掘进迎头片帮防护装置及掘进工作面迎头封闭的方法 Download PDFInfo
- Publication number
- CN103541749B CN103541749B CN201310511576.XA CN201310511576A CN103541749B CN 103541749 B CN103541749 B CN 103541749B CN 201310511576 A CN201310511576 A CN 201310511576A CN 103541749 B CN103541749 B CN 103541749B
- Authority
- CN
- China
- Prior art keywords
- head
- section
- type
- meeting
- falling wedge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种掘进迎头片帮防护装置及掘进工作面迎头封闭的方法,包括有倒楔式装置,倒楔式装置包括有一根长杆,长杆的一端倾斜削有一个斜面,长杆的另一端设有一个截面为梯形的凸起;采用锚杆及网片对迎头顶板至顶板以下1.5m范围内的矸石进行封闭加固,其中锚杆的一端设有圆锥型钢;爆破后,仔细观察迎头断面及顶板情况,进入工作面前首先要先敲帮问顶;根据迎头岩性情况在迎头断面布置适量的眼孔;眼孔布置好后在迎头断面铺上一层预先加工好的网片,并安装迎头断面倒楔式装置;最后迎头打眼、装药,待药装好后把迎头倒楔式封闭装置卸掉。本发明的倒楔式装置可以循环利用,现场操作安全、方便、简单、实用。
Description
技术领域
本发明涉及深井软岩巷道掘进迎头片帮防治技术,具体涉及一种掘进迎头片帮防护装置及掘进工作面迎头封闭的方法。
背景技术
掘进工作面迎头最大的安全威胁除了加强顶板管理外,还需要对迎头裸露断面进行封闭,施工后迎头断面裸露出来,高度比较大,如果迎头正断面护帮效果不好,掉落矸石很容易砸伤施工人员。
发明内容
本发明提供一种掘进迎头片帮防护装置及掘进工作面迎头封闭的方法,通过倒楔式装置封闭迎头断面,能有效的控制围岩脱落防止迎头断面片帮,为掘进工作面迎头安全施工提供了保障。
本发明采用的技术方案是:
掘进迎头片帮防护装置,其特征在于:包括有倒楔式装置,倒楔式装置包括有一根长杆,长杆的一端倾斜削有一个斜面,长杆的另一端设有一个截面为梯形的凸起。
利用掘进迎头片帮防护装置对掘进工作面迎头封闭的方法如下:
(1)采用锚杆及网片对迎头顶板至顶板以下1.5m范围内的矸石进行封闭加固,其中锚杆的一端设有圆锥型钢;
(2)爆破后,仔细观察迎头断面及顶板情况,进入工作面前首先要先敲帮问顶,找掉活矸、危岩;
(3)根据迎头岩性情况在迎头断面布置适量的眼孔,孔深一般在1.0m~1.5m;
(4)眼孔布置好后在迎头断面铺上一层预先加工好的网片,并安装迎头断面倒楔式装置;
(5)用大锤把倒楔式装置楔进眼孔内,使其更加牢固;
(6)最后迎头打眼、装药,待药装好后把迎头倒楔式封闭装置卸掉,这时就可以连线放炮,然后进入下一循环。
与已有技术相比,本发明有益效果体现在:
原老式掘进工作面迎头封闭方法为:直接采用等强螺纹锚杆或超前管缝式锚杆进行封闭,一旦迎头采用这种方法封闭后,就无法进行拆除,放炮时迎头断面封闭装置全部被炮崩坏,造成浪费。
本发明的倒楔式装置可以循环利用,现场操作安全、方便、简单、实用;掘进巷道迎头断面岩石较为松软的现象,对迎头断面进行了超前加固措施,实施以来效果非常明显,确实能起到安全保护的作用。
附图说明
图1为本发明的掘进迎头片帮防护装置及锚杆的示意图。
图2为本发明的掘进迎头片帮防护装置的安装原理图。
具体实施方式
如图1所示,掘进迎头片帮防护装置,包括有倒楔式装置,倒楔式装置包括有一根长杆1,长杆1的一端倾斜削有一个斜面2,长杆1的另一端设有一个截面为梯形的凸起3。
如图1、2所示,利用掘进迎头片帮防护装置对掘进工作面迎头封闭的方法如下:
(1)采用锚杆4及网片对迎头顶板至顶板以下1.5m范围内的矸石进行封闭加固,其中锚杆4的一端设有圆锥型钢5;
(2)爆破后,仔细观察迎头断面及顶板情况,进入工作面前首先要先敲帮问顶,找掉活矸、危岩;
(3)根据迎头岩性情况在迎头断面布置适量的眼孔,孔深一般在1.0m~1.5m;
(4)眼孔布置好后在迎头断面铺上一层预先加工好的网片6,并安装迎头断面倒楔式装置;
(5)用大锤把倒楔式装置楔进眼孔内,使其更加牢固;
(6)最后迎头打眼、装药,待药装好后把迎头倒楔式封闭装置卸掉,这时就可以连线放炮,然后进入下一循环。
管缝式锚杆每根25元,网片每片50元,锚杆盖板每个3元。每循环进尺0.7米,需要管缝式锚杆9根,网片2片,锚杆盖板9个。每循环花费超前支护材料费用为9×25+2×50+9×3=352元。每圆班三个循环共节约材料费用352×3=1056元。一个月节约材料费用1056×31=3.2736万元。一年节约的材料费用3.2736×12=39.2832万元。
改进后的倒楔式装置可以重复利用没有损耗。
Claims (1)
1.一种掘进工作面迎头封闭的方法,其特征在于,掘进迎头片帮防护装置,包括有倒楔式装置,倒楔式装置包括有一根长杆,长杆的一端倾斜削有一个斜面,长杆的另一端设有一个截面为梯形的凸起;
基于上述掘进迎头片帮防护装置的掘进工作面迎头封闭的方法包括以下步骤:
(1)采用锚杆及网片对迎头顶板至顶板以下1.5m范围内的矸石进行封闭加固,其中锚杆的一端设有圆锥型钢;
(2)爆破后,仔细观察迎头断面及顶板情况,进入工作面前首先要先敲帮问顶,找掉活矸、危岩;
(3)根据迎头岩性情况在迎头断面布置适量的眼孔,孔深在1.0m~1.5m;
(4)眼孔布置好后在迎头断面铺上一层预先加工好的网片,并安装迎头断面倒楔式装置;
(5)用大锤把倒楔式装置楔进眼孔内,使其更加牢固;
(6)最后迎头打眼、装药,待药装好后把迎头倒楔式封闭装置卸掉,这时就可以连线放炮,然后进入下一循环。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310511576.XA CN103541749B (zh) | 2013-10-25 | 2013-10-25 | 掘进迎头片帮防护装置及掘进工作面迎头封闭的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310511576.XA CN103541749B (zh) | 2013-10-25 | 2013-10-25 | 掘进迎头片帮防护装置及掘进工作面迎头封闭的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103541749A CN103541749A (zh) | 2014-01-29 |
CN103541749B true CN103541749B (zh) | 2016-03-02 |
Family
ID=49965560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310511576.XA Expired - Fee Related CN103541749B (zh) | 2013-10-25 | 2013-10-25 | 掘进迎头片帮防护装置及掘进工作面迎头封闭的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103541749B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112412506B (zh) * | 2020-11-20 | 2021-07-23 | 中国矿业大学 | 一种煤巷掘进迎头锚索支护的防冲方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2488571A (en) * | 2011-03-02 | 2012-09-05 | Powers Fasteners Europ Bv | Anchor bolt system |
CN103032085A (zh) * | 2012-12-11 | 2013-04-10 | 安徽恒源煤电股份有限公司 | 一种巷道迎头防片帮网使用施工工艺 |
CN203145969U (zh) * | 2013-03-13 | 2013-08-21 | 河南理工大学 | 一种巷道掘进迎头片帮防护装置 |
CN203559911U (zh) * | 2013-10-25 | 2014-04-23 | 安徽恒源煤电股份有限公司祁东煤矿 | 掘进迎头片帮防护装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10017761B4 (de) * | 2000-04-10 | 2013-03-28 | Hilti Aktiengesellschaft | Verwendung eines Rohrankers mit Profilierung |
-
2013
- 2013-10-25 CN CN201310511576.XA patent/CN103541749B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2488571A (en) * | 2011-03-02 | 2012-09-05 | Powers Fasteners Europ Bv | Anchor bolt system |
CN103032085A (zh) * | 2012-12-11 | 2013-04-10 | 安徽恒源煤电股份有限公司 | 一种巷道迎头防片帮网使用施工工艺 |
CN203145969U (zh) * | 2013-03-13 | 2013-08-21 | 河南理工大学 | 一种巷道掘进迎头片帮防护装置 |
CN203559911U (zh) * | 2013-10-25 | 2014-04-23 | 安徽恒源煤电股份有限公司祁东煤矿 | 掘进迎头片帮防护装置 |
Non-Patent Citations (1)
Title |
---|
深井软岩巷道掘进迎头片帮防治技术;王华;《安徽科技》;20101220(第12期);第50页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103541749A (zh) | 2014-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chen et al. | The current situation and prevention and control countermeasures for typical dynamic disasters in kilometer-deep mines in China | |
Zhou et al. | Methane drainage and utilization in coal mines with strong coal and gas outburst dangers: a case study in Luling mine, China | |
Gong et al. | Surrounding Rock Deformation Mechanism and Control Technology for Gob‐Side Entry Retaining with Fully Mechanized Gangue Backfilling Mining: A Case Study | |
CN103669369B (zh) | 基坑的支护结构及支护方法 | |
CN203939034U (zh) | 一种抗滑桩与锚索、锚固洞结合的边坡治理结构 | |
CN104278993A (zh) | 一种偏压隧道斜交进洞的施工方法 | |
Wang et al. | Reasonable coal pillar design and remote control mining technology for highwall residual coal resources | |
CN205116938U (zh) | 一种土木施工现场安全防护栏 | |
CN101749017B (zh) | 煤矿多巷掘进防突工艺 | |
Ren et al. | Proactive goaf inertisation for controlling longwall goaf heatings | |
CN103541749B (zh) | 掘进迎头片帮防护装置及掘进工作面迎头封闭的方法 | |
Ladinig et al. | Raise caving—a hybrid mining method addressing current deep cave mining challenges | |
CN203559911U (zh) | 掘进迎头片帮防护装置 | |
Wu et al. | Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydropower station | |
Zhou et al. | Conceptual site models for sinkhole formation and remediation | |
Wu et al. | Analysis of influence law of burial depth on surrounding rock deformation of roadway | |
CN207211158U (zh) | 装配式桩柱板墙基坑支护结构 | |
CN204849777U (zh) | 倾斜式压顶板双排桩支护结构 | |
CN206114063U (zh) | 一种地下水位监测装置 | |
CN204676569U (zh) | 一种岩质边坡较大危岩体的锚护结合处理结构 | |
CN203927685U (zh) | 一种一体式太阳能庭院灯 | |
KR20150006257A (ko) | 지주 구조물 설치를 위한 나선형 기초파일 | |
Orrego et al. | Undercutting method selection at Cadia East PC2-3 extension | |
CN104747229B (zh) | 低瓦斯矿井中高瓦斯区域掘进工作面的安全开采方法 | |
CN208545859U (zh) | 便于电缆敷设的地下车库顶板结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Kang Inventor after: Yang Lei Inventor after: Gao Yang Inventor after: Li Xia Inventor after: Wang Hua Inventor after: Zhu Guangsheng Inventor before: Wang Hua |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160302 Termination date: 20201025 |
|