CN103498571B - 采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法 - Google Patents

采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法 Download PDF

Info

Publication number
CN103498571B
CN103498571B CN201310476735.7A CN201310476735A CN103498571B CN 103498571 B CN103498571 B CN 103498571B CN 201310476735 A CN201310476735 A CN 201310476735A CN 103498571 B CN103498571 B CN 103498571B
Authority
CN
China
Prior art keywords
wire cloth
gauze wire
wall
stone structure
steel tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310476735.7A
Other languages
English (en)
Other versions
CN103498571A (zh
Inventor
董有
鞠树森
潘沂华
杨黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anping Sulin Wire Mesh Products Co., Ltd.
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310476735.7A priority Critical patent/CN103498571B/zh
Publication of CN103498571A publication Critical patent/CN103498571A/zh
Application granted granted Critical
Publication of CN103498571B publication Critical patent/CN103498571B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及一种采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法,属于抗震加固技术领域。包括原石结构墙体,还包括设置在原石结构墙体两侧的钢丝网以及贯通墙体的拉结钢筋,通过石结构墙体的拉结钢筋,使石结构墙体两侧形成钢筋骨架,再在钢筋骨架上绑扎钢丝网,然后喷射混凝土。本发明在对石结构房屋改动量较小的基础上,增加了钢筋内外骨架,改善了石结构墙体的抗剪、抗弯的变形性能,加强了石结构墙体的整体性,实现了对石结构房屋的抗震加固,可广泛应用于石结构房屋加固中。

Description

采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法
技术领域
本发明涉及一种采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法,是一种针对老旧石结构墙体的抗震加固方法,属于抗震加固技术领域。
背景技术
随着社会的发展,生产力水平的提高,人们越来越重视住宅的安全性。而由于石材结构抗压强度好,因墙体厚实冬暖夏凉而具有较好的实用性,受到不少农民的欢迎,大量被用作建筑材料。但石材结构属于散体材料结构,其抗剪、抗弯、抗拉性能差,遭受的破坏也大,尤其是大体量,层数较高的建筑物。并且目前石结构房屋墙体的砂浆标号普遍偏低,有的甚至是干砌石结构房屋,大部分石结构房屋中采用立砌块石中间夹碎石填充的形式较多,这种结构形式在地震时必然会遭到惨重的破坏。因此,提高石结构农居的加固措施显得尤为重要,这样既能够节约农民的改造成本,又能够提供更加安全可靠的居住环境,减少灾害造成的人员及财产损失,增加房屋的使用寿命。可以预见,随着人们对自身居住环境安全性要求的提高以及房屋抗震性能越来越被重视,如果该技术加以推广,在加固农居石结构房屋方面将有显著的经济效益。
发明内容
由于石块的形状不规则,大多墙体较厚,圈梁、构造柱的抗震构造作法并非十分适宜,本发明提出了一种采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法,用以解决石结构房屋的整体性及抗震性能差的问题。
本发明的技术方案如下:
一种采用穿墙钢筋骨架外加钢丝网的加固石结构,包括原石结构墙体,还包括设置在原石结构墙体两侧的钢丝网以及贯通墙体的拉结钢筋,钢丝网外侧喷射有混凝土;所述钢丝网和拉结钢筋与后喷射的混凝土形成坚实整体;其中,钢丝网底端与预埋在墙体两侧地基中的锚固环绑扎牢固,墙体上设置有锚孔,且钢丝网通过布置在锚孔内的铆钉固定,所述锚固环通过铆钉固定于地基中;所述拉结钢筋通过设置在墙体上的钻孔穿过墙体,且其两端绑扎在钢丝网的结点处。
进一步地,所述拉结钢筋直径为Φ12-Φ14。
所述拉结筋的钻孔直径不小于两倍的拉结钢筋直径。
所述钢丝网外侧喷射的混凝土厚度为0.2-2cm。
所述墙体上的锚孔为梅花状。
穿拉结钢筋的孔洞内填充有混凝土。
填充墙体上孔洞的混凝土强度不低于C20。
上述采用穿墙钢筋骨架外加钢丝网的加固石结构的施工方法,采用如下步骤:
步骤一:根据设计要求进行地基加固及处理,采用在土壤中打入钢板的形式挤密土壤,提高地基的承载力;
步骤二:在加固的地基表面浇筑混凝土地面,待混凝土达到规定强度后钉入铆钉同时固定锚固环,锚固环应避免倾斜;
步骤三:根据设计图纸定位划线,按梅花状在墙体上进行锚孔布置,根据拉结钢筋的位置进行孔洞布置,并做好清底工作,清除墙体表面的泥垢、水锈;
步骤四:根据设计要求在墙体上凿出锚孔及钻孔,并清理锚孔及孔洞内杂物,用皮老虎或压力水清洗孔内粉尘,在钻孔中埋入拉结钢筋并用细石混凝土浇捣密实;
步骤五:待拉结钢筋处混凝土强度达到70%以上时,绑扎钢丝网,将钢丝网底部与预先固定的锚固环绑扎牢固,并且在拉网之前,采取必要措施,以免拉网时端头锚固环脱落;
步骤六:由下而上,待钢丝网拉到拉结钢筋位置处,将拉结钢筋端部进行弯钩处理,将其绑扎在钢丝网的结点处,然后接着进行上一层钢丝网与拉结钢筋的绑扎,并按梅花状打入铆钉固定钢丝网,使钢丝网能够始终绷紧拉直;
步骤七:喷射混凝土到规定厚度,并进行养护。
有益效果:
本发明的优势在于采用穿墙钢筋骨架外加钢丝网加固石结构,避免了对原石结构的拆除重建,施工方法简单,经济合理,不会对原结构造成破坏。利用锚固环将钢丝网与地基相连接,并利用穿墙拉结钢筋固定钢丝网并与钢丝网绑扎牢固,使石结构墙体两侧形成钢筋骨架,最后喷射混凝土,大大提高石结构墙体的强度及抗震能力。
由于采用穿墙钢筋骨架外加钢丝网加固石结构施工简单,节约成本,能够很好地改善石结构墙体的抗剪、抗弯的变形性能,从而加强石结构墙体的整体性。为农民提供了更加安全可靠的居住环境,减少灾害造成的人员及财产损失,增加房屋的使用寿命。可以预见,随着人们对自身居住环境安全性要求的提高以及房屋抗震性能越来越得到重视,如果该技术加以推广,在加固农居石结构房屋方面将有显著的经济效益。
附图说明
图1为穿墙钢筋骨架外加钢丝网结构平面示意图;
图2为钢丝网加固示意图;
图3为图2的A-A剖面图;
图4为钢丝网与基础连接示意图;
图5为锚固环示意图。
图中,1:原石结构墙体;2:钢丝网;3:结点;4:拉结钢筋;5:混凝土;6:地基;7、锚固环;8、钢板。
具体实施方式
本发明的一种采用穿墙钢筋骨架外加钢丝网的加固石结构,参见图1至图5所示,包括原石结构墙体1,还包括设置在原石结构墙体1两侧的钢丝网2以及贯通墙体1的拉结钢筋4,所述钢丝网2和拉结钢筋4与后喷射的混凝土5形成坚实整体,参见图2至图3。其中钢丝网2底端与预埋在墙体1两侧地基6中的锚固环7绑扎牢固,并且在墙体1中按梅花状锚孔布置铆钉固定钢丝网2,参见图4。所述锚固环7通过铆钉固定于地基6中,所述地基6根据土壤性质进行加固处理,可采用在土体中打入钢板8的形式挤密土壤,参见图4。所述拉结钢筋4通过在墙体1上钻孔穿过墙体1并且两端绑扎在钢丝网2的结点3处,所述钻孔应根据拉结钢筋4位置确定并应用混凝土5填充密实。其中地基6经处理后,应在表面打一层混凝土5,以便铆钉将地基6与锚固环7连接可靠,同时钢板8厚度及间距应根据设计而定,锚固环7应理直,不得倾斜,参见图5。所述拉结钢筋4直径宜为Φ12-Φ14,拉结钢筋4钻孔直径不得小于两倍钢筋直径。灌孔混凝土5强度不应低于C20,钢丝网2应拉直绷紧,不得出现弯曲,钢丝网2外喷射混凝土5应保证有足够的厚度,能够充分握裹钢丝网2,保证钢丝网2不被锈蚀,优选厚度为0.2-2cm。其相应的施工方法为:
步骤一:地基处理,根据设计要求进行地基6加固,选择合理的加固方式,可采用在土壤中打入钢板8的形式挤密土壤,提高地基6的承载力;
步骤二:在加固的地基6表面浇筑混凝土地面,待混凝土5达到规定强度后钉入铆钉同时固定锚固环7,锚固环7应避免倾斜;
步骤三:根据设计图纸定位划线,按梅花状进行锚孔布置,根据拉结钢筋4的位置进行孔洞布置,并做好清底工作,清除墙体1表面的泥垢、水锈等杂质;
步骤四:根据设计要求在墙体1上凿出锚孔及孔洞,并清理孔内杂物,建议用皮老虎或压力水清洗孔内粉尘,在钻孔中埋入拉结钢筋4并用高标号细石混凝土5浇捣密实;
步骤五:待拉结钢筋4处混凝土5强度达到70%以上时,绑扎钢丝网2,首先应将钢丝网2底部与预先固定的锚固环7绑扎牢固,并且在拉网之前,应采取必要措施,以免拉网时端头锚固环7脱落;
步骤六:由下而上,待钢丝网2拉到拉结钢筋4位置处,将拉结钢筋4端部进行弯钩处理,将其绑扎在钢丝网2的结点3处,然后接着进行上一层钢丝网2与拉结钢筋4的绑扎,并按梅花状打入铆钉固定钢丝网2,使其能够始终绷紧拉直;
步骤七:喷射混凝土5到规定厚度,并进行养护。
以上为本发明的一具体实施方式,本发明的实施不限于此。

Claims (6)

1.一种采用穿墙钢筋骨架外加钢丝网的加固石结构,包括原石结构墙体(1),其特征在于:还包括设置在原石结构墙体(1)两侧的钢丝网(2)以及贯通墙体(1)的拉结钢筋(4),钢丝网(2)外侧喷射有混凝土;所述钢丝网(2)和拉结钢筋(4)与后喷射的混凝土(5)形成坚实整体;其中,钢丝网(2)底端与预埋在墙体(1)两侧地基(6)中的锚固环(7)绑扎牢固,墙体(1)上设置有锚孔,且钢丝网(2)通过布置在锚孔内的铆钉固定,所述锚固环(7)通过铆钉固定于地基(6)中;所述拉结钢筋(4)通过设置在墙体(1)上的钻孔穿过墙体(1),且其两端绑扎在钢丝网(2)的结点(3)处;穿拉结钢筋(4)的孔洞内填充有混凝土(5);所述墙体上的锚孔为梅花状。
2.根据权利要求1所述的采用穿墙钢筋骨架外加钢丝网的加固石结构,其特征在于:所述拉结钢筋(4)直径为Φ12-Φ14。
3.根据权利要求1所述的采用穿墙钢筋骨架外加钢丝网的加固石结构,其特征在于:所述拉结筋(4)的钻孔直径不小于两倍的拉结钢筋直径。
4.根据权利要求1所述的采用穿墙钢筋骨架外加钢丝网的加固石结构,其特征在于:所述钢丝网(2)外侧喷射的混凝土厚度为0.2-2cm。
5.根据权利要求1所述的采用穿墙钢筋骨架外加钢丝网的加固石结构,其特征在于:填充墙体(1)上孔洞的混凝土(5)强度不低于C20。
6.根据权利要求1-5任一项所述采用穿墙钢筋骨架外加钢丝网的加固石结构的施工方法,其特征在于:采用如下步骤:
步骤一:根据设计要求进行地基(6)加固及处理,采用在土壤中打入钢板(8)的形式挤密土壤,提高地基(6)的承载力;
步骤二:在加固的地基(6)表面浇筑混凝土(5)地面,待混凝土(5)达到规定强度后钉入铆钉同时固定锚固环(7),锚固环(7)应避免倾斜;
步骤三:根据设计图纸定位划线,按梅花状在墙体(1)上进行锚孔布置,根据拉结钢筋(4)的位置进行孔洞布置,并做好清底工作,清除墙体(1)表面的泥垢、水锈;
步骤四:根据设计要求在墙体(1)上凿出锚孔及钻孔,并清理锚孔及孔洞内杂物,用皮老虎或压力水清洗孔内粉尘,在钻孔中埋入拉结钢筋(4)并用细石混凝土(5)浇捣密实;
步骤五:待拉结钢筋(4)处混凝土(5)强度达到70%以上时,绑扎钢丝网(2),将钢丝网(2)底部与预先固定的锚固环(7)绑扎牢固,并且在拉网之前,采取必要措施,以免拉网时端头锚固环(7)脱落;
步骤六:由下而上,待钢丝网(2)拉到拉结钢筋(4)位置处,将拉结钢筋(4)端部进行弯钩处理,将其绑扎在钢丝网(2)的结点(3)处,然后接着进行上一层钢丝网(2)与拉结钢筋(4)的绑扎,并按梅花状打入铆钉固定钢丝网(2),使钢丝网(2)能够始终绷紧拉直;
步骤七:喷射混凝土(5)到规定厚度,并进行养护。
CN201310476735.7A 2013-10-12 2013-10-12 采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法 Expired - Fee Related CN103498571B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310476735.7A CN103498571B (zh) 2013-10-12 2013-10-12 采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310476735.7A CN103498571B (zh) 2013-10-12 2013-10-12 采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法

Publications (2)

Publication Number Publication Date
CN103498571A CN103498571A (zh) 2014-01-08
CN103498571B true CN103498571B (zh) 2015-09-09

Family

ID=49863821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310476735.7A Expired - Fee Related CN103498571B (zh) 2013-10-12 2013-10-12 采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法

Country Status (1)

Country Link
CN (1) CN103498571B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327153A (zh) * 2016-04-28 2017-11-07 卡本复合材料(天津)有限公司 一种碳纤维网格对柱子抗压加固方法
CN110173126A (zh) * 2019-04-22 2019-08-27 福建工程学院 一种石砌体房屋墙体加固方法
CN110206135B (zh) * 2019-05-21 2024-01-12 福建理工大学 一种石砌体房屋基础加固结构及方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203603524U (zh) * 2013-10-12 2014-05-21 北京筑福国际工程技术有限责任公司 采用穿墙钢筋骨架外加钢丝网的加固石结构

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203603524U (zh) * 2013-10-12 2014-05-21 北京筑福国际工程技术有限责任公司 采用穿墙钢筋骨架外加钢丝网的加固石结构

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
"农村干砌石结构房屋的抗震加固研讨";陈宙;《工程抗震》;19981205(第4期);第44-46页 *
"某单层石结构增层加固的设计与施工";张云波等;《工程力学增刊》;20000901;第353-356页 *
"用夹板墙法作砌体结构加固";李贵美;《安徽建筑》;20030828;第96-97页 *
"石结构房屋抗震加固构造措施和施工";陶文超;《工程抗震》;19851001(第3期);第18-20页 *

Also Published As

Publication number Publication date
CN103498571A (zh) 2014-01-08

Similar Documents

Publication Publication Date Title
CN107989231A (zh) 一种预制钢管混凝土边框剪力墙及其施工方法
CN104234050B (zh) 一种引孔植入式带支盘抗浮岩石锚杆及施工方法
CN103225422B (zh) 采用轻钢结构直接加层技术的既有砌体结构及其施工方法
CN207776149U (zh) 一种预制钢管混凝土边框剪力墙
CN203603524U (zh) 采用穿墙钢筋骨架外加钢丝网的加固石结构
CN107119799A (zh) 梁端摩擦耗能的预应力装配式节点构造及其施工方法
CN110005090A (zh) 一种可优化应力分布的自复位剪力墙
CN100458102C (zh) 钢板-混凝土组合衬砌
CN103498571B (zh) 采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法
WO2020168766A1 (zh) 先张拉后锚固式预应力抗浮锚杆结构
CN103711329A (zh) 外贴钢骨混凝土框架法加固结构的方法
CN107165177A (zh) 一种边坡支护施工方法
CN204098032U (zh) 一种引孔植入式带支盘抗浮岩石锚杆
CN201665875U (zh) 轻型重力式抗震混凝土挡土墙
CN100595397C (zh) 植筋和锚杆相结合的抗浮施工方法
CN206941799U (zh) 梁端摩擦耗能的预应力装配式节点构造
CN206428577U (zh) 一种大跨径钢波纹板拱桥
CN103498567B (zh) 砌筑墙体内后增暗圈梁抗震加固方法及其加固结构
CN203603525U (zh) 石结构外加夹板梁及夹板柱加固结构
CN209353576U (zh) 一种钢管混凝土组合异形柱外包式柱脚节点
CN108265823A (zh) 装配式钢管混凝土柱-独立基础-混凝土圈梁l形连接节点
CN109184741B (zh) 一种高承载力盾构隧道管片接头结构
CN103498572B (zh) 石结构外加夹板梁及夹板柱加固结构的施工方法
CN218061703U (zh) 一种采用外加混凝土套加固混凝土条形基础
CN106337512A (zh) 底部加强型钢管混凝土边框高强混凝土组合剪力墙及制作方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Du Lihong

Inventor before: Dong You

Inventor before: Ju Shusen

Inventor before: Pan Yihua

Inventor before: Yang Liming

TR01 Transfer of patent right

Effective date of registration: 20171031

Address after: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee after: Beijing Yong Bo Science and Technology Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building

Patentee before: Beijing Aeido International Engineering Technology Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171205

Address after: 225300 Yongan village, Yongan Town, Taizhou City, Jiangsu Province, No. 57

Patentee after: Dong Jinhuan

Address before: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee before: Beijing Yong Bo Science and Technology Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 225300 room 104, Pearl Road, Yongan Town, Yongan, Taizhou, Jiangsu

Patentee after: Dong Jinhuan

Address before: 225300 Yongan Village, Yonganzhou Town, Gaogang District, Taizhou City, Jiangsu Province, 57

Patentee before: Dong Jinhuan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190507

Address after: 053600 500 meters north of Nanzhangwo Village, Anping County, Hengshui City, Hebei Province

Patentee after: Anping Sulin Wire Mesh Products Co., Ltd.

Address before: 225300 room 104, Pearl Road, Yongan Town, Yongan, Taizhou, Jiangsu

Patentee before: Dong Jinhuan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20201012