CN103498685A - 极软岩巷道底板与两帮卸压窗口支护装置 - Google Patents

极软岩巷道底板与两帮卸压窗口支护装置 Download PDF

Info

Publication number
CN103498685A
CN103498685A CN201310482151.0A CN201310482151A CN103498685A CN 103498685 A CN103498685 A CN 103498685A CN 201310482151 A CN201310482151 A CN 201310482151A CN 103498685 A CN103498685 A CN 103498685A
Authority
CN
China
Prior art keywords
base plate
release window
pressure relief
roadway
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310482151.0A
Other languages
English (en)
Other versions
CN103498685B (zh
Inventor
高延法
曲广龙
杨柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Coal Science And Technology Research Institute Co Ltd
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201310482151.0A priority Critical patent/CN103498685B/zh
Publication of CN103498685A publication Critical patent/CN103498685A/zh
Application granted granted Critical
Publication of CN103498685B publication Critical patent/CN103498685B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

本发明公开了一种极软岩巷道底板与两帮卸压窗口支护装置,极软岩巷道设有钢筋混凝土砌碹,在钢筋混凝土砌碹的底板与两帮开设多个通透的空间,空间内装有或留有卸压窗口。卸压窗口的材料为钢管或者混凝土管。卸压窗口的外壁设有固定凸起。卸压窗口的横截面为圆形、多边形或椭圆形。可以有效降低巷道围岩应力,减少需支护体的载荷,以保持巷道稳定性。

Description

极软岩巷道底板与两帮卸压窗口支护装置
技术领域
本发明涉及一种极软岩巷道支护技术,尤其涉及一种极软岩巷道底板与两帮卸压窗口支护装置。
背景技术
随着煤炭资源向深部开采,深井软岩巷道围岩稳定性问题越来越突出。由于开采深度的不断增加,地质环境不断恶化,地应力增大,破碎岩体增多,巷道维护困难,地质灾害增多,巷道围岩稳定性控制问
题已成为制约煤炭资源向深部开采的首要问题。
大量理论研究和工程实践表明,在深井极软岩条件下,巷道围岩应力高且复杂,许多情况下依靠目前传统的支护方式不能有效地控制高应力极软岩巷道的强烈变形。目前比较先进的控制深井极软岩巷道围岩稳定性的方法有:(1)采用全封闭断面且具有高支撑强度的刚性支架如钢管混凝土支架,以及采用钢筋混凝土砌碹等方式;(2)在巷道围岩打卸压钻孔,对巷道围岩进行卸压,释放围岩内应力,改善应力状态。但是目前两种方法由于受施工方法和施工工艺的限制只能单独使用,无法同时使用,大大降低了使用效果。
发明内容
本发明的目的是提供一种可以有效降低巷道围岩应力、减少需支护体的载荷的极软岩巷道底板与两帮卸压窗口支护装置。
本发明的目的是通过以下技术方案实现的:
本发明的极软岩巷道底板与两帮卸压窗口支护装置,极软岩巷道设有钢筋混凝土砌碹,在所述钢筋混凝土砌碹的底板与两帮开设多个通透的空间,所述空间内装有或留有卸压窗口。
由上述本发明提供的技术方案可以看出,本发明实施例提供的极软岩巷道底板与两帮卸压窗口支护装置,由于在钢筋混凝土砌碹的底板与两帮开设多个通透的空间,空间内装有或留有卸压窗口,可以有效降低巷道围岩应力,减少需支护体的载荷,以保持巷道稳定性。
附图说明
图1为本发明实施例提供的极软岩巷道底板与两帮卸压窗口支护装置的结构示意图;
图2为本发明实施例中卸压窗口的侧面结构示意图;
图3为本发明实施例中卸压窗口的俯视结构示意图。
图中:1、钢筋混凝土砌碹,2、卸压窗口,3、锚杆,4、固定凸起。
具体实施方式
下面将对本发明实施例作进一步地详细描述。
本发明的极软岩巷道底板与两帮卸压窗口支护装置,其较佳的具体实施方式是:
极软岩巷道设有钢筋混凝土砌碹,在所述钢筋混凝土砌碹的底板与两帮开设多个通透的空间,所述空间内装有或留有卸压窗口。
所述卸压窗口的材料为钢管或者混凝土管。
所述卸压窗口的外壁设有固定凸起。
所述卸压窗口的横截面为圆形、多边形或椭圆形。
本发明在极软岩巷道支护中使用高支撑强度的全断面封闭支护措施时,设置卸压窗口,可以有效降低巷道围岩应力,减少需支护体的载荷,以保持巷道稳定性。所谓极软岩,是指岩石单轴抗压强度小于10MPa,且遇水泥化的粘土岩类。
应用本发明,在巷道全断面封闭支护技术基础上,设置卸压窗口,使得巷道围岩可以释放部分应力;卸压窗口的材料、位置与尺寸等由现场工程地质条件决定;卸压窗口内可以采用人工注水或人工破碎等方式促使卸压窗口内围岩软化变形以达到卸压效果并控制卸压速度;卸压窗口内围岩变形卸压后,将卸压窗口内变形破坏的围岩岩块清除可以达到持续卸压的效果。
具体实施例:
如图1所示,卸压窗口是指在对巷道进行全断面封闭方式进行支护时,在支护体上留设一定规格的空间,在空间内安设钢管或者混凝土管等,巷道围岩应力超过围岩自身承载能力时,围岩将产生破坏并从卸压窗口中被“挤出”,从而达到降低围岩应力的目的。
卸压窗口的材料可以是钢管,也可以是混凝土管,尺寸由巷道围岩性质和卸压要求决定。卸压窗口的底端要在巷道围岩中,上端露出巷道表面。卸压窗口和钢筋混凝土砌碹之间要牢固固定,如图2、图3所示,可以在钢管或混凝土管周围安设固定凸起,安装后用混凝土将钢管和围岩之间缝隙进行加固。
当卸压窗口内安设好经过一段时间后,巷道围岩开始破坏并从卸压窗口中被挤出来,当卸压窗口内碎石达到一半深度时将碎石清除,可实现持续卸压。如果卸压速度过慢,可在卸压窗口内注水或人工振捣破碎等方式加速围岩卸压。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明披露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书的保护范围为准。

Claims (4)

1.一种极软岩巷道底板与两帮卸压窗口支护装置,极软岩巷道设有钢筋混凝土砌碹,其特征在于,在所述钢筋混凝土砌碹的底板与两帮开设多个通透的空间,所述空间内装有或留有卸压窗口。
2.根据权利要求1所述的极软岩巷道底板与两帮卸压窗口支护装置,其特征在于,所述卸压窗口的材料为钢管或者混凝土管。
3.根据权利要求2所述的极软岩巷道底板与两帮卸压窗口支护装置,其特征在于,所述卸压窗口的外壁设有固定凸起。
4.根据权利要求1、2或3所述的极软岩巷道底板与两帮卸压窗口支护装置,其特征在于,所述卸压窗口的横截面为圆形、多边形或椭圆形。
CN201310482151.0A 2013-10-15 2013-10-15 极软岩巷道底板与两帮卸压窗口支护装置 Expired - Fee Related CN103498685B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310482151.0A CN103498685B (zh) 2013-10-15 2013-10-15 极软岩巷道底板与两帮卸压窗口支护装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310482151.0A CN103498685B (zh) 2013-10-15 2013-10-15 极软岩巷道底板与两帮卸压窗口支护装置

Publications (2)

Publication Number Publication Date
CN103498685A true CN103498685A (zh) 2014-01-08
CN103498685B CN103498685B (zh) 2016-06-08

Family

ID=49863933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310482151.0A Expired - Fee Related CN103498685B (zh) 2013-10-15 2013-10-15 极软岩巷道底板与两帮卸压窗口支护装置

Country Status (1)

Country Link
CN (1) CN103498685B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763442A (zh) * 2015-03-12 2015-07-08 中国矿业大学(北京) 高强度大缩量封闭型弧板支护结构体
CN104847377A (zh) * 2015-05-29 2015-08-19 山西工程技术学院 一种用于矿井巷道钢筋砼支柱的制作方法
CN112483180A (zh) * 2020-12-18 2021-03-12 山东科技大学 窗口介入法判断侧向大采空顶板结构型冲击危险性的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060165489A1 (en) * 2002-11-22 2006-07-27 Dong-Hyun Seo Structure of intermediate wall of three arch excavated tunnel and method for constructing the same
CN101975073A (zh) * 2009-09-30 2011-02-16 王晓利 一种可缩混凝土碹与锚杆联合支护系统及施工方法
CN103046934A (zh) * 2012-12-14 2013-04-17 太原理工大学 一种置孔释压材料用于软围岩巷道的支护方法
CN103343690A (zh) * 2013-07-26 2013-10-09 中鼎国际工程有限责任公司 斜井大断面过含水层井筒防渗漏结构及其施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060165489A1 (en) * 2002-11-22 2006-07-27 Dong-Hyun Seo Structure of intermediate wall of three arch excavated tunnel and method for constructing the same
CN101975073A (zh) * 2009-09-30 2011-02-16 王晓利 一种可缩混凝土碹与锚杆联合支护系统及施工方法
CN103046934A (zh) * 2012-12-14 2013-04-17 太原理工大学 一种置孔释压材料用于软围岩巷道的支护方法
CN103343690A (zh) * 2013-07-26 2013-10-09 中鼎国际工程有限责任公司 斜井大断面过含水层井筒防渗漏结构及其施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许正荣: "柔性改良砌碹支护在巷修中的应用", 《能源与环境》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763442A (zh) * 2015-03-12 2015-07-08 中国矿业大学(北京) 高强度大缩量封闭型弧板支护结构体
CN104763442B (zh) * 2015-03-12 2017-06-06 中国矿业大学(北京) 高强度大缩量封闭型弧板支护结构体
CN104847377A (zh) * 2015-05-29 2015-08-19 山西工程技术学院 一种用于矿井巷道钢筋砼支柱的制作方法
CN104847377B (zh) * 2015-05-29 2017-04-12 山西工程技术学院 一种用于矿井巷道钢筋砼支柱的制作方法
CN112483180A (zh) * 2020-12-18 2021-03-12 山东科技大学 窗口介入法判断侧向大采空顶板结构型冲击危险性的方法

Also Published As

Publication number Publication date
CN103498685B (zh) 2016-06-08

Similar Documents

Publication Publication Date Title
CN103643977A (zh) 一种全锚分区让压注浆锚杆及其使用方法
CN102011597B (zh) 隧道软弱围岩支护方法及支护结构
CN103557012B (zh) 一种大变形巷道围岩注浆紧固承载结构及施工方法
CN102352601A (zh) 隧道式复合锚碇
CN203742612U (zh) 煤矿深井软弱破碎围岩巷道快速施工支护系统
CN110145329A (zh) 一种深部软岩圆形巷道支护方法
CN110985079A (zh) 一种吸能抗冲击的巷道支护方法
CN103498685A (zh) 极软岩巷道底板与两帮卸压窗口支护装置
CN101975074B (zh) 软岩巷道锚拉钢管混凝土抗底臌装置及其施工方法
CN201288586Y (zh) 一种防止沿空留巷充填墙体滑移结构
CN108386217A (zh) 一种加固软弱岩体的自动分级扩头抗拔锚杆及其使用方法
CN205189918U (zh) 一种膨胀型中空注浆锚杆
CN205400774U (zh) 一种新型中空注浆锚索
CN106703850A (zh) 一种新型液压膨胀式可回收锚杆
CN205297608U (zh) 一种新型液压膨胀式可回收锚杆
CN106761841A (zh) 工作面回风平巷破碎煤体注浆加固方法
CN106368717B (zh) 一种隧道防塌方支护结构
CN105201525A (zh) 一种可修复的防治底鼓方法
CN205047240U (zh) 一种可弯折膨胀锚杆
CN205135647U (zh) 一种可修复的防治底鼓结构
CN203856490U (zh) 一种自进式中空注浆锚杆
CN207660543U (zh) 一种松软破碎厚托顶煤巷道顶板锚固孔成孔装置
CN203847138U (zh) 一种自进式中空注浆锚杆
CN106761815A (zh) 一种新型井筒井壁联合支护加固装置
CN112012769A (zh) 地震带下半刚性半柔性抗冲击隧道围岩支护结构及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NINGXIA COAL SCIENCE AND TECHNOLOGY RESEARCH INSTI

Effective date: 20150323

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150323

Address after: 100083 Beijing City, Haidian District Institute of China University of Mining and Technology No. 11 Ludwig

Applicant after: China University of Mining & Technology, Beijing

Applicant after: Ningxia coal science and Technology Research Institute Co Ltd

Address before: 100083 Beijing City, Haidian District Institute of China University of Mining and Technology No. 11 Ludwig

Applicant before: China University of Mining & Technology, Beijing

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20161015

CF01 Termination of patent right due to non-payment of annual fee