CN103491557B - The processing method and processing device of upgrading base station data - Google Patents
The processing method and processing device of upgrading base station data Download PDFInfo
- Publication number
- CN103491557B CN103491557B CN201210196473.4A CN201210196473A CN103491557B CN 103491557 B CN103491557 B CN 103491557B CN 201210196473 A CN201210196473 A CN 201210196473A CN 103491557 B CN103491557 B CN 103491557B
- Authority
- CN
- China
- Prior art keywords
- base station
- omc
- application layer
- layer protocol
- upgrading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Mobile Radio Communication Systems (AREA)
- Stored Programmes (AREA)
Abstract
The invention discloses a kind of processing method and processing devices of upgrading base station data, wherein, this method comprises: new base station edition and configuration data are downloaded to base station by application layer protocol in the case where base station firmware version meets promotion condition and bottom link is logical by OMC;OMC is activated new base station edition by application layer protocol.By with the present invention, solve in the related technology when OMC and base station due to upper-layer protocol it is obstructed lead to OMC and base station chain rupture in the case where, upgrading base station data can not be transmitted, and then the problem of upgrading base station can not be made, and then one kind is provided in the case where chain rupture, the relevant upgrading data in base station can also be handled, improve the efficiency of upgrading, the time is saved, the performance of system is improved.
Description
Technical field
The present invention relates to the communications fields, in particular to a kind of processing method and processing device of upgrading base station data.
Background technique
With the development of radio network technique, the application of wireless network and scale constantly expand.Base station is wanted in wireless network
The function of base station is improved, by base station edition upgrading in order to provide more services.Base station in wireless network can pass through
Operation and maintenance center (Operations & Maintenance Center, referred to as OMC) or LMT Local Maintenance Terminal (Local
Maintenance Terminal, referred to as LMT) carry out base station edition updating operation, the list of the batch upgrade ratio LMT of OMC
A base station operation upgrading is high-efficient, and therefore, upgrading base station is all made of OMC and is upgraded.
The premise that OMC upgrades base station is that OMC can refer to underlying protocol and high level with base station link setup, link setup herein
The all logical situation of agreement.After link setup, updating operation is carried out to base station by the version management function of OMC.
When span is larger between the version to be upgraded and operation version, since high-level communications protocol version changes,
Cause new version OMC and run early version base station can not link setup, herein referred as chain rupture, chain rupture herein refers to that underlying protocol is logical,
I.e. application layer transport layer below, link layer, physical layer protocol are all logical, the obstructed situation of upper-layer protocol.High level herein
Agreement generally refers to the snmp protocol of application layer, and OMC is needed through snmp protocol and base station link setup, and given by snmp protocol
Send out message in base station.Since OMC is different from the version of the snmp protocol of base station, cause snmp protocol obstructed, i.e. OMC and base station can not
It is communicated by this agreement.The software version management function of relevant OMC can only complete base station version in the case where link setup
This upgrading.
Summary of the invention
The present invention provides a kind of processing method and processing device of upgrading base station data, at least solve in the related technology, when
OMC and base station due to upper-layer protocol not by leading to OMC and base station chain rupture in the case where, upgrading base station data can not be transmitted, into
And the problem of upgrading base station can not be made.
According to an aspect of the invention, there is provided a kind of processing method of upgrading base station data, comprising: OMC is in base station
In the case that firmware version meets promotion condition and bottom link leads to, number by new base station edition and is configured by application layer protocol
According to downloading to base station;The OMC is activated the new base station edition by the application layer protocol.
Preferably, new base station edition and configuration data are downloaded to before base station by application layer protocol, further includes: institute
It states OMC and judges whether the base station firmware version meets the promotion condition.
Preferably, before the OMC judges whether the base station firmware version meets promotion condition, further includes: determine chain
It is obstructed that road is in the logical but high-rise link protocol of bottom link protocol.
Preferably, it after the OMC is activated the new base station edition by the application layer protocol, also wraps
Include: the OMC detects that the base station runs the new base station edition and completes link setup with the OMC, it is determined that establishes high
Layer protocol link.
Preferably, determine that the base station is established after upper-layer protocol link, further includes: detect the service operation of the base station
It is whether normal;If the service operation of the base station is abnormal, by the application layer protocol by the operation version of the base station
This rollback is the version before activation.
Preferably, the application layer protocol includes at least following one: TELNET agreement, SSH agreement.
According to another aspect of the present invention, a kind of processing unit of upgrading base station data is provided, OMC is applied to, comprising:
Download module, for being incited somebody to action by application layer protocol in the case where base station firmware version meets promotion condition and bottom link is logical
New base station edition and configuration data downloads to base station;Active module, for passing through the application layer protocol for the new base
Version of standing is activated.
Preferably, described device further include: judgment module, for judging whether the base station firmware version meets the liter
Grade condition.
Preferably, described device further include: determining module, for determining that link is in that bottom link protocol is logical but high-rise chain
Road agreement is obstructed.
Preferably, the application layer protocol includes at least following one: TELNET agreement, SSH agreement.
Present invention employs following methods: will be under new base station edition and the data needed to configure by using application layer association
It is downloaded to base station, makes base station that can receive upgrading data in the case where chain rupture, and by the application layer protocol to be upgraded
The new base station edition that receives of base station activated.By solving in the related technology as OMC and base station with the present invention
Due to upper-layer protocol not by leading to OMC and base station chain rupture in the case where, upgrading base station data can not be transmitted, and then base can not be made
Stand the problem of upgrading, and then provides one kind in the case where chain rupture, the relevant upgrading data in base station can also be handled,
The efficiency for improving upgrading, saves the time, improves the performance of system.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair
Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the processing method of upgrading base station data according to an embodiment of the present invention;
Fig. 2 is the flow chart of method for upgrading base station according to an embodiment of the present invention;
Fig. 3 is the flow chart of the method for upgrading base station of preferred embodiment one according to the present invention;
Fig. 4 is the flow chart of the method for upgrading base station of preferred embodiment two according to the present invention;
Fig. 5 is the flow chart of the method for upgrading base station of preferred embodiment three according to the present invention;
Fig. 6 is the structural block diagram one of the processing unit of upgrading base station data according to an embodiment of the present invention;
Fig. 7 is the structural block diagram two of the processing unit of upgrading base station data according to an embodiment of the present invention;
Fig. 8 is the structural block diagram three of the processing unit of upgrading base station data according to an embodiment of the present invention.
Specific embodiment
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and in combination with Examples.It should be noted that not conflicting
In the case of, the features in the embodiments and the embodiments of the present application can be combined with each other.
Based in the related technology, when OMC and base station due to upper-layer protocol not by leading to OMC and base station chain rupture the case where
Under, the problem of can not transmitting upgrading base station data, and then can not make upgrading base station, the embodiment of the invention provides a kind of base station liters
The processing method of grade data, the process of this method is as shown in Figure 1, include step S102 to step S104:
Step S102, OMC pass through application layer in the case where base station firmware version meets promotion condition and bottom link is logical
New base station edition and configuration data are downloaded to base station by agreement;
Step S104, OMC are activated new base station edition by application layer protocol.
The embodiment of the present invention uses following method: by new base station edition and being needed to configure by using application layer association
Data download to base station, make base station that can receive upgrading data with OMC chain rupture, and assist by the application layer
View activates the new base station edition that base station to be upgraded receives.By using the embodiment of the present invention, solves correlation
In technology when OMC and base station due to upper-layer protocol not by leading to OMC and base station chain rupture in the case where, upgrading base station can not be transmitted
Data, so the problem of upgrading base station can not be made, and then one kind is provided in the case where chain rupture, it can also be relevant by base station
Upgrading data are handled, and are improved the efficiency of upgrading, are saved the time, improve the performance of system.
It, can before new base station edition and configuration data are downloaded to base station by application layer protocol in implementation process
To carry out environment measuring to base station by application layer protocol, that is, judge whether base station firmware version meets promotion condition.In firmware
In the case that version meets promotion condition, step S102 is continued to execute, if not meeting firmware upgrade condition, illustrates base station
Current firmware is defective, which is not suitable for upgrading.This step provides a decision processes, make the process of upgrading base station more
Stablize.
Before OMC judges whether base station meets firmware upgrade condition, it can be determined that the state of current ink is determining chain
Road be in the logical but high-rise link protocol of bottom link protocol it is obstructed in the case where, then execute above-mentioned steps.Certainly, judgement is one
The preferred mode of kind, can also use this method in the case where not chain rupture.It may using this method in the case where link setup
More resources, naturally also a kind of mode are used than normal situation.It is logical but high-rise to determine that link is in bottom link protocol
The obstructed situation of link protocol saves the resource of system.
After the OMC in step S104 is activated new base station edition by application layer protocol, OMC detects base
It stands and runs new base station edition and complete link setup with the OMC, it is determined that establish upper-layer protocol link.
Determine that base station is established after upper-layer protocol link, whether the service operation that can detecte base station is normal;If base station
Service operation it is abnormal, then by application layer protocol by the operation version rollback of base station be activate before version.If base station
Service operation it is normal, then illustrate that this edition upgrading really can be used, improve the accuracy of upgrading base station.
The above method implement when, application layer protocol may include it is a variety of, for example, TELNET agreement, SSH protocol
Deng.It is illustrated in the case that below be TELNET agreement to application layer protocol, File Transfer Protocol is used in conjunction with.
The method that the present embodiment upgrades base station includes step S202 to step S206:
Step S202, OMC realize TELNET client and ftp client, and TELNET server-side and FTP service are supported in base station
End.
During above-mentioned steps are implemented, need to create NE on OMC (network element is chain rupture state), to guarantee network management
Base station can be connected to by TELNET and FTP;Base station configuration data is created on OMC, which can upgrade at present
It is downloaded to base station, for activating new base station edition, therefore, configuration data wants the normal operation that can ensure new version packet.
Step S204, the preparation before completing upgrading.
During above-mentioned steps are implemented, the base station edition packet that will upgrade imports OMC;Then, ring is carried out to base station
Border checks, guarantees that base station meets upgrading and requires.Environmental test passes through TELNET protocol realization.
Step S206, upgrades base station.
It during the step is implemented, needs to download base station edition and configuration data by OMC to base station, version and matches
The downloading for setting data can be realized by TELNET and File Transfer Protocol;The version of downloading is activated, activation operation is assisted by TELNET
View is realized;Base station run new version after, business is normally established, and with OMC link setup.
By using the present embodiment method, it is able to solve the upgrade problem of base station in the case of network management and base station chain rupture.And
Escalation process is batch operation, ensure that the efficiency of upgrading.
In system, OMC upgrade function entrance is realized, updating operation can be carried out by OMC client end interface;Base station
In escalation process, it can be identified and be encroached right by network packet capturing.
Preferred embodiment one
A kind of method that this preferred embodiment provides base station edition upgrading uses OMC pairs in the case where meeting chain rupture
The updating operation of base station progress batch.
Fig. 3 is the flow chart of this preferred embodiment, and this method mainly uses TELNET and File Transfer Protocol in chain rupture
Upgraded.The function TELNET protocol instead that can be realized File Transfer Protocol in the present embodiment, is only carried out with TELNET agreement
Upgrading.The embodiment includes step S302 to step S316:
Step S302, OMC realize TELNET client and ftp client, and TELNET server-side and FTP service are supported in base station
End.
Step S304, OMC can be logged in by TELNET agreement and File Transfer Protocol and be operated base station.
Step S306, creates NE on OMC, and completes the configuration of network element, and it is new that configuration data guarantees that base station can be run
Version packet.
Step S308 imports base station specification packet on OMC, operates for edition upgrading.
Step S310 carries out environmental test to base station by TELNET agreement, checks whether base station firmware version meets liter
Grade condition.
Base station edition and configuration data are downloaded to base station by TELNET agreement and File Transfer Protocol by step S312, OMC.
Step S314, OMC are activated the version downloaded by TELNET agreement.
Step S316, base station run new version, complete whole table configuration, complete transmission and establish, and establish corresponding business.This
When, link setup is completed in OMC and base station.
Preferred embodiment two
Fig. 4 is the flow chart of this preferred embodiment, is mainly upgraded using SSH and Secure File Transfer Protocol to base station edition, can
With the function of being realized with SSH protocol instead Secure File Transfer Protocol, only upgraded with SSH agreement.The embodiment include step S402 extremely
Step S416:
Step S402, OMC realize ssh client and SFTP client, and SSH server-side and SFTP server-side are supported in base station.
Step S404, OMC can be logged in by SSH agreement and Secure File Transfer Protocol and be operated base station.
Step S406, creates NE on OMC, and completes the configuration of network element, and it is new that configuration data guarantees that base station can be run
Version packet.
Step S408 imports base station specification packet on OMC, operates for edition upgrading.
Step S410 carries out environmental test to base station by SSH agreement, checks whether base station meets promotion condition.
Base station edition and configuration data are downloaded to base station by SSH agreement and Secure File Transfer Protocol by step S412, OMC.
Step S414, OMC are activated by the version that SSH agreement has been downloaded.
Step S416, base station run new version, complete whole table configuration, complete transmission and establish, and establish corresponding business.This
When, link setup is completed in OMC and base station.
The embodiment is realized using SSH and Secure File Transfer Protocol, is ensured network security, is improved the safety of system
Energy.
Preferred embodiment three
Fig. 5 is the flow chart of this preferred embodiment, including step S502 to step S520:
Step S502, OMC realize TELNET client and ftp client, and TELNET server-side and FTP service are supported in base station
End.
Step S504, OMC can be logged in by TELNET agreement and File Transfer Protocol and be operated base station.
Step S506, creates NE on OMC, and completes the configuration of network element, and it is new that configuration data guarantees that base station can be run
Version packet.
Step S508 imports base station specification packet on OMC, operates for edition upgrading.
Step S510 carries out environmental test to base station by TELNET agreement, checks whether base station meets promotion condition.
Base station edition and configuration data are downloaded to base station by TELNET agreement and File Transfer Protocol by step S512, OMC.
Step S514, OMC are activated the version downloaded by TELNET agreement.
Step S516, base station run new version, complete whole table configuration, complete transmission and establish, and establish corresponding business.This
When, link setup is completed in OMC and base station, judge BTS service whether normal operation.If normal, S518 is thened follow the steps, is otherwise held
Row step S520.
Base station can be run the version before version rollback to activation, by TELNET agreement to guarantee base by step S518
Business of standing operates normally.
Step S520, upgrades successfully.
The preferred embodiment increases the protection process of upgrading failure relative to above preferred embodiment, it is ensured that base station
The version before returning back to activation when new version failure is being run, is guaranteeing the normal operation of BTS service, optimizes system performance.
The embodiment of the invention also provides a kind of processing unit of upgrading base station data, which can be applied to OMC, should
The structural block diagram of OMC is as shown in Figure 6, comprising: download module 10, for meeting promotion condition and bottom chain in base station firmware version
In the case that road is logical, new base station edition and configuration data are downloaded to by base station by application layer protocol;Active module 20, under
It carries module 10 to couple, for activating new base station edition by application layer protocol.
Fig. 7 shows the structural block diagram of the preferred embodiment of the embodiment of the present invention, the device further include: judgment module 30, with
Download module 10 couples, for judging whether base station firmware version meets promotion condition.
In a preferred embodiment, which can be as shown in figure 8, comprises determining that module 40, with judgment module 30
Coupling, for determining that it is obstructed that link is in the logical but high-rise link protocol of bottom link protocol.
Preferably, above-mentioned apparatus can be also used for: after new base station edition is activated by application layer protocol,
Detect that base station runs new base station edition and completes link setup with OMC, it is determined that establish upper-layer protocol link.
After the device determines that upper-layer protocol link is established in base station, the service operation of base station can also be detected whether just
Often;If the service operation of base station is abnormal, by application layer protocol by the operation version rollback of base station be activate before version
This.
In above-mentioned apparatus operational process, application layer protocol may include: TELNET agreement, TELNET agreement and FTP association
View, SSH agreement, SSH agreement and Secure File Transfer Protocol etc..
It can be seen from the above description that the present invention realizes following technical effect:
The present invention implements that new base station edition and the data needed to configure are downloaded to base station by using application layer association, makes
Base station can receive upgrading data in the case where chain rupture, and be received by the application layer protocol to base station to be upgraded
New base station edition activated.By using the embodiment of the present invention, solve in the related technology when OMC and base station are due to height
In the case that layer protocol is not by leading to OMC and base station chain rupture, upgrading base station data can not be transmitted, and then upgrading base station can not be made
The problem of, and then one kind is provided in the case where chain rupture, the relevant upgrading data in base station can also be handled, improve and rise
The efficiency of grade, saves the time, improves the performance of system.
Obviously, those skilled in the art should be understood that each module of the above invention or each step can be with general
Computing device realize that they can be concentrated on a single computing device, or be distributed in multiple computing devices and formed
Network on, optionally, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored
It is performed by computing device in the storage device, and in some cases, it can be to be different from shown in sequence execution herein
The step of out or describing.In this way, the present invention is not limited to any specific hardware and softwares to combine.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of processing method of upgrading base station data characterized by comprising
Operation and maintenance center OMC passes through application layer in the case where base station firmware version meets promotion condition and bottom link is logical
New base station edition and configuration data are downloaded to base station by agreement;
The OMC is activated the new base station edition by the application layer protocol.
2. the method according to claim 1, wherein by new base station edition and configuring number by application layer protocol
According to downloading to before base station, further includes:
The OMC judges whether the base station firmware version meets the promotion condition.
3. according to the method described in claim 2, it is characterized in that, the OMC judges whether the base station firmware version meets
Before promotion condition, further includes:
It is obstructed to determine that link is in the logical but high-rise link protocol of bottom link protocol.
4. the method according to claim 1, wherein the OMC will be described new by the application layer protocol
After base station edition is activated, further includes:
The OMC detects that the base station runs the new base station edition and completes link setup with the OMC, it is determined that establishes high
Layer protocol link.
5. according to the method described in claim 4, it is characterized in that, determining that the base station is established after upper-layer protocol link, also
Include:
Whether the service operation for detecting the base station is normal;
If the service operation of the base station is abnormal, by the application layer protocol by the operation version rollback of the base station
For the version before activation.
6. the method according to any one of claims 1 to 5, which is characterized in that the application layer protocol include at least with
It is one of lower: TELNET agreement, SSH agreement.
7. a kind of processing unit of upgrading base station data is applied to operation and maintenance center OMC characterized by comprising
Download module, for being assisted by application layer in the case where base station firmware version meets promotion condition and bottom link is logical
New base station edition and configuration data are downloaded to base station by view;
Active module, for being activated the new base station edition by the application layer protocol.
8. device according to claim 7, which is characterized in that described device further include:
Judgment module, for judging whether the base station firmware version meets the promotion condition.
9. device according to claim 8, which is characterized in that described device further include:
Determining module, for determining that it is obstructed that link is in the logical but high-rise link protocol of bottom link protocol.
10. device according to any one of claims 7 to 9, which is characterized in that the application layer protocol include at least with
It is one of lower: TELNET agreement, SSH agreement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210196473.4A CN103491557B (en) | 2012-06-14 | 2012-06-14 | The processing method and processing device of upgrading base station data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210196473.4A CN103491557B (en) | 2012-06-14 | 2012-06-14 | The processing method and processing device of upgrading base station data |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103491557A CN103491557A (en) | 2014-01-01 |
CN103491557B true CN103491557B (en) | 2019-01-25 |
Family
ID=49831443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210196473.4A Active CN103491557B (en) | 2012-06-14 | 2012-06-14 | The processing method and processing device of upgrading base station data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103491557B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106803831A (en) * | 2015-11-26 | 2017-06-06 | 中兴通讯股份有限公司 | A kind of document distribution system and its management method and device |
CN106201586B (en) * | 2016-06-28 | 2019-12-20 | 青岛海信移动通信技术股份有限公司 | System upgrading method, terminal and system based on OTA |
CN106412971B (en) * | 2016-10-18 | 2019-10-18 | 武汉虹信通信技术有限责任公司 | A kind of abnormality eliminating method and device |
CN110011817B (en) * | 2018-01-04 | 2023-03-14 | 中兴通讯股份有限公司 | Network element upgrading method and device and computer readable storage medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101808009A (en) * | 2010-03-08 | 2010-08-18 | 中兴通讯股份有限公司 | Method and system for upgrading network equipment |
CN101888653A (en) * | 2009-05-15 | 2010-11-17 | 中兴通讯股份有限公司 | Firmware updating method, base station and network management center |
-
2012
- 2012-06-14 CN CN201210196473.4A patent/CN103491557B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101888653A (en) * | 2009-05-15 | 2010-11-17 | 中兴通讯股份有限公司 | Firmware updating method, base station and network management center |
CN101808009A (en) * | 2010-03-08 | 2010-08-18 | 中兴通讯股份有限公司 | Method and system for upgrading network equipment |
Also Published As
Publication number | Publication date |
---|---|
CN103491557A (en) | 2014-01-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101808009B (en) | Method and system for upgrading network equipment | |
CN109474977A (en) | A kind of monitoring method of equipment, apparatus and system | |
WO2015117527A1 (en) | Upgrade method and device | |
CN103840860B (en) | A kind of Bluetooth communication method and device | |
CN106055373A (en) | Automatic batch upgrading device and method for unmanned aerial vehicle firmware | |
CN108023778A (en) | Firmware upgrade method and its system | |
EP2571196B1 (en) | Method and device for upgrading radio relay equipment | |
CN103491557B (en) | The processing method and processing device of upgrading base station data | |
EP4066441B1 (en) | Management of iot devices in wireless communication networks | |
CN105933888A (en) | Burning method and device of eSIM (Subscriber Identity Module) card based on NFC | |
CN104836848A (en) | Method for remotely upgrading intelligent household electrical appliances | |
CN101854623B (en) | System and method for remote upgrade of M2M terminal | |
CN105897652A (en) | Standard protocol based heterogeneous terminal dynamic access method | |
CN103685530A (en) | Automatic upgrade control method and system for WLAN current network APs | |
CN105100021A (en) | Method, device and system for triggering device management sessions | |
JP6433578B2 (en) | Information self-registration method, apparatus, system, and computer storage medium | |
CN104317564A (en) | Method and device for updating feature phone software | |
CN110532009A (en) | A kind of smart machine upgrading management system and method | |
CN104199780A (en) | Method and system testing POS application program | |
CN103428738B (en) | Detect the abnormal method of Remote Radio Unit link and Remote Radio Unit | |
CN104965747A (en) | Method and device for upgrading software | |
CN103731861A (en) | Method and system for maintaining base station | |
CN107404535B (en) | Remote upgrading method and device for equipment | |
CN112015441A (en) | Updating method and system of vehicle-mounted terminal | |
CN107770213A (en) | Data processing method, device, server and terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |