CN103490342A - Double-bundled-conductor hoisting frame with idler wheels - Google Patents

Double-bundled-conductor hoisting frame with idler wheels Download PDF

Info

Publication number
CN103490342A
CN103490342A CN201310431182.3A CN201310431182A CN103490342A CN 103490342 A CN103490342 A CN 103490342A CN 201310431182 A CN201310431182 A CN 201310431182A CN 103490342 A CN103490342 A CN 103490342A
Authority
CN
China
Prior art keywords
hoisting frame
bundled
idler wheels
roller
conductors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310431182.3A
Other languages
Chinese (zh)
Inventor
杜铁硬
张立家
尹志锐
李辉
刘巍
王印忠
刘广欣
随学庆
梁占林
高冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310431182.3A priority Critical patent/CN103490342A/en
Publication of CN103490342A publication Critical patent/CN103490342A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a double-bundled-conductor hoisting frame with idler wheels and relates to the technical field of electric power circuit construction. The double-bundled-conductor hoisting frame comprises a hoisting frame body, hanging rings or hanging hooks are arranged on the hoisting frame body, the two idler wheels are arranged on the hoisting frame body, the two idler wheels are arranged in an up-and-down mode or a left-and-right mode, and the axes of the two idler wheels are both perpendicular to conductors. The pair of idler wheels which can revolve around the axes of the idler wheels are arranged on the double-bundled-conductor hoisting frame, therefore, the bundled conductors can slide along with the rotation of the idler wheels when the bundled conductors are placed on the idler wheels to be hoisted, the hard friction between an existing bundled conductor lifting machine and the bundled conductors is avoided, abrasion and breakage to conductor bodies of the bundled conductors in the hoisting process are reduced to the maximum degree, integrity of the conductors is powerfully protected, the work efficiency of electric power circuit remodeling is greatly improved, and the workload of secondary maintenance caused by damage to the conductors is avoided.

Description

Double bundle conductor hoisting frame with roller
Technical field
The present invention relates to the power line construction technical field.
Background technology
In recent years due to socioeconomic high speed development, new highway, railway, power circuit etc. are also among ruly High Speed Construction, old line crossing highway yet to be built, built, railway, power circuit etc. also increase day by day, also brought the problem that must change to the electrification in high voltage circuit, therefore also nervous carrying out of the work such as the transformation of circuit, rising, manyly face circuit that sky erects due to the construction that faces other newly constructed facilities, construction is impacted, have to carry out elevation reconstruction, particularly for the lifting of 220KV circuit double bundle conductor.The phenomenons such as wire causes the wire wearing and tearing at the lifter internal shift, the thigh that breaks easily occurred in 220KV circuit Double-bundle conductor lifter in the middle of the lifting lead wire process in the past.Can cause the phenomenons such as wire heavy wear, disconnected thigh while particularly using old-fashioned line lifter to promote higher wire, wire is had to certain danger, repair and need again holding time, and while using wire coaster lifting lead wire due to the line-spacing steel tower or electric pole far away, the high-altitude personnel can't in-position, and coaster can not correctly be installed easily.
So need now a kind ofly in the lifting wire process, can prevent that wire is due to the novel Double-bundle conductor lifting device that produces friction relatively with line lifter and cause the generation of wire wearing and tearing, disconnected burst phenomenon.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of hoisting frame of the double bundle conductor with roller, and this hoisting frame can prevent in the process of lifting wire that wire and hoisting frame from friction occurring and the thigh that is worn, breaks, flexible and convenient to use.
For addressing the above problem, the technical scheme that the present invention takes is: a kind of hoisting frame of the double bundle conductor with roller, the hoisting frame body comprised, the hoisting frame body is provided with link or hook, and two rollers, two rollers are vertical type or gauche form layout, and the axis of two rollers is all vertical with wire.
Preferred described hoisting frame body has a montant that is provided with link or hook, and the homonymy of montant is provided with upper and lower two U-shaped grooves, in described U-shaped groove, roller all is housed.
Preferred described hoisting frame body construction is an isosceles triangle framework, and the outside, two base angles of isosceles triangle framework respectively is provided with a U-shaped groove, in described U-shaped groove, roller all is housed, and described link or hook are isosceles triangle framework itself.
Preferred described roller is sheave.
The material of preferred described roller is aluminium alloy.
The beneficial effect that adopts technique scheme to produce is: should make lifting wire more convenient with the double bundle conductor hoisting frame of roller, the line mode of carrying of having avoided personnel's outlet that coaster is installed, and because this double bundle conductor hoisting frame is provided with a pair of roller that carries out rotation, when being put on roller wire when being promoted, wire can on roller, along with the rotation of roller, slide, avoided the rigid friction between former line lifter and wire, the line body wearing and tearing of wire in the middle of lifting process have farthest been reduced, disconnected strand, strong protection the integrality of wire, operating efficiency while greatly having promoted track remodelling, avoided needing due to harness damage the workload of secondary maintenance, flexible and convenient to use.
The accompanying drawing explanation
Fig. 1 structural representation of the present invention;
The structural representation of Fig. 2 another embodiment of the present invention.
Wherein, 1, roller, 2, montant, 3, U-shaped groove, 4, link or hook.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation: embodiment 1 is a kind of hoisting frame of the double bundle conductor with roller as shown in Figure 1, the hoisting frame body comprised, the hoisting frame body is provided with link or links up with 4, and two rollers 1, two rollers 1 are vertical type to be arranged, the axis of two rollers 1 is all vertical with wire.Described hoisting frame body has one and is provided with link or links up with 4 montant 2, and the homonymy of montant 2 is provided with upper and lower two U-shaped grooves 3, in U-shaped groove 3, roller 1 all is housed.Described roller 1 is sheave.The material of described roller 1 is aluminium alloy.During use, upper lower wire is carried on a shoulder pole respectively on upper and lower two rollers 1, the link by promoting end or link up with 4 purposes that reach lifting lead wire.
Embodiment 2 is a kind of hoisting frame of the double bundle conductor with roller as shown in Figure 2, comprises the hoisting frame body, and the hoisting frame body is provided with link or links up with 4, and 1, two roller 1 of two rollers is gauche form and arranges, the axis of two rollers 1 is all vertical with wire.Described hoisting frame body construction is an isosceles triangle framework, and the outside, two base angles of isosceles triangle framework respectively is provided with a U-shaped groove 3, in described U-shaped groove 3, roller 1 all is housed, described link or link up with 4 for isosceles triangle framework itself.Roller 1 is sheave.The material of described roller 1 is aluminium alloy.About during use, wire is carried on a shoulder pole respectively on the roller 1 of two of left and right, by promoting link or linking up with 4 purposes that reach lifting lead wire.
The beneficial effect that adopts technique scheme to produce is: should make lifting wire more convenient with the double bundle conductor hoisting frame of roller, the line mode of carrying of having avoided personnel's outlet that coaster is installed, and because this double bundle conductor hoisting frame is provided with a pair of roller that carries out rotation, when being put on roller wire when being promoted, wire can on roller, along with the rotation of roller, slide, avoided the rigid friction between former line lifter and wire, the line body wearing and tearing of wire in the middle of lifting process have farthest been reduced, disconnected strand, strong protection the integrality of wire, operating efficiency while greatly having promoted track remodelling, avoided needing due to harness damage the workload of secondary maintenance, flexible and convenient to use.

Claims (5)

1. the hoisting frame of the double bundle conductor with roller, it is characterized in that comprising the hoisting frame body, the hoisting frame body is provided with link or hook (4), and two rollers (1), two rollers (1) are vertical type or gauche form is arranged, the axis of two rollers (1) is all vertical with wire.
2. the hoisting frame of the double bundle conductor with roller according to claim 1, it is characterized in that: described hoisting frame body has a montant (2) that is provided with link or hook (4), the homonymy of montant (2) is provided with upper and lower two U-shaped grooves (3), and roller (1) all is housed in described U-shaped groove (3).
3. the hoisting frame of the double bundle conductor with roller according to claim 1, it is characterized in that: described hoisting frame body construction is an isosceles triangle framework, the outside, two base angles of isosceles triangle framework respectively is provided with a U-shaped groove (3), roller (1) all is housed in described U-shaped groove (3), and described link or hook (4) are isosceles triangle framework itself.
4. according to the described hoisting frame of the double bundle conductor with roller of claim 2 or 3, it is characterized in that: described roller (1) is sheave.
5. the hoisting frame of the double bundle conductor with roller according to claim 4, it is characterized in that: the material of described roller (1) is aluminium alloy.
CN201310431182.3A 2013-09-22 2013-09-22 Double-bundled-conductor hoisting frame with idler wheels Pending CN103490342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310431182.3A CN103490342A (en) 2013-09-22 2013-09-22 Double-bundled-conductor hoisting frame with idler wheels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310431182.3A CN103490342A (en) 2013-09-22 2013-09-22 Double-bundled-conductor hoisting frame with idler wheels

Publications (1)

Publication Number Publication Date
CN103490342A true CN103490342A (en) 2014-01-01

Family

ID=49830379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310431182.3A Pending CN103490342A (en) 2013-09-22 2013-09-22 Double-bundled-conductor hoisting frame with idler wheels

Country Status (1)

Country Link
CN (1) CN103490342A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105000463A (en) * 2015-06-09 2015-10-28 云南电网有限责任公司曲靖供电局 Vertical double-split wire lifting hook clamp used for 220kV hot-line work and made of carbon fiber plate
CN113644589A (en) * 2021-05-25 2021-11-12 国网河北省电力有限公司邯郸供电分公司 Totally-enclosed construction protection pulley for high-voltage transmission line

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201048253Y (en) * 2007-07-31 2008-04-16 重庆市电力公司江北供电局 Unattended cable-protecting pulley
CN201234091Y (en) * 2008-07-12 2009-05-06 宁夏电力公司吴忠供电局 Vertical double split conductive wire hanging hook
GB2484500A (en) * 2010-10-13 2012-04-18 Babcock Networks Ltd Apparatus and method for replacing an overhead conductor
CN202423961U (en) * 2011-11-17 2012-09-05 河南省电力公司安阳供电公司 Triangular hook for leads
CN102780179A (en) * 2012-07-25 2012-11-14 辽宁省电力有限公司辽阳供电公司 General suspension hook for 66-220kv compound lead
CN203014268U (en) * 2012-11-30 2013-06-19 新郑市供电公司 A wire changing pulley
CN103241645A (en) * 2013-05-31 2013-08-14 国家电网公司 Self-locking composite conducting wire hoisting hook
CN203456799U (en) * 2013-09-22 2014-02-26 国家电网公司 A double-bundled conductor hoisting frame equipped with rollers

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201048253Y (en) * 2007-07-31 2008-04-16 重庆市电力公司江北供电局 Unattended cable-protecting pulley
CN201234091Y (en) * 2008-07-12 2009-05-06 宁夏电力公司吴忠供电局 Vertical double split conductive wire hanging hook
GB2484500A (en) * 2010-10-13 2012-04-18 Babcock Networks Ltd Apparatus and method for replacing an overhead conductor
CN202423961U (en) * 2011-11-17 2012-09-05 河南省电力公司安阳供电公司 Triangular hook for leads
CN102780179A (en) * 2012-07-25 2012-11-14 辽宁省电力有限公司辽阳供电公司 General suspension hook for 66-220kv compound lead
CN203014268U (en) * 2012-11-30 2013-06-19 新郑市供电公司 A wire changing pulley
CN103241645A (en) * 2013-05-31 2013-08-14 国家电网公司 Self-locking composite conducting wire hoisting hook
CN203456799U (en) * 2013-09-22 2014-02-26 国家电网公司 A double-bundled conductor hoisting frame equipped with rollers

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105000463A (en) * 2015-06-09 2015-10-28 云南电网有限责任公司曲靖供电局 Vertical double-split wire lifting hook clamp used for 220kV hot-line work and made of carbon fiber plate
CN113644589A (en) * 2021-05-25 2021-11-12 国网河北省电力有限公司邯郸供电分公司 Totally-enclosed construction protection pulley for high-voltage transmission line

Similar Documents

Publication Publication Date Title
CN203319390U (en) Wire rope guiding device
CN103274311B (en) The rotary arm of pole type transformer
CN103490342A (en) Double-bundled-conductor hoisting frame with idler wheels
CN203456799U (en) A double-bundled conductor hoisting frame equipped with rollers
CN105048726B (en) A kind of equipment removed for power station stator bar
CN203331254U (en) Silicon wafer cutting assembly
CN202880699U (en) Bias-rail girder bridge crane
CN104242142B (en) The installation method of suspension type tube type bus
CN101997280A (en) Roll frame of string wire of power transmission line
CN204809813U (en) Angle steel tower high tension cable fixed bolster
CN204267088U (en) With the scraper loader on antiwear device and personal safe protection hurdle
CN102842869A (en) Method for replacing overhead ground wire or conducting wire rapidly
CN103247972A (en) Wire tractor
CN102664370A (en) Wire hanging hook
CN208890236U (en) Novel conductive wire apparatus for suspension easy to use
CN204906126U (en) A equipment for power station stator bar demolish
CN208700259U (en) 360 multi-functional drum construction frock with adjustable degree
CN201887374U (en) Waste wire recovery unit
CN202704912U (en) Rope guide device applied to well drilling winch
CN203319553U (en) Cable sliding device of traveling crane
CN203951103U (en) Novel high-voltage cable paying-off implement
CN205056647U (en) A roll -changing device for cold rolling production line
CN203760920U (en) 220kV double split lead synchronous lifting hook
CN205366248U (en) Automatic control workshop baling press system
CN102756987B (en) Cable machine main rope river-passing balance safety device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140101