CN103510044B - Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock - Google Patents

Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock Download PDF

Info

Publication number
CN103510044B
CN103510044B CN201310524013.4A CN201310524013A CN103510044B CN 103510044 B CN103510044 B CN 103510044B CN 201310524013 A CN201310524013 A CN 201310524013A CN 103510044 B CN103510044 B CN 103510044B
Authority
CN
China
Prior art keywords
spring
charging basket
hanging axis
basket
charging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310524013.4A
Other languages
Chinese (zh)
Other versions
CN103510044A (en
Inventor
任玉中
李康林
牟文林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING DAYOU SURFACE TECHNOLOGY Co Ltd
Original Assignee
CHONGQING DAYOU SURFACE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING DAYOU SURFACE TECHNOLOGY Co Ltd filed Critical CHONGQING DAYOU SURFACE TECHNOLOGY Co Ltd
Priority to CN201310524013.4A priority Critical patent/CN103510044B/en
Publication of CN103510044A publication Critical patent/CN103510044A/en
Application granted granted Critical
Publication of CN103510044B publication Critical patent/CN103510044B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Radiation-Therapy Devices (AREA)

Abstract

The invention discloses a kind of rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock, comprise hanging axis and some charging baskets, the column jecket core for hanging axis tying up is provided with at charging basket center, the bottom of a upper charging basket is stayed the opening of a charging basket, the opening going up most a charging basket is covered by the cover net be through on hanging axis, and all charging baskets and cover net are by the locking mechanism locking on hanging axis.In charging basket, be evenly equipped with some spring brace rods for hanging up spring be parallel to each other, spring brace rod two ends are provided with the clamp bracket for clamping spring.Hook phenomenon can not be there is between spring of the present invention, greatly reduce artificial mask work amount.Workpiece is put in good order, and a set of frock can fill hundreds of springs, improves the batch of rails fastening elastic rod, reduces the workload that workpiece enters frock, thus improves Zinc-nickel seeping layer production efficiency.

Description

Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock
Technical field
The present invention relates to Zinc-nickel seeping layer preservative treatment technology to improve, concrete finger is a kind of carries out Zinc-nickel seeping layer rotproofing frock used for product-rails fastening elastic rod that shape is special specially, and this frock heats infiltration layer step used for loading spring workpiece and being put in cylinder.
Background technology
Anticorrosive metal technology, mainly by carrying out special process to body surface, forms layer protective layer, object destruction caused under the effect of various corrosives or environment or rotten reaction is slowed down, to reach the object extending object work-ing life.Common anti-corrosion of metal technology mainly contains electro-galvanizing, galvanizing, carbonitriding, Dacroment and Zinc-nickel seeping layer etc.Have a step in Zinc-nickel seeping layer technique for heating infiltration layer, heating infiltration layer requires that metal works and the composite metal powder prepared are put in limit heating edge in the metal cylinder of sealing to be rotated, and Heating temperature is about 400 DEG C.
For rails fastening elastic rod, because it is complex-shaped, the character " ω " in alienation, if optionally put into a frock, then frock is put into cylinder, spring in rollers roll process, can be made mutually to be hooked on together, be difficult to be separated, the plenty of time need be spent manually to be separated; And the amount of putting also greatly reduces, these two aspects factor all can affect Zinc-nickel seeping layer production efficiency.
Summary of the invention
For prior art above shortcomings, the object of the present invention is to provide a kind of rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock avoided the mutual hook of spring, increase the amount of putting simultaneously.
The object of the present invention is achieved like this:
Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock, comprise hanging axis and be set on the some charging baskets on hanging axis successively, charging basket is one end open, round shape at the bottom of an end band, the column jecket core for hanging axis tying up is provided with at charging basket center, the bottom of a upper charging basket is stayed the opening of a charging basket, the opening going up most a charging basket is covered by the cover net be through on hanging axis, and all charging baskets and cover net are by the locking mechanism locking on hanging axis; In charging basket, be evenly equipped with some spring brace rods for hanging up spring be parallel to each other, the face that all spring brace rods are formed is perpendicular to hanging axis; Spring brace rod two ends are provided with the clamp bracket for clamping spring, rock back and forth at spring brace rod axial direction due to prevent spring.
Further, described charging basket comprises parallel upper basket ring and lower basket ring, and upper basket ring is fixedly connected with by vertical pillar stiffener with lower basket ring, and between column jecket core and lower basket ring, be provided with some radial force muscle, principal rod and lower basket ring form the end of charging basket jointly; Principal rod is positioned at and is welded with some glands below it and fixes muscle, gland is fixed the bottom that muscle is positioned at charging basket and is compressed for the spring that will next charging basket hangs up; The two ends of spring brace rod are fixed on upper basket ring, and are provided with reinforcement column between spring brace rod and principal rod.
On described principal rod, the side of being located thereon is welded with some supports and fixes muscle, supports fixing muscle and is used for supporting bottom spring.
Described locking mechanism is made up of the compression plate of hanging axis one end and the chock of the hanging axis the other end, and the hanging axis the other end is provided with rectangular lockhole vertically, and the compression plate of the laterally inserted rectangular lockhole of chock also and on hanging axis coordinates all charging baskets and cover net wedging.
A kind of hanging axis Combined fixture of rails fastening elastic rod is carried out Zinc-nickel seeping layer process by the present invention, and every stove can fill more than 20 basket, and every basket can hang up hundreds of springs.Compared to existing technology, its advantage is:
1, hook phenomenon can not be there is between spring, greatly reduce artificial mask work amount, thus improve Zinc-nickel seeping layer production efficiency.
2, greatly reduce frock quantity, reduce frock input cost.
3, workpiece is put in good order, and a set of frock can fill hundreds of springs, improves the batch of rails fastening elastic rod, reduces the workload that workpiece enters frock, thus improves Zinc-nickel seeping layer production efficiency.
4, the amount of finish of spring can be improved to greatest extent, expand the product adaptation scope of same infiltration layer heating tank body.
5, due to the provide protection of frock, workpiece can not injure cylinder, can improve the work-ing life of cylinder.
6, structure of the present invention is simple, and be skillfully constructed, easy accessibility, application prospect is good.
Accompanying drawing explanation
Fig. 1-structural representation of the present invention.
Fig. 2-exploded perspective view of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in Figure 1 and Figure 2, rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock of the present invention, it comprises charging basket 1, cover net 2 and hanging axis 3, and charging basket 1 is one end open, the round shape at the bottom of an end band.Column jecket core 4 for hanging axis tying up is fixed on charging basket 1 center, and column jecket core 4 is concordant with bottom charging basket 1, and column jecket core 4 top is higher than charging basket 1, and during actual design, column jecket core 4 top exceeds 15cm than charging basket 1.In charging basket 1, be evenly equipped with some spring brace rods 5 for hanging up spring be parallel to each other, the face that all spring brace rods 5 are formed is perpendicular to hanging axis.Spring brace rod two ends are provided with the clamp bracket 9 for clamping spring, rock back and forth at spring brace rod 5 axial direction due to prevent spring 15.Cover net 2 covers at charging basket 1 opening end, cover net 2 is provided with bores a hole with the rectangle supplying hanging axis to pass of column jecket core 4 with core, hanging axis is passed respectively and to be connected with cover net 2 by charging basket 1 and to be locked by locking mechanism from the perforation of column jecket core 4 and cover net, thus by spring Work-sheet pressing.
Charging basket materials are saved in order to simplified construction, described charging basket 1 comprises parallel upper basket ring and lower basket ring, upper basket ring is fixedly connected with by vertical pillar stiffener 13 with lower basket ring, column jecket core is positioned at upper basket ring and lower basket ring center, between column jecket core and lower basket ring, be provided with some radial force muscle 12, principal rod 12 and lower basket ring form the end of charging basket jointly.The two ends of spring brace rod 5 are fixed on upper basket ring, and are provided with reinforcement column between spring brace rod 5 and principal rod 12, for supporting the weight of spring.Principal rod 12 is positioned at and is welded with some glands below it and fixes muscle 6, gland is fixed the bottom that muscle 6 is positioned at charging basket and is compressed for the spring that will next charging basket hangs up.On principal rod 12, the side of being located thereon is welded with some supports and fixes muscle 7 simultaneously, supports fixing muscle 7 for supporting bottom spring.Spring brace rod 5, gland are fixed muscle 6, the fixing muscle 7 of support and clamp bracket 9 and are combined, and spring 15 is fixed completely.
See Fig. 2, above-mentioned locking mechanism is provided with compression plate 11 in hanging axis 3 one end, and the hanging axis the other end is provided with rectangular lockhole vertically, and the compression plate 11 of the laterally inserted rectangular lockhole of chock 14 also and on hanging axis coordinates charging basket 1 and cover net 2 wedging.In Fig. 2, compression plate 11 is in charging basket 1 bottom surface, chock 14 wedging cover net 2.Be provided with suspension ring 8 in hanging axis 3 one end, derricking gear can be hooked on suspension ring to be lifted up into frock and workpiece thereof, hangs out penetration enhancer heating drum.
Aforementioned schemes is the situation of a hanging axis tying up charging basket, and the present invention can optimize further, and hanging axis is the several charging basket of tying up simultaneously, the now corresponding increase of hanging axis length, thus makes frock put spring quantity to be multiplied.Here several charging basket structural principles are identical, and spring brace rod quantity can be identical with distance, also can not be identical, and height can be identical, also can not be identical.See Fig. 2, all charging basket 1(are illustrated as two, and all the other are all simple) opening upwards, successively overlap, the gland of a upper charging basket fixes the opening that muscle 6 covers next charging basket, is compressed by spring 15.Charging basket 1 opening gone up most covers by cover net 2, and in the middle of cover net 2, two muscle length are all greater than cover net 2 outer ring external diameter, and longer part is used for locking with hanger 10, makes cover net 2 and go up a charging basket 1 most mutual rotation can not occur.Hanging axis 3 passes from column jecket core 4 corresponding to all charging baskets and cover net 2 are bored a hole, and locking mechanism is constant.
When filling with substance, is first mounted on spring brace rod 5 by spring 15, and spring 15 distributes and wants even, tight, and center of gravity need remain on charging basket 1 medullary ray.Insert by column jecket core 4 hanging axis 3 fills with spring 15 again charging basket 1 by other several baskets and insert hanging axis successively.The height of charging basket is determined by the width of spring 15, and insertable charging basket number is determined by the length of cylinder, and the end of a upper charging basket just in time covers charging basket below, after topmost charging basket cover net 2 covers, with the horizontal slotting hanging axis of chock 7 by cover net 2 and charging basket 1 wedging.
The distance that the spring that length is different with width only need change between the height of charging basket and spring brace rod just can splendid attire.Combined by the charging basket of several co-altitude or different heights, reach the object of full stove infiltration layer heating.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (3)

1. rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock, it is characterized in that: comprise hanging axis (3) and be set on the some charging baskets (1) on hanging axis successively, charging basket is one end open, round shape at the bottom of an end band, the column jecket core (4) for hanging axis tying up is provided with at charging basket (1) center, the bottom of a upper charging basket is stayed the opening of a charging basket, the opening going up most a charging basket is covered by the cover net (2) be through on hanging axis, and all charging baskets and cover net are by the locking mechanism locking on hanging axis; In charging basket (1), be evenly equipped with some spring brace rods (5) for hanging up spring be parallel to each other, the face that all spring brace rods (5) are formed is perpendicular to hanging axis (3); Spring brace rod (5) two ends are provided with the clamp bracket (9) for clamping spring, rock back and forth at spring brace rod (5) axial direction due to prevent spring (15);
Described charging basket (1) comprises parallel upper basket ring and lower basket ring, upper basket ring is fixedly connected with by vertical pillar stiffener (13) with lower basket ring, between column jecket core and lower basket ring, be provided with some radial force muscle (12), principal rod (12) and lower basket ring form the end of charging basket jointly; Principal rod (12) is positioned at and is welded with some glands below it and fixes muscle (6), gland is fixed the bottom that muscle (6) is positioned at charging basket and is compressed for the spring that will next charging basket hangs up; The two ends of spring brace rod (5) are fixed on upper basket ring, and are provided with reinforcement column between spring brace rod (5) and principal rod (12).
2. rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock according to claim 1, it is characterized in that: on described principal rod (12), the side of being located thereon is welded with some supports and fixes muscle (7), supporting fixing muscle (7) for supporting bottom spring.
3. rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock according to claim 1 and 2, it is characterized in that: described locking mechanism is made up of the compression plate (11) of hanging axis (3) one end and the chock (14) of hanging axis (3) the other end, hanging axis (3) the other end is provided with rectangular lockhole vertically, and the compression plate (11) of the laterally inserted rectangular lockhole of chock (14) also and on hanging axis coordinates all charging baskets (1) and cover net (2) wedging.
CN201310524013.4A 2013-10-30 2013-10-30 Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock Active CN103510044B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310524013.4A CN103510044B (en) 2013-10-30 2013-10-30 Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310524013.4A CN103510044B (en) 2013-10-30 2013-10-30 Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock

Publications (2)

Publication Number Publication Date
CN103510044A CN103510044A (en) 2014-01-15
CN103510044B true CN103510044B (en) 2015-09-30

Family

ID=49893468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310524013.4A Active CN103510044B (en) 2013-10-30 2013-10-30 Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock

Country Status (1)

Country Link
CN (1) CN103510044B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108639583B (en) * 2018-05-16 2020-11-17 马鞍山钢铁股份有限公司 Packaging device for train wheel packaging and using method thereof
CN109629399B (en) * 2018-12-27 2021-08-17 陕西铁马铸锻有限公司 Concrete cover anchor bolt device
CN112501548B (en) * 2020-11-13 2023-03-21 重庆大有表面技术有限公司 Equipment for zinc-nickel infiltration layer treatment and zinc-nickel infiltration layer treatment method
CN114000099A (en) * 2021-11-03 2022-02-01 北京铁科首钢轨道技术股份有限公司 Full-automatic continuous zinc impregnation anti-corrosion process for elastic strip
CN114000100A (en) * 2021-11-03 2022-02-01 北京铁科首钢轨道技术股份有限公司 Spring strip zinc impregnation device and zinc impregnation method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4227874A (en) * 1978-05-24 1980-10-14 Rolock, Inc. Temperature resistant, structurally stable member
CN201459226U (en) * 2009-07-30 2010-05-12 重庆大有表面技术有限公司 Preservative treatment tooling for finger-type plate Zn-Ni infiltrated layer of light rail
CN202047128U (en) * 2011-04-27 2011-11-23 重庆大有表面技术有限公司 Universal movable grille tooling for anticorrosive treatment of zinc-nickel infiltrated layer of bolt
CN202688374U (en) * 2012-07-31 2013-01-23 阜新中孚轻金属科技有限公司 Aluminum alloy heat treatment charging basket

Also Published As

Publication number Publication date
CN103510044A (en) 2014-01-15

Similar Documents

Publication Publication Date Title
CN103510044B (en) Rails fastening elastic rod Zinc-nickel seeping layer rotproofing frock
CN208648554U (en) A kind of electric machine iron core lifting turn tool
CN204899180U (en) Steel construction jar body aerial working platform simply sets up device
CN206068547U (en) Tank container and its end frame
CN111155045B (en) Hanger for galvanizing of bent pipe
CN102633198B (en) Storage tank lifting construction method applicable to heavy wind areas
CN207401672U (en) Container angle automatic paint dipping circular route
CN203254299U (en) Support for rust removal and abrasive blasting of trench surface plate
JP2017043952A (en) Reinforcing bar ground assembly device and reinforcing bar ground assembly method
CN205989837U (en) A kind of flour feeding device dedicated
CN209430211U (en) One kind hanging mould support device for shield end well to be closed
CN205476397U (en) Bayonet supporting platform of chimney inner tube
CN108750975A (en) A kind of handler for Power Material
CN211818460U (en) Fixing base for manual carrying communication tower
CN204148776U (en) The assembled moulding bed of bent cap framework of steel reinforcement
CN105113776B (en) The support meanss and building method of pole inner top platform on a kind of spherical tank
CN208933417U (en) Well formula tempering furnace tempering frame
CN104261283B (en) A kind of construction method of antenna hanging apparatus of wireless base station
CN209094873U (en) A kind of dedicated turnover device of bracket welding
CN208309937U (en) The support construction of artistic stone curtain wall is installed
CN206616849U (en) Dry gas-holder cabinet wall mounting tool
CN205984630U (en) Transformer dip coating device
CN206154097U (en) Foundation ring platform of polishing
CN205361761U (en) Anchor chain mounted frame
CN207797754U (en) A kind of grinding wheel workshop stove vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Tool for performing preservative treatment on zinc-nickel seeping layers of steel rail fastener elastic strips

Effective date of registration: 20190329

Granted publication date: 20150930

Pledgee: Chongqing Longshang financing Company Limited by Guarantee

Pledgor: CHONGQING DAYOU SURFACE TECHNOLOGY Co.,Ltd.

Registration number: 2019500000008

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210416

Granted publication date: 20150930

Pledgee: Chongqing Longshang financing Company Limited by Guarantee

Pledgor: CHONGQING DAYOU SURFACE TECHNOLOGY Co.,Ltd.

Registration number: 2019500000008

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Anti corrosion treatment tooling for zinc nickel coating of rail fastener spring strip

Effective date of registration: 20210423

Granted publication date: 20150930

Pledgee: Chongqing Longshang financing Company Limited by Guarantee

Pledgor: CHONGQING DAYOU SURFACE TECHNOLOGY Co.,Ltd.

Registration number: Y2021500000008

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220422

Granted publication date: 20150930

Pledgee: Chongqing Longshang financing Company Limited by Guarantee

Pledgor: CHONGQING DAYOU SURFACE TECHNOLOGY Co.,Ltd.

Registration number: Y2021500000008

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Tooling for anti-corrosion treatment of zinc nickel infiltrated layer of rail fastener elastic strip

Effective date of registration: 20220512

Granted publication date: 20150930

Pledgee: Chongqing Longshang financing Company Limited by Guarantee

Pledgor: CHONGQING DAYOU SURFACE TECHNOLOGY Co.,Ltd.

Registration number: Y2022500000026

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230425

Granted publication date: 20150930

Pledgee: Chongqing Longshang financing Company Limited by Guarantee

Pledgor: CHONGQING DAYOU SURFACE TECHNOLOGY Co.,Ltd.

Registration number: Y2022500000026

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Equipment for anti-corrosion treatment of track and rail fasteners, spring bars, zinc nickel coating

Effective date of registration: 20230504

Granted publication date: 20150930

Pledgee: Chongqing Longshang financing Company Limited by Guarantee

Pledgor: CHONGQING DAYOU SURFACE TECHNOLOGY Co.,Ltd.

Registration number: Y2023500000030

PE01 Entry into force of the registration of the contract for pledge of patent right