CN103526828B - 外套结构梁柱节点和原结构梁柱节点连接结构的施工方法 - Google Patents

外套结构梁柱节点和原结构梁柱节点连接结构的施工方法 Download PDF

Info

Publication number
CN103526828B
CN103526828B CN201310476763.9A CN201310476763A CN103526828B CN 103526828 B CN103526828 B CN 103526828B CN 201310476763 A CN201310476763 A CN 201310476763A CN 103526828 B CN103526828 B CN 103526828B
Authority
CN
China
Prior art keywords
node
bean column
bearing
column node
resilient sleeper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310476763.9A
Other languages
English (en)
Other versions
CN103526828A (zh
Inventor
董有
鞠树森
杨黎明
潘沂华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Liancheng Construction Group Co., Ltd.
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310476763.9A priority Critical patent/CN103526828B/zh
Publication of CN103526828A publication Critical patent/CN103526828A/zh
Application granted granted Critical
Publication of CN103526828B publication Critical patent/CN103526828B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种外套结构梁柱节点和原结构梁柱节点连接结构的施工方法,属于抗震加固技术领域,包括加强节点、弹性垫板和定位块,所述加强节点由外套结构梁柱节点向原结构梁柱节点内扩形成,其与原结构梁柱节点之间预留有缝隙,所述缝隙内塞有弹性垫板,所述弹性垫板与原结构梁柱节点和加强节点压紧,在矩形加强节点和弹性垫板的下面有定位块,防止矩形加强节点和弹性垫板脱落。本发明连接形式结构简单,解决了外套结构梁柱节点和原结构梁柱节点连接处新旧建筑协同承担水平荷载的技术问题,可广泛应用于老旧建筑的加层改造。

Description

外套结构梁柱节点和原结构梁柱节点连接结构的施工方法
技术领域
本发明涉及一种外套结构梁柱节点和原结构梁柱节点连接结构的施工方法,属于抗震加固技术领域。
背景技术
随着城市规模的迅速扩大,土地的价值越来越高,老城区的一些建筑由于建筑年代较远,层数较低,土地无法充分利用,但由于绝大部分尚未达到使用年限,如果大规模拆除重建,必定造成大量的人力和财力的浪费。实际操作中,通常采用外套框架加层方案即在保持原有建筑不动的基础上,在其上进行加层,此技术方案由于新旧结构分离,能加层一般在三层以上,扩大了建筑面积,节约了用地。同时在加层加固过程中旧房可以正常使用,避免了大规模搬迁。只要结构处理得当,精心设计与施工,外套框架加层技术可取得显著的效果。
发明内容
本发明提供了一种外套结构梁柱节点和原结构梁柱节点连接结构的施工方法,要解决的是在原结构梁柱节点和外套结构梁柱节点连接处实现新旧建筑协同承担水平荷载,增强新旧建筑整体性的技术问题。通过外套结构梁柱节点内扩形成加强节点,将转角处的复杂连接转变为平面连接,在缝隙内填塞弹性垫板能够保证新、老结构之间的竖向相对位移基本不产生变形内力,待外套结构中的预应力筋张拉后,外套框架梁产生微小压缩变形,压紧弹性垫板即可实现新、老结构在水平方向的协同作用。
本发明的技术方案如下:
一种外套结构梁柱节点和原结构梁柱节点连接结构的施工方法,包括外套结构梁柱节点、原结构梁柱节点、加强节点、弹性垫板和定位块,所述加强节点由外套结构梁柱节点向原结构梁柱节点内扩形成,其与原结构梁柱节点之间预留有缝隙,所述缝隙内塞有弹性垫板,所述弹性垫板与原结构梁柱节点和加强节点压紧;在加强节点和弹性垫板的下面设置有定位块,所述定位块通过螺栓固定,其特征在于:具体施工方法如下:
步骤一:根据设计图纸要求,将套在原结构外的新加外套结构与原结构进行铰接连接完工后,且混凝土达到一定强度后,再进行外套结构梁柱节点和原结构梁柱节点的连接;
步骤二:在每个外套结构梁柱节点内,安装加强节点,将加强节点粘贴在外套结构梁柱节点内侧;
步骤三:将弹性垫板两面涂上胶,在外套结构梁柱节点内,至下而上将弹性垫板挤入加强节点和原结构梁柱节点之间的缝隙中;
步骤四:通过在原结构中植入螺栓,将定位块固定在加强节点和弹性垫板的下面,防止加强节点和弹性垫板脱落。
所述的弹性垫板为橡胶板、塑料板或聚氨酯板。
所述的定位块为橡胶块或塑料块。
所述的弹性垫板的面积不小于原结构梁柱节点端面的面积。
所述的加强节点的截面为外套结构梁柱节点向新加外套结构的外套结构梁下方扩大形成的矩形或向外套结构梁下方及两侧扩大形成的U型。
所述螺栓为两根。
有益效果:本发明很好的解决了原结构与外套框架在框架节点处的连接问题,对原结构无任何损伤,同时增加了原结构和外套结构的整体稳定性。通过将外套结构的梁柱节点向原结构梁柱节点内扩,将转角连接转化平面连接,而后在两者缝隙内填塞弹性垫板,从而实现水平荷载的协同承担,此连接结构,结构形式简单、经济合理、试验工程证明,实施效果明显。
附图说明
图1是外套结构梁柱节点和原结构梁柱节点的连接示意图
图2是外套结构梁柱节点和原结构梁柱节点的连接轴测图。
图中:1、弹性垫板;2、原结构梁柱节点;3、外套结构梁柱节点;4、加强节点;5、外套结构梁;6、定位块;7、螺栓。
具体实施方式
如图1-2所示,外套结构梁柱节点和原结构梁柱节点连接结构的施工方法,包括外套结构梁柱节点3、原结构梁柱节点2、矩形或U型加强节点4、弹性垫板1和定位块6,其中,加强节点4由外套结构梁柱节点3向原结构梁柱节点2内扩形成,其与原结构梁柱节点2之间预留有缝隙,所述缝隙内塞有弹性垫板1,弹性垫板1为橡胶板、塑料板或聚氨酯板,且弹性垫板1的面积不小于原结构梁柱节点2端面的面积。弹性垫板1与原结构梁柱节点2和加强节点4压紧,在加强节点4和弹性垫板1的下面设置有定位块6,定位块6为橡胶块或塑料块,所述定位块6通过两根螺栓7固定,其施工方法如下:
步骤一:根据设计图纸要求,将套在原结构外的新加外套结构与原结构进行铰接连接完工后,且混凝土达到一定强度后,再进行外套结构梁柱节点3和原结构梁柱节点2的连接;
步骤二:在每个外套结构梁柱节点3内,安装加强节点4,将加强节点4粘贴在外套结构梁柱节点3内侧;
步骤三:将弹性垫板1两面涂上胶,在外套结构梁柱节点3内,至下而上将弹性垫板1挤入加强节点4和原结构梁柱节点2之间的缝隙中;
步骤四:通过在原结构中植入螺栓7,将定位块6固定在加强节点4和弹性垫板1的下面,防止加强节点4和弹性垫板1脱落。
以上是本发明的一典型实施例,本发明的实施不限于此。

Claims (6)

1.一种外套结构梁柱节点和原结构梁柱节点连接结构的施工方法,包括外套结构梁柱节点(3)、原结构梁柱节点(2)、加强节点(4)、弹性垫板(1)和定位块(6),所述加强节点(4)由外套结构梁柱节点(3)向原结构梁柱节点(2)内扩形成,其与原结构梁柱节点(2)之间预留有缝隙,所述缝隙内塞有弹性垫板(1),所述弹性垫板(1)与原结构梁柱节点(2)和加强节点(4)压紧;在加强节点(4)和弹性垫板(1)的下面设置有定位块(6),所述定位块(6)通过螺栓(7)固定,其特征在于:具体施工方法如下:
步骤一:根据设计图纸要求,将套在原结构外的新加外套结构与原结构进行铰接连接完工后,且混凝土达到一定强度后,再进行外套结构梁柱节点(3)和原结构梁柱节点(2)的连接;
步骤二:在每个外套结构梁柱节点(3)内,安装加强节点(4),将加强节点(4)粘贴在外套结构梁柱节点(3)内侧;
步骤三:将弹性垫板(1)两面涂上胶,在外套结构梁柱节点(3)内,至下而上将弹性垫板(1)挤入加强节点(4)和原结构梁柱节点(2)之间的缝隙中;
步骤四:通过在原结构中植入螺栓(7),将定位块(6)固定在加强节点(4)和弹性垫板(1)的下面,防止加强节点(4)和弹性垫板(1)脱落。
2.根据权利要求1所述的方法,其特征在于:所述的弹性垫板(1)为橡胶板、塑料板或聚氨酯板。
3.根据权利要求1所述的方法,其特征在于:所述的定位块(6)为橡胶块或塑料块。
4.根据权利要求1所述的方法,其特征在于:所述的弹性垫板(1)的面积不小于原结构梁柱节点(2)端面的面积。
5.根据权利要求1所述的方法,其特征在于:所述的加强节点(4)的截面为外套结构梁柱节点(3)向外套结构梁(5)下方扩大形成的矩形或向外套结构梁(5)下方及两侧扩大形成的U型。
6.根据权利要求1所述的方法,其特征在于:所述螺栓(7)为两根。
CN201310476763.9A 2013-10-12 2013-10-12 外套结构梁柱节点和原结构梁柱节点连接结构的施工方法 Active CN103526828B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310476763.9A CN103526828B (zh) 2013-10-12 2013-10-12 外套结构梁柱节点和原结构梁柱节点连接结构的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310476763.9A CN103526828B (zh) 2013-10-12 2013-10-12 外套结构梁柱节点和原结构梁柱节点连接结构的施工方法

Publications (2)

Publication Number Publication Date
CN103526828A CN103526828A (zh) 2014-01-22
CN103526828B true CN103526828B (zh) 2016-01-20

Family

ID=49929148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310476763.9A Active CN103526828B (zh) 2013-10-12 2013-10-12 外套结构梁柱节点和原结构梁柱节点连接结构的施工方法

Country Status (1)

Country Link
CN (1) CN103526828B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672682A (zh) * 2016-01-11 2016-06-15 陆建衡 一种即有建筑增高与地下停车场更新改造结构
CN106284679B (zh) * 2016-10-10 2018-12-04 绍兴上虞霓虹科技有限公司 一种建筑用金属结点

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201581507U (zh) * 2009-12-30 2010-09-15 北京工业大学 钢结构梁柱抗连续倒塌加固节点
CN101979791A (zh) * 2010-12-02 2011-02-23 北京建工集团有限责任公司 环梁、环形牛腿柱劲性连接节点及其施工方法
CN202866318U (zh) * 2012-10-11 2013-04-10 北京筑福建设工程有限责任公司 外套结构梁柱节点和原结构梁柱节点的连接结构

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2972956B2 (ja) * 1990-05-31 1999-11-08 清水建設株式会社 柱と梁の接合工法およびその構造
JP2010255227A (ja) * 2009-04-22 2010-11-11 Kyoei Steel Ltd 柱梁接合構造、及び、鉄筋コンクリート部材

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201581507U (zh) * 2009-12-30 2010-09-15 北京工业大学 钢结构梁柱抗连续倒塌加固节点
CN101979791A (zh) * 2010-12-02 2011-02-23 北京建工集团有限责任公司 环梁、环形牛腿柱劲性连接节点及其施工方法
CN202866318U (zh) * 2012-10-11 2013-04-10 北京筑福建设工程有限责任公司 外套结构梁柱节点和原结构梁柱节点的连接结构

Also Published As

Publication number Publication date
CN103526828A (zh) 2014-01-22

Similar Documents

Publication Publication Date Title
CN103195085B (zh) 一种向下加层地下室及其建造方法
CN203174770U (zh) 预制柱与施工现场基座连接结构及建筑物
CN104452571B (zh) 一种现代竹人行桁架桥
CN103526828B (zh) 外套结构梁柱节点和原结构梁柱节点连接结构的施工方法
CN109339321A (zh) 一种便于施工的减震标准预制井格式楼板结构体系
CN207079626U (zh) 一种装配式地下管廊
CN110777950A (zh) 地下室汽车坡道出入口处封堵施工方法
CN204626235U (zh) 一种框架桥的拼接单元
CN202866318U (zh) 外套结构梁柱节点和原结构梁柱节点的连接结构
CN208563560U (zh) 平台型超高层建筑的结构体系
CN103437349B (zh) 钢筋混凝土灌注异形桩的施工方法
CN103924788B (zh) 既有建筑之间连接结构及施工方法
CN204491883U (zh) 一种装配式耗能钢板剪力墙
CN203429661U (zh) 向下加层地下室
CN203256756U (zh) 整体式桥台桥梁的预扩孔柔性桩结构
CN212248355U (zh) 一种管廊复杂节点处的变形缝结构
CN103643737B (zh) 预制钢筋混凝土构件组装成的多层立体框架
CN106545089A (zh) 一种穿斗式木构架抽柱空间拓展结构及其实施方法
CN206188271U (zh) 塔式起重机底架支撑压重结构
CN204081545U (zh) 一种既有混凝土柱与新增钢梁连接节点
RU2704408C1 (ru) Подземная мешковидная заполняющая конструкция для угольной шахты и способ ее использования
CN106907037A (zh) 悬挂式机械立体车库结构及其建造方法
CN204626231U (zh) 一种用于高填方区抗大变形的钢管混凝土箱型桥梁
CN103088829B (zh) 一种基坑中砼支撑的施工方法
CN202945827U (zh) 一种拼接游泳池

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Du Lihong

Inventor before: Dong You

Inventor before: Ju Shusen

Inventor before: Yang Liming

Inventor before: Pan Yihua

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171031

Address after: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee after: Beijing Yong Bo Science and Technology Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building

Patentee before: Beijing Aeido International Engineering Technology Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180718

Address after: 537100 the Guangxi Zhuang Autonomous Region Guigang City Gangnan District Jiangnan commercial city Guangxi Liancheng Construction Group Co., Ltd.

Patentee after: Guangxi Liancheng Construction Group Co., Ltd.

Address before: 102600 room 2212, 2 tower, Pope center 3, 2 Xinghua street, Daxing District, Beijing.

Patentee before: Beijing Yong Bo Science and Technology Ltd.