CN103542836B - 一种测量地铁车站控制点沉降变形的方法 - Google Patents
一种测量地铁车站控制点沉降变形的方法 Download PDFInfo
- Publication number
- CN103542836B CN103542836B CN201310554870.9A CN201310554870A CN103542836B CN 103542836 B CN103542836 B CN 103542836B CN 201310554870 A CN201310554870 A CN 201310554870A CN 103542836 B CN103542836 B CN 103542836B
- Authority
- CN
- China
- Prior art keywords
- elevation
- subway station
- survey
- vertical shaft
- leveling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 238000005259 measurement Methods 0.000 claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 230000005540 biological transmission Effects 0.000 claims description 4
- 238000003556 assay Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000004062 sedimentation Methods 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
Abstract
本发明公开了一种测量地铁车站控制点沉降变形的方法,包含:首先进行竖井高程联系测量;其次以地铁车站两侧竖井经联系测量的地下水准控制点为起始点,布设经过地铁车站水准点的附合水准路线,并按二等水准技术要求进行测量;最后在附合水准路线各项预设误差满足要求后,将附合水准路线测量数据输入测量平差软件进行平差,解算出地铁车站内水准控制点的高程。本发明的有益效果在于:本发明是能够有效解决车站底板控制点沉降变形测量的问题;本发明最大优点是得到的井下控制起算点精度高、操作简单,经两侧竖井进行高程附合测量有效的对水准控制点进行检核,为铺轨施工的条线调坡数据进行了可靠的数据保证。
Description
技术领域
本发明涉及一种地铁竖井联系测量方法,具体的说是涉及一种测量地铁车站控制点沉降变形的方法。
背景技术
地铁车站施工多利用施工竖井进行高程联系测量,由于地铁车站基本施工完成,先期经高程联系测量传递的控制点可能存在沉降变形,特别是一些明挖地铁车站、地基不稳定的地铁车站,经过加上建材重量和回填土重量,一般都有一定程度的沉降变形,由于车站已经封顶,控制点无法再利用高程联系测量方法把地面控制点高程传递到车站控制点上,无法解决车站底板控制点沉降变形测量的问题。
发明内容
鉴于已有技术存在的缺陷,本发明的目的是要提供一种精度高、操作简单的基于高程联系测量的附合水准导线测量方法。
为了实现上述目的,本发明的技术方案:
一种测量地铁车站控制点沉降变形的方法,其特征在于:包含如下步骤:
ⅰ、竖井高程联系测量:
a.测定近井水准点高程地面近井水准路线,附和在地面二等水准点上;
b.采用在地铁车站两个竖井内悬挂钢尺的方法进行地铁车站高程传递测量:在地铁车站两侧竖井口分别悬挂经检定合格的钢尺,并在所述钢尺末端各悬挂质量相同的重锤,在两个竖井的地上和地下同时安置两台水准仪以及相应的水准尺同时进行读数测量;
c.传递高程每次独立观测三测回,测回间变动仪器高,进行竖井高程联系测量高差计算且测得地上、地下水准点间高差较差小于3mm;
ⅱ、以地铁车站两侧竖井经联系测量的地下水准控制点为起始点,布设经过地铁车站水准点的附合水准路线,并按二等水准技术要求进行测量;
ⅲ、在附合水准路线各项预设误差满足要求后,将附合水准路线测量数据输入到测量平差软件进行平差,解算出地铁车站内水准控制点的高程。
所述的竖井高程联系测量高差计算还应包括对地上与地下水准点控制点间高差进行温度、尺长改正,当井深超过50m时进行钢尺自重张力改正;
所述地下水准控制点为地铁竖井内和车站内的可见点。
与现有技术相比,本发明的有益效果:
本发明的有益效果在于:本发明是一种精度高、操作简单的基于高程联系测量的附合水准导线测量方法,能够有效解决车站底板控制点沉降变形测量的问题;本发明最大优点是得到的井下控制起算点精度高、操作简单,经两侧竖井进行高程附合测量有效的对水准控制点进行检核,为铺轨施工的条线调坡数据进行了可靠的数据保证。
附图说明
图1为本发明现有的高程联系测量方法的示意图。
图2为本发明地下附合导线示意图。
图中:1、钢尺,2、重锤,3、水准仪,4、水准尺。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图,对本发明进行进一步详细说明。
一种测量地铁车站控制点沉降变形的方法,其特征在于:包含如下步骤:
首先进行竖井高程联系测量,如图1:
a.测定近井水准点高程地面近井水准路线,附和在地面二等水准点上;
b.采用在地铁车站两个竖井内悬挂钢尺的方法进行地铁车站高程传递测量:在地铁车站两侧竖井口分别悬挂经检定合格的钢尺,并在所述钢尺末端各悬挂质量相同的重锤,在两个竖井的地上和地下同时安置两台水准仪以及相应的水准尺同时进行读数测量;
c.传递高程每次独立观测三测回,测回间变动仪器高,进行竖井高程联系测量高差计算且测得地上、地下水准点间高差较差小于3mm;并对地上与地下水准点控制点间高差进行温度、尺长改正,当井深超过50m时进行钢尺自重张力改正;
其次根据两侧竖井经联系测量传递高程的地下水准控制点(即传递高程测得的控制点)为起始点,布设经过地铁车站水准点的附合水准路线,并按二等水准技术要求进行测量,所述地下水准控制点为地铁竖井内和车站内的可见点;
最后在附合水准路线各项预设误差满足要求后,将附合水准路线测量数据输入测量平差软件进行平差,解算出地铁车站内水准控制点的高程。
以上所述测量方法与限差均执行《城市轨道交通工程测量规范》(50308-2008)。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。
Claims (2)
1.一种测量地铁车站控制点沉降变形的方法,其特征在于:包含如下步骤:
ⅰ、竖井高程联系测量:
a.测定近井水准点高程地面近井水准路线,附和在地面二等水准点上;
b.采用在地铁车站两个竖井内悬挂钢尺的方法进行地铁车站高程传递测量:在地铁车站两侧竖井口分别悬挂经检定合格的钢尺,并在所述钢尺末端各悬挂质量相同的重锤,在两个竖井的地上和地下同时安置两台水准仪以及相应的水准尺同时进行读数测量;
c.传递高程每次独立观测三测回,测回间变动仪器高,进行竖井高程联系测量高差计算且测得地上、地下水准点间高差较差小于3mm;所述的竖井高程联系测量高差计算还应包括对地上与地下水准点控制点间高差进行温度、尺长改正,当井深超过50m时进行钢尺自重张力改正;
ⅱ、以地铁车站两侧竖井经联系测量的地下水准控制点为起始点,布设经过地铁车站水准点的附合水准路线,并按二等水准技术要求进行测量;
ⅲ、在附合水准路线各项预设误差满足要求后,将附合水准路线测量数据输入到测量平差软件进行平差,解算出地铁车站内水准控制点的高程。
2.根据权利要求1所述的测量地铁车站控制点沉降变形的方法,其特征在于:所述地下水准控制点为地铁竖井内和车站内的可见点。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310554870.9A CN103542836B (zh) | 2013-11-07 | 2013-11-07 | 一种测量地铁车站控制点沉降变形的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310554870.9A CN103542836B (zh) | 2013-11-07 | 2013-11-07 | 一种测量地铁车站控制点沉降变形的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103542836A CN103542836A (zh) | 2014-01-29 |
CN103542836B true CN103542836B (zh) | 2015-09-30 |
Family
ID=49966530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310554870.9A Active CN103542836B (zh) | 2013-11-07 | 2013-11-07 | 一种测量地铁车站控制点沉降变形的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103542836B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110440751A (zh) * | 2019-07-25 | 2019-11-12 | 中国十七冶集团有限公司 | 一种深基坑高程传递设备及其使用方法 |
CN115540818B (zh) * | 2022-12-02 | 2023-03-24 | 北京建工集团有限责任公司 | 一种通过构件传递基点高程的地下空间高程测量方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101373132A (zh) * | 2008-09-24 | 2009-02-25 | 北京交通大学 | 一种利用激光远程测量路基沉降的装置与方法 |
CN101403613A (zh) * | 2008-10-30 | 2009-04-08 | 广州市设计院 | 一种高程测量的新方法 |
JP4652185B2 (ja) * | 2005-09-13 | 2011-03-16 | 東京瓦斯株式会社 | 地下埋設管の沈下量測定具 |
CN102168969A (zh) * | 2011-01-18 | 2011-08-31 | 河海大学 | 一种船闸闸室墙变形监测装置及监测方法 |
CN102506809A (zh) * | 2011-11-23 | 2012-06-20 | 中铁第一勘察设计院集团有限公司 | 高速铁路运营维护阶段结构变形观测与数据处理方法 |
CN103115605A (zh) * | 2013-01-31 | 2013-05-22 | 大连市勘察测绘研究院有限公司 | 一种基于联系三角形的地铁竖井定向测量方法 |
-
2013
- 2013-11-07 CN CN201310554870.9A patent/CN103542836B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4652185B2 (ja) * | 2005-09-13 | 2011-03-16 | 東京瓦斯株式会社 | 地下埋設管の沈下量測定具 |
CN101373132A (zh) * | 2008-09-24 | 2009-02-25 | 北京交通大学 | 一种利用激光远程测量路基沉降的装置与方法 |
CN101403613A (zh) * | 2008-10-30 | 2009-04-08 | 广州市设计院 | 一种高程测量的新方法 |
CN102168969A (zh) * | 2011-01-18 | 2011-08-31 | 河海大学 | 一种船闸闸室墙变形监测装置及监测方法 |
CN102506809A (zh) * | 2011-11-23 | 2012-06-20 | 中铁第一勘察设计院集团有限公司 | 高速铁路运营维护阶段结构变形观测与数据处理方法 |
CN103115605A (zh) * | 2013-01-31 | 2013-05-22 | 大连市勘察测绘研究院有限公司 | 一种基于联系三角形的地铁竖井定向测量方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103542836A (zh) | 2014-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101614127B (zh) | 盾构贯通施工中过江水准测量方法 | |
CN103898816B (zh) | 一种城市轨道精密控制网测量方法 | |
CN102778226B (zh) | 井下长距离巷道腰线标定方法 | |
CN106123776B (zh) | 一种顶管智能顶进测量系统以及测量方法 | |
CN103115605A (zh) | 一种基于联系三角形的地铁竖井定向测量方法 | |
CN102607516B (zh) | 测量核电工程中的基准的高程的方法 | |
CN206090317U (zh) | 高桥墩滑模施工垂直度控制装置 | |
CN102433827A (zh) | 一种试车场高速环道路面施工放样方法 | |
CN104251688A (zh) | 顶管工程中利用激光直线定向测量工法 | |
CN101592487A (zh) | 磁环式分层沉降水平测试系统 | |
CN103196417A (zh) | 采用双联系三角形进行竖井定向测量的方法 | |
CN105865416A (zh) | 一种用于沉降监测的水准尺悬挂式水准测量方法 | |
CN108253930A (zh) | 一种已运营越江地铁隧道长期变形监测方法 | |
CN103542836B (zh) | 一种测量地铁车站控制点沉降变形的方法 | |
CN102733273A (zh) | 一种近似平差调整轨道控制基标点方法 | |
CN103276644A (zh) | 基于轨道基桩控制网进行轨道交通接触网、轨测量方法 | |
CN105821727B (zh) | 一种cpⅲ平面网测量方法 | |
CN102967237A (zh) | 一种用于悬索桥主缆索股架设多功能测量仪 | |
CN204154307U (zh) | 一种地质沉降监测装置 | |
CN105821728B (zh) | 一种cpⅲ平面网测量系统 | |
CN104316029A (zh) | 一种地质沉降监测装置及监测方法 | |
CN105672070A (zh) | 一种既有线车站站内单排轨道控制网建网方法 | |
CN104006798B (zh) | 墩柱垂直度测量仪 | |
CN103759705A (zh) | 用于复合水准仪的三点闭合布设测量法 | |
CN103344214A (zh) | 一种1.6次抛物线型特大桥墩测量及墩身线形控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 116021 No. 1, Floor 2, No. 1, Floor 3, No. 1, Floor 4, No. 186 Shengli Road, Shahekou District, Dalian, Liaoning Patentee after: Dalian survey and Mapping Research Institute Group Co.,Ltd. Address before: 4-5/F, Jindihaijing, No. 188, Shengli Road, Shahekou District, Dalian City, Liaoning Province, 116000 Patentee before: DALIAN ACADEMY OF RECONNAISSANCE AND MAPPING Co.,Ltd. |
|
CP03 | Change of name, title or address |