CN103501049A - Control method and system for distribution network - Google Patents
Control method and system for distribution network Download PDFInfo
- Publication number
- CN103501049A CN103501049A CN201310485408.8A CN201310485408A CN103501049A CN 103501049 A CN103501049 A CN 103501049A CN 201310485408 A CN201310485408 A CN 201310485408A CN 103501049 A CN103501049 A CN 103501049A
- Authority
- CN
- China
- Prior art keywords
- project
- power failure
- circuit
- distribution network
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses and provides a control method and a control system for a distribution network. The method comprises the following steps: acquiring the information of a line which requires power failure of each project of the distribution network, taking power failure lines in the line information as a first line in sequence, and then classifying the projects which comprise the first line into the same project group to obtain a first project group, for example, when both the project A and the project B comprise the same power failure line C, dividing the project A and the project B into the same project group. Therefore, the first project group is determined to be the project group which is required to be subjected to the power failure operation. In the way, an operator performs power failure operation on the first project group, namely when the power failure operation is performed on the line C, the project A and the project B can be executed simultaneously, so that the situation of performing power failure on the line repeatedly when each project is implemented are reduced.
Description
Technical field
The present invention relates to field of power, relate in particular a kind of control method and system of power distribution network.
Background technology
In recent years, along with deepening continuously of the distribution system reform of Utilities Electric Co., Utilities Electric Co. has applied the intelligent means such as public transformer terminals, fault detector, 3G video monitoring aspect distribution network construction, makes distribution network construction obtain improving significantly.
Distribution network construction comprises: engineering management, defect management, user's access, equipment move and a plurality of projects such as change.When implementing certain project, the circuit that operating personnel have a power failure to needs according to the power failure information of this project is had a power failure.Because distribution network construction comprises a plurality of projects, thereby there will be the situation about having a power failure that repeats between a plurality of projects in the process of construction of power distribution network, such as project A and project B need circuit C is had a power failure, when the project of enforcement A, operating personnel have a power failure to circuit C, when the project of enforcement B, operating personnel have a power failure to circuit C again, thereby occur circuit C is repeated to situation about having a power failure.
Summary of the invention
In view of this, the invention provides a kind of control method and system of power distribution network, to reduce the situation about having a power failure that repeats in the distribution network construction process.
For achieving the above object, the invention provides following technical scheme:
A kind of control method of power distribution network, described power distribution network comprises at least one project, described method comprises:
Obtain the line information of the required power failure of each described project of described power distribution network;
Successively using the dead line in described line information as the first circuit;
The project that will comprise described the first circuit is divided into same project team, obtains the first project team;
Determine the project team that described the first project team is pending power failure operation.
Preferably, after the project team of described definite described the first project team as pending power failure operation, also comprise:
Control described the first circuit and carry out power operation.
Preferably, after the line information of the described required power failure of each described project of obtaining described power distribution network, also comprise: the line information of storing the required power failure of each described project.
Preferably, described the first circuit of described control also comprises before carrying out power operation:
Gather the state information of job site, and judge according to described state information whether job site meets execution conditions;
When job site meets execution conditions, carry out the operation that has a power failure of described the first circuit of described control.
A kind of control system of power distribution network comprises:
Obtain the information acquisition unit of line information of the required power failure of each described project of described power distribution network;
Circuit determining unit using the dead line in described line information as the first circuit successively;
The project that will comprise described the first circuit is divided into same project team, obtains project team's division unit of the first project team.
Determine project team's determining unit of the project team that described the first project team is pending power failure operation.
Preferably, described system also comprises: the performance element of controlling described the first line outage.
Preferably, described system also comprises: the memory cell of storing the line information of the required power failure of each described project.
Preferably, described system also comprises: gather the state information of job site, and judge according to described state information whether job site meets the mobile terminal of execution conditions.
Preferably, described mobile terminal is also for showing described the first project team and described line information.
Known via above-mentioned technical scheme, compared with prior art, the present invention openly provides a kind of control method and system of power distribution network.The method is obtained the line information of the required power failure of each project of power distribution network, and successively using the dead line in line information as the first circuit, and then the project that will comprise the first circuit is divided into same project team, obtain the first project team, such as: when project A and project B comprise identical dead line C, project A and project B are divided into to same project team.And then, determine the project team that the first project team is pending power failure operation.Like this, operating personnel are to the operation that has a power failure of the first project team, while circuit C being had a power failure to operation, and project implementation A and project B simultaneously, thus reduced when implementing each project, repeat the situation to line outage.
The accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, below will the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to the accompanying drawing provided other accompanying drawing.
Fig. 1 shows the schematic flow sheet of an embodiment of the control method of a kind of power distribution network of the present invention;
Fig. 2 shows the schematic flow sheet of another embodiment of the control method of a kind of power distribution network of the present invention;
Fig. 3 shows the structural representation of an embodiment of the control system of a kind of power distribution network of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, rather than whole embodiment.Embodiment based in the present invention, those of ordinary skills, not making under the creative work prerequisite the every other embodiment obtained, belong to the scope of protection of the invention.
Show the flow chart of an embodiment of the control method of a kind of power distribution network of the present invention referring to Fig. 1.In the present embodiment, the method comprises:
101: the line information that obtains the required power failure of each described project of described power distribution network.
Construction at power distribution network generally includes: engineering management, defect management, user's access and equipment move and change project.When implementing each project, usually need to on-the-spot transmission line be had a power failure, the safety during with assurance enforcement project.
In actual applications, the line information of the required power failure of each project comprises: user's access data, the equipment that the defective data of the project data of engineering management project, defect management project, user access project moves the equipment that changes project and moves the equipment account information that changes data, power distribution network, and the topology information of circuit.
102: successively using the dead line in described line information as the first circuit.
While in line information, comprising a plurality of dead line, can be in a certain order using a plurality of dead lines successively as the first circuit, also can corresponding flag bit be set to a plurality of dead lines, the flag bits different according to different dead lines are successively using different dead lines as the first circuit.
103: the project that will comprise described the first circuit is divided into same project team, obtains the first project team.
In actual applications, each project may comprise same dead line, such as the dead line of project A, project B and project C is circuit a, project A, project B and project C is divided into to same project team.Simultaneously, each project also may inequality comprise same dead line, such as: the dead line of project A is a, the dead line of project B is b, the dead line of project C is b, and, using project B and project C as a project team, project A is separately as a project team.That is to say the dead line that different project team is corresponding different.
104: determine the project team that described the first project team is pending power failure operation.
Project team using the first project team as pending power failure operation, and then operating personnel are to the operation that has a power failure of the first circuit of the first project team, if the first project team comprises: project A and project B, the site operation personnel can implement project A and project B simultaneously, reach the purpose that reduces frequency of power cut.
Compared with prior art, the present invention openly provides a kind of control method and system of power distribution network.The method is obtained the line information of the required power failure of each project of power distribution network, and successively using the dead line in line information as the first circuit, and then the project that will comprise the first circuit is divided into same project team, obtain the first project team, such as: when project A and project B comprise identical dead line C, project A and project B are divided into to same project team.And then, determine the project team that the first project team is pending power failure operation.Like this, operating personnel are to the operation that has a power failure of the first project team, while circuit C being had a power failure to operation, and project implementation A and project B simultaneously, thus reduced when implementing each project, repeat the situation to line outage.
In actual applications, for the smooth enforcement of Guarantee item, usually also need job site is reconnoitred, to guarantee job site, meet execution conditions.Show the schematic flow sheet of another embodiment of the control method of a kind of power distribution network of the present invention referring to Fig. 2.Different from a upper embodiment, in this enforcement, the method also comprises:
201: gather the state information of job site and judge according to this state information whether job site meets execution conditions.
Wherein, the state information of job site can adopt corresponding hardware facility to obtain on-the-spot process exploration by the site operation personnel, no longer specifically introduces herein.
203: when job site meets execution conditions, control the first line outage.
Show the structural representation of an embodiment of the control system of a kind of power distribution network of the present invention referring to Fig. 3.In the present embodiment, this system comprises: information acquisition unit 1, the circuit determining unit 2 be connected with information acquisition unit, the project team's division unit 3 be connected with circuit determining unit 2, and the project team's determining unit 4 be connected with project team division unit 3.
This information acquisition unit 1, for the line information of the required power failure of each described project of obtaining described power distribution network.Wherein, this line information comprises that the defective data of project data, the defect management project of engineering management project, user's access data, equipment that the user accesses project move the equipment that changes project and moves the equipment account information that changes data, power distribution network, and the topology information of circuit.Accordingly, this information acquisition unit 1 comprises: for the information resource management system of gathering project data, defective data, user's access data, for the GIS-Geographic Information System of collecting device account information, and for the auxiliary tone graphics system of the topology information that gathers circuit.
Project team's division unit 3, be divided into same project team for the project that will comprise described the first circuit, obtains the first project team.
Project team's determining unit 4 is the project team that pending power failure operates for determining described the first project team.
Further, in actual applications, this circuit determining unit 2, project team's division unit 3 and project team's determining unit 4 can be built in a main website.This main website generates corresponding work plan according to the result of circuit determining unit 2, division unit 3 and project determining unit 4.
Meanwhile, this system also comprises: gather the state information of job site, and judge according to this state information whether job site meets the mobile terminal of execution conditions.
Optionally, this mobile terminal and main website can realize the mutual of data.Mobile terminal can be sent to main website by the status data collected at the construction field (site), and obtains work plan and line information that main website generates from main website, such as the topology information of circuit.
Optional this main website also, for the status data of the job site according to the mobile terminal transmission, carries out risk assessment to job site, and assessment result is sent to mobile terminal.
Operating personnel can judge whether to be constructed according to the judged result of mobile terminal, the risk evaluation result of main website.
Optionally, work ticket and operation order that this main website also can built-in project, so that on-the-spot operating personnel can implement this project in time.
In this specification, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is and the difference of other embodiment that between each embodiment, identical similar part is mutually referring to getting final product.For the disclosed device of embodiment, because it corresponds to the method disclosed in Example, so description is fairly simple, relevant part partly illustrates and gets final product referring to method.
To the above-mentioned explanation of the disclosed embodiments, make professional and technical personnel in the field can realize or use the present invention.Multiple modification to these embodiment will be apparent for those skilled in the art, and General Principle as defined herein can be in the situation that do not break away from the spirit or scope of the present invention, realization in other embodiments.Therefore, the present invention will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.
Claims (9)
1. the control method of a power distribution network, described power distribution network comprises at least one project, it is characterized in that, described method comprises:
Obtain the line information of the required power failure of each described project of described power distribution network;
Successively using the dead line in described line information as the first circuit;
The project that will comprise described the first circuit is divided into same project team, obtains the first project team;
Determine the project team that described the first project team is pending power failure operation.
2. method according to claim 1, is characterized in that, after the project team of described definite described the first project team as pending power failure operation, also comprises:
Control described the first circuit and carry out power operation.
3. method according to claim 1, is characterized in that, after the line information of the described required power failure of each described project of obtaining described power distribution network, also comprises: the line information of storing the required power failure of each described project.
4. method according to claim 2, is characterized in that, described the first circuit of described control also comprises before carrying out power operation:
Gather the state information of job site, and judge according to described state information whether job site meets execution conditions;
When job site meets execution conditions, carry out the operation that has a power failure of described the first circuit of described control.
5. the control system of a power distribution network, is characterized in that, comprising:
Obtain the information acquisition unit of line information of the required power failure of each described project of described power distribution network;
Circuit determining unit using the dead line in described line information as the first circuit successively;
The project that will comprise described the first circuit is divided into same project team, obtains project team's division unit of the first project team;
Determine project team's determining unit of the project team that described the first project team is pending power failure operation.
6. system according to claim 5, is characterized in that, described system also comprises: the performance element of controlling described the first line outage.
7. system according to claim 5, is characterized in that, described system also comprises: the memory cell of storing the line information of the required power failure of each described project.
8. system according to claim 5, is characterized in that, described system also comprises: gather the state information of job site, and judge according to described state information whether job site meets the mobile terminal of execution conditions.
9. system according to claim 8, is characterized in that, described mobile terminal is also for showing described the first project team and described line information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310485408.8A CN103501049B (en) | 2013-10-16 | 2013-10-16 | A kind of control method of power distribution network and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310485408.8A CN103501049B (en) | 2013-10-16 | 2013-10-16 | A kind of control method of power distribution network and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103501049A true CN103501049A (en) | 2014-01-08 |
CN103501049B CN103501049B (en) | 2016-01-06 |
Family
ID=49866231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310485408.8A Active CN103501049B (en) | 2013-10-16 | 2013-10-16 | A kind of control method of power distribution network and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103501049B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105205573A (en) * | 2015-10-27 | 2015-12-30 | 国网福建省电力有限公司 | Planned project selecting and sequencing method comprehensively taking basic power supply responsibility of power network enterprise into consideration for low and medium voltage distribution network |
CN111009900A (en) * | 2019-12-24 | 2020-04-14 | 广州供电局有限公司 | Rapid detection method for power distribution network power failure range overlapping |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102044020A (en) * | 2010-12-03 | 2011-05-04 | 湖州电力局 | Power distribution reliability pre-control method based on distribution network topology |
JP4850171B2 (en) * | 2007-12-21 | 2012-01-11 | 中国電力株式会社 | Power failure information integration system and power failure information integration method |
CN102938109A (en) * | 2012-11-21 | 2013-02-20 | 广东电网公司 | Power network blackout arranging method and device |
CN103106622A (en) * | 2013-02-05 | 2013-05-15 | 广东电网公司 | Method and system of power cut overhauling and scheduling |
CN103177401A (en) * | 2013-03-21 | 2013-06-26 | 广东电网公司佛山供电局 | Distribution network e power failure method for fault maintenance |
-
2013
- 2013-10-16 CN CN201310485408.8A patent/CN103501049B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4850171B2 (en) * | 2007-12-21 | 2012-01-11 | 中国電力株式会社 | Power failure information integration system and power failure information integration method |
CN102044020A (en) * | 2010-12-03 | 2011-05-04 | 湖州电力局 | Power distribution reliability pre-control method based on distribution network topology |
CN102938109A (en) * | 2012-11-21 | 2013-02-20 | 广东电网公司 | Power network blackout arranging method and device |
CN103106622A (en) * | 2013-02-05 | 2013-05-15 | 广东电网公司 | Method and system of power cut overhauling and scheduling |
CN103177401A (en) * | 2013-03-21 | 2013-06-26 | 广东电网公司佛山供电局 | Distribution network e power failure method for fault maintenance |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105205573A (en) * | 2015-10-27 | 2015-12-30 | 国网福建省电力有限公司 | Planned project selecting and sequencing method comprehensively taking basic power supply responsibility of power network enterprise into consideration for low and medium voltage distribution network |
CN111009900A (en) * | 2019-12-24 | 2020-04-14 | 广州供电局有限公司 | Rapid detection method for power distribution network power failure range overlapping |
Also Published As
Publication number | Publication date |
---|---|
CN103501049B (en) | 2016-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101354627B1 (en) | Engineering topology generating method of the digital substation and the apparatus thereof | |
CN103036727B (en) | Electric power communication network regional security warning method and system thereof | |
CN103312031A (en) | Electric power device data acquisition system and acquisition method | |
CN104270389A (en) | Method and system for automatically restoring security configuration vulnerability of router/ interchanger | |
CN102931733B (en) | A kind of residual current remote data acquisition and operation monitoring system | |
CN102967839B (en) | Detection method and device for online monitoring communication system of transformer substation | |
CN108072858A (en) | Electric energy meter method for quality control, system and terminal device | |
CN103278731B (en) | A kind of method for diagnosing faults based on secondary loop information and system | |
CN103501049B (en) | A kind of control method of power distribution network and system | |
CN101425940B (en) | Method, apparatus and system for alarm processing | |
CN103812688A (en) | Alarm determining method and device | |
CN112737124B (en) | Method and device for constructing power equipment monitoring terminal | |
CN111447140A (en) | Intelligent data acquisition gateway, redundant network communication system and method | |
CN103558819A (en) | Slicing machine fault diagnosis system | |
CN112907157A (en) | Power grid risk visualization method and system based on meteorological early warning | |
CN105652119A (en) | Method, device and system for acquiring fault information | |
CN116938953A (en) | Block chain-based data processing method and device, electronic equipment and storage medium | |
CN111552213A (en) | Power communication equipment | |
CN105634781A (en) | Multi-fault data decoupling method and device | |
CN104822157A (en) | Micro power wireless communication protocol conformance testing system for short-distance power communication | |
CN109586405B (en) | Micro-grid system and communication method thereof | |
EP2887497B1 (en) | Apparatus and method for correcting acquired data | |
CN105930952A (en) | Energy consumption analysis and evaluation system for power distribution equipment | |
CN104734354A (en) | Intelligent power grid overhaul system based on network topology and overhaul method | |
CN204681160U (en) | A kind of grid maintenance intelligent system of topology Network Based |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||