CN103510546A - 一种严冬下设备基础暖棚法防护施工方法 - Google Patents

一种严冬下设备基础暖棚法防护施工方法 Download PDF

Info

Publication number
CN103510546A
CN103510546A CN201210221356.9A CN201210221356A CN103510546A CN 103510546 A CN103510546 A CN 103510546A CN 201210221356 A CN201210221356 A CN 201210221356A CN 103510546 A CN103510546 A CN 103510546A
Authority
CN
China
Prior art keywords
brooder
equipment foundations
construction method
severe winter
structure platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201210221356.9A
Other languages
English (en)
Inventor
向继辉
门长根
李玲
战丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Original Assignee
CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd filed Critical CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Priority to CN201210221356.9A priority Critical patent/CN103510546A/zh
Publication of CN103510546A publication Critical patent/CN103510546A/zh
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

一种严冬下设备基础暖棚法防护施工方法,包括1)暖棚的构建,2)建议散热器的制作及供暖管道的铺设,3)散热器数量的确定,4)后期的组织管理。通过采用本方案达到在严冬的外界环境条件下,对设备基础的安全施工,操作简便,节约成本。

Description

一种严冬下设备基础暖棚法防护施工方法
技术领域
本发明涉及一种设备基础施工方法,尤其是一种严冬下设备基础暖棚法防护施工方法。
背景技术
根据《建筑工程冬期施工规程》(JG104-97)和其他相关规范的规定,在室外日平均气温连续5天稳定低于5℃即进入冬期施工。冬季施工面临两大问题:混凝土生产质量保证和浇筑混凝土的保温保湿防护,传统的混凝土保温保湿方法为草袋和麻袋覆盖其上及喷施温水。其弊端十分显著,首先是材料的浪费,其次是后期清理的不便,再次是保温效果差。
发明内容
为了解决传统方法面临的诸多问题,本发明提供了一种严冬下设备基础暖棚法防护施工方法。既减少了材料的浪费又解决了后续施工中面临的清理不便的问题,同时保温保湿效果良好。
 本发明解决其技术问题采用的技术方案是:一种严冬下设备基础暖棚法防护施工方法,包括以下步骤:
       1)封闭车间两侧通风井道维护墙下窗洞口,在1.00m的结构平台上覆盖帆布帐篷;
       2)在设备基础两侧安装简易散热器,铺设采暖管道;
       3)后期的组织管理;
通过以上步骤实现设备基础冬季施工的保温保湿。
 上述的暖棚设施内装有测温测湿装置,并安排有专人看护记录。
 上述的暖棚覆盖的帆布帐篷采用的是高密度聚乙烯帆布,且封闭覆盖使用双层。
 上述暖棚结构平台上的实施方法为:用悬索法对两侧1.0m结构平台的顶部,沿纵向每隔1.5m设置¢12—18钢筋锚固桩,从锚桩顶横向水平拉设¢4钢缆绳悬索,用以支承覆盖其上的帆布帐篷。帆布横向跨越基础的两个侧面,垂直落地并拉紧压实,由此形成具有4.6m净空高度的暖棚内施工条件。
 上述暖棚散热器的制作。现场自制简易型光面管散热器,材料选用D133×4钢管,4排散热管设计长5m,以并联形式焊制,组件高度1m。散热器支管连接采取异侧上进下出方式,出口处设置凝结水排放阀门。
  上述后期的组织管理包括一下几步:
       (1)重视测温工作。专人负责如实记录,规定测温间隔时间不超过4h,随时掌握棚内温度变化;
       (2)设平台下专用施工通道。严禁随意揭棚开口进料,按设定通道出入,做到施工有序;
       (3)加强防护维修工作。成立专职防护维修小组,实行24小时三班工作制,及时修复暖棚围护结构中破损帆布;及时排除采暖系统和供热蒸汽管道系统的故障等;
       (4)预备采暖炉临时预案。在遇抢修蒸汽采暖故障时,视棚内温度变化,随时补充焦炭炉临时热源,确保棚内所需温度。
本发明的有益效果是,通过温度湿度测量设备随时掌控暖棚内散热器的个数来调节暖棚内的温度、湿度以满足施工的要求,操作简便,可行性高 ,价格便宜。
附图说明
下边结合附图和实施例对本发明做进一步说明。
图1是设备基础及防护环境示意图。
图2是简易散热器示意图。
图3是采暖系统的平面布置图。
图中1.帆布封闭,2.帆布罩面及钢缆绳拉设,3.通风井道,4.进气管,5.出气管,6.排水阀门,7.散热器,8供热管道。
具体实施方式
 如图1所示暖棚是采用高密度聚乙烯帆布覆盖在结构平台上,并沿两侧垂直落地拉紧压实,构成暖棚。
单位暖棚耗热量的计算方法采用一般概算确定,按冷却面系数法计算:Q=M·K·Δt·α·V求的。现场自制简易型光面管散热器,材料选用D133×4钢管,4排散热管设计长5m,以并联形式焊制,组件高度1m。散热器支管连接采取异侧上进下出方式,出口处设置凝结水排放阀门。单个简易散热器(7)热负荷Q1=L·q,其中q为光面管散热器单位长度的散热量(W/m),现场采用0.2MPa高压蒸汽系统,查的q=767.5W/m。
散热器数量n的确定,由等式Q=n·Q1。采暖器平面布置,散热器安装既要均匀布置采暖,又要不妨碍棚内作业与通道交通,确定将15件散热器组成三个采暖控制系统,每5件为一组,呈三列沿设备基础的端部纵向对称布置;供热管道敷设,从现场热源处接入0.2MPa高压蒸汽热媒,敷设至车间内供热干管管线420m,经负荷计算选用干线管径DN80,入棚内支线管径DN50。设计进入车间内的两条干管线路各铺设在两侧1.00结构平台上,分别担负单元暖棚内一个采暖系统和两个采暖系统的供暖。对暴露户外干支供热管线,采用40mm厚矿棉保温材料严密包裹以防受冻。暖棚温控。随时掌握气温变化情况,通
过控制棚内三条采暖系统的采暖量,保证棚内温度达到5℃以上。为节约蒸汽资源,通常在室外气温-20℃以上时,仅启用设备基础旁的两个采暖系统的10件散热器装置;只有当室外气温超过-20℃以下时,再开启位于通道一侧的第三条采暖系统的采暖装置。
后期的组织管理包括重视测温工作、设平台下专用施工通道、加强防护维修工作、预备采暖炉临时预案等步骤。

Claims (6)

1.一种严冬下设备基础暖棚法防护施工方法,包括以下步骤:
1)封闭车间两侧通风井道维护墙下窗洞口,在1.00m的结构平台上覆盖帆布帐篷;
2)在设备基础两侧安装简易散热器,铺设采暖管道;
3)后期的组织管理;
通过以上步骤实现设备基础冬季施工的保温保湿。
2.根据权力要求1所述的一种严冬下设备基础暖棚法防护施工方法,其特征在于暖棚是使用高密度聚乙烯帆布覆盖在结构平台上并沿结构平台两侧垂至地面压实封闭。
3. 根据权力要求1所述的一种严冬下设备基础暖棚法防护施工方法,其特征在于现场自制作简易型光面管散热器,材料选用D133×4钢管,4排散热管设计长5m,以并联形式焊制,组件高度1m;散热器支管连接采取异侧上进下出方式,出口处设置凝结水排放阀门。
4.根据权力要求1所述的一种严冬下设备基础暖棚法防护施工方法,其特征在于后期的组织管理包括重视测温工作;设置平台下专用通道;加强防护维修工作;预备采暖炉临时预案。
5.根据权力要求2所述的暖棚构建是采用双层高密度聚乙烯覆盖在结构平台上。
6.根据权力要求2所述的暖棚构建结构平台上的实施方法为:用悬索法对两侧1.0m结构平台的顶部,沿纵向每隔1.5m设置¢12—18钢筋锚固桩,从锚桩顶横向水平拉设¢4钢缆绳悬索,用以支承覆盖其上的帆布帐篷。
CN201210221356.9A 2012-06-30 2012-06-30 一种严冬下设备基础暖棚法防护施工方法 Withdrawn CN103510546A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210221356.9A CN103510546A (zh) 2012-06-30 2012-06-30 一种严冬下设备基础暖棚法防护施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210221356.9A CN103510546A (zh) 2012-06-30 2012-06-30 一种严冬下设备基础暖棚法防护施工方法

Publications (1)

Publication Number Publication Date
CN103510546A true CN103510546A (zh) 2014-01-15

Family

ID=49893925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210221356.9A Withdrawn CN103510546A (zh) 2012-06-30 2012-06-30 一种严冬下设备基础暖棚法防护施工方法

Country Status (1)

Country Link
CN (1) CN103510546A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719144A (zh) * 2021-07-13 2021-11-30 中铁十九局集团有限公司 梁体冬期施工养护的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2247314Y (zh) * 1996-05-08 1997-02-12 马金宝 节能热风炉
US5954046A (en) * 1994-05-19 1999-09-21 Resaro Ab Heating and ventilation system for a building
CN1235758A (zh) * 1998-05-18 1999-11-24 薛光雨 无骨架塑料薄膜日光暖棚
CN2445571Y (zh) * 2000-08-09 2001-09-05 王远伦 可快速拆装的充气塑料暖棚
CN2849530Y (zh) * 2005-11-11 2006-12-20 金贞淑 一种新型采暖结构
CN201048500Y (zh) * 2007-05-24 2008-04-23 范志明 新型温室大棚复合保温被

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5954046A (en) * 1994-05-19 1999-09-21 Resaro Ab Heating and ventilation system for a building
CN2247314Y (zh) * 1996-05-08 1997-02-12 马金宝 节能热风炉
CN1235758A (zh) * 1998-05-18 1999-11-24 薛光雨 无骨架塑料薄膜日光暖棚
CN2445571Y (zh) * 2000-08-09 2001-09-05 王远伦 可快速拆装的充气塑料暖棚
CN2849530Y (zh) * 2005-11-11 2006-12-20 金贞淑 一种新型采暖结构
CN201048500Y (zh) * 2007-05-24 2008-04-23 范志明 新型温室大棚复合保温被

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨桂海: ""混凝土箱梁暖棚法冬期施工"", 《城市道桥与防洪》 *
黄斗才: "《建筑工程冬期施工实用手册》", 30 April 1993, 北京:水利电力出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719144A (zh) * 2021-07-13 2021-11-30 中铁十九局集团有限公司 梁体冬期施工养护的方法

Similar Documents

Publication Publication Date Title
CN104315629B (zh) 利用谷电辅助蓄冷/蓄热的地埋管地源热泵系统及方法
US5048507A (en) Endothermic building
Causone et al. A zero energy concept building for the Mediterranean climate
Kitagawa et al. Thermal storage effect of radiant floor cooling system using phase change materials in the hot and humid climate of Indonesia
CN204678577U (zh) 一种低温粮仓智能制冷系统
CN104567092A (zh) 一种跨季节储能式供冷与供暖装置及控制方法
CN110359458B (zh) 一种用于大体积混凝土的智能防护管理系统
CN104499716A (zh) 一种砼冬期施工的保温装置
CN112947626B (zh) 用于大坝温控的可变拓扑网格及其控制方法
CN103510546A (zh) 一种严冬下设备基础暖棚法防护施工方法
CN105625189B (zh) 一种空心高墩混凝土浇筑保温养护系统
CN102538117B (zh) 一种高层住宅地下车库塔楼范围的通风除湿系统
CN204063227U (zh) 一种包含余热利用热风循环加热系统的组合节能供暖系统
Carlucci et al. Zero-energy living lab
CN208309685U (zh) 一种下进出水防冻型智慧集成泵站
CN204165170U (zh) 利用谷电辅助蓄冷/蓄热的地埋管地源热泵系统
CN107785805A (zh) 一种智能箱式变电站
CN107120718A (zh) 工人生活区临建设施太阳能加热洗浴及冬季供暖系统
CN218905779U (zh) 一种箱梁混凝土蒸汽养护系统
CN207829502U (zh) 一种烟囱检修与防腐冬季施工加热保温系统
CN206641063U (zh) 屋顶绿化装置
CN108894281A (zh) 一种下进出水防冻型智慧集成泵站
CN105888267B (zh) 基于热水盘管自动加温养护的高层建筑冬期施工方法
CN104180416A (zh) 生活区临建房冬季供暖系统
Osintsev et al. Research of different heating modes of greenhouses

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C04 Withdrawal of patent application after publication (patent law 2001)
WW01 Invention patent application withdrawn after publication

Application publication date: 20140115