CN103508687A - Sleeve lime kiln empty-kiln baking method - Google Patents

Sleeve lime kiln empty-kiln baking method Download PDF

Info

Publication number
CN103508687A
CN103508687A CN201210210070.0A CN201210210070A CN103508687A CN 103508687 A CN103508687 A CN 103508687A CN 201210210070 A CN201210210070 A CN 201210210070A CN 103508687 A CN103508687 A CN 103508687A
Authority
CN
China
Prior art keywords
kiln
burner
temperature
moisture
exhaust gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210210070.0A
Other languages
Chinese (zh)
Other versions
CN103508687B (en
Inventor
何明伟
袁斯浪
朱东
张贤新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Metallurgy Engineering Co Ltd
Original Assignee
Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd, Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Priority to CN201210210070.0A priority Critical patent/CN103508687B/en
Priority claimed from CN201210210070.0A external-priority patent/CN103508687B/en
Publication of CN103508687A publication Critical patent/CN103508687A/en
Application granted granted Critical
Publication of CN103508687B publication Critical patent/CN103508687B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Details (AREA)

Abstract

The invention relates to a sleeve lime kiln. A sleeve lime kiln empty-kiln baking method comprises the steps: introducing coal gas to temporary burners of the sleeve lime kiln; starting up an exhaust gas draught fan to allow a negative pressure in the kiln to be greater than or equal to -0.05 kPa; igniting the temporary burners in order, inserting ash discharging devices from ash discharging device observation holes, and making the burners upward and fixing; when the temperature in the kiln rises to 50 DEG C, controlling the temperature rising speed at 3 DEG C to 5 DEG C per hour for rising the temperature; when the temperature rises to 280 to 300 DEG C, carrying out heat preservation; 24 hours later after beginning to baking the kiln, opening burner drainage screws and exhaust gas flue drainage holes, after the burners drain, tightening the screws, and timing for every 4 hours to drain once; carrying out continuous heat preservation until drainage ports have no obvious water, that is to said moisture of a refractory material in the kiln is baked to a reasonable control range; cutting off temporary burner coal gas valves; closing the exhaust gas draught fan; and eight hours later, closing a cooling draught fan. The method can effectively remove the moisture in the refractory material and ensure the high-temperature using performance of the refractory material.

Description

The empty kilning kiln of sleeve lime kiln method
Technical field
The present invention relates to sleeve lime kiln, relate in particular to sleeve lime kiln and dry kiln method.
Background technology
As the saying goes, within three minutes, put up a kiln, baking in seven minutes.The significance of industrial furnace baking is self-evident.After any industrial furnace builds up, in its resistance to material, after laying-in seasoning maintenance, all must must toast just and can put into production use.
The object that sleeve lime kiln dries kiln is exactly free-water, the crystal water of getting rid of in refractory materials construction backsight body, to obtain the applied at elevated temperature performance of refractory materials.Yet domestic sleeve kilning kiln mode is continued to use Italian Fu Kasi sleeve kilning kiln mode always, be to toast after kiln body is filled Wingdale, this even affects the applied at elevated temperature performance of refractory materials with regard to the serious eliminating effect that has had influence on the inside liner of resistance to material moisture again.Fact proved there is no good roast technic, after going into operation, local resistance to material tends to occur seminess.
Summary of the invention
The present invention is intended to address the aforementioned drawbacks, and the empty kilning kiln of a kind of sleeve lime kiln method is provided.The present invention can effectively remove the moisture in resistance to material and guarantee the applied at elevated temperature of resistance to material performance.
An empty kilning kiln method, it comprises the following steps:
Step 1, draws coal gas to the interim burner of sleeve lime kiln;
Step 2, starts exhaust gas fan, makes negative pressure >=-0.05kpa in kiln;
Step 3, lights a torch, opening point firelock valve, then open interim burner gas pipeline valve, and after interim burner is lighted one by one, from ash discharging gear vision slit, inserting ash discharging gear, burner is also fixing upward;
Step 4, after igniting, kiln temperature rises, and during to 50 ℃, utilizes interim burner gas valve control temperature rise rate to be 3 ℃ to 5 ℃ per hour and heats up;
Step 5, when kiln temperature is warmed up to 280 to 300 ℃, starts to be incubated 12h ~ 48h;
When kiln temperature is warmed up to more than 300 ℃, start cooling blower (separate unit);
Step 6, started to dry kiln after 24 hours, and a large amount of moisture content appears in exhaust gas fan and burner, opened burner draining screw and waste gas flue water vent, tighten the screws after burner draining, regularly a water of 4 hours rows;
Step 7, observes drainage point drainage situation, if water port is without obvious moisture, represents that in kiln, refractory materials moisture has been dried reasonable span of control; If after insulation 48h, while finding still to have obvious moisture, should continue insulation, until water vent is without obvious moisture;
Step 8, cuts off interim burner gas valve; Close exhaust gas fan.
Step 9, closes cooling blower (random operation) after eight hours.
The described empty kilning kiln of sleeve lime kiln method, in described step 7, when kiln temperature is warmed up to more than 300 ℃, starts cooling blower cooling.
For addressing the above problem, the present invention adopts empty kilning roasting, compared with continuing to use Italian Fu Kasi sleeve kilning kiln mode, can more effectively get rid of free-water, crystal water in the liner of resistance to material in kiln.After kilning is roasting, in kiln, resistance to material reaches best applied at elevated temperature performance after heating-up furnace.Kiln body fault reduces, and sleeve kiln extends work-ing life.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated:
Fig. 1 is heating curve figure of the present invention.
Embodiment
As shown in Figure 1, the empty baking of sleeve lime kiln is important measures of circulation passage obstruction after interior refractory materials work-ing life of prolongation kiln and minimizing kiln body are produced.The concrete technology flow process of empty baking kiln is as follows:
(1). draw coal gas to the interim burner of sleeve lime kiln;
(2). start exhaust gas fan, rotating speed (valve opening) is controlled at 5% ~ 10%, makes negative pressure >=-0.05kpa in kiln;
(3). light a torch, opening point firelock valve, then open interim burner gas pipeline valve, and after interim burner is lighted one by one, from ash discharging gear vision slit, inserting ash discharging gear, burner is also fixing upward;
(4). after igniting, when kiln temperature rises to 50 ℃, by 3 ℃ to 5 ℃ per hour, heat up.Ascending, descending temperature is controlled by interim burner gas valve.
(5). when kiln temperature is warmed up to 280 to 300 ℃, (generally dry approximately 5 to 7 days kiln time), start to be incubated 12h ~ 48h;
(6). when kiln temperature is warmed up to more than 300 ℃, start cooling blower (separate unit);
(7). starting to dry kiln after 24 hours, there is a large amount of moisture content in exhaust gas fan and burner, should open burner draining screw and waste gas flue water vent, tighten the screws after burner draining.Regularly within 4 hours, arrange a water.
(8). in kiln, insulation, in 12h-48h, is observed drainage point drainage situation, if water port is without obvious moisture, represents that in kiln, refractory materials moisture has been dried reasonable span of control.After insulation 48h, while finding still to have obvious moisture, should continue insulation, until water vent is without obvious moisture;
(9). cut off interim burner gas valve;
(10). close exhaust gas fan;
(11) after .8 hour, close cooling blower (random operation).

Claims (2)

1. the empty kilning kiln of a sleeve lime kiln method, is characterized in that, it comprises the following steps:
Step 1, draws coal gas to the interim burner of sleeve lime kiln;
Step 2, starts exhaust gas fan, makes negative pressure >=-0.05kpa in kiln;
Step 3, lights a torch, opening point firelock valve, then open interim burner gas pipeline valve, and after interim burner is lighted one by one, from ash discharging gear vision slit, inserting ash discharging gear, burner is also fixing upward;
Step 4, after igniting, kiln temperature rises, and during to 50 ℃, utilizes interim burner gas valve control temperature rise rate to be 3 ℃ to 5 ℃ per hour and heats up;
Step 5, when kiln temperature is warmed up to 280 to 300 ℃, starts to be incubated 12h ~ 48h;
When kiln temperature is warmed up to more than 300 ℃, start cooling blower (separate unit);
Step 6, started to dry kiln after 24 hours, and a large amount of moisture content appears in exhaust gas fan and burner, opened burner draining screw and waste gas flue water vent, tighten the screws after burner draining, regularly a water of 4 hours rows;
Step 7, observes drainage point drainage situation, if water port is without obvious moisture, represents that in kiln, refractory materials moisture has been dried reasonable span of control; If after insulation 48h, while finding still to have obvious moisture, should continue insulation, until water vent is without obvious moisture;
Step 8, cuts off interim burner gas valve; Close exhaust gas fan;
Step 9, closes cooling blower (random operation) after eight hours.
2. the empty kilning kiln of sleeve lime kiln according to claim 1 method, is characterized in that, in described step 7, when kiln temperature is warmed up to more than 300 ℃, starts cooling blower cooling.
CN201210210070.0A 2012-06-25 Sleeve lime kiln sky kilning kiln method Expired - Fee Related CN103508687B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210210070.0A CN103508687B (en) 2012-06-25 Sleeve lime kiln sky kilning kiln method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210210070.0A CN103508687B (en) 2012-06-25 Sleeve lime kiln sky kilning kiln method

Publications (2)

Publication Number Publication Date
CN103508687A true CN103508687A (en) 2014-01-15
CN103508687B CN103508687B (en) 2016-11-30

Family

ID=

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109282640A (en) * 2018-09-29 2019-01-29 攀钢集团钒钛资源股份有限公司 Turn round kilning kiln method
CN111414028A (en) * 2020-04-16 2020-07-14 广东中鹏热能科技有限公司 Temperature adjusting system for empty kiln and control method thereof
CN111943531A (en) * 2020-08-24 2020-11-17 广东韶钢松山股份有限公司 Kiln drying method of double-chamber lime shaft kiln

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009155161A (en) * 2007-12-26 2009-07-16 Nakayama Sekkai Kogyo Kk Manufacturing method of salt fired quicklime by vertical burning furnace and salt fired quicklime manufactured by the method
CN102303956A (en) * 2011-07-22 2012-01-04 石家庄市新华工业炉有限公司 Sleeve-type lime kiln
CN202208690U (en) * 2011-09-13 2012-05-02 石家庄市新华工业炉有限公司 Air circulation system for calcining compartment of sleeve kiln

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009155161A (en) * 2007-12-26 2009-07-16 Nakayama Sekkai Kogyo Kk Manufacturing method of salt fired quicklime by vertical burning furnace and salt fired quicklime manufactured by the method
CN102303956A (en) * 2011-07-22 2012-01-04 石家庄市新华工业炉有限公司 Sleeve-type lime kiln
CN202208690U (en) * 2011-09-13 2012-05-02 石家庄市新华工业炉有限公司 Air circulation system for calcining compartment of sleeve kiln

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
熊谟远: "《电石生产工艺学》", 31 October 1988, article ""石灰窑的操作管理"", pages: 171~172 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109282640A (en) * 2018-09-29 2019-01-29 攀钢集团钒钛资源股份有限公司 Turn round kilning kiln method
CN111414028A (en) * 2020-04-16 2020-07-14 广东中鹏热能科技有限公司 Temperature adjusting system for empty kiln and control method thereof
CN111943531A (en) * 2020-08-24 2020-11-17 广东韶钢松山股份有限公司 Kiln drying method of double-chamber lime shaft kiln

Similar Documents

Publication Publication Date Title
CN103123224B (en) Open-type roasting furnace heating curve and furnace moving operational method
CN106929038A (en) A kind of method for carrying out baker using red Jiao to dry coke quenching auxiliary
CN101705323A (en) Heat insulation method for top combustion type silicon brick hot-blast stove
CN108046764A (en) A kind of bavin for building the purple pottery of water burns gentle burning group technology
CN204786554U (en) Fire boiler at bottom of living beings
CN104214826A (en) Energy-saving control system for mini-boiler
CN103508687A (en) Sleeve lime kiln empty-kiln baking method
CN110318879B (en) Moisture and frost prevention device of gas turbine air inlet filter element and control method thereof
CN103508687B (en) Sleeve lime kiln sky kilning kiln method
CN104879774B (en) The furnace drying method of tilting furnace
CN109404981A (en) A kind of energy-efficient a heatable brick bed connection stove
CN202470394U (en) Inversed grate firing boiler
CN104152612A (en) Blast furnace baking method
CN104152616B (en) Blast furnace promotes top pressed baker method
CN103588401B (en) Coal gas of converter dries calcining furnace and the furnace drying method of desulfurated plaster
CN104178605B (en) Two roller bed conveyors roller furnace
CN103664008B (en) Low-temperature control process for oven baking of annular sleeve kiln
CN102563853A (en) Inverted grate-firing boiler
RU2538557C2 (en) Convection-accumulating stove-fireplace
CN202126085U (en) Indoor straw gas heating stove
CN108624339B (en) Winter dry quenching furnace annual repair heat preservation method
CN211267947U (en) Improved atmospheric sterilizing range
CN204404510U (en) A kind of Novel water heating stove
CN206146220U (en) Oven temperature controlling means
CN104019665A (en) Soaking pit minor-repair dry-off method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 200941, No. 8, building 168, four Yuan Road, Shanghai, Baoshan District

Patentee after: SHANGHAI BAOYE METALLURGY ENGINEERING Co.,Ltd.

Patentee after: SHANGHAI BAOYE GROUP Corp.,Ltd.

Address before: 200941, No. four, 168 yuan Road, Shanghai, Baoshan District

Patentee before: SHANGHAI BAOYE CONSTRUCTION INDUSTRIAL FURNACE ENGINEERING TECHNOLOGY Co.,Ltd.

Patentee before: SHANGHAI BAOYE GROUP Corp.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

CF01 Termination of patent right due to non-payment of annual fee