CN103500384A - Comprehensive management system for power distribution and consumption side communication basic resources - Google Patents
Comprehensive management system for power distribution and consumption side communication basic resources Download PDFInfo
- Publication number
- CN103500384A CN103500384A CN201310492776.5A CN201310492776A CN103500384A CN 103500384 A CN103500384 A CN 103500384A CN 201310492776 A CN201310492776 A CN 201310492776A CN 103500384 A CN103500384 A CN 103500384A
- Authority
- CN
- China
- Prior art keywords
- gis
- platform
- side communication
- resource
- database server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a comprehensive management system for power distribution and consumption side communication basic resources. The comprehensive management system comprises an internal system and an external system, wherein the external system comprises a GIS (Geographic Information System) platform; the GIS platform comprises a GIS basic database server and a GIS power grid database server; the internal system comprises a GIS application server, a database server and a plurality of clients; the GIS platform, the GIS application server, the database server and the clients are connected with one another and perform data exchange through a computer communication network. The comprehensive management system for power distribution and consumption side communication basic resources disclosed by the invention has the advantages of increasing the management efficiency of power distribution and consumption side communication basic resources, raising the management level of a power communication department, rapidly handling equipment and circuit faults, bringing convenience to the work of communicators and communication dispatchers, and the like.
Description
Technical field
The present invention relates to a kind of adapted electricity side communication infrastructure resource integrated management system.
Background technology
Power telecom network is the important infrastructure of electric system, is the basis of power network schedule automation, the network operation marketization and management modernization, is the important means of guaranteeing power grid security, stable, economical operation.Along with the construction of a large amount of network facilitiess with come into operation, putting into operation in a large number of adapted electricity side communication network device especially, seem more and more important to the management of communication network.And the management of Internet resources is importances of network management, also be to provide the basis of other upper layer network management function.The characteristics amount of being of communication network resource data is large and very close with the relation of map, take fiber optic network as example, no matter be geographical resource (as communication station, circuit), or device resource (as optical cable, splice tray) all comprises the space vector information that characterizes locus and topological relation, and the attribute information that records particular content and essential characteristic.Change traditional communication network resource way to manage, these data can be shown comprehensively intuitively on map, and can carry out analysis-by-synthesis to related data, make the staff break away from uninteresting data literal form, to providing powerful support for of macro-level policy-making, this need to utilize the resource management system of GIS technological development with geography information.In conventional art, adopt extensive communication infrastructure resource management scheme, the communication network maintenance and management is more at random, and efficiency is low.In prior art, usually adopt manual browse many atlas and machine account ability traffic carried resource query and statistical work, need a large amount of time just can complete consulting of related content, work efficiency is very low.
Therefore, adopt based on Geographic Information System (GIS) etc. and there is powerful graphics management and the KXG of spatial analysis functions, will become the inevitable choice that supports the communication infrastructure resource management.Progressively complete enforcement along with state net GIS service platform, should set up the total management system based on adapted electricity side communication infrastructure resource under this platform, transition period will be usingd the local GIS platform in area as communication GIS Deta bearer platform, accumulation GIS application data resource, proper time, convenient can the derivation to state netted the GIS service platform.
Summary of the invention
The present invention is the weak point existed in above-mentioned prior art for avoiding, provide a kind of adapted electricity side communication infrastructure resource integrated management system, with the efficiency of management that improves the adapted electricity side communication resource, improve the management level of power communication department, tackle equipment and line fault fast.
The present invention be the technical solution problem by the following technical solutions.
Adapted electricity side communication infrastructure resource integrated management system, its design feature is to comprise built-in system and external system; Described external system comprises the GIS platform, and described GIS platform comprises basic database server and GIS electric network data storehouse server; Described built-in system comprises GIS application server, database server and a plurality of client; Be connected by computer communication network between described GIS platform, GIS application server, database server and a plurality of client and carry out the data exchange.
The design feature of adapted electricity side communication infrastructure resource integrated management system of the present invention also is:
Described computer communication network is gigabit networking.
What in described GIS basic database server, store is for the fundamental geological spatial data of background display in Electric Power Network Planning resource information panorama data platform; What in the server of GIS electric network data storehouse, store is by the relevant power network resources of production, marketing, scheduling of the managing power network resources function maintenance and management of Electric Power Network Planning resource information panorama data platform.
Compared with the prior art, beneficial effect of the present invention is embodied in:
Adapted electricity side communication infrastructure resource integrated management system of the present invention, to utilize the integrated modeling means of artwork to build complete adapted electricity side powerline network information model, communication resource management is described as to the graphics system of a component layer, minute color, minute linear, minute symbol, intuitively cable resource and communication station equipment is presented in face of the user comprehensively.On the electronic chart basis of full vector quantization, the Organization And Management of realization to adapted electricity side communication infrastructure resource, easily to cable resource, communication facilities resource, equipment routing iinformation safeguarded, inquired about, analysis etc., realize the Core Features such as the communication line conservation of resources, locating query statistics, the management of communication line thematic map.Adapted electricity side communication infrastructure resource information organizational form based on the GIS technology and analysis and the conclusion of management mode; Based on state net GIS spatial Information Service platform standard, realize sharing with mutual of all kinds of power network resources; Foundation and the automatic analysis of communication resource logical topology model; The technology of componentization, loose coupling of take is the system constructing architecture.
Adapted electricity side communication infrastructure resource integrated management system of the present invention, change the communication infrastructure resource management scheme that tradition is extensive, by setting up a graphical communication infrastructure resource management system, communication network is safeguarded under strict, effective and normalized management and monitoring, for the maintenance of the communication resource provides accurate and visual science decision foundation and analysis means flexibly and fast;
Adapted electricity side communication infrastructure resource integrated management system of the present invention, also changed and adopted in the past manual browse many atlas and machine account ability traffic carried resource query and statistical work, now only need with just having completed consulting of all related contents several seconds, and can in the GIS figure, represent intuitively, efficiency has at least improved 100 times;
Can accomplish " knowing what's what " aspect communication resource management, by the route analysis of system, can clearly understand current network resources existence, position and with the complete documentation of the aspects such as relation of other resource; Whether a certain resource is carrying the last layer service application, and whether they occupied, by whom, taken; Whether be installed with optical cable in pipeline, the routing iinformation on Mei Genlan road etc. can be represented by the clear analysis of system, improves the service efficiency of resource;
Adapted electricity side communication infrastructure resource integrated management system of the present invention, can improve the management level of power communication department significantly, tackles fast equipment and line fault, facilitates Communication Personnel and communication scheduling personnel's work.
Adapted of the present invention electricity side communication infrastructure resource integrated management system, have the efficiency of management, management level that improve power communication department that can improve the adapted electricity side communication resource, tackle equipment and line fault fast, facilitate Communication Personnel and communication scheduling personnel's advantages such as work.
The accompanying drawing explanation
The structured flowchart that Fig. 1 is adapted electricity side communication infrastructure resource integrated management system of the present invention.
Below pass through embodiment, and the invention will be further described by reference to the accompanying drawings.
Embodiment
Referring to Fig. 1, adapted electricity side communication infrastructure resource integrated management system, it comprises built-in system and external system; Described external system comprises the GIS platform, and described GIS platform comprises basic database server and GIS electric network data storehouse server; Described built-in system comprises GIS application server, database server and a plurality of client; Be connected by computer communication network between described GIS platform, GIS application server, database server and a plurality of client and carry out the data exchange.
Described computer communication network is gigabit networking.
What in described GIS basic database server, store is for the fundamental geological spatial data of background display in Electric Power Network Planning resource information panorama data platform; What in the server of GIS electric network data storehouse, store is by the relevant power network resources of production, marketing, scheduling of the managing power network resources function maintenance and management of Electric Power Network Planning resource information panorama data platform.
Adapted electricity side communication infrastructure resource integrated management system of the present invention, utilize the built adapted electricity GIS that establishes application, in accordance with state net GIS information service standard, actual demand in conjunction with distribution automation system and user power utilization information acquisition system to communication network resource, adopt the Distributed Application technology, foundation combines with electric line and the resource management of adapted electricity side apparatus, conscientiously solve the practical problems that power communication department faces in network resource management, advanced tools and the method for Power Communication Resources being carried out to effectively management are provided, provide complete for relevant departments simultaneously, standard, ageing data information, can provide aid decision making for layout of roads, for design and construction provide foundation.
The present invention adopts the ArcGIS technology platform to set up adapted electricity side communication infrastructure resource integrated management system, adopt componentization and loose coupling technology route, provide the exchanges data means based on the standard interface assembly, provide unified data access and data access specification, the extensibility that safeguards system is good.
Adapted electricity side communication infrastructure resource integrated management system of the present invention, adopt with state and net Spatial Data Model and the service call standard that the GIS service platform is close; Carry out the overall architecture of implementation platform based on SOA framework and modular design principle; Adopt the developing instrument of ArcGIS development platform as system; Basic map and state's net GIS service platform are consistent, and adopt national the earth 2000 coordinate-systems; Map adopts polar plot and the striograph Overlapping display of 1:2000; Obtain the resource requirement data by normal data shared mechanism and service interface from data platform; Realize foundation and the automatic analysis of communication resource logical topology model based on the dynamic topology algorithm; Adopt flexible drawing assembly to realize the resource management that becomes more meticulous of deployed with devices figure in communication station.
The system physical structure is as Fig. 1, and the data-interface of external system by exploitation in the service end database, and provides the functions such as data analysis, data pick-up conversion by data pick-up useful in outside GIS platform.The function such as client comprises for the client provides that resource is checked, the conservation of resources, resource query, resource distribution, system arrange.
On the basis of the GIS of local power supplying companies bureaus basic platform, integrated regional geography information figure and distribution resource information, realize that adapted electricity side communication infrastructure conservation of resources management tool and the basic resource of C/S model showed subsystem.Wherein basic resource maintenance management tool-face, to producers, provides the integrated management to the communication resource, model information, communication topology information and other relevant informations; Basic resource shows that subsystem, towards personnel such as management, provides various dimensions, graphical stat and the display function of the communication resource.
Adapted electricity side communication infrastructure resource integrated management system of the present invention, adapted electricity side communication infrastructure resource information organizational form based on the GIS technology and analysis and the conclusion of management mode, the adapted electricity side communication infrastructure conservation of resources management of the C/S model based on the GIS technology; Integrated management to the communication resource, model information, communication topology information and other relevant informations is provided; The analysis of business demand, organizational form and management mode provides practice reference with the application that branches out that is summarized as follow-up state net GIS service platform.
Adapted electricity side communication infrastructure resource integrated management system of the present invention, based on state net GIS spatial Information Service platform standard, realize sharing with mutual of all kinds of power network resources, based on state net GIS spatial Information Service platform standard, develops; Other system of adapted electricity side communication infrastructure resource and power distribution network realizes mutually calling, complementing one another in the loose coupling mode.
Adapted of the present invention electricity side communication infrastructure resource integrated management system, foundation and the automatic analysis of its communication resource logical topology model, build the system model of device resource, path resource, physical topology and route thereof with communication logic topology connected relation; Realize the resource management of physical equipment and board level thereof, terminals sub level in communication site; Possess powerful route automatic analysis function, but automatic analysis goes out all routes standing from originating station to termination, and whole highlighted demonstrations on map; Provide the route analysis of optical cable to the cable core level, can clearly understand every optical fiber of optical cable service condition, locus and with the annexation of other Internet resources.
Adapted of the present invention electricity side communication infrastructure resource integrated management system, the technology of componentization, loose coupling of take is the system constructing architecture, in accordance with state net GIS Simulation spatial service platform standard, the Technical Architecture of componentization, loose coupling of take is system infrastructure; Provide the exchanges data means based on the standard interface assembly, unified data access and data access specification is provided.
Claims (3)
1. adapted electricity side communication infrastructure resource integrated management system, is characterized in that, comprises built-in system and external system; Described external system comprises the GIS platform, and described GIS platform comprises GIS basic database server and GIS electric network data storehouse server; Described built-in system comprises GIS application server, database server and a plurality of client;
Be connected and carry out the data exchange by computer communication network between described GIS platform, described GIS server, described database server and a plurality of client.
2. adapted electricity side communication infrastructure resource integrated management system according to claim 1, is characterized in that, described computer communication network can be gigabit networking.
3. according to claim 1 and 2 described adapted electricity side communication infrastructure resource integrated management systems, it is characterized in that, what in described GIS basic database server, store is for the fundamental geological spatial data of background display in Electric Power Network Planning resource information panorama data platform.What in the server of GIS electric network data storehouse, store is by the relevant power network resources of production, marketing, scheduling of the managing power network resources function maintenance and management of Electric Power Network Planning resource information panorama data platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310492776.5A CN103500384A (en) | 2013-10-18 | 2013-10-18 | Comprehensive management system for power distribution and consumption side communication basic resources |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310492776.5A CN103500384A (en) | 2013-10-18 | 2013-10-18 | Comprehensive management system for power distribution and consumption side communication basic resources |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103500384A true CN103500384A (en) | 2014-01-08 |
Family
ID=49865589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310492776.5A Pending CN103500384A (en) | 2013-10-18 | 2013-10-18 | Comprehensive management system for power distribution and consumption side communication basic resources |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103500384A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104376149A (en) * | 2014-10-27 | 2015-02-25 | 国家电网公司 | Real-time online topology simulation method based on power distribution table area |
CN109902394A (en) * | 2019-03-04 | 2019-06-18 | 陈龙雨 | A kind of network modeling method based on user's block information |
CN112328727A (en) * | 2020-11-27 | 2021-02-05 | 中国矿业大学 | Comprehensive management system for closing coal mine resource GIS |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003330994A (en) * | 2002-05-13 | 2003-11-21 | Yappa Corp | Park design system using 3d image |
CN102930393A (en) * | 2012-10-25 | 2013-02-13 | 海南电网公司 | Comprehensive power grid information display visualization system |
CN202870818U (en) * | 2012-09-04 | 2013-04-10 | 江门市先达电脑科技有限公司 | Geographic information system (GIS) service management system |
-
2013
- 2013-10-18 CN CN201310492776.5A patent/CN103500384A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003330994A (en) * | 2002-05-13 | 2003-11-21 | Yappa Corp | Park design system using 3d image |
CN202870818U (en) * | 2012-09-04 | 2013-04-10 | 江门市先达电脑科技有限公司 | Geographic information system (GIS) service management system |
CN102930393A (en) * | 2012-10-25 | 2013-02-13 | 海南电网公司 | Comprehensive power grid information display visualization system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104376149A (en) * | 2014-10-27 | 2015-02-25 | 国家电网公司 | Real-time online topology simulation method based on power distribution table area |
CN104376149B (en) * | 2014-10-27 | 2018-03-20 | 国家电网公司 | One kind is based on power distribution station real-time online topology simulation method |
CN109902394A (en) * | 2019-03-04 | 2019-06-18 | 陈龙雨 | A kind of network modeling method based on user's block information |
CN112328727A (en) * | 2020-11-27 | 2021-02-05 | 中国矿业大学 | Comprehensive management system for closing coal mine resource GIS |
CN112328727B (en) * | 2020-11-27 | 2023-09-15 | 中国矿业大学 | Closed coal mine resource GIS integrated management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102722764B (en) | Integration network optimization computer-aided decision support System | |
CN102385739B (en) | A kind of county power supply company integration information management platform | |
CN105303306B (en) | Electric power material dispatching platform system | |
CN104537573A (en) | Power grid operation information panoramic visualized display system | |
CN104966245B (en) | A kind of visualization power supply plan auxiliary preparation method based on power grid GIS | |
CN103093392A (en) | Electrical power system three-dimensional digitalization operation platform | |
CN102760255A (en) | Underground power network data management and power network planning system and management method | |
CN101751435A (en) | Data exchanging system and method for electric power system | |
CN109889358B (en) | 3D visual IT monitoring management system | |
CN103093024A (en) | Web geographic information system (WEBGIS)-based visualized showing method for planning power grid | |
CN110826165A (en) | GIS-based power supply path display method for important power users | |
CN107330062A (en) | Management and running panorama display systems based on GIS | |
CN102722786A (en) | Intelligent scheduling support platform for power grid professional systems | |
CN110288176A (en) | Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS | |
Wlazlo et al. | A cyber topology model for the texas 2000 synthetic electric power grid | |
CN110276516A (en) | Distribution monitoring analysis and repairing command methods based on power grid GIS | |
CN103489139A (en) | Comprehensive analysis and management system for urban distribution network planning | |
CN104967534B (en) | A kind of Grid Central and distribution substation's cable resource unified management and planing method | |
CN103500384A (en) | Comprehensive management system for power distribution and consumption side communication basic resources | |
CN207235018U (en) | Multi-functional wiring system | |
CN104573997B (en) | Distribution network mapping and thematic map application architecture design method | |
CN205050194U (en) | Powerline network emergency preplan generates device | |
CN114186950A (en) | Optical cable resource management method and system | |
CN104134131A (en) | Portable communication resource management system and method based on geographic information | |
CN104156828A (en) | Portable communication resource management system based on geographic information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140108 |