CN103490407A - Synchronous detection method between flexible direct-current power transmission controllers - Google Patents
Synchronous detection method between flexible direct-current power transmission controllers Download PDFInfo
- Publication number
- CN103490407A CN103490407A CN201310426266.8A CN201310426266A CN103490407A CN 103490407 A CN103490407 A CN 103490407A CN 201310426266 A CN201310426266 A CN 201310426266A CN 103490407 A CN103490407 A CN 103490407A
- Authority
- CN
- China
- Prior art keywords
- controller
- recorded broadcast
- omega
- control device
- power transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a synchronous detection method between flexible direct-current power transmission controllers. The method solves the technical problems that control signals between the controllers are not synchronous, and accordingly the final valve controller will lose a control pulse calculating the step size, the current of a converter oscillates periodically, and a system is not stable. A controller device A and a controller device B are included, the controller device A comprises a controller A and a controller A recording and playing device, the controller device B comprises a controller B and a controller B recording and playing device, and the control signals are transmitted from the controller A to the controller B. The method has the advantages that whether the two controllers are synchronous can be visually checked, control mistakes are prevented, the current of the converter is prevented from oscillating periodically, and stability of the system is improved.
Description
Technical field:
The invention belongs to field, flexible DC power transmission field, relate to a kind of judge in the flexible DC power transmission system synchronization detecting method whether synchronous between each controller, the synchronization detecting method between especially a kind of flexible DC power transmission controller.
Background technology:
Technology of HVDC based Voltage Source Converter is one of outer high-power electric and electronic research field Focal point and difficult point of Present Domestic.It adopts the power electronic device such as high-power IGBT, can realize the independent control of active power and reactive power, and not need the electrical network commutation voltage to support, and can power to passive system.Adopt the full-control type device, transient voltage falls etc. in transient process and not there will be commutation failure.When trend is reversed, direct current direction reversion and direct voltage polarity is constant, and between converter without communication, be conducive to form the multi-terminal HVDC transmission system in parallel that load disturbance easily has again higher reliability, have broad application prospects.
But Technology of HVDC based Voltage Source Converter still lacks and builds and operating experience in the world at present, Technology of HVDC based Voltage Source Converter is in developing stage at home and abroad, the controllers such as the system control of flexible DC power transmission system, the control of standing, valve control all need simultaneous techniques, but rarely have description about controlling synchronous problem both at home and abroad, about controller, whether synchronous determination methods also seldom.The controller of flexible DC power transmission system is the controllers such as digital processing unit (DSP) or programmable gate array (FPGA), and between each controller, communication is carried out at interval regular time (calculating step-length).If control signal between each controller (modulating wave) is asynchronous, can cause final valve control can lose a control impuls of calculating step-length, cause the concussion of current transformer current cycle, cause that system is unstable.
Summary of the invention:
The object of the invention is to overcome the shortcoming of above-mentioned prior art, synchronous detection system and method between a kind of flexible DC power transmission controller are provided, solve control signal between each controller (modulating wave) asynchronous, can cause final valve control can lose the control impuls of a calculating step-length, cause the concussion of current transformer current cycle, cause the unsettled technical problem of system.
The objective of the invention is to solve by the following technical programs:
Synchronous detection system between a kind of flexible DC power transmission controller, comprise A control device and B control device, and the A control device comprises controller A and controller A recorded broadcast device; The B control device comprises controller B and controller B recorded broadcast device, and control signal sends to controller B from controller A.
Synchronization detecting method between a kind of flexible DC power transmission controller, arrange A control device and B control device, and the A control device comprises controller A and controller A recorded broadcast device; The B control device comprises controller B and controller B recorded broadcast device, makes control signal send to controller B from controller A.
As shown in Figure 2, step is described below the flow chart of synchronism detection:
(1) controller of A covering device sends the three-phase modulations ripple of pure order to B covering device controller, and wherein the three-phase modulations ripple of pure order is defined as:
Wherein, u
a, u
b, u
cfor instantaneous three-phase modulations ripple, ω is angular frequency, and t is the time,
for initial angle.
(2) the three-phase modulations ripple that controller A recorded broadcast device sends controller A carries out recorded broadcast, and three-phase modulations ripple controller B received with Time Controller B recorded broadcast device carries out recorded broadcast.
(3) record ripple signal controller A wave recording device obtained carries out the PARK conversion, checks whether its dq0 has sudden change.The PARK transform definition is as follows:
Wherein, u
a, u
b, u
cfor instantaneous three-phase modulations ripple, u
d, u
q, u
0for the dq0 component, ω is angular frequency, and t is the time.
(4) if the dq0 that step (3) PARK conversion obtains has sudden change, revise A cover controller and send the modulating wave algorithm, re-start step (1).If the dq0 that step (3) PARK conversion obtains is unchanged, carry out step (5).
(5) recorded broadcast of B covering device is carried out to the PARK conversion, check whether dq0 has sudden change.
(6) if the dq0 that step (5) PARK conversion obtains has sudden change, illustrate between two devices problem is synchronously arranged, need to revise B cover controller receiving algorithm, if there is not sudden change, synchronous success is described.
Whether beneficial effect of the present invention is: adopt the present invention can intuitively search between two controllers synchronous, prevent from controlling and make mistakes, the concussion of current transformer current cycle, the stability of improvement system.
The accompanying drawing explanation:
Fig. 1 is control device structural representation of the present invention;
Fig. 2 is synchronous detection algorithm implementation process figure of the present invention;
Fig. 3 is the three-phase modulations ripple figure that controller A of the present invention sends;
Fig. 4 is the dq0 signal graph obtained from A cover record ripple of the present invention;
Fig. 5 is the dq0 signal graph obtained from B cover record ripple of the present invention.
Embodiment:
Below in conjunction with accompanying drawing, the present invention is described in further detail:
The cover of two shown in of the present invention control devices are (referring to mistake referring to Fig. 2,3,4,5! Do not find Reference source.), all comprise at least one controller and a recorded broadcast device; Wherein A cover controller comprises controller A and controller A recorded broadcast device; The B control device comprises controller B and controller B recorded broadcast device.Control signal sends to controller B from controller A.Take certain Practical Project as example, check the stationary problem between two cover controllers.Process is as follows:
(1) controller of A covering device sends to B covering device controller the three-phase modulations ripple that the 50Hz amplitude is 144 pure orders, and wherein the three-phase modulations ripple of pure order is defined as:
(2) the three-phase modulations ripple that controller A recorded broadcast device sends controller A is recorded ripple, and three-phase modulations ripple controller B received with Time Controller B recorded broadcast device carries out recorded broadcast; The three-phase modulations waveform as shown in Figure 3.
(3) record ripple signal controller A wave recording device obtained carries out the PARK conversion, checks whether its dq0 has sudden change.The signal obtained in this example is as shown in Figure 4:
(4) can find out from the graph, dq0 axle component, without obvious sudden change, illustrates that the modulating wave sent is correct, therefore carries out step (5), and the recorded broadcast of B covering device is carried out to the PARK conversion.
(5) recorded broadcast of B covering device is carried out to the PARK conversion, result as shown in Figure 5.
The above, it is only preferred embodiment of the present invention, not the present invention is done to any pro forma restriction, although the present invention discloses as above with preferred embodiment, yet not in order to limit the present invention, any those skilled in the art, within not breaking away from the technical solution of the present invention scope, when the method that can utilize above-mentioned announcement and technology contents are made a little change or be modified to the equivalent embodiment of equivalent variations, in every case be the content that does not break away from technical solution of the present invention, any simple modification of above embodiment being done according to technical spirit of the present invention, equivalent variations and modification, still belong in the scope of technical solution of the present invention.
Claims (3)
1. the synchronous detection system between a flexible DC power transmission controller, it is characterized in that: comprise A control device and B control device, the A control device comprises controller A and controller A recorded broadcast device; B cover controller comprises controller B and controller B recorded broadcast device, and control signal sends to controller B from controller A.
2. the synchronization detecting method between a flexible DC power transmission controller, it is characterized in that: A control device and B control device are set, and the A control device comprises controller A and controller A recorded broadcast device; The B control device comprises controller B and controller B recorded broadcast device, makes control signal send to controller B from controller A.
3. the synchronization detecting method between the flexible DC power transmission controller as claimed in claim 2 is characterized in that:
(1) controller of A covering device sends the three-phase modulations ripple of pure order to B covering device controller, and wherein the three-phase modulations ripple of pure order is defined as:
Wherein, u
a, u
b, u
cfor instantaneous three-phase modulations ripple, ω is angular frequency, and t is the time,
for initial angle;
(2) the three-phase modulations ripple that controller A recorded broadcast device sends controller A carries out recorded broadcast, and three-phase modulations ripple controller B received with Time Controller B recorded broadcast device carries out recorded broadcast;
(3) record ripple signal controller A wave recording device obtained carries out the PAPK conversion, checks whether its dq0 has sudden change.The PAPK transform definition is as follows:
Wherein, u
a, u
b, u
cfor instantaneous three-phase modulations ripple, u
b, u
q, u
0for the dq0 component, ω is angular frequency, and t is the time;
(4) if the dq0 that step (3) PARK conversion obtains has sudden change, revise A cover controller and send the modulating wave algorithm, re-start step (1); If the dq0 that step (3) PARK conversion obtains is unchanged, carry out step (5);
(5) recorded broadcast of B covering device is carried out to the PARK conversion, check whether dq0 has sudden change;
(6) if the dq0 that step (5) PARK conversion obtains has sudden change, illustrate between two devices problem is synchronously arranged, need to revise B cover controller receiving algorithm, if there is not sudden change, synchronous success is described.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310426266.8A CN103490407B (en) | 2013-09-17 | 2013-09-17 | Synchronization detecting method between a kind of flexible DC power transmission controller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310426266.8A CN103490407B (en) | 2013-09-17 | 2013-09-17 | Synchronization detecting method between a kind of flexible DC power transmission controller |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103490407A true CN103490407A (en) | 2014-01-01 |
CN103490407B CN103490407B (en) | 2015-08-12 |
Family
ID=49830439
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310426266.8A Active CN103490407B (en) | 2013-09-17 | 2013-09-17 | Synchronization detecting method between a kind of flexible DC power transmission controller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103490407B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080100278A1 (en) * | 2006-10-27 | 2008-05-01 | International Rectifier Corporation | Cycle by cycle synchronous buck converter control based on external clock |
CN202772593U (en) * | 2012-09-14 | 2013-03-06 | 广东电网公司东莞供电局 | Reactive power compensator control device |
CN102983584A (en) * | 2012-07-13 | 2013-03-20 | 中电普瑞科技有限公司 | Unified power flow controller used for unbalanced system |
CN103236717A (en) * | 2013-04-12 | 2013-08-07 | 湖南大学 | Synchronous reference voltage based multiple PWM (pulse width modulation) converter parallel operation control method |
-
2013
- 2013-09-17 CN CN201310426266.8A patent/CN103490407B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080100278A1 (en) * | 2006-10-27 | 2008-05-01 | International Rectifier Corporation | Cycle by cycle synchronous buck converter control based on external clock |
CN102983584A (en) * | 2012-07-13 | 2013-03-20 | 中电普瑞科技有限公司 | Unified power flow controller used for unbalanced system |
CN202772593U (en) * | 2012-09-14 | 2013-03-06 | 广东电网公司东莞供电局 | Reactive power compensator control device |
CN103236717A (en) * | 2013-04-12 | 2013-08-07 | 湖南大学 | Synchronous reference voltage based multiple PWM (pulse width modulation) converter parallel operation control method |
Also Published As
Publication number | Publication date |
---|---|
CN103490407B (en) | 2015-08-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101202445B (en) | Method for double feed-in DC power transmission | |
CN201994674U (en) | Reactive power compensation and harmonic suppression device for photovoltaic grid-combined system | |
CN106950512B (en) | Energy storage converter grid-connected and grid-disconnected characteristic integrated detection system and method | |
CN102307004A (en) | L-capacitance-L (LCL)-filtering-based controlled rectifier parameter identification method | |
CN101900751A (en) | Detection method of real-time voltage vectors in energy feedback unit | |
CN105406752A (en) | Control system for I-type and T-type three-level bidirectional PWM (Pulse-Width Modulation) rectifiers | |
CN105006980B (en) | The three level NPC current transformer PWM control strategies overlapped based on carrier wave | |
CN109196766A (en) | Two-way insulated type DC/DC converter and smart grid | |
CN204559217U (en) | A kind of Novel direct-current power system | |
CN203827203U (en) | High-power optical storage integrated converter | |
CN105006841A (en) | Three-phase grid-connected inverter seamless grid-connected controller and control method thereof | |
CN103490407A (en) | Synchronous detection method between flexible direct-current power transmission controllers | |
CN202333838U (en) | Isolated grid-connected inverter power supply | |
Wei et al. | A three-phase PWM rectifier with reactive power compensation function | |
CN203839974U (en) | High-voltage tripolar direct-current power transmission system | |
CN204089675U (en) | 10kV high-voltage variable-frequency and variable-speed system | |
CN203522193U (en) | Voltage stabilizing system for parallel operation of asynchronous generator set | |
CN103606955A (en) | Micro-grid power source based on half cycle sine wave | |
CN103490425A (en) | Voltage stabilizing system and method for asynchronous generator set parallel operation | |
CN102570880B (en) | Three-phase full-bridge converter device | |
CN203366966U (en) | Transformer capable of conducting double-voltage input or output | |
CN203747685U (en) | DSP based three-level space vector modulating system | |
CN203984154U (en) | Box synchronous unit frequency-conversion bank reference power supply peculiar to vessel | |
CN104319802A (en) | Long-distance power transmission system | |
CN203632573U (en) | A digital implementation system for PWM rectifier current hysteresis control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Guo Haiping Inventor after: Ou Kaijian Inventor after: Han Weiqiang Inventor after: Guo Qi Inventor after: Lin Xuehua Inventor before: Guo Haiping Inventor before: Ou Kaijian Inventor before: Han Weiqiang Inventor before: Guo Qi Inventor before: Lin Xuehua |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |