理システム内のプロジェクト
CN107272608B (zh) 云平台中的工业设备和系统证明
US9043263B2 (en) Systems and methods for control reliability operations using TMR
US9507336B2 (en) Apparatus and method for determining an aggregate control connection status of a field device in a process control system
US9218233B2 (en) Systems and methods for control reliability operations
EP2801934A1 (en) Remote assistance via a cloud platform for industrial automation
US9031681B2 (en) System and method for controlling the operations of a manufacturing facility
EP3437256A1 (en) Fog computing facilitated flexible factory
US11500348B2 (en) System and method for improved power utilization in hart field instrument transmitters to support bluetooth low energy
JP2021026755A (ja) 産業用コントローラのデータ完全性を保証するためのaiの使用
US20220057788A1 (en) End to end smart manufacturing architecture for operational efficiency and quality control
Lewis et al. Maintenance of mobile mine equipment in the information age
CN109299789A (zh) 设备点检方法及装置
CN103544571A (zh) 一种系统工作流程异常监测方法
KR101692470B1 (ko) 원자력 발전소 엔지니어링 프로세스 이행 통합 장치 및 그 방법
EP3686821B1 (en) Industrial machine management system, method for managing industrial machine, and program
US9779610B2 (en) Automated loop check for smart junction boxes
US11675347B2 (en) Industrial machine monitoring device
US20190129387A1 (en) Slicing and merging production events
US10235447B2 (en) Method and system for co-operative intelligent HMIs for effective process operations
CN202748648U (zh) 工业生产库区钢卷实时监测系统
US20240054425A1 (en) Methods and systems for real-time recommendations for optimized operations
EP4322086A1 (en) Methods and systems for real-time recommendations for optimized operations
CN110322136B (zh) 一种发布/订阅分布式系统健康度评价方法
CN202404416U (zh) 用于控制工业制造过程的系统和控制程序

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA ELECTRIC POWER RESEARCH INSTITUTE STATE GRID

Free format text: FORMER OWNER: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20150109

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150109

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Metering Center

Applicant after: State Grid Zhejiang Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: China Electric Power Research Institute

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140129